RFP 6978829 B-137 Alteration to 2nd FL Restrooms.pdf
PDF 482 KB Posted
- Attached to
- ALTERATION (LEVEL II) TO EXISTING SECOND FLOOR RESTROOMS Federal contract opportunity
- Solicitation number
- N40085-6978829
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| SpecsAsOne.pdf | ||
| DrawingAsOne.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-137 Alteration to 2nd FL Restrooms REQUEST FOR PROPOSAL
MCAS Cherry Point, North Carolina Project No. 6978829
30 June 2020
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
FACILITIES ENGINEERING AND ACQUISITION DIVISION, CHERRY POINT
POC: Joseph Schwarz, Contract Specialist (252) 466-4345
ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL
FOR THIS PROJECT:
N4008515D0847
Civil Works Contracting, LLC
221 North Front Street, Suite 205
Wilmington, NC 28401
POC: Christopher Scerri
Tel: (910) 859-8574 chris@civilworkscontracting.com
N4008515D0848
Hager Construction Company
2037 Gilmore Street
Jacksonville, FL 32204
POC: John Hager
Tel: (904) 356-0908 john@hagerconstructioncompany.com
N4008515D0850
Onopa Services, LLC
541 N. Palmetto Ave. Suite 104
Sanford, FL 32771-1371
POC: David Bermudez
Tel: (407) 323-2214 david@onopa.com
N4008515D0851
Quadrant Construction, Inc.
166 Center Street
Jacksonville, NC 28546
POC: Steven Kellum
Tel: (910) 937-0003 chriswhaley@qcenc.com mailto:cscerri@civilworkscontracting.com mailto:john@hagerconstructioncompany.com mailto:david@onopa.com mailto:chriswhaley@qcenc.com
GENERAL REQUIREMENTS
Project No.: 6978829
(Clauses incorporated in Base Contract apply to this solicitation)
Title: B-137 Alteration to 2nd FL Restrooms
NAICS Code and Standard Size: 236220, Commercial and Institutional Building
Construction, $39.5 Million
Contract Completion Date: All work shall be completed within 310 calendar days after award
Estimated Cost Range: Between $250,000 and $500,000
Wage Determination: General Decision NC20200065 Building dated 01/03/2020
Liquidated Damages: $156 per calendar day of delay
Basis for Award: Lowest Price
Proposal Acceptance Period: This project has been identified as a “STRADDLE PROJECT.” All proposals shall be acceptable for a period of 130 days.
Site Visit: 7 July 2020 @ 1000 Contractors are to meet at the FEAD office, Building 163, MCAS Cherry Point
This will be the ONLY Government Scheduled Site Visit for this Project.
Bond Requirements: Bid bonds are required in accordance with FAR 28.101-1 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) business day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration.
In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and
FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award.
• No bonds are required for proposals less than $35K.
• Proposals valued at $35K and greater will require a payment bond only.
• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.
Proposal Due Date/Time: 23 July 2020, 1200 local time
E-Mail Address for Proposals and Requests for information (RFIs):
1. roicc_chpt_ktr_bids@navy.mil
2. joseph.schwarz1@navy.mil
3. ericka.j.bishop@navy.mil
*note: Proposals must be sent to ALL of the above email addresses.
Requests for Information (RFIs): RFIs must be submitted email addresses above. The cut off for RFIs is 14 July 2020 by 0900 in order to process all inquiries by the proposal due date.
Specifications, drawings, and all associated project documents are posted on beta.SAM.gov www.beta.SAM.gov.
NOTE THE FOLLOWING:
The Government intends to evaluate proposals and issue a task order without discussions.
Therefore, each initial offer should contain the offeror’s best terms from a price standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.
Any changes to the Scope of work, Technical Specifications, or Drawings will be issued on a Standard Form (SF) 30.
This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government.
Any cost incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.
Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation.
If funding becomes available, the successful offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering (May 2011).
http://www.beta.sam.gov/
General Decision Number: NC20200065 01/03/2020
Superseded General Decision Number: NC20190065
State: North Carolina Construction Type: Building
Counties: Chowan, Craven, Dare, Gates, Jones, Martin and Washington Counties in
North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after
January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
* PLUM0421-004 07/01/2018
Rates Fringes
PIPEFITTER (Excluding HVAC
System Installation).............$ 28.00 12.01
SUNC2011-046 08/26/2011
Rates Fringes
BRICKLAYER. ..................... $ 19.38 8.73
CARPENTER (Drywall Hanging
Only). .......................... $ 18.13 1.31
CARPENTER (Form Work Only). ..... $ 14.21 0.41 http://www.dol.gov/whd/govcontracts
CARPENTER, Excludes Drywall
Hanging, and Form Work. ......... $
14.64
2.39
CEMENT MASON/CONCRETE FINISHER...$ 14.02 0.00
ELECTRICIAN. .................... $ 17.10 1.47
HVAC MECHANIC (HVAC Duct
Installation Only). ............. $
15.58
1.53
IRONWORKER, STRUCTURAL. ......... $ 18.75 5.62
LABORER: Common or General. .... $ 10.57 0.67
LABORER: Landscape &
Irrigation. ..................... $
10.29
1.82
LABORER: Mason
Tender-Brick/Cement/Concrete. ... $
10.00
0.00
OPERATOR:
Backhoe/Excavator/Trackhoe. ..... $
14.71
2.33
OPERATOR: Crane. ............... $ 19.25 2.37
OPERATOR: Grader/Blade. ........ $ 15.71 1.49
PAINTER: Brush, Roller and
Spray. .......................... $
14.36
1.97
PLUMBER (HVAC Unit
Installation). .................. $
16.96
3.17
PLUMBER, Excludes HVAC Unit
Installation. ................... $
17.34
2.09
ROOFER. ......................... $ 13.55 0.80
SHEET METAL WORKER, Excludes
HVAC Duct and Unit
Installation. ................... $
13.09
1.28
TRUCK DRIVER: Dump Truck. ...... $ 12.50 1.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal
Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate
(weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey.
Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.
Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was http://www.dol.gov/whd/govcontracts union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.
08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage
Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W. Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and
Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals
Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Company Name:____________________________________
Company Address: ________________________________
MACC Contract Number: ___________________________
Date: ______________
Facilities Engineering & Acquisition Division
PSC Box 8006
MCAS Cheery Point, NC 28533-0006
Proposal for Project: 6978829 - B-137 Alteration to 2nd FL Restrooms
Marine Corps Air Station Cherry Point, NC
Amendments Acknowledged: No Amendments Issued or Amendments_______
Subcontractors to be used*:
Subcontractor Discipline
*Insert additional lines as needed
Proposal amounts:
Item # Amount
Total $