WESTERN REGION PAVEMENT PRESERVATION (WRPP) MATOC
TASK ORDER REQUEST FOR PROPOSALS
Solicitation No. 69056723R000003
Project Number: CO NP MULTI PMS(1), Project Name: Pavement Preservation Colorado
Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans
This solicitation cites
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
This project uses U.S. Customary units of measure
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
610 EAST FIFTH STREET
VANCOUVER, WA 98661-3801
Phone (360) 619-7520
EMAIL: WFL.CONTRACTS@DOT.GOV
WORLD HERITAGE SITE
QUICK INDEX
Page Item --- Offer Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Offerors A-3 SF1442, Solicitation, Offer and
Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Rates E-1 Special Contract Requirements H-1 Permits/Plans I-1 Reserved J-1 Fire Protection and Suppression
Proposal Due Date:
See Page A-3, Block 13A
PROPOSAL REMINDERS
Electronic bids will not be accepted.
Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:
• Have you rechecked your figures?
• Have you completed the bid schedule?
• Have you completed and signed the SF 1442, Solicitation, Offer & Award?
• Have you acknowledged all amendments?
• Have you completed the Representations & Certifications (Page B-1)?
• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?
• Does the lower left corner of the proposal envelope state “Proposal Enclosed”?
• Does the lower left corner include the Solicitation Number and project name and number?
A-1 Notice to Offerors mailto:wfl.contracts@dot.gov
PROJECT No. CO NP MULTI PMS(1), PROJECT NAME Pavement Preservation Colorado
BEGINNING AT See Plans
ENDING AT See Plans
LENGTH 37.3 MILES
NATIONAL PARKS Bent’s Old Fort National Historic Site, Curecanti
National Recreation Area, Great Sand Dunes National Park, Mesa Verde National Park
COUNTY Gunnison, Montezuma, Montrose, Otero
STATE Colorado
FIXED COMPLETION DATE See FAR Clause 52.211-10
SPECIAL NOTICE
CO NP MULTI PMS(1), Pavement Preservation Colorado
Solicitation No.: 69056723R000003
THIS “TASK ORDER REQUEST FOR PROPOSAL” IS SOLELY FOR THE
FOLLOWING CONTRACTS AND CONTRACTORS:
Contract Number Contractor Name Contractor Number 69056718D000001 American Pavement Systems 209.275.7031
69056718D000002 Riverside Contracting, Inc 406.721.9267
69056718D000003 SWP Contracting & Paving 623.544.7305
69056718D000004 Century Companies 406.535.1200
69056718D000005 Intermountain Slurry Seal 775.352.1938
69056718D000006 Hat Creek Construction & Materials 530.335.5501
69056718D000007 Geneva Rock Product 801.743.7774
69056718D000008 VSS International 916.373.2410
THIS PROJECT IS BEING ADVERTISED ON THE FEDERAL BUSINESS
OPPORTUNITIES WEBSITE TO ANNOUNCE THE UPCOMING PROJECT
AND ASSIST POTENTIAL SUBCONTRACTORS BY PUBLICIZING
OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM THE
ABOVE PRIME CONTRACTORS.
Additional information may be found on our web pages:
Advertised Projects:
https://flh.fhwa.dot.gov/business/construction/idiq/wrpp.htm
Description: This web page contains a link to the projects currently advertised on SAM.GOV.
https://flh.fhwa.dot.gov/business/construction/idiq/wrpp.htm
Offer Submittal Checklist
Before submitting your offer, please review the following:
Done?
Is this in the envelope?
Bid Envelope
Did I correctly address the envelope? (See page A-3, blocks 7 & 8)
Does the lower left corner of the envelope include the Solicitation Number and the project name/number?
Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award)
Did I include our firm name and address in block 14?
Did I include our firm’s phone number in block 15?
Did I include our firm’s remittance address in block 16?
(Use when different than block 14)
Did I include my unique entity identifier and my Cage Code?
Did I include the number & date of all amendments in block 19?
Did the appropriate official sign/date in block 20A, 20B & 20C?
Subcontracting Plan (see page A-6a)
Did I include the completed subcontracting plan (LARGE businesses only)
Bid Schedule (see page A-7)
Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?
Did the appropriate official initial corrections?
When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)
Bid Bond (Standard Form 24)
Bids received without a valid bid bond will be rejected.
Did I complete my bid bond correctly?
Did I include the original?
Did I attach the Power of Attorney to the bid bond?
Authority to Sign
Did I include a completed form for each person signing the SF1442 and Bid Bond?
Representations & Certifications & FAR Clause
Did I include the completed B-pages (beginning on B-1)?
Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-118)?
System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/
Do we have up-to-date data in SAM?
Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?
NOTE: The Contractor is fully responsible to verify that all data is correct each time a bid package is submitted. Failure to properly input and/or update your data may cause the bid to be rejected.
https://www.sam.gov/portal/public/SAM/
Driving Directions to our Vancouver Washington Office:
Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en
Authority to Sign
INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.
Corporate Certificate
I, ____________________________________________ (name), certify that I am the
________________________________________(title), of the corporation named as the Offeror/Principal herein;
that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is
________________________________________ (title) of this corporation;
that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.
_____________________________________ (signature) Affix Corporate Seal
_____________________________________ (title)
INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.
Limited Liability Certificate
I, ____________________________________________ (name), certify that I am the
________________________________________(title), of the limited liability company named as the Offeror/Principal herein;
that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is
________________________________________ (title) of this company;
that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.
_____________________________________ (signature) Affix Company Seal (as applicable) __________ _________________________ (title)
INSTRUCTIONS: When the offeror/principal is a partnership, include this
Authority to Bind Partnership
This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.
(Include names and signatures of all partners)
INSTRUCTIONS: When the offeror/principal is a joint venture, include this
Authority to Bind Joint Venture
This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:
(State “None” or describe limitations, if any)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.
(Include names and signatures of all applicable individuals)
INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:
Sole Proprietorship Requirement
An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.
If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.
RESERVED
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0045
Expiration Date: 8/31/2025
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of
1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is
9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT
OF BID
PRICE
AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER
69056723R000003 MILLION(S) THOUSAND(S) HUNDRED(S) CENTS
FOR (Construction, Supplies or
Services)
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.
Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
3.
Corporate
Seal NAME(S) &
TITLE(S)
(Typed)
1. 2. 3.
INDIVIDUAL SURETY(IES)
SIGNATURE(S)
1.
(Seal) 2.
(Seal)
NAME(S)
(Typed)
1. 2.
CORPORATE SURETY(IES)
S U
R E
T Y
A
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Seal
SIGNATURE(S) 1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is NOT usable
STANDARD FORM 24 (REV. 8/2016)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)
INDIVIDUAL PARTNERSHIP JOINT VENTURE
CORPORATION OTHER (Specify)
STATE OF INCORPORATION
S U
R E
T
B
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate
Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
S U
R E
T Y
C
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate
Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
S U
R E
T Y
D
NAME &
ADDRESS
STATE OF INCORPORATION LIABILITY LIMIT ($)
Corporate
Seal SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
S U
R E
T
E
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
S U
R E
T
F
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
S U
R E
T
G
SIGNATURE(S)
1. 2.
NAME(S) &
TITLE(S)
(Typed)
1. 2.
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General
Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE
SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.
The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
STANDARD FORM 24 (REV. 8/2016) BACK
Table of Contents Project: CO NP MULTI PMS (1), Pavement Preservation Colorado
TABLE OF CONTENTS
06/15/22–FP14
DESCRIPTION PAGE
Notice to Offeror .............................................................................................................................. A-1
Solicitation, Offer, and Award (SF 1442) ...................................................................................... A-3
Bid Schedule .................................................................................................................................... A-7
Solicitation Provisions ...................................................................................................................... B-1
Contract Clauses ............................................................................................................................... C-1
General Wage Decision ................................................................................................................... D-1
SCRs Table of Contents
SPECIAL CONTRACT REQUIREMENTS (SCR)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.
Division 100 ......................................................................................................................... E-1 Division 150 ...................................................................................................................... E- 29 Division 400 ........................................................................................................................ F- 1 Division 500 ...................................................................................................................... F- 15 Division 600 ....................................................................................................................... F-16 Division 700 .........................................................................................................................G-1
(Reserved) ........................................................................................................................................ H-1
Fire Protection and Suppression Plan ............................................................................................... I-1
(Reserved) .......................................................................................................................................... J-1
Table of Contents
(This page intentionally left blank)
A-1
Notice to Offeror
NOTICE TO OFFEROR
06/15/22–FP14
THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.
The FP-14 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. To view the FP-14 electronically go to:
https://highways.dot.gov/federal-lands/specs.
The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown.
Metric equivalents are shown in parenthesis.
When submitting bids, drawings, calculations, and other construction documents, use only U.S. Customary units of measure, unless otherwise stated.
I. Project Location
General Location. The project work is located at: Bent’s Old Fort National Historic Site (BEOL);
Curecanti National Recreation Area (CURE); Great Sand Dunes National Park (GRSA); and Mesa Verde National Park (MEVE), respectively. The approximate latitude and longitude coordinates for the beginning of the project are:
• BEOL: 38° 2'37.53"N, 103°25'53.37"W
• CURE: 38°27'59.13"N, 107° 9'56.31"W
• GRSA: 37°44'23.75"N, 105°30'59.83"W
• MEVE: 37°12'2.23"N, 108°29'18.36"W
Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.
https://highways.dot.gov/federal-lands/specs
A-2
Project: CO NP MULTI PMS (1), Pavement Preservation Colorado
II. Pre‐proposal Information.
GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR
THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON 12/06/2022.
Refer to page A-5 for information on how to submit questions related to General Information and Technical Information. Answers to General and Technical Questions will be posted at https://sam.gov/opp/37c22ffe1a3f4701902def4f67273a76/view
Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.
MATOC. This solicitation is solicited under the Western Region Pavement Preservation Multiple Award Task Order Contract (MATOC). Selection of the successful offer is based on price.
Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://sam.gov/opp/37c22ffe1a3f4701902def4f67273a76/view. A paper copy of the plan sheets is available by submitting the form posted with this solicitation.
Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.
Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204- 8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.
Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).
SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.
Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.
Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1
A-2a
Project: CO NP MULTI PMS (1), Pavement Preservation Colorado
Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.
Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.
Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA.
Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .
COVID-19 Site Access Constraints. There may be access constraints related to the COVID-19 Pandemic. If you are intending to submit an Offer and are unable to visit the sites because of access constraints related to the COVID-19 Pandemic, please let us know.
III. Post Award Information.
Insurance. Insurance requirements are described in Subsection 107.05.
Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.
IV. Specifications and Permits.
Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at https://highways.dot.gov/federal-lands/specs. A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail to:
report.center@dot.gov, or by phone 814-239-1160, or fax 814-239-2156.
Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.
Material Sources. Material sources have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).
mailto:WFL.Contracts@dot.gov http://www.sba.gov/content/contractors https://www.sam.gov/SAM/ http://www.cpars.gov/index.htm https://highways.dot.gov/federal-lands/specs mailto:report.center@dot.gov
A-2b
(This page intentionally left blank)
,-./0123415./6 78192:15./6 .2 ;9<:52= >�
���$�)�@A�
BB
�CD
EFGGDHE
IDJKLFM
FM
KCD
HDNDHID
OPIK
QD
GPRRS
JFOTRDKDU
QS
FGGDHFHV
W�
�����X����� Y� ��X� Z� ,[/483\9 :29:
4.\9= -̂ __̀-a -7__b=����c
�M IDdRDU
QLU
IFRLJLKdKLFMI
EFGGDHE
dMU
EFGGDHFHE
ODdM
EQLUE
dMU EQLUUDHVE����e��� f��*g f���g hijiklm nopqrls tjuovowxklxoyvhnzt z{|}{~� h{� �t��| h�h}n |}~{{}�lv�y��ik zt ����� ������ hijiklm nopqrls tjuovowxklxoyvhnzt h{� �t��| h�h}n |}~{{}�lv�y��ik zt �|ii �my��
'�����X��� ������X���� )��$X����
,a51896 5\9/15��5/� /.�6 \:19=
}qow wymo�oxlxoyv ow jiwopvij �l�iuivx �kiwik�lxoyv �ymykljy t���~�t��{ z�}n£ hijiklm t�¤�owxoyv ~ip�mlxoyvw ¡ht~¢ lvj }klvw¥ykxlxoyv t�¤�owxoyv ~ip�mlxoyvw
¦iviklm zlpi �i�owoyv
|¥i�olm �yvxkl�x ~i¤�okiuivxw
|xlvjlkj |¥i�o§o�lxoyvw §yk �yvwxk��xoyv y§ ~yljw lvj �kojpiw yv hijiklm nopqrls
�kÿi�xw© h�ª�«
�̄ °±²Y³±̄² ́Yµµ Z®¶·° ̧®²¹̄²ºY°³®
>�Y� X$�� ������X���� ���X��� Y¼Y²½¾ °̄±·³® ̧²̄³®®½�
̧®²¹̄²ºY°³® ̧®²·̄½ ºY°½Y±̄²¿ °®¶̄±·YZµ®� f�®® ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬�g>?� ��#$���X����eY� �®Yµ®½ ̄¹¹®²́ ̄²·¶·°Yµ Y°½ ·́
²®ÀÁ·²®½�·́¾
Z� ̄¹¹®²
¶ÁY²Y°±®®
³� �µµ ̄¹¹®²́ Y²®
́ÁZ®³±
f>g ¼̄ ²Ã
²®ÀÁ·²®º®°±́¾
Y°½ f�g ̄±®² ̧²̄Ä·́·̄°́ Y°½ ³µYÁ́®́ ·°³̄²̧ ²̄Y±®½ ́̄ µ·³·±Y±·̄° ¹Áµµ ̄² Z¿ ²®¹®²®°³®�
,\:19=� �¹ Y ́®Yµ®½ Z·½ ́̄ µ·³·±Y±·̄°¾ ̄¹¹®²́ ¼·µµ Z® ̧ÁZµ·³µ¿ ̧̄ ®°®½ Y± ±Y± ±·º®�
�®Yµ®½ ®°Ä®µ̧̄ ®́ ³̄°±Y·°·°¶ ̄¹¹®²́ ́Yµµ Z® ºY²Ã®½ ́̄¼ ̄¹¹®²̄²Ǻ °Yº® Y°½ Y½½²®́ ¾́ ́̄ µ·³·±Y±·̄° °ÁºZ®²¾ Y°½ ½Y±® Y°½ ±·º® ̄¹¹®²́ Y²® ½Á®�½� �¹¹®²́ ̧²̄Ä·½·°¶ µ®́ ́±Y°
>�Z� ÆÇ̀ bÆ6 5/\54:19 È51É5/ É.È Ê:/� 4:89/\:2 \:�0 :�192 :È:2\ 5/ [19Ê
ËÌÍ�=
³Yµ®°½Y² ½Y¿́ Y°½ ³̄º̧ µ®±® ¼·±·° ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ³Yµ®°½Y² ½Y¿́ Y¹±®² ²®³®·Ä·°¶ �«���lpi tª����������� ("!�Î�>Î>""Î?�>�
³̄ ·̧®́ ̧®²¹̄²º ¼̄ ²Ã
²®ÀÁ·²®½
Y²® ½Á® Y± ̧µY³® ̧́ ®³·¹·®½ �±®º Z¿ ¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬ ,É.32= µ̄³Yµ ±·º® ³Yµ®°½Y² ½Y¿́ ¹̄² '̄ Ä®²°º®°± Y³³®̧±Y°³® Y¹±®² ½Y±® ̄¹¹®²́ Y²® ½Á® ¼·µµ Z® ³̄°́·½®²®½ Y°½ ¼·µµ Z® ²®Â®³±®½�
���X f�®Ä� !Î+"g�²®́³²·Z®½ Z¿ '�����f!+ ���g "?��?�Î>f½g
See Page A-5 360-619-7520
A-3
| �������������� | ���� | |
| �� | � |
| �� | �� | |
| ����������� | � |
�������� !"#$%&�'"(�")*+$%�$,)'-�&.�.%�/%$'&$%�&0'"�&0$�*1"1*)*%$,)1%$*$"&�#&'&$2�1"�1&$*�3425�6'1-)%$�&.�1"#$%&�'"(�")*+$%�*$'"#�&0$�.77$%.%�'88$9&#�&0$�*1"1*)*�1"�1&$*�3425:
�;��<=>?�=<@�=@@A?BB�CD�CDD?ACA� !"8-)2$�E!F�G.2$: �H���?I?JKC<?�<C�� !"8-)2$�'%$'�8.2$:�L��A?>M��=<N?�=@@A?BB� !"8-)2$�."-(�17�2177$%$"&�&0'"�1&$*�3O5:
NC@? D=NMIM�P�NC@?QRSTUVW�X������� �
��Y��=NZ<C[I?@�?>?<��CD�=>?<@>?<�B
S\\]̂ � _)#&�+$�7)--(�8.*9-$&$2�+(�.77$%.%:
̀0$�.77$%.%�'8a".b-$2/$#�%$8$19&�.7�'*$"2*$"&#�&.�&0$�#.-181&'&1."�cc�/1d$�")*+$%�'"2�2'&$�.7�$'80:=>?<@>?<��<C�@=�?�ef���<=>?�=<@��M�I?�CD�J?ABC<�=g�KCAMh?@��C�BM�<�CDD?A� ̀(9$�.%�9%1"&: ef���BM�<=�gA? ef���CDD?A�@=�?QiQ̂ j� ̀.�+$�8.*9-$&$2�+(�k.d$%"*$"&:e���M�?>B�=NN?J�?@l ee��=>Cg<� em��=NNCg<�M<��=<@�=JJACJAM=�MC<�@=�=e;��Bgn>M��M<oCMN?B��C�=@@A?BB�BKC[<�M<��������� O�8.91$#�)"-$##�.&0$%b1#$�#9$8171$2: M�?> eH��C�K?A��K=<�DgII�=<@�CJ?<�NC>J?�M�MC<�JgABg=<���CeL��=@>M<MB�?A?@�nP NC@? e���J=P>?<��[MII�n?�>=@?�nP
Gpq̀ rsG̀ !qk�p66!Gtr�u!vv�Gp_Fvt̀ t�!̀t_�wx�pr�wy�sz�sFFv!Gs{vt G."&%'8&.%�1#�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&�'"2�%$&)%" G."&%'8&.%�1#�".&�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&5:|.)%�.77$%�."�&01#�#.-181&'&1."�1#�0$%$+(�'88$9&$2�'#�&.�&0$�1&$*#�-1#&$25��̀01#�'b'%2�8."#)**'&$#&0$�8."&%'8&}�b0180�8."#1#&#�.7� ':�&0$�k.d$%"*$"&�#.-181&'&1."�'"2�(.)%�.77$%}�'"2� +:�&01#�8."&%'8&�'b'%25�q.�7)%&0$%�8."&%'8&)'-�2.8)*$"&�1#�"$8$##'%(5mf���<=>?�=<@��M�I?�CD�NC<�A=N�CA�CA�J?ABC<�=g�KCAMh?@��C�BM�<� ̀(9$�.%�9%1"&: m����<=>?�CD�NC<�A=N�M<��CDDMN?A� ̀(9$�.%�9%1"&:mf���BM�<=�gA? mf���@=�? m����g<M�?@�B�=�?B�CD�=>?AMN= m����@=�?nP
~J=�? CD
eX��<?�C�M=�?@�=�A??>?<� eY��=[=A@G."&%'8&.%�'/%$$#�&.�7)%"1#0�'"2�2$-1d$%�'--�1&$*#�.%�9$%7.%*�'--�b.%a�%$,)1%$*$"&#�12$"&171$2."�&01#�7.%*�'"2�'"(�8."&1")'&1."�#0$$&#�7.%�&0$�8."#12$%'&1."�#&'&$2�1"�&01#�8."&%'8&5�̀0$%1/0&#�'"2�.+-1/'&1."#�.7�&0$�9'%&1$#�&.�&01#�8."&%'8&�#0'--�+$�/.d$%"$2�+(� ':�&01#8."&%'8&�'b'%2}� +:�&0$�#.-181&'&1."}�'"2� 8:�&0$�8-')#$#}�%$9%$#$"&'&1."#} �8.91$#�&.�1##)1"/�.7718$5:
�f�g�B�N��emf;¦�§ ;��g�B�N��eHm¦�§
B�=<@=A@�DCA>��;;e�¦A?o��;̈XH§�n=NZ
See Bid Schedule
See Page A-5
A-4
A-5
Continuation SF 1442
Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to
4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.
FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.
Submit questions via e-mail at wfl.plans-spec@dot.gov.
QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website https://sam.gov/ .
• Insert the solicitation number in the search box
• Scroll to the project.
• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.
FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region)
FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Sam.gov website.
Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in
FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.
Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway
Projects, FP-14, U.S. Customary Units.
Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).
ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-
14, U.S. Customary Units.
Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for
Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary
Units.
mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://sam.gov/
A-6
Continuation SF 1442
ESTIMATED PRICE RANGE. The price range of the project work is between $7,000,000 and
$10,000,000.
SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan with their proposal. A large business is one whose average gross annual receipts over the past 3 years equal $39.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to
SMALL businesses.
APM 025E – Revised 7/12/2021 1
ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN
1. INSTRUCTIONS:
• Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid. The statement shall be signed by an official authorized to make decisions on behalf of the firm.
• The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.
• Text lines may be added to this template as needed.
*insert and complete additional tables if the contract includes option year(s).
1 SDVOSB is a subcategory of VOSB. Any dollar amount applied to SDVOSB also applies to VOSB.
2 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.
SUBCONTRACTING GOALS – BASE YEAR
Total prime contract amount – Base Year: $
Total planned subcontracted amount (regardless of firm/entity size status) – Base Year:
Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.)
Total planned subcontracts to Small Business concerns: $ %
• Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)1:
o Total planned subcontracts to Service-Disabled Veteran Owned Small Business (SDVOSB) concerns:
• Total planned subcontracts to Historically Underutilized Business Zones (HUBZones): $ %
• Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):
• Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)2 concerns:
A-6a
APM 025E – Revised 7/12/2021 2
1.1 Rationale if establishing a goal lower than 3% for VOSB:
1.2 Rationale if establishing a goal lower than 3% for SDVOSB:
1.3 Rationale if establishing a goal lower than 3% for HUBZone:
1.4 Rationale if establishing a goal lower than 5% for SDB:
1.5 Rationale if establishing a goal lower than 5% for WOSB:
1.6 Rationale if establishing a goal lower than the current DOT subcontracting goal:
2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Add additional rows if more space is needed.]
3 List all applicable size standards for each proposed subcontractor.
Type of Supply/Service to be Subcontracted
Company/Firm
Name
Subcontracted
Amount
Subcontractor Size
Standard (Other Than
SB, SB, VOSB, SDVOSB,
HUBZone, SDB, WOSB)3
A-6b https://www.sba.gov/document/support-agency-contracting-goals
APM 025E – Revised 7/12/2021 3
3. The following methods were used to develop the subcontract percentage goals:
4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)
5. [Select appropriate option.] Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.
6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:
7. The following individual will administer the subcontracting program:
Name:
Title:
Address:
Telephone:
E-mail:
This individual's specific duties, as they relate to the subcontracting program, are as follows:
8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and
WOSB subcontractors will have an equitable opportunity to compete for subcontracts:
A-6c http://www.sam.gov/ http://www.dsbs.sba.gov/
APM 025E – Revised 7/12/2021 4
[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $700,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.
9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:
10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:
[Initial each line]
Cooperate in any studies or surveys as may be required;
Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;
After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;
Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);
Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;
Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;
Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;
A-6d http://www.esrs.gov/
APM 025E – Revised 7/12/2021 5
Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;
Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;
Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and
Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).
Submitted by:
POC Name:
Title:
Email Address:
Company Name:
DUNS/CAGE:
Mailing Address:
Signature
A-6e http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P308_50712
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CO NP MULTI PMS(1)
Project Name:Pavement Preservation Colorado
A - 8
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0100 40601-0000 FOG SEAL
335.0 TON $____________ $____________
A0120 40702-0300 CHIP SEAL, TYPE 1C
475,000 SQYD $____________ $____________
A0160 40711-0000 EMULSIFIED ASPHALT
870.0 TON $____________ $____________
A0180 40712-0000 BLOTTER
40 TON $____________ $____________
A0200 40901-2000 MICRO SURFACING, TYPE 2
255,000 SQYD $____________ $____________
A0220 41401-3000 CRACKS, CLEANING AND FILLING
800 LNFT $____________ $____________
A0240 41402-2000 CRACKS, CLEANING AND SEALING
20.00 MILE $____________ $____________
A0260 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
640 SQYD $____________ $____________
A0280 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
9,000 SQYD $____________ $____________
A0300 50202-0000 SEALING JOINTS AND CRACKS
15,000 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 9
A0320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A0340 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH
80 HOUR $____________ $____________
A0360 62201-2360 VACUUM SWEEPER
80 HOUR $____________ $____________
A0380 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
A0400 63313-0000 RUMBLE STRIP (CENTERLINE)
110,000 LNFT $____________ $____________
A0420 63315-0000 RUMBLE STRIP
90 SQYD $____________ $____________
A0440 63401-0000 PAVEMENT MARKINGS (TYPE B)
1,500,000 LNFT $____________ $____________
A0460 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
255 EACH $____________ $____________
A0480 63407-0200 RECESSED PAVEMENT MARKER, BI-DIRECTIONAL REFLECTIVE
100 EACH $____________ $____________
A0500 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
440 EACH $____________ $____________
A0520 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
4 EACH $____________ $____________
A0540 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
180,000 LNFT $____________ $____________
A0560 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
400.0 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 10
A0580 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
6,000 HOUR $____________ $____________
A0600 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
300 HOUR $____________ $____________
A0620 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
100 DAY $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 1
Solicitation Provisions
Federal Acquisition Regulation
Representations, Certifications and Other Statements of Offeror
To the extent that any of the following Provisions may be in conflict with the Provisions in the IDIQ contract, the following Provisions will control.
The Offeror Makes the Following Representations and Certifications as a Part of its Offer.
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality
Agreements or Statements-Representation (Jan 2017)
(a) Definition.
“Internal confidentiality agreement or statement,” “subcontract”, and “subcontractor”, as used in this provision, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal
Confidentiality Agreements or Statements.
(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to
Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive
Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information
(e.g., agency Office of the Inspector General).
52.204-8 Annual Representations and Certifications. (MAY 2022)
(a) (1) The North American Industry Classification System (NAICS) code for this acquisi is__ NAICS 237310 – Highway, Street & Bridge Construction.
(2) The small business size standard is39.5 million.
Completing FAR provision 52.204-8 Annual Representation and Certifications.
• This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $39.5 million. If your average annual gross receipts for the past 3 years are above $39.5 million you are a large business for this solicitation. If they are below $39.5 million you are a small business. Please complete the certification listed in paragraph (d).
• Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the System for Award Management (SAM) website: https://www.sam.gov/SAM/ https://www.acquisition.gov/sites/default/files/current/far/html/52_200_206.html#wp1158787 https://www.sam.gov/SAM/
B - 2
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition—
(i)Is set aside for small business and has a value above the simplified acquisition threshold;
(ii)Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii)Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph
(d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) □ Paragraph (d) applies.
(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A) The acquisition is to be made under the simplified acquisition procedures in part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal
Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .