RFP 65-22 Form C Pricing Response.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- BD-22-1206-40000-40000-74764
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a pricing response form (Form C) related to RFP 65-22 for Storage Tank Environmental Compliance Services issued by the Massachusetts Bay Transportation Authority (MBTA). The RFP is seeking qualified vendors to provide system-wide storage tank compliance services for a 3-year contract term with two 1-year option periods. The services requested include storage tank consulting, monitoring, testing, inspection, and related parts/materials. The pricing form covers numerous service items with estimated quantities and unit pricing for the base 3-year term and each option year.
The pricing form indicates the basis of award will be the grand total for the 3-year base term. There is also a not-to-exceed amount listed for replacement parts, materials, rental equipment, and supplies. A minimum site fee per visit is also specified. No information is provided on set-asides, incumbents, funding sources, or other salient commercial terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFP 65-22 Storage Tank Environmental Compliance Services | ENTER VENDOR NAME: | ||||||||
| FORM C -- Pricing Response | |||||||||
| Instructions: Fill out all YELLOW cells. Totals will calculate automatically. | |||||||||
| Description of Service Item | 3 YEAR CONTRACT | Option Year 1 | Option Year 2 | ||||||
| Item | Unit | ENTER PRICE PER UNIT: | ESTIMATED Quantity PER YEAR | Total Price per 3 Year Contract | Estimated Quantity | Total Price for Option Year 1 | Estimated Quantity | Total Price for Option Year 2 | |
| A | Storage Tank Environmental Compliance Program Implementation and Startup | once | n/a | $0.00 | |||||
| B | Consulting Services | ||||||||
| B1 | UST/AST General Consulting Services | per hour | 900 | $0.00 | 300 | $0.00 | 300 | $0.00 | |
| B2 | UST/AST Permitting and Admin Services | per hour | 300 | $0.00 | 100 | $0.00 | 100 | $0.00 | |
| B3 | LSP/PE Consulting Services | per year | 300 | $0.00 | 100 | $0.00 | 100 | $0.00 | |
| C | On Call Technical Services | ||||||||
| C1 | Non-Emergency On Call Service | per hour | 2250 | $0.00 | 750 | $0.00 | 750 | $0.00 | |
| C2 | Emergency On Call Service | per hour | 150 | $0.00 | 50 | $0.00 | 50 | $0.00 | |
| D | Monitoring, Reconsiliation, and Analysis Services | ||||||||
| D1 | ATG System Remote Monitoring Services (x19 ATGs) | per ATG month | 684 | $0.00 | 228 | $0.00 | 228 | $0.00 | |
| D2 | Web Based Inventory Reconciliation (x9 Facilities) | per facility monthly | 324 | $0.00 | 108 | $0.00 | 108 | $0.00 | |
| E | Sump and Containment Pump Out Services | per facility | 60 | $0.00 | 20 | $0.00 | 20 | $0.00 | |
| F | Tank System Compliance Testing Services | ||||||||
| F1 | ATG System Testing and Certification | per system annually | 57 | $0.00 | 19 | $0.00 | 19 | $0.00 | |
| F2 | Cathodic Protection System Testing | per system tri- annually | 6 | $0.00 | 2 | $0.00 | 2 | $0.00 | |
| F3 | Dispenser Calibration | per dispenser | 69 | $0.00 | 23 | $0.00 | 23 | $0.00 | |
| F4 | Emergency Stop Button Testing | per facility annually | 30 | $0.00 | 10 | $0.00 | 10 | $0.00 | |
| F5 | Helium Pinpoint Testing | per test as needed | 9 | $0.00 | 3 | $0.00 | 3 | $0.00 | |
| F6 | Line Interstitial Testing | per test as needed | 9 | $0.00 | 3 | $0.00 | 3 | $0.00 | |
| F7 | Impact Valve Testing | per test annually | 30 | $0.00 | 10 | $0.00 | 10 | $0.00 | |
| F8 | Spill Bucket Testing | per test triannually | 102 | $0.00 | 34 | $0.00 | 34 | $0.00 | |
| F9 | Stage 1 Vapor Recovery Testing | per system annaully | 12 | $0.00 | 4 | $0.00 | 4 | $0.00 | |
| F10 | Sump Containment Testing | per test tri-annually | 33 | $0.00 | 11 | $0.00 | 11 | $0.00 | |
| F11 | Dispenser Pan Containment Testing | per test tri-annually | 24 | $0.00 | 8 | $0.00 | 8 | $0.00 | |
| F12 | Tank Tightness Testing | per test as needed | 6 | $0.00 | 2 | $0.00 | 2 | $0.00 | |
| F13 | Line Tightness Testing | per test as needed | 45 | $0.00 | 15 | $0.00 | 15 | $0.00 | |
| F14 | Automatic Line Leak Detector Testing | per test annually | 39 | $0.00 | 13 | $0.00 | 13 | $0.00 | |
| F15 | Tank interstitial Testing | per test as needed | 9 | $0.00 | 3 | $0.00 | 3 | $0.00 | |
| G | Inspection Services | ||||||||
| G1 | Third Party UST Inspections | per facility tri-annually | 12 | $0.00 | 4 | $0.00 | 4 | $0.00 | |
| G2 | Monthly UST Inspections (15 Facilities x 36 Months = 540 Inspections) | per facilty monthly | 540 | $0.00 | 180 | $0.00 | 180 | $0.00 | |
| G3 | Monthly SPCC AST Inspections (52 Tanks x 36 Months = 1,872 Inspections) | per tank monthly | 1872 | $0.00 | 624 | $0.00 | 624 | $0.00 | |
| G4 | Semi-Annual AST Inspections (15 Facilities) | per tank semi- annually | 624 | $0.00 | 208 | $0.00 | 208 | $0.00 | |
| G6 | Periodic In Service AST Tightness Tests | per tank as needed | 75 | $0.00 | 25 | $0.00 | 25 | $0.00 | |
| G7A | API 653 In Service AST Inspection and Prep | per tank every 5 years | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | |
| G7B | API 653 Out of Service AST Inspection and Prep | per tank every 10 years | 1 | $0.00 | 1 | $0.00 | 1 | $0.00 | |
| Basis of Award - Grand Total (sum of column F): | $0.00 | Option Year 1 Total: | $0.00 | Option Year 2 Total: | $0.00 | ||||
| H | Replacement Parts, Materials, Rental Equipment, and Supplies Associated with All Work: | ESTIMATED. Not to exceed: | $225,000 | ESTIMATED. Not to exceed: | $75,000 | ESTIMATED. Not to exceed: | $75,000 | ||
| I | Minimum Site Fee | per site (max 2 per day) | $500 |
File details come from the government source that posted it. Updated .