RFP 2627-3AB Environmental Health and Safety Services Addendum 1.pdf
PDF 228 KB Posted
- Attached to
- Environmental Health & Safety Services
- Solicitation number
- 2627-3AB
- Issued by
- New Haven County, Connecticut
About this file
This Addendum #1 to RFP 2627-3AB provides clarifications and supplemental information for Cheshire Public Schools' Environmental Health and Safety (EH&S) Management Services solicitation. The proposal opening is scheduled for November 20, 2026 at 2:00 PM at the Cheshire Public Schools Office of Management Services, Room 12, with a non-mandatory site visit held on Tuesday, November 3, 2026 at 9:00 AM at Cheshire High School, 525 Main Street, Cheshire, Connecticut 06410. The addendum addresses inquiries from three prospective bidders (Safety Smart Consulting Services LLC, Walden Environmental Engineering, and HRP Associates, Inc.) regarding team qualifications, staffing requirements, training delivery, and service scope clarifications. Key responses clarify that combined qualifications of prime contractors and named subconsultants may satisfy the ten-year experience requirement and three Connecticut public agency or school district reference requirements, that required Certified Safety Professional (CSP) and Certified Industrial Hygienist (CIH) credentials may be provided through named subconsultants, and that no minimum weekly onsite hours or dedicated staffing requirements are prescribed beyond quarterly facility inspections and annual district-wide audits. The contract term is two years with up to three one-year extensions at district discretion, with annual contract pricing guaranteed during the initial two-year period.
The addendum identifies that the district currently employs 989 staff members across multiple job classifications and utilizes Vector Solutions for online training covering topics including Bloodborne Pathogen Exposure, First Aid, Cyberbullying, Cybersecurity Overview, and CT Child Abuse and Neglect Mandatory Reporting. Existing environmental programs are managed by separate contractors: Chem Scope, Inc. (AHERA), Fuss & O'Neill (UST and Tier II), Total Pest, LLC (Integrated Pest Management), HazCompliance, LLC (SDS Management), EnviroMed Services, Inc. (Air Quality and Radon Testing), and Barton & Loguidice and Fuss & O'Neill (Stormwater). The selected consultant must review reports from these providers and incorporate them into the overall EH&S management plan. Proposers must clearly identify which services are included in fixed fees versus those billed separately at hourly or unit rates subject to prior written authorization, with proposals to include detailed exclusions, assumptions, and additional costs. No set-aside restrictions apply to this procurement, which is open to all qualified vendors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHESHIRE PUBLIC SCHOOLS
Addendum #1 November 16, 2026
EH&S MANAGEMENT SERVICES
Proposal Number: #2627-3AB Proposal Opening Date: November 20, 2026 Proposal Opening Time: 2:00 PM Proposal Opening Place: Cheshire Public Schools, Office of Management Services, Room 12 Non-Mandatory Site Visit: Tuesday November 3, 2026 @ 9:00 A.M. Cheshire High School 525 Main St.
Cheshire, CT 06410
RFI questions provided by: Safety Smart Consulting Services LLC
Team qualifications and references — Pages 13 and 23–24 May the ten-year experience requirement and three Connecticut public agency or school district references be sat-isfied through the combined qualifications of the prime contractor and named subconsultant firms, or must these requirements be met independently by the prime contractor?
Answer - Combined qualifications are acceptable.
Please also confirm whether the required CSP and CIH may be provided through named subconsultants.
Answer - Yes. The required Certified Safety Professional (CSP) and Certified Industrial Hygienist (CIH) creden-tials may be provided through named subconsultants, provided their qualifications are documented in the proposal and they are identified as part of the project team. The prime consultant shall remain responsible for overall con-tract performance and coordination, and any changes to the proposed key personnel or subconsultants shall be subject to the District’s approval.
Staffing and service coverage — Pages 21–23 Beyond the quarterly facility inspections and annual District-wide audit, are there minimum weekly onsite hours, dedicated staffing requirements, or prescribed response times?
Answer -No. It is however, expected that responses to related to release reporting, AHJ inspections or other events that constitute an emergency be responded to appropriately.
May the designated project manager also serve in a technical capacity as the team’s CSP or CIH, provided quali-fications and service coverage are maintained?
Answer - Yes
Training and implementation quantities — Pages 18–21 and Appendix A Please provide available employee counts by job classification and any anticipated annual quantities for instruc-tor-led training or practical evaluations beyond the District’s existing Vector Solutions offerings.
Answer - see the attached table. The Proposer shall evaluate the CONN-OSHA requirements as it relates to prac-tical training and evaluation versus on-line training as currently provided by Vector. It is expected that some prac-tical safety training will be required specifically related to trades and/or equipment operation that will be identi-fied by the gap analysis.
Are updated program documents, equipment inventories requiring machine-specific lockout/tagout procedures, and confined-space inventories available to establish the implementation workload and identify changes since the 2022 assessment?
Answer - Some existing documentation and inventory information may be available; however, the purpose of this RFP is to address the nonconformances identified in the 2022 assessment and bring the District's programs and practices into compliance. Respondents should anticipate reviewing and validating existing records, identifying gaps, updating documentation and inventories, and assisting with implementation of the necessary corrective ac-tions.
Fixed-fee inclusions and separately authorized services — Pages 19–25 Please clarify which training delivery, sampling and laboratory work, specialized assessments, and incident or emergency support must be included in the fixed fees, and which may be offered under an hourly or unit-rate schedule subject to prior written authorization.
Answer - The RFP does not specify these allocations. Proposals shall identify services included in the fixed fee, such as routine training, inspections, assessments, program development, and standard incident support. Special-ized training, sampling and laboratory work, specialized assessments, and significant incident or emergency re-sponse may be billed separately at proposed hourly or unit rates, subject to the District’s prior written authoriza-tion. All exclusions, assumptions, and additional costs are to be clearly identified in the proposal.
Please also confirm the division of responsibilities between the selected consultant and the District’s existing AHERA, IPM, and IAQ/IEQ providers.
Answer – recurring services are currently provided by the following:
AHERA – Chem Scope. Inc.
UST & Tier II – Fuss & O’Neill IPM -Total Pest. LLC SDS Management – HazCommpliance, LLC Air Quality/Radon Testing – EnviroMed Services, Inc.
Stormwater - Barton & Loguidice / Fuss & O’Neill
Proposer is to review reports and incorporate into the overall EH&S management plan.
RFI questions provided by: Walden Environmental Engineering
The Initial Compliance Assessment section states that Appendix A is for reference only, while the Proposal Form requests a “Deliverables Estimate Based on Appendix A.” Can you clarify?
For purposes of preparing the Proposal, respondents should assume that the Summary Table included in Appendix A is valid and represents the baseline for the Initial Compliance Assessment. Respondents should provide an es-timate of the deliverables necessary to address the identified gaps through the development, revision, and imple-mentation of appropriate processes, procedures, and supporting documentation.
Which training topics and workforce groups are currently covered by Vector Solutions?
Answer - Please see attached for general Vector training. Some groups may have specific training modules (such as Food Service/Civil Rights training). The attachment provided is the general base training that all employees are responsible for completing.
Will CPS grant the selected vendor access to its Vector Solutions system?
Answer - We can provide information, but the selected vendor will likely not have administrative access directly to the portal.
Please confirm whether transportation, food service, custodial services, and other potentially contracted opera-tions are included in the assessment.
Answer - Transportation, food service, custodian and building / grounds maintenance are in house services. The only contracted service that would require minor oversite would be related to SDS documentation of clean-ing/disinfectant supplies used by our contracted cleaning service.
Are any district-controlled facilities, leased spaces, warehouses, or maintenance locations included beyond those listed in the RFP?
Answer - There are no ancillary facilities, owned or rented, outside of what is listed in this request for proposal.
RFI questions provided by: HRP Associates. Inc.
Please provide a list of environmental programs being managed by other consultants and note if those programs are within the scope of this project?
Answer – recurring services are currently provided by the following:
AHERA – Chem Scope. Inc.
UST & Tier II – Fuss & O’Neill IPM -Total Pest. LLC SDS Management – HazCommpliance, LLC Air Quality/Radon Testing – EnviroMed Services, Inc.
Stormwater - Barton & Loguidice / Fus Proposer is to review reports and incorporate into the overall EH&S management plan.
How would CPS like the successful bidder to account for analytical services for industrial hygiene or IAQ sam-pling in their scope of services, without knowing the amount or required analytical?
The successful Proposer may provide a menu option for analytical services and IAQ sampling outside of what is identified in the previous RFI question. For purposes of this proposal, do not include services, sampling or testing not specifically identified in the RFP. Proposer may list exclusions in their submission.
Please provide a list of trainings the online training program includes.
Answer - see the attached table. The Proposer shall evaluate the CONN-OSHA requirements as it relates to prac-tical training and evaluation versus on-line training as currently provided by Vector. It is expected that some prac-tical safety training will be required specifically related to trades and/or equipment operation that will be identi-fied by the gap analysis.
What kind of examples would CPS like to see for training? Videos, PDFs of training materials, training brochure or options, etc.? Additionally, is there a preferred method of training presentation that CPS would like to have highlighted?
As described in the previous RFI question, CPS utilizes and online training module in the training of staff. The Proposer shall consider reviewing the training modules and determine that the training provided meets CONN- OSHA standards for safety training. In the assessment, The Proposer shall consider where practical training is re-quired and will confer with CPS as to the best method of executing the training.
END ADDENDUM #1 DATED 11/13/2026
Job Class Code Desc COUNTA of Job Class Code Desc
10 MONTH SEC/MEDIA 28
12 MONTH SECRETARY 30
12 MONTH SECRETARY-MAINT 1
ADMINISTRATORS 22
ASSISTANT MANAGER 1
ASST SUPERINTENDENT 1
BC BEHAVIOR ANALYST 3
BLDG. MAINTAINER APPRENTIC 1
BUILDING MAINTAINER 13
COACH 54
CREDENT INTERVENTIONIST 1
DIRECTORS 2
DISTRICT TEACHER SUB 16
DRIVERS 10
FOOD SERVICE MGR 1
FOREMAN 2
HALL MONITOR 5
HOURLY 12 MONTH NON UNION 1
LEARNING SUPPORT TUTOR 20
LUNCHROOM/PLAYGROUND AI 36
MAINTAINER 2 5
MAINTENANCE SUMMER 2
MANAGERS 11
MARCHING BAND SUPPORT ST 19
NURSES 10
OCC THERAPIST 5
OUTSIDE MAINTENANCE 3
PARA DTI 3 50
PARA EDUCATOR 1 4
PARA EDUCATOR 2 61
PARA EDUCATOR 3 57
PT SECRETARY/MEDIA 1
SCHOOL LUNCH SUBS 7
SCHOOL LUNCH WORKER 35
SECT - TA SUB 6
SPEECH LANG PATH ASSISTAN 2
STUDY HALL MONITOR 2 1
STUDY HALL MONITOR 3 5
SUB NURSE 7
SUB SUPPORT 3
SUB TEACHER 2
SUMMER SCHOOL 11
SUPERINTENDENT 1
TEACHER 423
TEACHER APPRENTICE 3
TRANS AIDES 3
TUTORS 4
Grand Total 989
VECTOR 26-27 SY GROUP TRAINING PLAN
Bloodborne Pathogen Exposure (25 min) CPS Custom EpiPen Training for Teachers & Substitute Teachers (8 min) CPS Social Networking Rights Responsibilities & Duties Policy (2 min) CT Child Abuse &Neglect:Mandatory Reporting (Triennial) (40 min) Cyberbullying (23 min) Cybersecurity Overview (15 min) First Aid (49 min) Human Trafficking Awareness (Triennial) (60 min) Responsible Use Policy (2 min) Secondary Transition Training for Paraeducators (60 min)
File details come from the government source that posted it. Updated .