This is a Request for Proposals (RFP) issued by the Commonwealth of Virginia Department of Environmental Quality to establish a term contract for conducting a Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study in response to Executive Order 22. The study will assess cumulative effects of multiple data centers operating within Virginia, examining backup generator emissions, air quality impacts, and emissions reduction opportunities. The contractor must deliver a comprehensive Weight-of-Evidence Assessment, develop emissions inventories, conduct air quality modeling using CMAQ or CAMx platforms, perform source apportionment analysis, and evaluate future-year air quality projections. Key deliverables include a draft WOE Assessment due February 15, 2027, and a final WOE Assessment due March 1, 2027, with all other tasks to be completed by December 31, 2027. An optional virtual preproposal conference is scheduled for November 19, 2026, at 1:00 PM EST. Electronic sealed proposals are due by 2:00 PM EST on December 3, 2026. The contract will have an initial one-year term with four optional one-year renewal periods. Work will be performed statewide under the direction of the DEQ, with Carol Papazian serving as the Procurement Manager.
The RFP does not specify a firm fixed price but identifies this as an optional use, requirements-based contract with ancillary services available. No purchase commitment is guaranteed, and DEQ reserves the right to procure identical or similar services from other sources. The contractor must furnish all necessary personnel, resources, subject matter experts, materials, supplies, and travel expenses to complete the study. Virginia does not discriminate in contract awards based on race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity, political affiliation, veteran status, military family status, or other protected characteristics. The RFP includes standard terms and conditions with special provisions for compliance with federal and state regulations, quality assurance procedures, and data accessibility requirements. No specific set-asides for small businesses or other contractor categories are indicated in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 1.pdf | ||
| RFP 27-02-CP - ATTACHMENT F - PRICE SCHEDULE - ADDENDUM NO. 1.xlsx | XLSX spreadsheet | |
| RFP 27-02-CP- ATTACHMENT F - PRICE SCHEDULE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
(RFP)
RFP #: 27-02-CP
Issue Date: November 4, 2026
Title: Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study
Commodity Code: 92642/92652/92672
Issuing Agency: Commonwealth of Virginia Department of Environmental Quality Attn: Carol Papazian, Contract Officer P. O. Box 1105 Richmond, VA 23218
Using Agency And/Or Location Department of Environmental Quality Where Work Will Be Performed: Statewide
Initial Period Of Contract: One (1) year initial term, with four (4) successive one (1) year optional renewals.
Electronic Sealed Proposals Will Be Received Until 2:00 PM Est. on December 3, 2026, For Furnishing The Goods/Services Described Herein (Note: There is no “Public Bid Opening”; the date referenced in the Virginia Business Opportunities (VBO) refers to the due date/time for the sealed proposals).
All Inquiries For Information Should Be Directed To: Carol Papazian, Procurement Manager, Phone: (804) 774-8002 or E-mail: carol.papazian@deq.virginia.gov
In Compliance With This Request For Proposals And To All The Conditions Imposed Therein And Hereby Incorporated By Reference, The Undersigned Offers And Agrees To Furnish The Goods/Services In Accordance With The Attached Signed Proposal Or As Mutually Agreed Upon By Subsequent Negotiation.
Name And Address Of Firm:
_____________________________________________ Date: ________________________________________
_____________________________________________ By: _________________________________________
_____________________________________________ (Signature In Ink)
__________________________Zip Code:________ Name: ________________________________________ eVA Vendor ID or DUNS Number: ______ (Please Print)
Fax Number: (___) ________________________ Title: _________________________________________ E-mail Address: ___________________________ Telephone Number: (___)_________________________
OPTIONAL PREPROPOSAL CONFERENCE: A virtual optional preproposal conference will be held at 1:00 PM on November 19, 2026 (Refer to Section VIII herein). * If special ADA accommodations are needed, please contact Carol Papazian (804-774-8002; carol.papazian@deq.virginia.gov) by November 16, 2026.
Note: This public body does not discriminate against faith-based organizations in accordance with the Code of Virginia,§ 2.2-4343.1 or against a bidder or offeror because of race, religion, color, sex, national origin, age, disability, sexual orientation, gender identity or expression, political affiliation, veteran status, status as a military family, or any other basis prohibited by state law relating to discrimination in employment. Faith-based organizations may request that the issuing agency not include subparagraph A.(7) in General Terms and Condition 3. Such a request shall be in writing and explain why an exception should be made in that invitation to bid or request for proposal.
RFP #: 27-02-CP
TABLE OF CONTENTS
PAGE
I. PURPOSE
II. OPTIONAL USE
III. BACKGROUND
IV. STATEMENT OF NEEDS
V. PROPOSAL PREPARATION AND SUBMISSION INSTRUCTIONS
VI. EVALUATION AND AWARD CRITERIA
VII. REPORTING AND DELIVERY INSTRUCTIONS
VIII. OPTIONAL PREPROPOSAL CONFERENCE
IX. GENERAL TERMS AND CONDITIONS
X. SPECIAL TERMS AND CONDITIONS
XI. METHOD OF PAYMENT
XII. PRICE SCHEDULE
XIII. ATTACHMENTS
ATTACHMENT A / OFFEROR DATA SHEET
ATTACHMENT B / STATE CORPORATION COMMISSION FORM………………………….67
ATTACHMENT C / PROPRIETARY/TRADE SECRET INFORMATION
IDENTIFICATION……………………………………………………………………………………………...68
ATTACHMENT D / SMALL BUSINESS SUBCONTRACTING PLAN………………………
ATTACHMENT E / ANTI-DISCRIMINATION CHECKLIST……………………………………..71
ATTACHMENT F/
PRICE SCHEDULE……………………………,,,,…………………………………..Separate Attachment
I. PURPOSE:
The intent and purpose of this Request for Proposals (RFP) is to solicit sealed proposals to establish a term contract through competitive negotiation with a qualified source to provide the Backup- Generation Cumulative Impact Analysis and Emissions Reductions Study (“Study” / “Project”) services as required by Executive Order 22 (EO22), and other related tasks, as specified herein, for the Department of Environmental Quality, an agency of the Commonwealth of Virginia (“Virginia”), hereinafter referred to as the “DEQ.”
The initial contract term is one (1) year, with four (4) optional one (1)-year renewal periods.
II. OPTIONAL USE CONTRACT (Ancillary Services):
The ancillary services resulting from this contract will be an optional use, requirements-based contract. The DEQ is in no way required to make purchases from the Contractor and may, in its sole discretion, purchase the identical and/or similar goods/services from other sources. Any estimates/quantities contained herein do not represent a purchase commitment by the DEQ.
III. BACKGROUND:
Executive Order 22 establishes Virginia’s Data Center Accountability Framework to ensure that the rapid growth of data centers benefits Virginia communities while protecting residents from rising energy costs, environmental harm, and strain on critical infrastructure. The order directs State agencies to strengthen transparency, environmental protections, energy affordability, grid reliability, and responsible data center development. A cumulative impact study is necessary to assess the combined effects of multiple data centers operating or planned within the same geographic area. Specifically, the order directs DEQ, in consultation with the Virginia Department of Health and Virginia Energy, to conduct or oversee a cumulative impact review of data center backup generators, examining their number, capacity, fuel types, operating hours, geographic concentration, combined emissions, and localized air-quality impacts, particularly in communities hosting multiple facilities. The review shall also consider available measures to reduce emissions, protect public health, improve transparency, and promote retrofit of Tier II gen-sets to Tier IV or equivalent emissions controls, battery storage, fuel cells, clean firm generation, non-diesel alternatives, and other feasible technologies that can meet reliability needs while reducing public-health and environmental impacts from backup generation. This analysis is needed to evaluate cumulative emissions and air quality impacts and opportunities to reduce emissions, and inform improvements to permitting, monitoring, reporting, enforcement, and public disclosure.
EO22 establishes an expedited timeline for DEQ to conduct or oversee a cumulative-impact review of diesel and other backup generation operations associated with data centers. Within 180 days of EO22 (March 17, 2027), DEQ must submit findings and recommendations to the Office of the Governor addressing potential improvements to data center permitting, monitoring, reporting, enforcement, emissions controls, and public disclosure. Given this compressed timeframe of the cumulative impact analysis, it is necessary to conduct this study in a phased approach (refer to Section IV.B).
This project is designed to utilize as much recent EPA modeling data as possible. DEQ will utilize the results from this Study to evaluate EPA’s emissions and modeling work and enhance those efforts to ensure that DEQ will have accurate and appropriate data inputs to the air quality model and the most reliable model outputs for this study; and to inform DEQ and policy makers about the environmental impacts of rapidly expanding data center infrastructure, as well as other sectors, and inform mitigation strategies.
IV. STATEMENT OF NEEDS:
A. Definitions - for the purpose of this RFP, the following definitions should apply to Section
IV:
1. Ancillary Services: Services not included in the contract “Total Fixed Price” for the
Backup-Generation Cumulative Impact Analysis and Emissions Reductions.
2. Normal Business Hours: Monday through Friday, 8:00 AM to 5:00 PM EST.
3. Overtime Hours: Monday through Friday, 5:00 PM to 8:00 AM EST., weekends and
Virginia State observed holidays.
4. Subject Matter Expert (SME): Personnel retaining professional understanding of air quality and public health impacts associated with the development, construction, and operation of data centers in the Commonwealth.
5. Contractor’s Project Team - may include, but is not limited to, the following Contractor personnel:
a. Principal (e.g., major deliverable review, staffing issues, project approval authority).
b. Project Manager (e.g., coordinates data analysis, modeling, reporting, communications with DEQ).
c. Quality Control (“QC”) Reviewer: (e.g., technical review, verification, compliance interpretations).
d. Other Project Team Members (e.g., including any SME with relevant project experience).
6. DEQ Project Team - includes the following DEQ personnel roles:
a. DEQ Project Manager.
b. DEQ Contract Administrator.
c. DEQ Central Office Technical and Policy Liaison.
B. General Requirements – the Contractor should:
1. Furnish (as applicable) all personnel (i.e., labor and supervision), resources (e.g., subject matter experts {SMEs}, materials, supplies, incidentals, travel/transportation, etc., necessary to provide the Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study (to include the “Ancillary Services”) specified herein, and in response to, this RFP.
2. Conduct a comprehensive air quality analysis in the following two (2) phases, in accordance with EO22, with a focus on quantifying and analyzing emissions from data centers and other significant emissions sectors; and identifying and developing recommendations to reduce emissions and enhance oversight:
a. First Phase: Conduct a Weight-of-Evidence (WOE) Assessment of Data Emissions, Air Quality Impacts, and Potential Improvements, as described in Section IV.C., Task 2.
b Second Phase: Employ the Community Multiscale Air Quality (CMAQ) model and/or the Comprehensive Air Quality Model with Extensions (CAMx), incorporating source apportionment techniques to determine sector-specific contributions to ambient pollutant concentrations:
(1) Additionally, the study may (at the Contractor’s discretion) evaluate the use of plume-in-grid (PiG) modeling for large point sources to improve spatial and temporal resolution of pollutant dispersion.
3. Schedule and conduct and/or participate in virtual project ‘kick-off’ meeting and other project meetings with DEQ staff, and/or other entities, in accordance with the meeting schedule (and upon request by DEQ at no additional cost).
4. Submit:
a. Monthly progress reports to the DEQ Contract Administrator (or designee).
b. The draft WOE Assessment and Recommendations (Section IV.C., Task 2) to DEQ for review no later than February 15, 2027.
c. The Final WOE Assessment and Recommendations (Section IV.C., Task 2) to DEQ no later than March 1, 2027.
5. Complete all tasks in Section IV.C, (except for Section IV.C., Task 2), no later than December 31, 2027, or as otherwise mutually established by the Contractor and DEQ.
C. Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study (“Project”) – the Contractor should perform the following “Tasks”:
Task 1 / Project Management – the Contractor should:
1. General Requirements:
a. Perform routine comprehensive project oversight and ensure complete conformance with the contract; and should:
(1) Identify any contract compliance issues at the earliest possible date, immediately inform the DEQ Contract Administrator to mutually determine how the noncompliance will be corrected by the Contractor, at the Contractor’s sole expense.
b. Limit work to the development of the work plan and the quality assurance documents until DEQ has approved the work plan (refer to Section IV.C., Task 1.2).
2. Work Plan:
a. Development:
(1) Produce and submit a draft work plan to the DEQ Project Manager within 14 calendar days after the effective date of the contract, that addresses each of the contract “Tasks”; and that complies any existing federal, state and local laws, regulations and policies.
(2) Amend the draft work plan upon request by DEQ and submit the final work plan to the DEQ Project Manager within seven (7) calendar days of receiving written approval from the DEQ Project Manager of the last draft work plan.
b. Components – the work plan should:
(1) Incorporate appropriate methodologies and techniques for thoroughly and efficiently completing each of the contract “Tasks”.
(2) Document the methods and approaches that will be used for each contract “Task”, to evaluation products and software tools.
(3) Include, at minimum, the following information per contract “Task”:
(a) A detailed list of the deliverables;
(b) The schedule for each deliverables;
(c) The Contractor personnel and associated role; and
(d) All other pertinent information.
3. Communications:
a. Schedule a weekly call with the DEQ Project Manager to provide project updates, address any project challenges and obtain input and guidance as required from DEQ.
b. Respond to all DEQ inquiries and requests for information within two (2) business days.
4. Task Reports:
a. Monthly Task Progress Reports: Submit a monthly progress report per contract
“Task”, to the DEQ Project Manager within two (2) weeks of the last calendar day of each month, that outlines the progress to date, and any problems that need to be addressed.
b. Summary Task Progress Reports: - submit a summary of each contract “Task” as follows:
(1) Content: Each summary progress report should include:
(a) An executive summary that provides a brief overview and summary of the modeling effort, emissions, meteorology and air quality models used, model configuration, model performance evaluation overview and results, and rationale for the selected configuration;
(b) Summaries of quality assurance procedures completed for the Task;
(c) A description of the technical work performed for the Task;
(d) Summaries and conclusions;
(e) A list of all final work products delivered; and
(f) A discussion of data accessibility and availability for review by DEQ, stakeholders, and the public.
(2) Draft Summary Task Progress Report – submit:
(a) A draft outline for each summary task progress report, for review by the DEQ Project Manager, within two (2) weeks of completing the Task ; and should, upon request by DEQ:
(1) Amend the draft outline and submit the final outline to the DEQ Project
Manager within seven (7) calendar days of receiving written approval from the DEQ Project Manager of the last draft outline.
(b) A draft summary task progress report to the DEQ Project Manager, based upon the DEQ-approved outline, within two (2) weeks of receiving DEQ approval of the outline; and should amend the draft upon request by DEQ.
(3) Final Summary Task Progress Report: Submit the final summary progress report to the DEQ Project Manager within seven (7) calendar days of receiving written approval from DEQ of the last draft summary task progress report.
5. Project Summary Report – submit a summary of the overall project as follows:
a. Content: The project summary report should include:
(1) An executive summary that provides a brief overview and summary of the modeling effort, emissions, meteorology and air quality models used, model configuration, model performance evaluation overview and results, and rationale for the selected configuration;
(2) Summaries of quality assurance procedures completed for the project;
(3) A description of the technical work performed for the project;
(4) Summaries and conclusions;
(5) A list of all final work products delivered; and
(6) A discussion of data accessibility and availability for review by DEQ, stakeholders, and the public.
b. Draft Project Summary Report: Submit a draft project summary report to the DEQ
Project Manager within two (2) weeks of submitting the final “Summary Task Project Report”, that details, documents, and summarizes the final results of the project; and should amend the draft upon request by DEQ.
c. Final Project Summary Report: Submit the final project report to the DEQ Project Manager within seven (7) calendar days of receiving written approval from DEQ of the last draft project summary report, as follows:
(1) Two (2) hard copies;
(2) An electronic copy of the report in Microsoft Word (*.docx) (and made available by the Contractor on the Technical Website (refer to Section IV.C, Task 9); and
(3) As a slide presentation that DEQ can distribute to stakeholders.
Task 2 / WOE Assessment of Data Center Emissions, Air Quality Impacts, and Potential Improvements – the Contractor should (* ”shall” as indicated below):
1. General Requirements:
a. Prepare a comprehensive weight-of-evidence (WOE) assessment of the potential air quality and public health impacts associated with the development, construction, and operation of data centers in Virginia.
b. Develop findings and recommendations on potential improvements to:
(1) Data center permitting;
(2) Reporting;
(3) Enforcement;
(4) Emissions controls; and
(5) Public disclosure (potential improvements) based on the assessment.
c. Use a transparent, scientifically defensible WOE framework to determine:
(1) What conclusions are supported by the available evidence;
(2) The degree of uncertainty associated with those conclusions; and
(3) Which material questions remain unresolved.
2. Assessment Requirements – Develop an assessment that can:
a. Systematically identify, evaluate, and synthesize all relevant available emissions inventories, facility-specific emissions data, ambient air quality measurements, technical analyses, atmospheric modeling results, epidemiological studies, exposure assessments, and other scientific or regulatory studies that may inform an understanding of data center-related impacts and potential improvements.
b. Distinguish between impacts directly attributable to data center operations, including backup generation, and impacts associated with supporting infrastructure and activities, including electricity generation, transmission and distribution infrastructure, backup power generation, fuel storage and handling, construction, and associated transportation; and should:
(1) Evaluate both local and regional impacts, including potential effects on criteria pollutants, greenhouse gases, air toxics and hazardous air pollutants, secondary pollutant formation, population exposure, and health risks.
c. Explicitly consider:
(1) The number, capacity, fuel type, expected operating hours, and geographic concentration of backup generators;
(2) Available measures to reduce emissions, protect public health, and improve transparency; and
(3) Measures to promote retrofit of Tier II gen-sets to Tier IV or equivalent emissions controls, battery storage, fuel cells, clean firm generation, non-diesel alternatives, and other feasible technologies that can meet reliability needs while reducing public-health, climate change, and environmental impacts from backup generation.
Note:
The assessment shall not presume that data centers either cause or do not cause significant adverse health impacts.
The conclusions and recommendations from the assessment should be based on the strength, consistency, relevance, and limitations of the evidence.
3. Compilation and Characterization of Available Information:
a. Develop a comprehensive inventory of available information sources relevant to data center emissions, air quality, exposure, and potential health impacts in Virginia and, where appropriate, other jurisdictions; sources should include, but not be limited to:
(1) Facility and Emissions Information: Permits, permit applications, emissions inventories, emissions statements, stack test results, continuous emissions monitoring data, engine certification and performance data, operating records, fuel-use records, emergency generator testing and maintenance schedules, and available information on actual and permitted emissions from backup generators and other combustion equipment.
(2) Electricity Generation and Grid-Related Emissions: Emissions associated with electricity demand attributable to data centers, including relevant power plants, dispatch patterns, marginal generation where supported by data, transmission constraints, and projected changes in the generation mix:
(a) The Contractor should distinguish average grid emissions from marginal or scenario-based estimates; and explain the relevance of each approach.
(3) Ambient Air Quality and Meteorological Data: U.S. Environmental Protection
Agency (EPA) Air Quality System (AQS) monitoring data, state and local monitoring networks, available specialized monitoring studies, meteorological observations, and other suitable measurements of nitrogen dioxide (NO2), ozone (O3), particulate matter (PM2.5 and PM10), sulfur dioxide (SO2), carbon monoxide (CO), air toxics, and other relevant pollutants.
(4) Emissions and Air Quality Modeling: Available CMAQ, CAMx, AERMOD, CALPUFF, or other relevant modeling studies, including regional photochemical modeling, near-source dispersion modeling, source-apportionment analyses, sensitivity simulations, and future-year projections.
(5) Health and Exposure Studies: Peer-reviewed epidemiological studies, toxicological studies, risk assessments, exposure assessments, literature reviews, and other research addressing pollutants associated with data center operations or supporting electricity generation.
(6) Planning and Development Information: Existing and proposed data center locations, facility size and operating characteristics, backup power capacity, generator counts and configurations, expected operating hours, planned electricity demand, construction activity, available and emerging alternate backup generation technologies (with a focus on low-carbon options), nearby sensitive receptors, population characteristics, and relevant land-use information.
(7) Legal, Regulatory and Technical Requirements/Guidance: Applicable federal and state air quality standards, emissions estimation methods, modeling guidance, health-based benchmarks, permitting requirements, public transparency measures, voluntary and mandatory backup generation retrofit measures, and relevant technical reports.
b. Identify the source, date, geographic coverage, temporal resolution, pollutant coverage, methods, and principal findings of each material dataset or study; and the Contractor should:
(1) Document data gaps, conflicting estimates, unavailable information, assumptions required to use the information, and any material restrictions on its interpretation.
c. Distinguish measured or otherwise documented emissions from permitted emissions, modeled emissions, and estimated emissions:
(1) Where estimates differ, the Contractor should investigate the reasons for the differences and assess the implications for the overall conclusions.
4. Consultation with Virginia Department of Health and Virginia Energy: Consult least three
(3) times (either jointly or separately) with the Virginia Department of Health (“VDH”) and Virginia Energy (“VE”) during the development of the assessment and the associated recommendations.
5. Evaluation of Study Quality, Reliability, and Applicability:
a. Establish and apply a consistent study-quality evaluation framework; and evaluate each material study, dataset, or analysis according to criteria appropriate to its purpose and methodology, including:
(1) Scientific Rigor and Transparency: Whether the methods, assumptions, inputs, analytical procedures, and limitations are clearly documented and sufficiently reproducible.
(2) Data Quality and Completeness: The representativeness, accuracy, precision, completeness, temporal coverage, spatial resolution, and quality-control procedures associated with the underlying data.
(3) Emissions Characterization: Whether emissions are based on actual measurements, facility-specific operating data, validated emissions factors, permitted limits, engineering estimates, or generalized assumptions, whether episodic and intermittent operations are addressed, and whether emissions are likely to be under or overestimated.
(4) Methodological Validity: Whether the analytical or modeling approach is appropriate for the question being evaluated, whether established guidance has been followed, and whether the method has been adequately tested or validated.
(5) Model Performance and Validation: For modeling studies, whether relevant performance metrics, observational comparisons, sensitivity analyses, uncertainty assessments, and independent quality-assurance procedures are reported.
(6) Spatial and temporal representativeness: Whether the study captures the locations, population groups, meteorological conditions, operating schedules, and averaging periods relevant to the potential impact being evaluated.
(7) Causal Attribution: Whether the study can distinguish data center-related effects from background pollution, other industrial sources, traffic, regional power generation, wildfire smoke, biogenic emissions, and other contributing sources.
(8) Health Relevance: Whether the pollutants, exposure pathways, population groups, health outcomes, and exposure durations evaluated are relevant to the health questions being addressed.
(9) Peer Review and Independent Verification: Whether the work has undergone peer review, regulatory review, independent technical review, or other verification, and whether any substantive criticisms or unresolved methodological issues have been addressed.
(10)Conflicts of Interest and Reproducibility: Whether funding sources, affiliations, potential conflicts, data accessibility, and the availability of methods or supporting materials are disclosed sufficiently to assess the independence and reproducibility of the work.
b. Rating System:
(1) Classify the quality and applicability of each major body of evidence using a clearly defined rating system, such as high, moderate, low, or indeterminate, with explicit criteria for each category; the ratings should reflect the fitness of the evidence for the particular question being evaluated, rather than treating publication status or the use of a particular modeling tool as sufficient proof of quality.
(2) Not assign a low-quality rating solely because a study reports an unfavorable result, nor a high-quality rating solely because a study reports no significant impact.; and should explain in the assessment, how:
(a) Study quality affects the weight assigned to each finding.
(b) Conflicting findings are reconciled.
6. Evaluation of Emissions, Air Quality, and Potential Health Impacts - evaluate the available evidence across the following analytical areas:
a. Direct emissions from data center operations: Assess emissions from backup generators, routine generator testing, other on-site combustion equipment, and relevant ancillary activities; and:
(1) Evaluate the implications of generator technology, fuel type, emissions controls, engine tier or certification, operating schedules, startup and transient conditions, simultaneous generator operation, and emergency events; and
(2) Distinguish permitted maximum emissions from realistic operating scenarios and from documented actual emissions.
b. Indirect emissions associated with electricity demand:
(1) Evaluate potential air quality effects from electricity generation attributable to data center demand;
(2) Where data permit, assess alternative approaches to attributing emissions, including average grid emissions, marginal generation, and dispatch- or scenario-based estimates; and
(3) Explain the limitations of each approach, including uncertainty in dispatch behavior, regional electricity flows, generation additions and retirements, and future grid conditions:
(a) The Contractor should avoid double counting emissions that are represented in both facility-related estimates and power-sector inventories.
c. Local and regional air quality:
(1) Assess evidence concerning potential changes in NO2, ozone, PM2.5, and other relevant pollutants;
(2) Consider primary emissions, secondary pollutant formation, atmospheric transport, chemical interactions, seasonal variation, meteorology, background concentrations, and cumulative contributions from other sources; and
(3) Evaluate near-facility impacts separately from regional impacts where the available methods permit.
d. Potential exposure and health effects:
(1) Review evidence concerning exposure pathways, pollutant concentrations, proximity to sources, population distribution, sensitive receptors, and relevant health-based benchmarks;
(2) Evaluate whether existing studies estimate ambient concentrations, personal exposure, population exposure, health risk, or observed health outcomes, and clearly distinguish among these measures; and
(3) Where appropriate, discuss potential health implications without representing modeled concentration changes as demonstrated health effects.
e. Cumulative and future impacts:
(1) Evaluate the combined influence of existing and proposed data centers, associated electricity demand, other industrial and mobile sources, and relevant regional emissions;
(2) Consider projected growth in data center capacity, changes in backup generation, electricity generation, emissions controls, and regulatory requirements; and
(3) Identify circumstances under which cumulative impacts may differ materially from assessments of individual facilities.
7. Weight-of-Evidence Synthesis and Uncertainty Assessment:
a. Integrate the available evidence in accordance with the WOE approach described above:
(1) Synthesis: The synthesis should consider reliability, consistency, coherence, biological and atmospheric plausibility, spatial and temporal relevance, and independent corroboration of the findings:
(a) The Contractor should distinguish between evidence that supports a conclusion, evidence that is inconsistent or inconclusive, and areas where evidence is insufficient to reach a reliable conclusion.
(2) WOE Analysis:
(a) The Contractor should:
(i) Develop a set of clearly stated assessment questions and conceptual pathways linking data center activities to emissions, ambient concentrations, exposure, and potential health outcomes.
(ii) Prepare evidence matrices summarizing the major findings, methods, quality ratings, limitations, and relevance of the available studies and datasets.
(iii)Where feasible, conduct or recommend sensitivity analyses and scenario comparisons to determine which assumptions or inputs most strongly influence the findings.
(iv)Identify conclusions that are robust across reasonable assumptions, conclusions that depend on specific assumptions, and questions that cannot currently be resolved.
(v) Explain the extent to which the available evidence supports conclusions about source contributions, concentration changes, exposure, health risk, or causal health effects, without treating these distinct types of evidence as interchangeable.
(vi)Not:
(vi.i) Treat a lack of monitoring data or a lack of published health as affirmative evidence that impacts are absent.
(vi.ii) Interpret (by itself) the presence of a pollutant, a modeled contribution, or an association in an epidemiological study, as proof that data centers caused a particular health outcome.
(b) The analysis should:
(i) Identify agreement and disagreement among emissions estimates, monitoring data, modeling results, and health studies, and evaluate plausible explanations for material discrepancies.
(ii) Characterize uncertainty arising from emissions inventories, generator operating assumptions, electricity attribution, model inputs and performance, atmospheric chemistry, background conditions, exposure estimates, and the transferability of health evidence to Virginia.
(iii) Distinguish quantitative uncertainty, such as the range of plausible emissions or concentration estimates, from qualitative uncertainty, such as gaps in scientific understanding or limitations in study design.
8. Development and Evaluation of a High-Resolution Virginia CMAQ or CAMx Modeling Platform:
a. As a principal recommendation of the WOE Assessment, evaluate the expected value of developing a high-resolution regional air quality modeling platform for Virginia using the Community Multiscale Air Quality (CMAQ) model or the Comprehensive Air Quality Model with Extensions (CAMx).
b. Design a platform to improve Virginia’s ability to evaluate:
(1) Local and regional air quality effects associated with existing and projected data center development;
(2) Electricity demand; and
(3) Other relevant emission sources.
9. Recommendations and Prioritization of Future Work: Based on the WOE findings, provide prioritized recommendations to improve Virginia’s technical understanding and management of potential data center-related air quality and health impacts, as well as recommendations on potential improvements to data center permitting, reporting, enforcement, emissions controls, and public disclosure; recommendations should:
a. Distinguish between actions that can be implemented using existing data, monitoring networks, emissions inventories, modeling platforms, and regulatory authorities, and those that require additional data collection, enhanced monitoring, targeted research, or new technical capabilities.
b. Identify the expected benefits, technical feasibility, resource requirements, and estimated implementation timeline for each action.
10. Deliverables - submit each of the following deliverables to the DEQ Project Manager for review by the specified due dates indicated below:
a. Work Plan and Assessment Protocol: Proposed assessment questions, literature and data search strategy, study-quality framework, WOE methodology, and quality-assurance procedures.
b. Data and Study Inventory: A searchable inventory of material datasets, studies, emissions estimates, modeling analyses, and health assessments, including source information, applicability, quality ratings, and limitations.
c. Technical Evidence and Quality Assessment: A report documenting emissions characterization, study-quality evaluations, model performance and validation where relevant, uncertainty, conflicting findings, and data gaps.
d. Draft WOE Assessment and Recommendations: An integrated evaluation of the evidence regarding direct emissions, electricity-related emissions, air quality, exposure, potential health impacts, cumulative and future conditions, and recommendations on potential improvements. (February 15, 2027).
e. Final WOE Assessment and Recommendations: A revised report incorporating DEQ comments, a summary of conclusions and their evidentiary strength, prioritized recommendations, and a proposed implementation roadmap. (March 1, 2027).
f. Supporting Materials: Evidence matrices, references, assumptions, data dictionaries, analytical files, scripts, figures, and other materials necessary for DEQ to reproduce the principal analyses, subject to applicable data-use, licensing, confidentiality, and security restrictions.
11. Quality Assurance, Technical Review, and Transparency:
a. Implement a quality-assurance and quality-control (QA/QC) plan throughout the project:
(1) The plan should include verification of data sources and calculations, review of assumptions and methods, version control, traceability of conclusions to support evidence, and independent technical review of material analyses.
b. Maintain a clear distinction between observed data, estimated emissions, modeled concentrations, inferred exposure, modeled health risks, and observed health outcomes; the Contractor should:
(1) Disclose all material limitations and ensure that conclusions are proportionate to the strength of the evidence.
(2) Describe all uncertainty transparently, rather than obscured by single-point estimates or unqualified statements.
Task 3 / Emissions Inventory Development – the Contractor should:
1. General Requirements: Utilize EPA 2022 base year inventory and projection year inventories for 2025 and 2030; the Contractor:
a. May propose alternative projection years based on available EPA data.
b. Should incorporate any adjustments for any individual sources and/or source categories, upon request by DEQ.
2. 2022 Base Year Emissions Inventories:
a. Use EPA’s 2022 base year, or a more recent year if available.
b. Not make any revisions to EPA’s base year emissions inventories, aside from incorporating Virginia-specific data center emissions.
3. Revisions to Projection Year Emissions Inventories:
a. Electricity Generating Unit (EGU) Point Source Emissions:
(1) As requested by DEQ, revise the mass emissions inventory to incorporate revisions associated with changes in emissions due to permitting of new units, retirements, control enhancements, and/or fuel switches; the Contractor should:
(a) Follow instructions for updating the EGU inventory provided by DEQ.
(b) The Contractor shall document all revisions to the projection year inventory.
b. Non-EGU Point Source Emissions, Including Data Centers:
(1) As requested by DEQ, revise the mass emissions inventory to incorporate revisions associated with changes in emissions due to permitting of new units, retirements, control enhancements, and/or fuel switches.
(2) Document all revisions to the projection year inventory.
c. Emissions for Other Categories:
(1) Unless otherwise requested by DEQ, utilize EPA’s emissions projections for other categories including but not limited to the following:
(a) On-road mobile source emissions;
(b) Non-road mobile source emissions;
(c) Marine, aircraft, and rail (MAR) mobile source emissions;
(d) Fire emissions;
(e) Area source emissions;
(f) Biogenics; and
(g) International emissions.
(2) Upon completing the compilation of emissions for other categories, prepare the emissions data for processing.
4. Emission Summaries and Quality Assurance:
a. Category Requirements: Upon completion of updates to emissions as agreed upon by the Contractor and DEQ, submit:
(1) 2022 and projection year summaries in Excel format for the:
(a) EGU;
(b) Non-EGU point;
(c) Area;
(d) On-road;
(e) Non-road; and
(f) MAR source categories.
(2) A separate summary specifically for Virginia data centers.
b. Summary Requirements:
(1) Stationary EGU and Non-EGU Point Sources.
(2) Submit the summaries by facility, emissions unit, process, and release point identifiers and source classification code (SCC); the summaries should:
(a) Compare annual NOX, volatile organic compound (VOC), PM2.5-PRI, PM10-PRI, and SO2 emissions between the two inventories.
(b) Be compiled in an Excel file.
(3) Area, On-Road, Non-Road, and MAR Categories: Submit the summaries for Virginia by county, SCC, and pollutant.
c. Quality Assurance: Conduct and document quality assurance review and ensure that all of the revisions to the projection year emissions are performed correctly.
Task 4 / Air Quality Modeling – the Contractor should:
1. General Requirements:
a. Develop and submit a modeling protocol to the DEQ Project Manager within sixty
(60) days of the effective date of the contract , that documents the overall approach to the emissions and air quality modeling that will be conducted; the Contractor:
(1) May references where applicable to EPA documentation and protocols.
(2) Should:
(a) Implement the methodologies and techniques described in the modeling protocol as approved to guide the evaluations for all modeling.
(b) Use 2022 WRF meteorology generated by the EPA.
b. Obtain prior written approval of the modeling domains from the DEQ Project Manager.
2. Modeling Protocol Requirements:
a. Modeling Domains:
(1) Continental United States 12-Kilometer Domain (“CONUS_12” that is identical to EPA’s “12US2”):
(a) The Contractor should use the larger CONUS_12 modeling domain for primary air quality modeling.
(2) Reduced 12-kilometer Domain (“Virginia_12”):
(a) The Contractor may recommend a smaller 12-kilometer domain for source apportionment tagging or other technical reasons.
b. Modeling Protocol Components – the modeling protocol should include, but not be limited to all of the following, as applicable:
(1) The technical approach, including methodologies and techniques for thoroughly and efficiently evaluating emissions and air quality model output data, performance thresholds and metrics including but not limited to EPA’s most current guidance on the use of models and other analyses for demonstrating attainment of air quality standards, and recommended model configuration;
(2) The emissions processing methodology and data sources that will be used;
(3) Gridding plans (e.g., temperatures used for biogenic, gridding surrogates, and speciation profiles);
(4) Vegetation and land use data;
(5) Development of initial and boundary conditions;
(6) Chemistry parameters and chemical mechanisms;
(7) Vertical diffusivities;
(8) Computer resources;
(9) Project schedule;
(10)Quality assurance procedures for each of the modeling tasks, including accountability for correcting errors found through review and quality assurance activities; and
(11)An observational dataset to be used for model performance evaluation and additional analyses.
3. 2022 Base Year Air Quality Modeling:
a. Use the EPA 2022 modeling platform as the starting point for this analysis.
b. Benchmark the air quality model with the CONUS_12 domain using the latest version of selected model and compare the results to available EPA data, where applicable.
4. Projection Year Air Quality Modeling:
a. Run the selected air quality model using the DEQ-approved projection year air quality modeling platform.
b. Replicate any smaller domain results with the EPA CONUS platform, as applicable, to support source apportionment tagging.
Task 5 / Regridding of Emissions and Meteorological Data for High-Resolution Air Quality Modeling – the Contractor should:
1. General Requirements:
a. Evaluate, develop, process, and quality assure the emissions and meteorological input datasets necessary to:
(1) Support high-resolution air quality modeling using CMAQ and/or CAMx, toinclude the appropriate spatial transformation of existing:
(a) 12-km (or other domain as approved by DEQ) emissions inventories processed through the Sparse Matrix Operator Kernel Emissions (SMOKE) modeling system; and
(b) 12-km (or other domain as approved by DEQ) meteorological fields generated by the Weather Research and Forecasting (WRF) model to the designated 4-km and 1.33-km modeling grids.
(2) Produce internally consistent, spatially resolved emissions and meteorological datasets suitable for evaluating air quality impacts at finer spatial scales, including the characterization of local emission sources, urban and suburban concentration gradients, and potential air quality impacts associated with data centers (e.g., “Data Center Alley”) and other localized emission activities.
b. Ensure that all regridding procedures:
(1) Preserve the integrity of the original datasets to the greatest extent practicable;
(2) Are technically appropriate for the intended air quality modeling application; and
(3) Do not consist solely of uniform interpolation or proportional subdivision of 12-km (or other domain as approved by DEQ) grid-cell emissions.
2. Emissions Processing and Regridding:
a. Evaluate the existing 12-km (or other domain as approved by DEQ) SMOKE emissions outputs and determine the appropriate methods for preparing emissions inputs for the 4-km and 1.33-km modeling domains:
(1) Processing should account for the spatial allocation of emissions, temporal profiles, chemical speciation, source categories, and other relevant characteristics of the original inventory.
b. Employ appropriate spatial allocation methods, including available source-specific geographic information, point-source locations and characteristics, area-source surrogates, roadway networks, population and land-use data, and other relevant spatial surrogates, as appropriate to the emissions sector and inventory:
(1) Where higher-resolution spatial allocation data are unavailable, the Contractor should document the assumptions and limitations associated with distributing emissions from the 12-km (or other domain as approved by DEQ) grid to the finer-resolution grids.
c. Preserve, as applicable, pollutant definitions, units, chemical mechanism compatibility, temporal allocation, vertical allocation, and source-sector identification; the Contractor should:
(1) Ensure that point-source emissions retain their geographic locations and associated stack parameters, subject to the requirements of the selected air quality model and emissions-processing system.
(2) Evaluate biogenic emissions and other meteorology-dependent emissions for consistency with the meteorological fields and processing approach used for the high-resolution modeling domains.
d. Assess whether the existing 12-km (or other domain as approved by DEQ) SMOKE outputs contain sufficient spatial information to support the intended 4-km and 1.33-km applications:
(1) Where appropriate, the Contractor should recommend and implement additional emissions processing using higher-resolution spatial surrogates, source-level inventory data, or other suitable methods rather than relying exclusively on redistribution of existing 12-km (or other domain as approved by DEQ) grid-cell totals.
3. Meteorological Data Processing and Regridding:
a. Evaluate the existing 12-km (or other domain as approved by DEQ) WRF meteorological outputs and determine the appropriate approach for developing meteorological inputs for the 4-km and 1.33-km CMAQ and/or CAMx simulations.
b. Assess whether the existing 12-km (or other domain as approved by DEQ) WRF fields can be appropriately processed for the finer-resolution domains or whether additional WRF simulations, including nested or one (1)-way nested simulations at 4-km and 1.33-km resolution, are necessary to adequately resolve local meteorological conditions:
(1) The Contractor’s assessment should consider the limitations of spatial interpolation of meteorological fields, particularly for complex terrain, coastal environments, urban areas, land-water interfaces, and locations influenced by localized circulations or other mesoscale processes.
c. Where existing WRF fields are regridded, use appropriate spatial interpolation and meteorological preprocessing procedures consistent with the selected air quality modeling system:
(1) The Contractor should ensure that the resulting fields meet the input requirements of the applicable CMAQ or CAMx meteorological processor, including appropriate treatment of horizontal and vertical coordinates, map projections, grid definitions, terrain, land-use characteristics, vertical layers, time steps, and meteorological variables.
d. Clearly distinguish between spatial interpolation of existing 12-km (or other domain as approved by DEQ) meteorological fields and the generation of new high-resolution meteorological simulations:
(1) The Contractor should not represent interpolated 12-km (or other domain as approved by DEQ) meteorology as equivalent to meteorological conditions dynamically simulated at 4-km or 1.33-km resolution.
4. Grid Configuration and Model Compatibility:
a. Establish and document the horizontal grid definitions for the 12-km (or other domain as approved by DEQ), 4-km, and 1.33-km domains, including map projection, grid origin, grid cell dimensions, domain boundaries, and horizontal grid cell counts:
(1) The Contractor should configure the finer-resolution domains to maintain appropriate spatial alignment and coverage relative to the parent domain and the intended modeling study area.
b. Ensure that the emissions and meteorological datasets are spatially and temporally compatible and meet the requirements of the selected CMAQ or CAMx modeling configuration, to include: verification of compatible domain definitions, simulation periods, time zones and time conventions, vertical-layer structures, chemical mechanisms, emissions species, and file formats.
5. Quality Assurance and Quality Control:
a. Implement a quality assurance and quality control (QA/QC) program that:
(1) Verifies the accuracy, completeness, and suitability of the regridded datasets; and that at a minimum, includes the following QA activities:
(a) Verification of grid definitions, map projections, domain coverage, and spatial alignment;
(b) Evaluation of emissions totals before and after spatial processing, by pollutant, source category, and relevant time period, with explanations for any differences;
(c) Identification of missing, invalid, or anomalous emissions values and meteorological fields;
(d) Verification of temporal coverage, time-step consistency, vertical-layer compatibility, and required input variables;
(e) Evaluation of the spatial distribution of emissions to identify artifacts associated with regridding or allocation procedures;
(f) Review of meteorological fields for interpolation artifacts, unrealistic gradients, discontinuities, and other potential deficiencies; and
(g) Confirmation that the processed files satisfy the input requirements of the applicable CMAQ or CAMx preprocessing and modeling systems.
(2) Can be justified on technical grounds and prioritizes the production of scientifically defensible, internally consistent, and reproducible inputs suitable for required high-resolution air quality modeling.
b. Document all material assumptions, limitations, interpolation procedures, spatial surrogates, software versions, configuration settings, and corrective actions:
(1) The Contractor should evaluate emissions mass conservation where applicable, recognizing that differences may arise from changes in domain coverage, spatial allocation, source treatment, or emissions processing methodology.
6. Deliverables – provide the following deliverables:
a. Technical Approach Memorandum: Description of the proposed emissions and meteorological regridding methodologies, including an assessment of whether additional high-resolution emissions processing or WRF simulations are necessary.
b. Regridded Emissions Datasets: Quality-assured emissions inputs suitable for the 4-km and 1.33-km CMAQ and/or CAMx modeling domains, including associated processing configuration files and documentation.
c. Meteorological Datasets: Processed meteorological inputs suitable for the designated modeling domains, together with documentation identifying whether the inputs were spatially interpolated from existing 12-km (or other domain as approved by…