RFP 7084923.pdf

PDF 417 KB Posted

Attached to
Repair and Upgrade Permitted Hazardous Waste Site on Slocum
Solicitation number
N400857084923
Issued by

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
7084923 SpecificationsAsOne.pdf PDF
7084923 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR AND UPGRADE PERMITTED

HAZARDOUS WASTE SITE ON SLOCUM

MCAS Cherry Point, North Carolina Project No. 7084923

10/25/2021

FEAD MCAS CHERRY POINT

POC: Joseph Schwarz, Contract Specialist (252) 466-4345 joseph.a.schwarz4.civ@us.navy.mil

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-21-D-0097

Blue Rock Structures, Inc.

10689 Hwy 17

Pollocksville, NC 28573

POC: Ellen Hartness

Phone: 910-743-0505 ext 102 estimating@bluerockstr.com

N40085-21-D-0098

Civil Works Contracting, LLC

190 Raleigh St.

Wilmington, NC 28412

POC: Jeremiah Stoops

Phone: 910-859-8574

Jstoops@civilworkscontracting.com

N40085-21-D-0099

Encon Desbuild JV2 LLC

8201 Corporate Drive, Ste. 720

Hyattsville, MD 20785

POC: Devang Ajmera

Phone: 301-244-0711 devang@enconcorp.org

N40085-21-D-0100

Futron, Inc

14067 Crown Court

Woodbridge, VA 22193

POC: Daniel Mayo

Phone: 571-402-3200 daniel.mayo@futroninc.com

N40085-21-D-0101

Joyce & Associates Construction, Inc.

6994 Hwy 70

Newport, NC 28570

POC: Robert Bittner

Phone: 252-223-3171 info@joyceandassoc.com

N40085-21-D-0102

Military & Federal Construction Co.

846 Bell Fork Rd.

Jacksonville, NC 28540

POC: Raymond Wray

Phone: 910-353-3797 estimating@mafnc.com

N40085-21-D-0103

Muter Construction, LLC

111 E. Vance St.

Zebulon, NC 27597

POC: Damon Jones

Phone: 919-404-8330 djones@muterconstruction.com

N40085-21-D-0104

Rand Enterprises, Inc

850 39th Street. Suite 101

Newport News, VA 23607

POC: Doug Morris

Phone: 757-247-1090 doug.morris@rei-va.com

N40085-21-D-0105

Reasor-Asturian JV, LLC

17 W. Maxwell Street

Pensacola, FL 32501

POC: Ted Hamilton

Phone: 850-530-0780 rajvrfp@asturiangroup.com

N40085-21-D-0106

WB Brawley Company

3314 Jaeckle Dr. Suite 120

Wilmington, NC 28403

POC: Darren McClerren

Phone: 910-452-3127 dmcclerren@brawley.net

MCAS Cherry Point, North Carolina Project No. 7084923

10/25/2021

GENERAL REQUIREMENTS

Project No.: 7084923

Title: Repair and Upgrade Permitted Hazardous Waste Site On Slocum

NAICS Code and Standard Size: 236220, Commercial and Institutional Building

Construction Contractors, 39.5 Million

Contract Completion Date: 270 days after award

Estimated Cost Range: Between $200,000 and $500,000

Wage Determination: General Decision Number: NC20210065 01/01/2021

Liquidated Damages: $139 per Calendar Day

Special Scheduling: None

Basis for Award: Lowest Price

Proposal Acceptance Period: 90 days from receipt of offers

Site Visit: 29 October 2021 at 10:00 AM EST.

Additional applicable clause: DFAR 252.223-7999 Ensuring Adequate Covid-19 Safety

Protocols for Federal Contractors (Deviation 2021-O0009) (OCT 2021)

Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request.

Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration.

In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and

FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award.

• No bonds are required for proposals less than $40K.

• Proposals valued at $40K and greater will require a payment bond only.

MCAS Cherry Point, North Carolina Project No. 7084923

10/25/2021

• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.

Proposal Due Date: 18 November, 2021@ 12:00 PM EST

E-Mail Address for Proposals: is listed below:

1. roicc_chpt_ktr_bids@navy.mil

2. ericka.j.bishop.civ@us.navy.mil

3. joseph.a.schwarz4.civ@us.navy.mil

*note: Proposals must be sent to ALL of the above email addresses. Subject line should contain the project number and contractor information.

Proposals may also be hand-delivered to Building 87 and must be stamped/signed in by proposal due date and time.

Requests for Information (RFIs): RFIs must be submitted by the prime contractor to ericka.j.bishop.civ@us.navy.mil and joseph.a.schwarz4.civ@us.navy.mil. The cut off for

RFIs is 8 November, 2021 by 9:00 AM EST in order to process all inquiries by the proposal due date.

The specifications and drawings are posted as attachments on https://sam.gov/.

“OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF

FUNDS ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS

SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR

PROPOSAL COSTS RESULTING FROM THIS SOLICITATION.”

"General Decision Number: NC20210065 01/01/2021

Superseded General Decision Number: NC20200065

State: North Carolina

Construction Type: Building

Counties: Chowan, Craven, Dare, Gates, Jones, Martin and Washington

Counties in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of

$10.95 for calendar year 2021 applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR

5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/01/2021

* PLUM0421-004 07/01/2020

Rates Fringes

PIPEFITTER (Excluding HVAC

System Installation).............$ 29.35 12.41

SUNC2011-046 08/26/2011

Rates Fringes

BRICKLAYER.......................$ 19.38 8.73

CARPENTER (Drywall Hanging

Only)............................$ 18.13 1.31

CARPENTER (Form Work Only).......$ 14.21 0.41

CARPENTER, Excludes Drywall

Hanging, and Form Work...........$ 14.64 2.39

CEMENT MASON/CONCRETE FINISHER...$ 14.02 0.00

ELECTRICIAN......................$ 17.10 1.47

HVAC MECHANIC (HVAC Duct

Installation Only)...............$ 15.58 1.53

IRONWORKER, STRUCTURAL...........$ 18.75 5.62

LABORER: Common or General......$ 10.57 0.67

LABORER: Landscape &

Irrigation.......................$ 10.29 1.82

LABORER: Mason

Tender-Brick/Cement/Concrete.....$ 10.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.71 2.33

OPERATOR: Crane.................$ 19.25 2.37

OPERATOR: Grader/Blade..........$ 15.71 1.49

PAINTER: Brush, Roller and

Spray............................$ 14.36 1.97

PLUMBER (HVAC Unit

Installation)....................$ 16.96 3.17

PLUMBER, Excludes HVAC Unit

Installation.....................$ 17.34 2.09

ROOFER...........................$ 13.55 0.80

SHEET METAL WORKER, Excludes

HVAC Duct and Unit

Installation.....................$ 13.09 1.28

TRUCK DRIVER: Dump Truck........$ 12.50 1.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for

Federal Contractors applies to all contracts subject to the Davis-

Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a)(1)(ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014.

PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be

Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007

5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data.

EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional

Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part

1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Company Name:____________________________________

Company Address: ________________________________

MACC Contract Number: N40085-21-D-______________

Date: ______________

Facilities Engineering & Acquisition Division

PSC Box 8006

MCAS Cheery Point, NC 28533-0006

Proposal for Project: 7084923 - Repair and Upgrade Permitted Hazardous

Waste Site on Slocum

Marine Corps Air Station Cherry Point, NC

Amendments Acknowledged: No Amendments Issued or Amendments_______

Subcontractors to be used*:

Subcontractor Discipline

*Insert additional lines as needed

Proposal amounts:

Item # Amount

0001AA – Labor to perform SOW $

0001AB – Materials to perform SOW $

0001AC – Equipment to perform SOW $

Total CLIN 0001 $

Comments:

Repair and Upgrade Permitted Hazardous Waste Site on Slocum WO #7084923

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

02/ 14, CHG 3: 11/ 18

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - BASE PRICE. Price includes all work necessary to improve and upgrade the hazardous waste facility located on Slocum Road as described in the project documents. Work must be priced as follows:

CLIN 0001AA: Price for all LABOR necessary to perform the work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB, 0001AC.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN

0001AA

0001AA Price for all LABOR necessary to perform the work in accordance with the drawings and specifications.

CLIN 0001AB: : Price for all EQUIPMENT, owned or rented, utilized in the performance of the work in accordance with the drawings and specifications, but excluding work described in Contract Line Item

(CLIN)0001AA, 0001AC.

CLIN DESCRIPTION TOTAL PRICE FOR CLIN

0001AB

0001AB Price for all EQUIPMENT necessary to perform the work in accordance with the drawings and specifications.

CLIN 0001AC: Price for all MATERIAL incorporated work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AA, 0001AB.

DOCUMENT 00 22 13.00 20 Page 1

Repair and Upgrade Permitted Hazardous Waste Site on Slocum WO #7084923

CLIN DESCRIPTION TOTAL PRICE FOR 0001AC

0001AC Price for all MATERIALS necessary to perform the work in accordance with the drawings and specifications.

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, and 0001AC.

b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Document --

DOCUMENT 00 22 13.00 20 Page 2

00 22 13.00 20.pdf
00 22 13.00 20 - SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
1.2 GENERAL BID NOTES
PART 2 PRODUCTS
PART 3 EXECUTION
00 22 13.00 20.pdf
00 22 13.00 20 - SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
1.2 GENERAL BID NOTES
PART 2 PRODUCTS
PART 3 EXECUTION

File details come from the government source that posted it. Updated .