Addendum No. 1.pdf

PDF 314 KB Posted

Attached to
RFP #: 27-02-CP / Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study
Solicitation number
RFP-131166
Issued by
Virginia

About this file

Summary of Addendum No. 1 to RFP 27-02-CP

This addendum to the Virginia Department of Environmental Quality's Request for Proposal 27-02-CP clarifies and supplements requirements for a Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study. The contractor will conduct a comprehensive Weight-of-Evidence (WOE) assessment evaluating the cumulative effects of data center backup generator emissions on air quality in Virginia, develop emissions inventories incorporating data center-specific information, perform high-resolution air quality modeling using CMAQ/CAMx platforms, conduct source apportionment and future-year projections, and develop a technical website for data sharing. The Draft WOE is due February 15, 2027, with the Final WOE due March 1, 2027; all remaining tasks must be completed by December 31, 2027. DEQ anticipates contract award by December 23, 2026, and contract execution by January 8, 2027. The initial contract term is one year with four optional one-year renewals for ancillary services. The contract value exceeds $100,000. Contractors may begin Task 2 activities immediately following contract execution without waiting for formal Work Plan approval to meet the aggressive Executive Order 22 deadline of March 17, 2027.

The RFP requires fixed-price pricing for Tasks 1-9 submitted on Attachment F with fully-loaded hourly rates for job classifications including Principal, Project Manager, Environmental Data Analyst, QC Reviewer, Study Developer, and other project team members. Offerors must include separate fixed-price proposals for plume-in-grid modeling (optional) and in-person meeting attendance (at DEQ's discretion). No set-aside restrictions apply to this procurement. The Small Business Subcontracting Plan represents 20 points of the 100-point evaluation criteria; DSBSD-certified small business prime contractors receive maximum points, while other businesses receive credit up to 75 percent of available points based on their proposed subcontracting expenditures with certified small businesses. The Commonwealth's statewide goal is that 42 percent of purchases be made from DSBSD-certified small businesses. All subcontractors must hold DSBSD certification by the December 3, 2026 proposal due date. DEQ will provide available facility-level data center information, emissions inventory data, permitting records, and air monitoring data; the contractor is responsible for identifying data gaps, obtaining supplemental information from other sources, and compiling the Virginia-specific data center emissions inventory. All documents, reports, and deliverables become property of DEQ; contractors may request written approval to publish peer-reviewed articles or conference presentations subject to DEQ's prior review and 30-day advance notice.

View the file

Other files

File Type Posted
RFP 27-02-CP - ATTACHMENT F - PRICE SCHEDULE - ADDENDUM NO. 1.xlsx XLSX spreadsheet
RFP 27-02-CP.pdf PDF
RFP 27-02-CP- ATTACHMENT F - PRICE SCHEDULE.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Commonwealth of Virginia

VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

www.deq.virginia.gov

David L. Bulova Michael S. Rolband, PE, PWD, PWS Emeritus Secretary of Natural and Historic Resources Director

Addendum No. 1

RFP #: 27-02-CP

ADDENDUM NO. 1 TO ALL OFFERORS:

Reference – Request for Proposal: RFP #: 27-02-CP Commodity: Backup-Generation Cumulative Impact Analysis and Emissions Reductions Study Dated: April 27, 2026

For Delivery To: Department of Environmental Quality Proposal Due: December 3, 2026 @ 2:00 PM Est.

General Questions:

Q.1. Can DEQ share an anticipated budget range for the ixed-price study (Tasks 1–9), excluding optional ancillary services?

A.1 Requests for sealed proposals, such as this RFP, re lect a contract value that exceeds $100,000.

Q.2. When does DEQ expect the contract to start? May the consultant begin Task 2 (WOE) before the work plan is of icially approved, given the fast turnaround for the Draft WOE?

A.2. DEQ agrees that work should commence as soon as practicable following contract execution and that initiation of certain activities should not be delayed pending formal approval of the Work Plan. Accordingly, the Contractor may begin work on Task 2 (Weight of Evidence Analysis) prior to formal Work Plan approval, in coordination with DEQ and subject to the requirements of the executed contract.

Q.3. The draft WOE is due February 15th and inal is due March 1st, 2027. How long will DEQ take in its review given the 14-day timeline between draft and final WOE assessments?

A.3. DEQ anticipates conducting an expedited review of the Draft WOE submitted on February

15, 2027, to accommodate the required March 1, 2027, deadline for the Final WOE. DEQ intends to provide consolidated comments and feedback to the Contractor as soon as practicable following receipt of the Draft WOE, with the goal of completing its review within approximately ive (5) business days. The Contractor should plan to incorporate

DEQ's comments and address any necessary revisions within the remaining period prior to submission of the Final WOE. The Contractor should also coordinate closely with DEQ throughout the review process to identify and resolve substantive issues as early as possible and maintain the established schedule.

Addendum No. 1

RFP #: 27-02-CP

Q.4. For schedule purposes, can VADEQ clarify as to when an award will be made and planned contract execution?

A.4. DEQ anticipates making the contract award on or before December 23, 2026, with contract execution expected to occur on or before January 8, 2027. These dates represent

DEQ's current anticipated procurement schedule and are subject to completion of the applicable procurement and contract approval processes.

Q.5. Interplay of contract effective date and EO22's ixed deadlines. The WOE deliverables have ixed calendar deadlines (draft February 15, 2027; inal March 1, 2027) tied to EO22's 180-day statutory clock (March 17, 2027), while other requirements are keyed to "days after the effective date of the contract" (e.g., draft work plan due 14 days after effective date; modeling protocol due 60 days after effective date). Given the RFP issue date and proposal evaluation/negotiation timeline, can DEQ con irm the anticipated contract effective/award date?

A.5. DEQ anticipates making the contract award on or before December 23, 2026, with contract execution and an anticipated effective date on or before January 8, 2027. These dates represent DEQ's current anticipated procurement schedule and are subject to completion of the applicable procurement and contract approval processes.

DEQ recognizes that the WOE deliverable deadlines are ixed calendar dates established to support the requirements of Executive Order 22, including the submission of the Draft

WOE by February 15, 2027, and the Final WOE by March 1, 2027, ahead of the March 17, 2027, deadline. These deliverable dates are not intended to shift based on the contract effective date.

To accommodate these deadlines, DEQ anticipates authorizing the Contractor to begin work on Task 2 (Weight of Evidence Analysis) immediately following contract execution, without waiting for formal approval of the overall Work Plan. The Contractor should therefore plan to initiate Task 2 activities as soon as the contract becomes effective and coordinate closely with DEQ regarding available background information, documentation, and technical resources needed to support the WOE assessment.

Other contract requirements that are tied to the effective date of the contract, including submission of the Draft Work Plan within 14 days and the Modeling Protocol within 60 days, should retain their respective contract-relative schedules. The Contractor should account for both the ixed EO22 deliverable deadlines and the contract-relative milestones when developing its proposed project schedule.

DEQ intends to work closely with the Contractor to facilitate timely initiation of activities, provide consolidated feedback, and maintain the accelerated schedule necessary to meet the EO22 reporting requirements.

Reference Section III, ”BACKGROUND”:

Q.1. pg 3: What role will the bidder have in helping to submit “ indings and recommendations to the Office of the Governor” and will this be the WOE?

A.1. The Contractor's primary responsibility under this contract will be to conduct the Weight of Evidence (WOE) assessment and develop the associated technical indings and recommendations to inform DEQ's response to Executive Order 22. The WOE will represent an important component of the information and technical basis used by DEQ in developing its indings and recommendations for presentation to the Secretary of Natural and Historic Resources and ultimately the Of ice of the Governor. However, the WOE itself should not be considered the entirety of the DEQ’s response or formal submission under

EO22.

DEQ may request that the Contractor support the presentation and discussion of the WOE indings and recommendations with senior Commonwealth leadership. The format, timing, participants, and extent of the Contractor's involvement in these brie ings have not yet been determined and will depend on the Commonwealth's internal coordination and direction as the EO22 process moves forward.

DEQ will retain responsibility for coordinating the overall EO22 response and determining how the WOE indings and recommendations are incorporated into the information and recommendations ultimately presented to the Secretary and the Governor.

Q.2. Regarding a potential meeting with VADEQ and the Secretary, is that to be assumed in-person or virtual?

A.2. Please refer to Section IV.B., “General Requirements” below.

Refer to the additions below to Section IV.B., “General Requirements.”

Reference Section IV, ”STATEMENT OF NEEDS”:

Subsection “A.5.d” - “Definitions” / “Contractor’s Project Team: – is revised as follows:

“d. Other Project Team Members (e.g., including data analysts, study developers and any SME with relevant project experience).”

Subsection “B” - “General Requirements”:

Q.1. (General, no pg number): Should the CMAQ/CAMx modeling account for out-of-state pollutants and cross-boundary transport? If so, does DEQ have these emission inventories already compiled or will this be the job of the consultant?

A.1. Yes. The CMAQ/CAMx modeling should account for out-of-state emissions and cross-boundary pollutant transport, as these emissions can have a signi icant in luence on air quality within the Commonwealth. Accounting for emissions from surrounding states and other upwind areas is essential to accurately characterize regional background concentrations, assess the cumulative impacts of multiple emission sources, and distinguish the contribution of Virginia-based sources, including data centers, from impacts associated with transported pollution.

The Contractor should be responsible for identifying, obtaining, compiling, and processing the necessary out-of-state emissions inventories for use in the modeling.

Q.2. Main Concern: Findings and recommendations of the Contractor’s report could be misrepresented thereby damaging the reputation of the Contractor. Some of the clauses in the RFP would prohibit the Contractor to correct any misrepresentation with the factual contents of their report to correct any misrepresentation.

A.2. DEQ recognizes the importance of preserving the integrity, independence, and scienti ic defensibility of the Contractor’s technical work.

DEQ will not require, direct, or otherwise compel the Contractor to alter, omit, or misrepresent factual indings, technical analyses, modeling results, or professional conclusions presented in any report or deliverable prepared under this contract. The

Contractor shall retain responsibility for the accuracy, scienti ic integrity, and professional defensibility of its work.

DEQ may review deliverables and provide comments or request revisions to address factual errors, methodological concerns, technical de iciencies, clarity, or consistency with the contract requirements. However, any requested revisions will not require the

Contractor to change or suppress indings or conclusions that are supported by the

Contractor's analyses and professional judgment. If the Contractor disagrees with a requested revision on scienti ic or technical grounds, the Contractor shall provide a written explanation to DEQ identifying the technical basis for its position, including supporting analyses and documentation. DEQ will work with the Contractor in good faith to resolve such disagreements. DEQ retains authority over its of icial reports, policy positions, and recommendations; however, the Contractor's underlying factual indings and independent technical conclusions will not be misrepresented or attributed to the

Contractor in a manner that does not accurately re lect its work.

DEQ retains its authority to develop and communicate its own policy positions and recommendations based on the Contractor’s work and other relevant information. DEQ will distinguish its agency policy positions, recommendations, and conclusions from the

Contractor’s independent technical indings, analyses, and professional conclusions. DEQ will not attribute modi ied technical conclusions or interpretations to the Contractor without the Contractor’s approval if those modi ications materially change or are inconsistent with the Contractor’s original indings or professional conclusions.

If DEQ or another party publicly presents, summarizes, or otherwise characterizes the

Contractor's indings or conclusions in a manner that materially misrepresents the factual contents or technical conclusions of the Contractor's work, the Contractor may identify the misrepresentation and provide a written clari ication or correction of the factual record to DEQ. DEQ will not unreasonably restrict the Contractor from providing such clari ication, subject to applicable laws, con identiality requirements, and restrictions governing the disclosure of Commonwealth information.

Q.3 PiG (plume-in-grid) modeling cost treatment. Section IV.B.2.b(1) makes PiG modeling optional "at the Contractor's discretion," but Tab 6 (Price) states that if an Offeror "proposes" to evaluate PiG modeling, that cost must be included in the Total Fixed Price.

Does the state intend that PiG, if used, must be specified at time of proposal?

A.3. PiG modeling is optional and its appropriateness should be determined based on the Contractor's technical recommendation, in consultation with DEQ. Offerors shall identify the total fixed price for PiG modeling in accordance with “ATTACHMENT F – PRICE SCHEDULE – ADDENDUM NO. 1”. The Contractor's recommendation regarding whether PiG modeling is warranted should be made during the project based on the technical needs of the modeling assessment and in coordination with DEQ. The Contractor should obtain prior approval to perform PiG modeling from the DEQ Project Manager.

The following is added to Section IV.B, “General Requirements”:

“6. As requested by DEQ, participate in at least one (1) virtual meeting or brie ing with the

Secretary of Natural and Historic Resources and/or the Of ice of the Governor to present and discuss the WOE indings, conclusions, and recommendations.

7. Provide technical support, as requested by DEQ, to assist in communicating the WOE findings and recommendations and responding to questions related to the assessment.”

Subsection “C” - “Task 2 / WOE Assessment of Data Center Emissions, Air Quality Impacts, and Potential Improvements”:

Q.1. Pg 8, 3a: Bidders are requested to "Develop a comprehensive inventory of available information sources relevant to data center emissions, air quality, exposure, and potential health impacts in Virginia and, where appropriate, other jurisdictions" - When is it appropriate to consider other jurisdictions? Is the bidder responsible for de ining this criteria, or does DEQ have guidance?

A.1. DEQ does not intend to prescribe speci ic criteria for determining which studies or information sources from other jurisdictions should be included. The Contractor should use its professional judgment to identify and evaluate studies from other jurisdictions that may have indings, methodologies, or technical information that are transferable or otherwise relevant to assessing data center-related emissions, air quality, exposure, and potential health impacts in Virginia. The Contractor should consider the applicability of these studies to Virginia-speci ic conditions and appropriately weigh the information based on its technical quality, scienti ic defensibility, relevance, and usefulness to the assessment. The rationale for including and weighting studies from other jurisdictions should be documented as part of the Contractor’s WOE analysis.

Q.2. What data sources will VADEQ be providing for the Weight-Of-Evidence study, such as lists and details of current and planned data centers, as well as equipment housed? Would you expect the contractor to obtain that information?

A.2. Refer to Section IV.H.,“DEQ Project Responsibilities.” The Contractor should be responsible for reviewing and evaluating the information provided, identifying additional data gaps and relevant information needs, and obtaining supplemental information from other appropriate sources as necessary to complete the WOE assessment.

Subsection “C” - “Task 3 / Emissions Inventory Development”:

Q.1. Existing data center inventory. Section III and Task 3 reference "Virginia-speci ic data center emissions" to be incorporated into the EPA 2022 base year inventory. Does DEQ already possess a facility-level data center emissions/backup-generator inventory (permits, generator counts, fuel types) that will be provided to the Contractor, or is compiling that inventory part of the Contractor's scope under Task 3?

A.1. Refer to Section IV.H.,“DEQ Project Responsibilities.” The Contractor should be responsible for reviewing and evaluating the information provided, identifying data gaps, and compiling and developing the necessary Virginia-specific data center emissions inventory for incorporation into the EPA 2022 base year inventory under Task 3.

Subsection “C” - “Task 5 / Regridding of Emissions and Meteorological Data for High- Resolution Air Quality Modeling”:

Q.1. pg 18: Does DEQ intend for the bidder to complete new WRF runs for this modeling?

A.1. DEQ does not speci ically require the Contractor to perform new ine-scale WRF meteorological modeling at 4-km resolution or iner. The need for additional WRF modeling should be determined at the Contractor's discretion based on its assessment of the technical requirements and potential bene its to the modeling analysis. The Contractor may also utilize available tools and modeling approaches, such as CAMx lexi-nesting, to nest existing 12-km WRF meteorological ields to iner resolutions. The Contractor should recommend an approach that provides an appropriate balance of technical rigor, model performance, and computational ef iciency to support the objectives of the project.

Q.2. pg 18: How many future years and scenarios should the bidder budget for in its modeling?

A.2. The selection of projection years should be based on the availability and quality of baseline emissions and meteorological data, the anticipated timing and pace of data center development in Virginia, and the ability to develop technically defensible future-year emissions scenarios. The near-term projection year (2025 or 2026) should re lect the most representative current or near-current conditions for which suf icient emissions and supporting data are available. The longer-term projection year should generally represent a period approximately ive (5) to 10 years beyond the near-term projection year and should account for reasonably anticipated data center development, changes in backup generation capacity and operation, projected emissions from other signi icant source sectors, and other relevant changes in regional emissions.

The Contractor should recommend the speci ic projection years, and associated emissions scenarios based on these criteria, including consideration of consistency with available

EPA emissions inventories and other applicable modeling platforms. The selected years and scenarios should provide a meaningful assessment of both near-term and longer-term potential data center contributions to air quality while maintaining scienti ic defensibility and consistency with established air quality modeling practices. (Also refer to Section

IV.H.,“DEQ Project Responsibilities”.)

Q.3. pg 18: Should the modeling contain sensitivities, such as high data center growth or low data center growth?

A.3. Yes. The Contractor should recommend and evaluate appropriate sensitivity scenarios to assess the potential range of air quality impacts associated with data center development and operations in Virginia. These sensitivities should consider variations in anticipated data center growth, including high-growth and low-growth scenarios, as well as other relevant assumptions that could in luence emissions and air quality impacts. Examples may include differences in the number, size, and location of data centers; the number and capacity of backup generators; generator operating hours and frequency of testing; fuel types and emissions characteristics; and the extent to which backup generators may operate during grid emergencies or other extended operating scenarios. The Contractor should also consider sensitivities associated with emissions controls, projected operating practices, and the timing of anticipated data center development. The Contractor should recommend a reasonable set of sensitivity scenarios based on available information and the technical objectives of the modeling assessment. (Also refer to Section IV.H.,“DEQ

Project Responsibilities”.)

Subsection “C” - “Task 8 / Future Year Model Projections”:

Q.1. Pg 29, 2b: Bidders are requested to "Develop and document future-year emissions projections for, at a minimum, the following categories where relevant to the study area" - How is relevance to the study area de ined? Is the bidder responsible for de ining this criteria, or does DEQ have guidance?

A.1. The primary study area is the Commonwealth of Virginia; however, the Contractor’s assessment should also account for emissions from upwind sources outside of Virginia that may contribute to air quality impacts within the Commonwealth through regional transport. The Contractor should use its professional judgment and technical expertise to determine which emissions source categories are relevant to the study area, considering their potential contributions to ambient concentrations of NO2, PM2.5, and ozone, as well as their signi icance to the overall modeling assessment. The Contractor should coordinate this determination with the DEQ Project Manager.

In developing future-year emissions projections, the Contractor should consider applicable EPA guidance and documentation requirements for emissions inventories (e.g., 40 CFR Part 51, Subpart A, and EPA's Emissions Inventory Guidance), including appropriate documentation of emissions sources, projection methodologies, assumptions, growth factors, and control measures. The Contractor should document the rationale for including or excluding relevant source categories and geographic areas to ensure that the emissions projections are comprehensive, transparent, and technically defensible.

Subsection “C” - “Task 9 / Data Handling and Sharing”:

Q.1. Technical website. Task 9 requires a technical website maintained by the Contractor with transferability to DEQ "prior to expiration of the timeframe within which the Contractor maintains the website." Does this imply that the contractor is responsible for costs for hosting this website prior to transfer to DEQ?

A.1. Yes. The Contractor should be responsible for the costs associated with developing, hosting, and maintaining the technical website for the duration of the Contractor's responsibility under Task 9, through its eventual transfer to DEQ. Offerors shall include the anticipated website development, hosting, maintenance, and associated costs in

“ATTACHMENT F – PRICE SCHEDULE – ADDENDUM NO. 1.” Task 9.1 is revised as follows:

“1. Website Development:

a. Should develop, host and maintain a technical website for access by DEQ and stakeholders that will serve as the primary means for making available substantial emissions and air quality modeling results, summaries, and other documentation; and should:

(1) Incorporate a logical set of tools that will allow access to any of the graphical and statistical analyses generated throughout this project.

(2) Be structured:

(a) And organized in a way that enables DEQ to acquire all iles; and, in the sole discretion of DEQ, to duplicate the site on DEQ’s own platform.

(b) Using compatible design and platform techniques that enable a simple transfer of its contents to the DEQ website or another host site, prior to expiration of the timeframe within which the Contractor maintains the website.

b. Develop routines to place model outputs on the web site after each run is complete, that enable DEQ to review the results and notify the DEQ Project

Manager when required information has been posted.

c. Obtain prior approval from the DEQ Project Manager, for all material posted to the website.

d. Coordinate the transition the technical website to DEQ, upon request by

DEQ, to include providing all of the necessary iles, documentation, and administrative credentials to facilitate the transition to DEQ,

e. Maintain the technical website, to include ensuring full functionality and accessibility until the transition of the website to DEQ is complete.

Subsection “E” - “Ownership”:

Q.1. RFP Section IV.E (p. 36): All documents become property of DEQ and Contractor has no rights unless speci ied by DEQ in writing to any such documentation.

A.1. Yes. All documents, reports, data, analyses, modeling results, supporting materials, and other deliverables developed or produced by the Contractor under this contract shall become the property of DEQ, consistent with the requirements of Section IV.E of the RFP.

The Contractor shall have no rights to use, reproduce, distribute, or publish such materials without prior written authorization from VADEQ, except as otherwise permitted under the contract or applicable law.

Q.1.a. Will the DEQ make the Contractors report publicly available?

A.1.a: Executive Order 22 requires DEQ to report to the Office of the Governor, and DEQ may include the Contractor's final report as part of that submission. DEQ anticipates evaluating the Contractor's final report upon receipt and expects that any public release of the report or associated materials will be handled in a manner consistent with the Virginia Freedom of Information Act (VFOIA), Virginia Code § 2.2-3700 et seq. The availability of the report and associated materials will be subject to applicable disclosure requirements and any exemptions provided by law.

Q.1.b. Given the RFP’s requirements for transparency, scientific defensibility and reproducibility, will the DEQ permit the contractor to prepare and submit peer-reviewed journal articles or conference papers describing the methods, modeling results, uncertainties and technical conclusions developed under the contract? If so, would DEQ grant the contractor a non-exclusive right to use project data, analyses, methods, figures and results for scientific publication and professional presentation, subject to appropriate protection of confidential or restricted information?

A.1.b: Consistent with the conditions outlined below, DEQ may permit the Contractor to prepare and submit peer-reviewed journal articles, technical papers, conference presentations, and other professional publications describing the methodologies, modeling approaches, analyses, results, uncertainties, and technical conclusions developed under this contract.

Subject to DEQ's prior written approval, the Contractor may use material developed under the contract for scientific publications and professional presentations. subject to the conditions outlined below.

1) Prior Review and Approval: The Contractor shall submit proposed publications and presentations to VADEQ for review and written approval at least 30 calendar days prior to submission or public presentation.

2) Confidentiality and Restricted Information: The Contractor shall not disclose confidential, proprietary, security-sensitive, or otherwise restricted information in any publication or presentation. Any information subject to applicable disclosure restrictions shall be removed or appropriately protected.

3) Ownership of Deliverables: All project deliverables shall remain the property of DEQ in accordance with the ownership provisions of this contract.

The publication rights granted herein do not transfer ownership of project deliverables or grant the Contractor any ownership interest in Commonwealth materials.

4) Acknowledgment and Attribution: Publications and presentations shall acknowledge DEQ's sponsorship of the work and clearly identify the publications as the Contractor's scientific or professional work rather than official DEQ policy positions or endorsements, unless otherwise agreed in writing.

Q.2. Scienti ic independence where DEQ’s conclusions differ:

Q.2.a. If DEQ’s ultimate policy findings, recommendations or interpretations differ from the Contractor’s technical conclusions, would the contractor retain the ability to accurately publish or otherwise document the underlying analysis and its own scientific conclusions, with a clear statement that the contractor’s technical conclusions do not necessarily represent DEQ’s policy conclusions?

A.2.a: See response to Section IV, the “Statement of Needs”, subsection “B”, “General Requirements”, Q.2 above.

Q.3. Attribution and technical sign-off:

Q.3a. If DEQ modifies a Contractor-prepared technical conclusion or interpretation in a way the Contractor believes is not supported by the underlying analysis, will the Contractor have the opportunity to document that disagreement?

A.3.a: See response to Section IV, the “Statement of Needs”, subsection “B”, “General Requirements”, Q.2 above.

Q.3b. Will DEQ clearly distinguish agency policy conclusions from technical conclusions attributable to the contractor, and refrain from attributing modified conclusions to the contractor without its written approval?

A.3.b: See response to Section IV, the “Statement of Needs”, subsection “B”, “General Requirements”, Q.2 above.

Q.4. Contract implementation Q.4a. If DEQ agrees with some of the principles in 1-3 above, will DEQ incorporate them expressly into the resulting contract rather than relying on informal approval after award?

A.4.a: The contract document will consist of the RFP (to include all addenda to the RFP), the Contractor’s proposal and all subsequent clarifications and negotiated changes to the RFP and/or to the Contractor’s proposal.

Subsection “F.1” - “Contractor / Contractor Personnel Requirements”:

Q.1. On page 36 of 71, Section F. (Contractor)…our interpretation of the language appears to imply that entities that work for Data Centers are precluded from bidding on this project to avoid potential conflicts of interest. Can you clarify?

A.1 The RFP makes clear that pursuant to the requirements of Virginia Executive Order 22 (2026), neither the Contractor nor any of its subcontractors or employees shall enter into a non-disclosure agreement, or similar agreement, with the owner, operator, or tenant of any data center related to the performance of this Contract.

DEQ recognizes that prospective contractors may have existing or ongoing professional relationships with data center owners, operators, tenants, or other entities in the data center industry, including relationships subject to non-disclosure agreements (NDAs). Such relationships, by themselves, will not be considered a conflict of interest or grounds for disqualification from this procurement. However, DEQ expects full transparency regarding these relationships to the extent permitted by applicable contractual obligations.

As part of the proposal, contractors should disclose any existing or ongoing data center-related work, including work performed in Virginia and other jurisdictions, and identify any associated NDAs. To the extent permitted under those agreements, contractors should disclose the name of the client, the location and general nature of the work, and other relevant details. Where an existing NDA prohibits disclosure of the client’s identity or other identifying information, the contractor shall disclose the existence and number of such agreements, whether the work involves a single data center or multiple facilities, and the general nature and scope of the work to the extent permitted by the agreements. Contractors should identify any applicable disclosure restrictions so that DEQ can evaluate the circumstances on a case-by-case basis. Contractors are not expected to violate existing contractual confidentiality obligations in responding to the solicitation.

Existing or prior work for data center entities, including work subject to NDAs, will not automatically disqualify a contractor. However, a financial ownership interest in the contractor by a data center owner or operator, or another relationship that creates an actual or reasonably perceived conflict of interest or compromises the contractor's ability to provide independent and objective technical findings, could constitute grounds for disqualification. DEQ will evaluate disclosed relationships based on their nature, scope, and potential to affect the contractor's independence and objectivity.

Contractors may continue existing data center-related work and accept new data center-related engagements during the procurement and performance of this contract, provided that such work does not involve or compromise the specific work being performed under this contract, interfere with the contractor's independence, or create an actual or perceived conflict of interest. The same disclosure expectations will apply to new engagements undertaken during the contract period. Contractors shall promptly notify DEQ of any new relationships or circumstances that could reasonably affect their ability to perform the contract objectively and independently.

With respect to work performed under this contract, contractors shall not enter into NDAs or other confidentiality agreements with data center owners, operators, tenants, or other entities that would restrict the contractor's ability to provide DEQ with information, data, analyses, modeling results, technical findings, or other materials relevant to the Study. This requirement applies to information that is relevant to the contractor's responsibilities under the contract, including information necessary to evaluate data center-related air quality, noise, environmental, and other impacts. Contractors must ensure that any agreements in connection with the Study do not impair DEQ's access to the information necessary to complete the work or the transparency and reproducibility of the Study.

DEQ's objective is to ensure that the Study is conducted independently, objectively, and transparently, without unnecessarily precluding qualified firms from undertaking work outside the scope of this contract. All disclosed relationships and potential conflicts will be evaluated based on the specific circumstances.

Subsection “G” - “Price / Quote / Invoicing Requirements”:

Q.1. Page 38 of the RFP includes language regarding the use of contract year rates and limitations on when those rates can be charged. Would DEQ please con irm that Bidders may provide rates for each contract year contemplated by the RFP or may quote an escalation rate to apply to Option Periods?

A.1. “Attachment F”, the “Price Schedule”, subsection “3” is for the hourly rates for “Ancillary

Services” for the initial contract period; please refer to ”; refer to Section X, “SPECIAL TERMS

AND CONDITIONS”, subsection “19”, “RENEWAL OF CONTRACT (ANCILLARY SERVICES)” regarding price escalation for the “Option Periods”.

Q.2. In Section IV of the RFP Ancillary Services, subsection G.2.b(e) the RFP states that bidders must provide a total ixed cost estimate for ancillary tasks in addition to T&M labor category rates. However, Section IV.D Ancillary Services provides limited details regarding the scope and number of possible requests for these services. Can the state please provide additional details regarding the scope of activities it would like bidders to cost out, or alternatively, remove the requirement to provide a total cost estimate in addition to the T&M rates?

A.2. At this time, DEQ does not have any speci ic, pre-determined needs for “Ancillary Services”.

Subsection “D”, “Ancillary Services” is included in the event DEQ is tasked with additional work, beyond the work speci ied in subsection “IV.A” through subsection “IV.C”, “Task 9” and subsection IV.E through IV.G.1 (refer to “ATTACHMENT F - PRICE SCHEDULE – ADDENDUM NO. 1.”, subsection “2”), for which DEQ requires assistance from the Contractor. In that event, the Contractor should provide a speci ic quote for the speci ic ancillary service(s) requested by DEQ in accordance with subsection “G.2.b.(1)”.

Subsection “H” - “DEQ Project Responsibilities”:

Q.1. (general): Please specify what data from VA DEQ will be available to the consultant for building the emissions inventory and in what format the data will be supplied (e.g. excel spreadsheets, PDFs, GIS data, modeling iles).

A.1. Subsection “H” is revised as follows below.

Q.2. Will VA DEQ supply the bidder with run-hour, fuel records, or emission statements for data centers or any other stationary emissions sources?

A.2. Subsection “H” is revised as follows below.

Q.3. Will VA DEQ be able to share con idential data submitted by data centers to DEQ?

A.3. Subsection “H” is revised as follows below.

Q.4. What data sources will VADEQ be providing for the Weight-Of-Evidence study, such as lists and details of current and planned data centers, as well as equipment housed? Would you expect the contractor to obtain that information?

A.4. Please refer to the applicable responses above; and Subsection “H” is revised as follows below.

“H. DEQ Project Responsibilities – DEQ will:

1. Provide the Contractor with electronic iles that DEQ has available, as needed to perform the Study.

2. Provide locality contact information for the identi ied facilities.

3. Be available to answer questions from the Contractor regarding unique or unusual situations they may observe regarding interpretation of legislative language or other project scope needs (preferably, through standing, pre-scheduled virtual meetings).

4. Task 2:

a. Study: Provide the Contractor with available:

(1) Provide the Contractor with available:

(a) Data and information within its possession that may support the WOE analysis. This may include, but is not limited to, emissions inventory information, permitting records, compliance and enforcement information, air monitoring data, air quality modeling results, and air quality planning documents and analyses.

(b) Information regarding existing and planned data centers, including facility-specific information and equipment details, to the extent such information is available.

(2) Facilitate coordination with relevant agencies and stakeholders, as appropriate, to support the Contractor's information-gathering efforts.

b. Draft WOE: Provide consolidated comments and feedback to the Contractor as soon as practicable following receipt of the Draft WOE, with the goal of completing its review within approximately five (5) business days.

5. Task 3:

a. Facilitate coordination with EPA and other states, other relevant agencies and other appropriate entities as necessary, to assist the Contractor in obtaining available emissions inventory data and related information.

b. Provide the Contractor with all available facility-level data center information and emissions-related information in its possession, including permitting records, available backup generator information, equipment counts, fuel types, and emissions data:

Note: The level of detail, completeness, and quality of available information may vary among individual data centers.

6. Task 5 – Coordinate with the Contractor to establish the final:

a. Projection years, data center development assumptions, and emissions inputs.

b. Sensitivities and associated assumptions.

Reference Section V, ”PROPOSAL PREPARATION AND SUBMISSION INSTRUCTIONS”:

Subsection B. / “SPECIFIC PROPOSAL INSTRUCTIONS” / TAB 4.B.1.b – “Experience and Qualifications” / “Personnel” – is revised as follows:

“b. Provide a general de inition of your company’s personnel categories (i.e. Principal, Project Manager, Data Analysts, QC Reviewer, Study Developer and for the other project team members (identi ied in “ATTACHMENT F,” the “PRICE SCHEDULE”).”

Subsection B. / “SPECIFIC PROPOSAL INSTRUCTIONS” / TAB 6 – “Proposed Price” / “Note” – is revised as follows:

“Note:

Offerors shall identify the total ixed price per meeting, to attend an in-person meeting, upon request by DEQ on “ATTACHMENT F -PRICE SCHEDULE –

ADDENDUM NO. 1.”, subsection “2.k.”

If an Offeror proposes to evaluate the use of plume-in-grid (PiG) modeling for large point sources to improve spatial and temporal resolution of pollutant dispersion, the cost associated with that evaluation shall identi ied on

“ATTACHMENT F - PRICE SCHEDULE – ADDENDUM NO. 1.”, subsection “2.l” and “2.m.”

Reference Section VI, ” EVALUATION AND AWARD CRITERIA”:

Subsection A.4 / “EVALUATION CRITERIA”:

Q.1. RFP Section VI.A (pp. 48-49) EVALUATION CRITERIA:

Q.5a. The RFP Evaluation Criteria includes 20 points out of 100 for the Small Business

Subcontracting Plan (SBSP) but doesn’t provide how the SBSP participation would be scored. Attachment D of the RFP lists a goal of over 42% of Virginia’s purchases be made from small businesses. Is the scoring system based on this 42% such that if 42% of the work is being performed by small businesses a full 20 points is awarded and prorated accordingly (e.g., 21% of the work would get 10 points) or is there some other scoring system for the SBSP?

A.5.a. The Commonwealth of Virginia’s scoring procedure is provided below:

“D. When assigning points for the Small Business Subcontracting Plan criteria, a DSBSD-certified small business, which shall include women-owned and minority-owned businesses and businesses with DSBSD service disabled veteran owned status when they have also received DSBSD small business certification, who serves as the prime contractor, will receive the maximum number of evaluation points for this criteria.

The weight for the small business subcontracting plan shall not be less than 20% of the total point value. See Annex 7-G, Section A of the Small Business Subcontracting Plan. Example: 20 points available for Small Business Subcontracting and the Offeror is a DSBSD-certified small business then that Offeror would receive 20 points. No further subcontractin g would be required.

E. Other businesses that are not DSBSD-certified small businesses will receive credit based on their Small Business Subcontracting Plan not to exceed 75% of the points assigned to this evaluation criterion i.e. 20 points X 75%= 15 points. Points will be assigned based on each offeror’s proposed subcontracting expenditures with DSBSD-certified small businesses for the initial contract period as indicated in the offeror’s submitted subcontracting plan in relation to each offeror’s total price. See Annex 7-G, Section B of the Small Business Subcontracting Plan for proposed small business subcontracting expenditures.

The Offeror’s proposed subcontractor use of DSBSD-certified small businesses is divided by the Offeror’s total proposed price. The quotient is then multiplied by the points assigned for the criteria to determine the evaluation points to be assigned.

Offeror’s proposed use of DSBSD-certified small businesses as subcontractors = % Factor X Available = Points Offeror’s Price Points Assigned

Offeror’s proposed use of DSBSD-certified Offeror small businesses as subcontractors Points Points

Price Offeror's Price = % Factor x (15)* = Assigned

A 15,250 = 10 x 15 = 1.5

$152,500 152,500

B 26,800 = 17 x 15 = 2.5 $158,000 158,000

C 43,251 = 26 x 15 = 3.9 $166,350 166,350

D 95,904 = 54 x 15 = 8.1 $177,600 177,600

* Point value shown is only an example and will vary with the RFP based on points assigned to Small Business Subcontracting Plan criteria not to exceed 75% of the points assigned to this evaluation criterion i.e. 20 points X 75%= 15 points.

Reference Section IX, ” GENERAL TERMS AND CONDITIONS”:

Q.1. General Terms #10.C (p. 53) conditions a inal-payment certi ication requirement on whether "provision of a SWaM procurement plan is a condition to the award," but the solicitation's actual small-business disclosure requirement is labeled the "Small Business Subcontracting Plan" (Attachment D; Special Terms #22, pp. 63–64). Can the agency con irm whether the "SWaM procurement plan" referenced in General Terms #10.C is the same document as the Small Business Subcontracting Plan required under Attachment D, and therefore whether the inal-payment certi ication and payment-withholding provisions of General Terms #10.C apply to this contract?

A.1. Yes, section IX.10.C, “PAYMENT” is referring to “ATTACHMENT D”. the “Small Business Subcontracting Plan” and shall apply to the contract; also refer to Section X.22.B., the

“SPECIAL TERM AND CONDITIONS”, SUBMISSION OF SMALL BUSINESS

SUBCONTRACTING PLAN, EVIDENCE OF COMPLIANCE WITH SMALL BUSINESS

SUBCONTRACTING PLAN, AND SUBCONTRACTOR REPORTING”:

“B. Evidence of Compliance with Small Business Subcontracting Plan: Each prime contractor who wins an award in which provision of a small business subcontracting plan is a condition of the award, shall deliver to the contracting agency or institution monthly reports substantiating compliance in accordance with the small business subcontracting plan. If a variance exists, the contractor shall provide a written explanation. A subcontractor shall be considered a Small Business for purposes of a contract if and only if the subcontractor holds a certification as such by the DSBSD.

Payment(s) may be withheld until the purchasing agency confirms that the contractor has certified compliance with the contractor’s submitted Small Business Subcontracting Plan or is in receipt of a written explanation of the variance. The agency or institution reserves the right to pursue other appropriate remedies for non-compliance to include, but not be limited to, termination for default.”

Reference Section X.22.,”SPECIAL TERMS AND CONDITIONS”, SUBMISSION OF SMALL

BUSINESS SUBCONTRACTING PLAN, EVIDENCE OF COMPLIANCE WITH SMALL BUSINESS

SUBCONTRACTING PLAN, AND SUBCONTRACTOR REPORTING:

Q.1 We understand that it can take up to 30 days to get a small business registered under the Viginia SB program. Would VADEQ be willing to relax that requirement, or make it required after award notification?

A.1 No DEQ cannot extend any flexibility, it is requirement by the Commonwealth of Virginia, that entities must be certified as a DSBSD-certified small business by the due date for receipt of bids or proposals; also refer to Section X.22.A:

“A. Submission of Small Business Subcontracting Plan: It is the statewide goal of the Commonwealth that 42% of its purchases be made from small businesses certified by DSBSD. This includes discretionary spending in prime contracts and subcontracts. All bidders/offerors are required to submit a Small Business Subcontracting Plan. The contractor is encouraged to offer such subcontracting opportunities to DSBSD-certified small businesses. This shall include DSBSD-certified women-owned and minority-owned businesses and businesses with DSBSD service disabled veteran-owned status when they have also received DSBSD small business certification.

Where it is not practicable for any portion of the goods/services to be subcontracted to other suppliers, the bidder/offeror shall note such on the Small Business Subcontracting Plan. No bidder/offeror or subcontractor shall be considered a small business unless certified as such by the Department of Small Business and Supplier Diversity (DSBSD) by the due date for receipt of bids or proposals.”

Reference Section XII, ” PRICE SCHEDULE”:

Q.1. For costing purposes, should we only consider the Base Period? If not, can you provide parameters to develop a cost estimate for Option periods 1 through 4?

A.1. The “Option periods 1 through 4” are only for “Ancillary Services”; refer to Section X, “SPECIAL TERMS AND CONDITIONS”, subsection “19”, “RENEWAL OF CONTRACT (ANCILLARY SERVICES)”; and refer to “ATTACHMENT F -PRICE SCHEDULE – ADDENDUM

NO. 1.”

Q.2. Attachment F Price Schedule, Section 3 Ancillary Services, Sections C and D include two areas for labor classi ications/titles and rates. Some of the classi ications in Section C align with the roles listed within the proposal requirements on page 46, however there are additional roles (SME) that are not listed in the Price Schedule. Would DEQ please clarify if Bidders are required to use the exact labor titles for key personnel? If Bidders must use the titles in the Price Schedule, would DEQ please con irm that it is not necessary to supply a de inition for the categories listed in Section C? Additionally, would the State please con irm that Bidders may include more than three supplemental labor classi ications in Section D as appropriate to their proposed staf ing?

A.2. Offerors should use the same “job classifications” as presented in “Attachment F”, the “Price Schedule,” subsection “3.c.”; refer to Section V.B, ”PROPOSAL PREPARATION AND

SUBMISSION INSTRUCTIONS” / “SPECIFIC PROPOSAL INSTRUCTIONS”, TAB 4.B.1.b., which requests a definition:

“b. Provide a general de inition of your company’s personnel categories (i.e.

Principal, Project Manager, Environmental Data Analyst, QC Reviewer, Study Developer and for the other project team members (identi ied in “ATTACHMENT F,” the “PRICE SCHEDULE”).”

Offerors should identify all other job classifications (i.e. those not specified in subsection “3.c.”, e.g. environmental subject matter experts) and may propose more than three (3) “supplemental labor classifications” for “Attachment F”, the “Price Schedule,” subsection “3.d.”

Q.3. The Price Schedule Section 3 for Ancillary Services requires Bidders to provide fully-loaded hourly rates and only includes quantities for evaluation purposes in Section C. We note that Page 38 of the RFP’s Price / Quote / Invoicing Requirements outlines requirements for Bidders to provide an estimated level of support for Ancillary Services.

Would DEQ please con irm that these quote requirements are intended to apply to post-award requests for Ancillary support?

A.3. Yes, those quote requirements apply to post-award requests for “Ancillary Services” as applicable (i.e. services not included in the total fixed price for subsection “IV.A” through subsection “IV.C”, “Task 9”, and subsection IV.E through IV.G.1; refer to “ATTACHMENT F - PRICE SCHEDULE – ADDENDUM NO. 1.”, subsection “2”).

Q.4 Question: Project timeline and renewal periods The RFP specifies a one-year initial term with four optional one-year renewals, and asks that all tasks other than Task 2 be completed by December 31, 2027. Should the proposed scope, schedule and pricing (including Attachment F and the Small Business Subcontracting Plan) cover only the initial one-year term? Or does DEQ want offerors to also describe anticipated work or pricing for the renewal years, such as updates, extended analyses or follow-on phases?

A.4 Please refer to DEQ’s response above to “Q.1” and to DEQ’s response above to “Q.2” under

Subsection “G” - “Price / Quote / Invoicing Requirements; the proposed Small Business

Subcontracting Plan requested on “ATTACHMENT D” should only be for the initial contract period and should be based upon the total ixed price proposed on “ATTACHMENT F -

PRICE SCHEDULE – ADDENDUM NO. 1.”, subsection “2.”

Q.5. Would VA DEQ entertain either fixed price responses or hybrid T&M and fixed price responses to requests for quotes for ancillary tasks?

A.5. No, pricing for ancillary services for which the Contractor does not have an existing fixed price (refer to “ATTACHMENT F - PRICE SCHEDULE – ADDENDUM NO. 1.”, subsection “3.e”) shall be based upon the fixed contract hourly rate per contract job classification, in accordance with the contract price schedule (“ATTACHMENT F”); in the event DEQ requests ancillary services, the Contractor should submit a quote for the ancillary services that identifies the total fixed price, in accordance with Section IV.G.2.b.(1).

Q.6. Our proposal team includes a member of academia whose institution utilizes cost accounting systems that do not align with producing fully-loaded labor rates that would conform to the requirements of the Attachment F Price Schedule for Ancillary Services, Fixed Hourly Rates, and…