RFP 26-818 Summary
This Request for Proposals (RFP) is issued by the City of Shreveport on behalf of the Shreveport Airport Authority for the turnkey supply, delivery, installation, and commissioning of six new Passenger Boarding Under Bridge-Mounted Pre-Conditioned Air (PCA) and Ground Power Unit (GPU) units at Shreveport Regional Airport. The equipment will be installed at Gates 1, 2, 3, 5, 7, and 8 to provide pre-arrival and pre-departure air conditioning for aircraft and boarding bridges. A mandatory site visit is scheduled for November 18, 2026, at 10:00 a.m. at Shreveport Regional Airport's 3rd Floor Conference Room. Proposals must be received by December 1, 2026, at 3:00 p.m. and will remain firm for 120 calendar days from the opening date. The equipment must be compatible with JBT Passenger Boarding Bridges and accommodate various aircraft types including CRJ, ERJ, Airbus A319/320/321, and Boeing models. Installation requires removal and disposal of existing PCA and 400 HZ units at Gates 3 and 5, with startup and commissioning required as part of the scope. The contract will be awarded to the responsive and responsible offeror deemed most advantageous to the City based on evaluation criteria, with no commitment to award or pay proposal preparation costs.
Evaluation will be based on equipment and labor cost (0-50 points), demonstrated qualifications and similar project experience (0-35 points), and timing of delivery (0-15 points), for a total of 100 points. Pricing must be firm for the contract duration and inclusive of all labor, materials, tools, equipment, delivery, installation, commissioning, mobilization, and overhead costs. An Architectural and Engineering (A&E) firm will determine equivalent products for brand specifications. The City has set a 1.5 percent Disadvantaged Business Enterprise (DBE) goal for this federally-funded project; proposers must demonstrate good faith efforts to meet this goal and must comply with Federal Aviation Administration standards AC 150/5370-10H and AC 150/5220-21C. Proposers must submit two signed originals, three additional copies, one redacted copy if claiming confidential information, and searchable electronic copies on two USB drives. Required exhibits include a narrative approach to scope of work, five references with similar projects, a detailed cost proposal itemizing PCA equipment, GPU equipment, and installation costs by gate, a felony conviction/E-Verify affidavit, and Fair Share compliance forms. All subcontractors must be tracked and reported; the contractor will be required to obtain airport security badging at a cost of $100 per badge. Equipment warranty covers one year from the earlier of the delivery date or 60 days after delivery, and all new components must be free of defects.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Shreveport
REQUEST FOR PROPOSALS (Airport) RFP 26-818
JET BRIDGE MOUNTED PCA/GPU UNITS RE-BID
INDEX
THE FOLLOWING FORMS MUST BE RETURN WITH YOUR SUBMITTALS
Page Numbers
Proposal Invitation 2
General Information - Part I 3-4
Introduction - Part II 5-6
Scope of Work- Part III 7-8
Evaluation Criteria- Part IV 9
Submission Requirements- Part V 10
Index of reference items not included herein that is incorporated by reference with the same force and effect as if set forth in full text. Should any of these be in conflict with those listed herein, the more stringent will apply.
The General Contract Clauses (Section 20), the Standard Instructions/Conditions for Request for Proposals (Section 30) will no longer be incorporated in solicitations but will be incorporated by reference in the City of Shreveport (hereinafter the City) book of Standard Solicitation Instructions / Provisions and General Contract Clauses; which are available at www.shreveportla.gov (click on Business, then on Bids & RFPs). If you do not have a computer, you can use one of the public use computers that are available at the Shreve Memorial Library or at most library branches.
EXHIBITS
(ALL EXHIBITS MUST BE FURNISHED WITH YOUR PROPOSAL)
NARRATIVE ON THE APPROACH TO THE SCOPE OF WORK A-11
OFFERORS EXPERIENCE B-12
COST PROPOSAL C-13-15
FELONY CONVICTION E-VERIFY AFFIDAVIT D -16
FAIR SHARE FORMS 1-4 E-17-27
APPENDIX
(DO NOT FURNISH WITH YOUR PROPOSAL)
#1 - ADJUDICATED OR LIEN PROPERTY AFFIDAVIT 28
#2 - INSURANCE 29-32
#3 - FORMAT FOR THE RETURN ENVELOPE 34
Revised 01-20-21 http://www.shreveportla.gov/
October 26, 2026
RFP 26-818
MUST BE RECEIVED NOT LATER THAN 3:00 P.M. ON: December 01, 2026
PROPOSAL TITLE: JET BRIDGE MOUNTED PCA/GPU UNITS RE-BID
You are invited to submit proposals in accordance with the requirements of this solicitation which are contained herein.
There will be a mandatory site visit: November 18, 2026, at 10:00am Shreveport Regional Airport-3rd Floor Conference Room 5103 Hollywood Ave, Suite 300 Shreveport LA, 71109-7764
In order for your proposal to be considered, it must be received in the Purchasing office not later than the date and time as listed above. Solicitation documents are posted on BidNetDirect. To view the general RFP information and receive notices by email, register with BidNetDirect. Registration is free. Solicitation documents are also available at www.shreveportla.gov/Solicitations. BidNetDirect shall be the official source of solicitation documents.
It shall be the responder’s responsibility to make inquiry as to the addenda issued. All inquiries pertaining to this RFP shall reference RFP number as shown above. Paper proposals received by the Purchasing Office after the time specified will be documented and then returned to the Offeror unopened. Due to the possibility of negotiation with all Offerors, the identity of any Offeror or the contents of any proposal will not be public information until after the contract award is made.
Paper proposals and modifications received in response to this Request for Proposals shall be time stamped upon receipt and secured in the Purchasing Division until the established due date. Attendance by the submitter on the established due date is unnecessary because submittals will be opened at a later time in the presence of a procurement employee or selection committee member.
The proposals must be signed by an official authorized to bind the Offeror, and it shall contain a statement to the effect that the proposal is firm for a period of at least 120 days from the closing date for submission of proposals. Paper proposals must be submitted using the envelope format as provided in this solicitation document in a sealed opaque envelope/container showing the above proposal title, number, opening date, time of opening and appropriate license number(s) on the outside of the envelope or if a sealed container is used, then all this information shall be shown on the top of the container. The City does not accept faxed or emailed responses for formal solicitations. Proposers must be legally registered and licensed to conduct business in the State of Louisiana.
All submittals (see Part V, Submission Requirements) received in response to this Request for Proposals will be rated by the City’s Selection Committee, based upon the Evaluation Criteria as listed in Part IV. If the best Offeror is clearly identified from the point summary, there will not be a need for oral presentations. If not, then an oral presentation from a minimum of two (the highest rated) firms shall be required. This solicitation does not commit the City to award a contract, to pay any costs incurred in the preparation of a proposal, or to procure or contract for the articles of goods or services.
The City reserves the right to accept or reject any or all proposals received as a result of this request, to waive informalities, to negotiate with all qualified Offerors, or to cancel in part or in its entirety this proposal, if it is in the best interest of the City to do so.
City of Shreveport
Renee Anderson, MBA, CPPO, CPPB, NIGP-CPP Purchasing Agent
Important- If you consider the specifications as restrictive or have a problem with this document, please contact the Purchasing Agent at least five days before the proposal opening at (318) 673-5450 http://www.shreveportla.gov/Solicitations
PART I
GENERAL INFORMATION
1.0 Proposals will be considered as specified herein or attached hereto under the terms and conditions of this proposal.
2.0 Proposals must be made in the official name of the firm or individual under which business is conducted (showing an official business address) and must be signed in ink by a person duly authorized to legally bind the person, partnership, company, or corporation submitting the proposal.
3.0 Offerors are to include all applicable requested information and are encouraged to include any additional information they wish to be considered.
4.0 It is up to you to make sure that all the information requested is returned to us by using the envelope format shown in this package.
5.0 Each Proposer shall submit two (2) signed original response. Three (3) additional copies of the proposal should be provided, as well as one (1) redacted copy, if applicable (See Section 7.0) and a searchable electronic copy on two (2) separate USB flash drives.
5.1.1 Send Proposals to:
5.1.1.1 City of Shreveport
5.1.1.2 Office of The Purchasing Agent
5.1.1.3 Government Plaza-Suite 610
5.1.1.4 505 Travis Street
5.1.1.5 Shreveport, LA 71101-3042
6.0 QUESTIONS
6.1 Offerors requiring additional information may e-mail or fax their questions so that they will be received at least five (5) working days prior to proposal opening to:
6.2 Email ashley.germany@shreveportla.gov or fax Ashley Germany at 318-673-5408.
6.3 Answers to questions received that should change and/or clarify this solicitation will be provided in writing to all Offerors via an amendment.
7.0 CONFIDENTIAL INFORMATION, TRADE SECRETS, AND PROPRIETARY INFORMATION
7.1 The designation of certain information as trade secrets and/or privileged or confidential proprietary information shall only apply to the technical portion of the proposal. The financial proposal will not be considered confidential under any circumstance. Any proposal copyrighted or marked as confidential or proprietary in its entirety may be rejected without further consideration or recourse.
7.2 For the purposes of this procurement, the provisions of the Louisiana Public Records Act (La. R.S. 44.1 et.
seq.) shall be in effect. Pursuant to this Act, all proceedings, records, contracts, and other public documents relating to this procurement shall be open to public inspection. Proposers are reminded that while trade secrets and other proprietary information they submit in conjunction with this procurement may not be subject to public disclosure, protections must be claimed by the Proposer at the time of submission of its Technical Proposal. Proposers should refer to the Louisiana Public Records Act for further clarification.
7.3 The Proposer shall clearly designate the part of the proposal that contains a trade secret and/or privileged or confidential proprietary information as “confidential” in order to claim protection, if any, from disclosure. The Proposer shall mark the cover sheet of the proposal with the following legend, specifying the specific section(s) of the proposal sought to be restricted in accordance with the conditions of the legend:
7.4 “The data contained in pages _____ of the proposal have been submitted in confidence and contain trade secrets and/or privileged or confidential information and such data shall only be disclosed for evaluation purposes, provided that if a contract is awarded to this Proposer as a result of or in connection with the submission of this proposal, the City of Shreveport shall have the right to use or disclose the data therein to the extent provided in the contract. This restriction does not limit the City of Shreveport’s right to use or disclose data obtained from any source, including the Proposer, without restrictions.”
7.5 Further, to protect such data, each page containing such data shall be specifically identified and marked
“CONFIDENTIAL”.
mailto:ashley.germany@shreveportla.gov
7.6 If the Proposer’s response contains confidential information, the Proposer should also submit a redacted copy of their proposal along with their original proposal. When submitting the redacted copy, the Proposer should clearly mark the cover as such - “REDACTED COPY” - to avoid having this copy reviewed by an evaluation committee member. The redacted copy should also state which sections or information has been removed.
The proposer should also submit one (1) electronic redacted copy of its proposal on a USB flash drive. The redacted copy of the proposal will be the copy produced by the City if a competing proposer or other person seeks review or copies of the Proposer’s confidential data.
7.7 If the Proposer does not submit the redacted copy, it will be assumed that any claim to keep information confidential is waived.
7.8 Proposers must be prepared to defend the reasons why the material should be held confidential. By submitting a proposal with data, information, or material designated as containing trade secrets and/or privileged or confidential proprietary information, or otherwise designated as “confidential”, the Proposer agrees to indemnify and defend (including attorney’s fees) the City and hold the City harmless against all actions or court proceedings that may ensue which seek to order the City to disclose the information.
7.9 The City reserves the right to make any proposal, including proprietary information contained therein, available to other agencies or organizations for the sole purpose of assisting the City in its evaluation of the proposal. The City shall require said individuals to protect the confidentiality of any specifically identified proprietary information or privileged business information obtained as a result of their participation in these evaluations.
8.0 Additionally, any proposal that fails to follow this section and/or La. R.S. 44:3.2.(D)(1) shall have failed to properly assert the designation of trade secrets and/or privileged or confidential proprietary information and the information may be considered public records.
Part II
1.0 INTRODUCTION
2.0 INTENT
2.1 The Shreveport Airport Authority is seeking proposals for qualified vendors for the turnkey supply, delivery, installation, and commissioning of six (6) new Passenger Boarding Under Bridge-Mounted Intergraded/Combo pre-conditioned air (PCA).
3.0 PRICE CHANGES
3.1 Prices will be firm for the duration of the contract term.
4.0 AWARDS
4.1 An award resulting from this request shall be awarded to the responsive and responsible Offeror whose proposal is determined to be most advantageous to the City, taking into consideration price and the evaluation factors set forth in the RFP; however, the right is reserved to reject any and all proposals received, to waive any informalities, and in all cases the City will be the sole judge as to whether an Offerors proposal has or has not satisfactorily met the requirements of this RFP.
5.0 EVALUATION OF PROPOSALS FOR MULTIPLE AWARDS
5.1 In addition to other factors, proposals will be evaluated on the basis of advantages to the City that might result from making more than one award (multiple awards). For the purpose of making this evaluation, administrative costs to the City for issuing and administering each contract awarded under this invitation will be considered, and individual awards will be for the items and combinations of items which result in the lowest aggregate price to the City, including such administrative costs.
6.0 BRAND NAMES
6.1 Wherever in the specifications the name of a certain brand, make, manufacturer, or definite specification is utilized, they are used only to denote the quality standard of the product desired and that they do not restrict Offerors to the specific brand, make, manufacturer, or specification named; that they are used only to set forth and convey to prospective Offerors the general style, type, character, and quality of the product desired;
and that equivalent products will be acceptable.
6.2 It shall be the responsibility of the Purchasing Agent and the professionally employed architect or engineer to determine what is considered an equivalent product on any and all projects in which they have been legally employed to perform professional services.
7.0 PURCHASE ORDER REQUIREMENT
7.1 The City of Shreveport shall not be responsible for invoices exceeding $500 that do not have a written purchase order covering them.
8.0 PUBLIC ACCESS TO PROCUREMENT INFORMATION
8.1 No such documents or other documents relating to this procurement will be presented or made otherwise available to any other person, agency, or organization until the City Attorney’s Office has approved their release. Commercial or financial information obtained in response to this RFP which is privileged and confidential will not be disclosed.
8.2 Such privileged and confidential information includes information which, if disclosed, might cause harm to the competitive position of the Offeror supplying the information.
8.3 All Offerors, therefore, must visibly mark as Confidential each part of their proposal which they consider containing proprietary information.
9.0 PAYMENTS DUE THE CITY
9.1 Section 26-211 of the City’s Code of Ordinances requires the following:
9.1.1 On every contract to which the City is a party and for which written specifications are prepared, the specification shall include the requirement that before the contract is awarded the contractor shall pay all taxes, licenses, fees, and other charges which are outstanding and due to the City.
9.1.2 No contract to which the city is a party shall be awarded to any person who:
9.1.3 Has not paid all taxes, licenses, fees, and other charges which are outstanding and due the city, or
9.1.4 Owns any property which is adjudicated to the city, or which has demolition liens, grass cutting liens, or any other property standards liens on it, or
9.1.5 Owns more than 25% of a legal entity that owns any property which is adjudicated to the city, or which has demolition liens, grass cutting liens, or any other property standards liens on it.
9.1.6 For purposes of this section, Own shall mean to be the last record owner of property prior to a tax sale or adjudication.
9.1.7 Bids/proposals will not be accepted from, or contract awarded to any person, firm, or corporations which have at any time failed to execute a contract that has been awarded to them by the City, or which is in arrears to the City upon debt or contract, or which is a defaulter as surety or otherwise upon any obligation to the City.
10.0 ASSIGNMENT
10.1 This contract shall not be assigned without the prior written consent of the city through its Mayor.
11.0 UNSATISFACTORY WORK
11.1 The City shall not be obligated to pay for unsatisfactory work.
12.0 COMPLIANCE WITH CIVIL RIGHTS LAWS
12.1 By submitting and signing this bid, bidder agrees to abide by the requirements of the following as applicable:
Title VI and VII of the Civil Rights Act of 1964, as amended by the Equal Opportunity Act of 1972, Federal Executive Order 11246, Federal Rehabilitation Act of 1973, as amended, the Veterans Readjustment Assistance Act of 1974, Title IX of The Education Amendments of 1972, the Age Act of 1975, and bidder agrees to abide by the requirements of the Americans with Disabilities Act of 1990. Bidder agrees not to discriminate in its employment practices and will render services under any contract entered into as a result of this solicitation without regard to race, color, religion, sexual orientation, national origin, veteran status, political affiliation, or disabilities. Any act of discrimination committed by bidder, or failure to comply with these statutory obligations when applicable, shall be grounds for termination of any contract entered into as a result of this solicitation.
13.0 JOINT VENTURE
13.1 If the Proposer is a joint venture, provide the following information:
13.1.1 Date of formation
13.1.2 Name and address of each venture partner
13.1.3 Principals of each venture partner
13.1.4 Venture partner holding the majority interest in the venture and its percentage of interest.
13.1.5 Proposer shall include a copy of the Joint Venture agreement as an attachment to proposal. Such attachment shall not count in the page limit.
PART III
1.0 SCOPE OF WORK
1.1 The Shreveport Airport Authority seeks proposals from qualified vendors for the turnkey supply, delivery, installation and commissioning of six (6) new Passenger Boarding Under Bridge-Mounted Pre-Conditioned (PCA) and Ground Power Unit (GPU) units for pre-arrival and pre- departure air conditioning for aircraft and boarding bridges at Shreveport Regional Airport.
1.2 The units will be Point-of-Use units, with new cable and hose management systems.
1.3 The proposer must comply with AC 150/5370-10H and AC 150/5220-21C as applicable.
1.4 An on-site assessment will be required to verify existing infrastructure conditions and establish definitive engineering requirements for the PCA and GPU installation.
2.0 Existing Conditions and Equipment Requirements
2.1 Equipment will be installed on bridges at Gates 1, 2, 3, 5, 7 and 8. Each gate has 480V, 400A fusible disconnect, 3 phase 4 wire, 60HZ.
2.2 The proposer will be required to connect to the load side of the fusible disconnect.
2.2.1 Equipment procured must be compatible with JBT Passenger Boarding Bridges as listed
2.3 Aircraft Mix:
2.3.1 CRJ 200,700,900
2.3.2 ERJ 140, 145,175
2.3.3 A319,320,321
2.3.4 Boeing 717, 737, 757
2.3.5 MD-80 Extension kit not required
2.4 The proposal requires the proposer to provide all tools, labor, materials, equipment and supervision for complete installation and operation.
2.5 Existing PCA & 400 HZ units are to be removed and turned over to the proposer for disposal.
2.5.1 Gate 3-PCA removal and disposal
2.5.1.1 Gate 5-GPU removal and disposal
2.6 Start up and commissioning of equipment required as part of this solicitation/scope of work.
2.6.1 Required operational date of the new units will be the installation/operational certification date.
Gate Model Number Year
1 A3 58/110 125R 2010
2 A3 28/110-125R 2009
3 A3 58/110-125R 2010
5 A3 58/110 125R 2010
7 A3 58/110-125R 2010
8 A3 53/104-125R 2006
2.6.2 All areas of the airport disturbed by the Contractor’s operations not within the construction limits as set forth by the Owner shall be restored at least equal to original condition at no cost to the Owner.
2.6.3 During installation, only one gate at a time can be down.
3.0 Additional required documentation:
3.1 Vendor shall also provide to buyer/owner a list of replacement parts and a copy of all maintenance and operational manuals (1 for each PCA/GPU unit)-6 total.
3.1.1 Contractor will be required to be badged, for installation will occur in the secured area. Cost of badge is $100, $50 for a replacement badge.
4.0 WARRANTY:
4.1 Vendor will coordinate the receipt, inspection, storage, and tracking of any and all Owner-Purchased
Materials in a manner that satisfies requirements for any and all applicable Manufacturer Warranties and will provide written documentation supporting all installer and Manufacturers warranties.
4.2 Equipment Warranty. Vendor warrants to Buyer/Owner that:
4.2.1 Equipment as Delivered shall be new at the time of Delivery and shall have been manufactured using new components
4.2.2 During the Equipment Warranty Period the Equipment shall be free of any Defects (the “Equipment
Warranty”).
4.3 As used herein, the “Equipment Warranty Period” means the period of time commencing on the earlier to occur of:
4.3.1 The date that the Equipment is placed into service as evidenced by the operation thereof for commercial purposes and
4.3.1.2 The day that is sixty (60) days after the date of Delivery of the Equipment and continuing to and ending on the first (1st) anniversary of such date.
PART IV- EVALUATION CRITERIA
RFP#: 26-818 Title of RFP: Jet Bridge Mounted Combination PCA/GPU Units Re-bid
Evaluator: Phone #:
Date: Company Name:
POINT
RANGE
POINTS
ASSIGNED
1 Equipment Cost and Labor 0-50
2 Demonstrated qualifications- recent experience-similar projects 0-35
3 Timing of Delivery 0-15
TOTAL POINTS: 100 Points
*The points for cost shall be furnished by the Purchasing Agent, based upon the standard formula as listed below: Fee schedules, including total life cycle costs (when applicable), will be scored by applying the maximum number of points permissible to the responsible firm submitting the lowest responsive fee. All other Offerors are prorated points, by determining the percentage of differential between the low Offerors responsive total and cost and each of the other Offerors total cost, and then applying the percentage of differential accordingly.
It is the responsibility of the Originating Department to submit scoring criteria and point range for each item.
PART V
PROVIDE SUBMISSION REQUIREMENTS IN THE FOLLOWING FORMAT
Proposals submitted in the prescribed format and with properly completed exhibit forms, as provided herein, will be evaluated for contract award.
1.0 SUBMISSION REQUIREMENTS & CHECKLIST
1.1 To achieve a uniform review process and allow for adequate comparability, the proposals must be organized in the manner specified below:
1.1.1 A Table of Contents - clearly identify the material, by section and page number.
1.1.2 A Letter of Transmittal - limit to four printed pages.
1.1.3 __ Provide number of years in business, office location, email address, and financial stability of company.
1.1.4 __ Briefly state your firms understanding of the work to be done and make positive commitment to perform the work.
1.1.5 __ Identify your proposals principal strengths and weaknesses.
1.1.6 __ Give the names of the persons who will be authorized to make representations for your firm, their titles, addresses, and telephone numbers.
1.1.7 __ State whether or not your firm has been involved in any litigation and/or has been disqualified by any agency within the past five (5) years, because of your performance. Explain fully if your firm has been involved in any litigation and/or has been disqualified.
1.1.8 __ Indicate the number and dates of amendments that you have received. (end of transmittal letter)
1.2 Provide narrative on the approach to the scope of work (proposed project plan) using the format of Exhibit A.
1.3 Document five of Offerors prior similar projects with name, address, and phone number of a contact with whom City can discuss Offerors past performance using the format of Exhibit B.
1.4 Provide cost proposal using the format of Exhibit C.
1.5 Submit Exhibit D - FELONY CONVICTION/E-VERIFY AFFIDAVIT.
1.6 Submit Exhibit E – FAIR SHARE REQUIREMENTS
1.7 List any exceptions to this RFP (and/or the enclosed City’s Standard Agreement).
1.8 Provide list of sub consultants and state years of experience of your firm and each sub consultant for this type of work.
1.9 Other information and materials which the Offeror wishes to submit in support of this proposal, qualification, etc.
RFP NO. EXHIBIT A
PAGE of
NARRATIVE ON THE APPROACH TO THE SCOPE OF WORK
(Proposals should respond to the Scope of Work point by point by numeric reference.)
RFP NO. EXHIBIT B
1.0 OFFERORS EXPERIENCE
1.1 Contract Title:
1.1.1 Contract Period: From To
1.1.2 Geographic Area Serviced:
1.1.3 Scope of Work:
1.1.4 References:
1.1.5 Contracting Office:
1.1.5.1 Title:
1.1.5.2 Address:
1.1.5.3 City: State Zip
1.1.5.4 Telephone # (s):
2.0 OFFERORS EXPERIENCE
2.1 Contract Title:
2.1.1 Contract Period: From To
2.1.2 Geographic Area Serviced:
2.1.3 Scope of Work:
2.1.4 References:
2.1.5 Contracting Office:
2.1.5.1 Title:
2.1.5.2 Address:
2.1.5.3 City: State Zip
2.1.5.4 Telephone # (s):
3.0 OFFERORS EXPERIENCE
3.1 Contract Title:
3.1.1 Contract Period: From To
3.1.2 Geographic Area Serviced:
3.1.3 Scope of Work:
3.1.4 References:
3.1.5 Contracting Office:
3.1.5.1 Title:
3.1.5.2 Address:
3.1.5.3 City: State Zip
3.1.5.4 Telephone # (s):
4.0 OFFERORS EXPERIENCE
4.1 Contract Title:
4.1.1 Contract Period: From To
4.1.2 Geographic Area Serviced:
4.1.3 Scope of Work:
4.1.4 References:
4.1.5 Contracting Office:
4.1.5.1 Title:
4.1.5.2 Address:
4.1.5.3 City: State Zip
4.1.5.4 Telephone # (s):
5.0 OFFERORS EXPERIENCE
5.1 Contract Title:
5.1.1 Contract Period: From To
5.1.2 Geographic Area Serviced:
5.1.3 Scope of Work:
5.1.4 References:
5.1.5 Contracting Office:
5.1.5.1 Title:
5.1.5.2 Address:
5.1.5.3 City: State Zip
5.1.5.4 Telephone # (s):
RFP NO. EXHIBIT C
COST PROPOSAL
PCA equipment costs GPU equipment costs Installation costs (total gate)
Gate 1 $ $ $
Gate 2 $ $ $
Gate 3 $ $ $
Gate 5 $ $ $
Gate 7 $ $ $
Gate 8 $ $ $
TOTAL $ $ $
TOTAL PROPOSAL COST $
The Bidder’s prices per this Section, shall be inclusive of all costs- labor, materials, tools, and equipment associated with providing the services herein, which shall include delivery, installation and commissioning of the new units, ensuring performance standards are met. Direct, indirect costs necessary to complete the scope of work and adjacent work are to be included in the cost, along with all overhead and profit
Mobilization shall consist of the preparatory work and operations for beginning work on the Project; costs of bonds and required insurance; costs of operations necessary to move personnel, badging, equipment, supplies, and incidentals to the site; No separate cost will be paid for mobilization. All costs related to mobilization shall be considered incidental to and included in the unit cost prices.
RFP NO. EXHIBIT C
COST PROPOSAL
OFFERORS CERTIFICATIONS
HAS A FEDERAL AGENCY OR A FEDERALLY CERTIFIED STATE OR LOCAL AGENCY PERFORMED ANY REVIEW OF YOUR ACCOUNTS OR RECORDS IN CONNECTION WITH ANY GRANT OR CONTRACT WITHIN ANY GRANT
OR CONTRACT WITHIN THE PAST TWELVE MONTHS?
YES NO (IF YES GIVE NAME, ADDRESS, AND TELEPHONE NUMBER OF REVIEWING OFFICE.)
1.0 In compliance with this Request for Proposal, and subject to all conditions thereof, the undersigned agrees:
1.1 This proposal, as stated, is open for acceptance for a period of 120 calendar days from date of opening: and
1.2 To furnish all services, materials, and equipment necessary and incidental to perform the proposed project.
1.3 That this proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal.
1.4 Acting on behalf of the Offeror, this is to attest that the undersigned is a duly authorized representative of the above captioned firm, corporation, or business.
1.5 By signing this document, the Offeror understands and agrees that the identity of any Offeror or the contents of any proposal will not be public information until after the contract award is made.
1.6 If awarded a contract/purchase order, my company understands and agrees to provide the sub consultant information as listed in GENERAL CONTRACT PROVISIONS (www.shreveportla.gov/bids/bids.htm), paragraph 16, SUBCONTRACTOR TRACKING. I hereby certify that sub consultant(s) (would/would not) be used.
1.7 In accordance with the ACDBE Requirements of this RFP, the Offeror assures the City that he or she will meet or exceed the DBE Goal requirements. ACDBE goal for this project is 1.5%.
Signature Offerors Representative Title authorized to enter into contract with the City of Shreveport
Company
Authorized Signature (typed/printed)
Telephone Fax Number
Emergency Number(s) Date
E-mail Address Offerors Federal Employer I.D. Number
FELONY CONVICTION/E-VERIFY AFFIDAVIT
This document must be furnished by the lowest responsive Bidder in a separate envelope, or by fax, or e-mail not later than then 10 days after the bid opening. Failure to submit at the specified time may result in the bid being declared as non-responsive. Do not submit with your IFB document.
RFP Number: __26-818_
By signing this document in accordance with La. R.S. 38:2227, the appearer, as a Bidder on the above project, does hereby attest that:
1.0 No sole proprietor or individual partner, incorporator, director, manager, officer, organizer, or member who has a minimum of a ten percent (10%) ownership in the bidding entity named below has been convicted of, or has entered a plea of guilty or nolo contendere to any of the following state crimes or equivalent federal crimes:
1.1 Public bribery (R.S. 14:118) 1.2 Extortion (R.S. 14:66)
1.3 Corrupt influencing (R.S. 14:120) 1.4 Money laundering (R.S. 14:23)
2.0 Within the past five years from the project bid date, no sole proprietor or individual partner, incorporator, director, manager, officer, organizer, or member who has a minimum of a ten percent (10%) ownership in the bidding entity named below has been convicted of, or has entered a plea of guilty or nolo contendere to any of the following state crimes or equivalent federal crimes, during the solicitation or execution of a contract or bid awarded pursuant to the provisions of Chapter 10 of Title 38 of the Louisiana Revised Statutes:
2.1 Theft (R.S. 14:67) 2.2 Identity Theft (R.S. 14:67.16)
2.3 Theft of a business record (R.S.14:67.20) 2.4 False accounting (R.S. 14:70)
2.5 Issuing worthless checks (R.S. 14:71) 2.6 Bank fraud (R.S. 14:71.1)
2.7 Forgery (R.S. 14:72) 2.8 Contractors; misapplication of payments (R.S. 14:202)
2.9 Malfeasance in office (R.S. 14:134)
3.0 By signing this document in accordance with La. R.S. 38:2212.10, the appearer, as a Bidder on the above project, does hereby attest that:
3.1 The private employer is registered and participates in a status verification system (E-Verify) to verify that all employees in the state of Louisiana are legal citizens of the United States or are legal aliens.
3.2 The private employer shall continue, during the term of the contract, to utilize a status verification system to verify the legal status of all new employees in the state of Louisiana.
3.3 The private employer shall require all subcontractors to submit to the employer a sworn affidavit verifying compliance with Paragraphs (3.1) and (3.2) of this Subsection.
If evidence is submitted substantiating that a false attestation has been made and the project must be readvertised or the contract cancelled, the awarded entity making the false attestation shall be responsible to the public entity for the cost of rebidding, additional costs due to increased cost of bids and any and all delay costs due to the rebid or cancellation of the contract.
And executes this document as:
Company Name:
Address:
Phone Number: FAX Number:
By:
Signature of Authorized Owner or Representative Title Date
Print Name: E-Mail Address:
Fax to: 318-673-5408 OR E-Mail to: __ashley.germany@shreveportla.gov__ (10-23-15)
EXHIBIT D
CITY OF SHREVEPORT
Section 40-Fair Share Requirements (Revised 10-28-2024) Applies to IFB, RFP, RFS, and RFQ Documents except when a Commodity Purchase or if for the Airport.
1.0 DEFINITIONS
1.1 Bid-shall mean bid for IFBs, proposal for RFPs, and quote for RFQs.
1.2 Contractor-shall mean prime contractor for IFBs, RFPs, and RFQs. For RFSs, Contractor shall mean Prime Consultant.
1.3 Offeror-shall mean a person who submits an RFP.
1.4 Subcontractor-shall mean subcontractor for IFBs, and RFQs. For RFSs, Subcontractor shall mean Sub consultant.
1.5 FSC-is Fair Share Certified (specific to City-Funded Projects and included in the Fair Share computation).
Fair Share Certification applications may be obtained as follows:
1.6 Contact 318-673-5017
1.6.1 Fair Share Office
1.6.2 505 Travis Street, Suite 260
1.6.3 Shreveport, LA 71101
1.6.4 FSC Application Affidavits maybe downloaded at:
https://www.shreveportla.gov/DocumentCenter/View/21385/10072022---Fair-Share-Application
DBE-is Disadvantaged Business Enterprise (specific to Federally-funded Projects - generally FAA, DOTD or FTA projects).
1.7 S/DBE-is Small Disadvantaged Business Enterprise (again, specific to Federally-Funded Projects - a group that is defined by the Government as "presumptively disadvantaged" by provisions of CFR 49). DBE applications may be obtained as follows: http://www8.dotd.louisiana.gov/UCP/UCPdownloads.aspx
1.8 City of Shreveport Vendor Applications may be downloaded at: https://www.shreveportla.gov/780/Section- 800.
2.0 PURPOSE OF THE PROGRAM
2.1 The City of Shreveport has implemented this program to ensure that their construction and service contracts provide employment and growth opportunities for small disadvantaged businesses.
2.2 Therefore, when the goal has not been met, prime contractors are required to submit proof showing that good faith efforts have been made to contract with FSC, S/DBE or DBE subcontractors.
2.3 All efforts must be documented.
2.4 Direct commodity purchases made by the City of Shreveport are exempt from the program.
3.0 FAIR SHARE CONTRACT CLAUSES
3.1 The following Fair Share Contract Clauses and Good Faith Effort Requirements are only a small part of the Fair Share Program.
3.1.1 The Fair Share Program full text and forms that will be needed are posted in the Purchasing Office, or available upon request, or available on our web site at www.shreveportla.gov, and are incorporated by reference in all solicitation documents with the same force and effect as if set forth in full text.
3.1.2 ANY DEVIATIONS FROM THE FAIR SHARE REQUIREMENTS LISTED HEREIN MUST BE CLEARLY
IDENTIFIED WITH EACH SOLICITATION RESPONSE.
3.1.3 PLEASE CALL THE FAIR SHARE OFFICE AT (318) 673-5017 OR THE PURCHASING DIVISION AT (318)
673-5450 IF YOU HAVE ANY QUESTIONS.
3.2 Prompt Payment Clause
EXHIBIT E
http://www.ci.shreveport.la.us/pdf/bids/sect40.pdf https://www.shreveportla.gov/DocumentCenter/View/21385/10072022---Fair-Share-Application http://www8.dotd.louisiana.gov/UCP/UCPdownloads.aspx https://www.shreveportla.gov/780/Section-800 https://www.shreveportla.gov/780/Section-800
3.2.1 The City of Shreveport will, after acceptance of goods or services and the receipt of a proper invoice from the contractor, process request for payment, said payment to be paid within thirty (30) days.
3.2.2 Prime contractors shall then be required to ensure payment is made to any designated small or disadvantaged business (subcontractors), within fifteen (15) business days of receipt of payment to the prime contractor from the City.
3.2.3 Upon satisfactory completion of a contract, the City and/or prime contractor will ensure that any retainage payments are returned within thirty (30) business days.
3.2.4 Failure to comply with the terms of this requirement may be grounds for termination of the contract by the City.
3.3 Affirmative Action Clause
3.3.1 The contractor, sub recipient, or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract.
3.3.2 The contractor shall carry out applicable requirements of the appropriate funding guidelines for each contract.
Failure by the contractor to carry out these requirements is a material breach of the contract which may result in the termination of this contract or such other remedy as the City deems appropriate.
3.4 Participation of Small Disadvantaged Business Concerns
3.4.1 It is the policy of the City of Shreveport that all prime contractors and service providers utilize qualifying small, disadvantaged business concerns.
3.4.2 The City has set a goal of 25% for participation of these said business concerns in all City-let contracts and/or purchases.
3.4.3 Specific goals are set on federally funded contracts as determined by the regulating federal agency and language to that effect shall be included in those contracts.
3.4.4 Failure by a contractor or service provider to include these designated businesses could constitute breach of contract and result in remedial action.
3.4.4.1 Assurance of utilization of FSC, S/DBE, and DBE subcontractors is given through FSC FORM 4, Letter of Intent.
3.5 Subcontractor Payment Certification
3.5.1 Every contract by the City for the performance of work will contain a provision requiring the prime contractor to certify in writing that all subcontractors and suppliers have been paid for work and materials from previous progress payments received (less any retainage) by the prime contractor prior to receipt of any further progress payments.
3.5.2 In the event a contractor is unable to pay subcontractors or suppliers until it has received a progress payment from the City, the prime contractor shall pay all subcontractors or suppliers funds due, from said progress payments within forty-eight hours of receipt of payment from the City.
3.5.3 During the contract and upon completion of the contract, the City of Shreveport may request documentation to certify payments to subcontractors or suppliers. This provision in no way creates any contractual relationship between any subcontractor and the City of Shreveport or any liability on the City of Shreveport for the contractor’s failure to make timely payment to the subcontractor.
3.6 Fair Share Certified (FSC), S/DBE or DBE PARTICIPATION-GOOD FAITH EFFORT REQUIREMENTS
3.7 PRE-BID EFFORTS REQUIRED REGARDING FAIR SHARE, S/DBEs or DBEs
3.8 Bidders are required to contact, and make good faith efforts to contract with City and Louisiana Unified Certification Program (LAUCP) Certified FSC, S/DBE or DBE firms for each division of work identified in these documents which will be performed by a subcontractor.
3.9 A list of FSC, S/DBE or DBE contractors specializing in the divisions of work identified for subcontracting on this project can be found at the following Web Sites…City Projects:
https://www.shreveportla.gov/141/Online-Database Federal Projects: http://www8.dotd.louisiana.gov/ucp/
3.10 These requirements are contractual obligations and are included in all contracts.
3.11 Failure to comply may result in a finding of breach of the contract, disqualification of the bidder to bid on future https://www.shreveportla.gov/141/Online-Database http://www8.dotd.louisiana.gov/ucp/ contracts, or a claim for damages.
3.12 Who to contact
3.12.1 For each division of work identified in these documents that will be performed by a subcontractor, Bidders must contact:
3.12.2 Every FSC, S/DBE or DBE firm that attended the pre-bid meeting (if one was held) which specializes in a division of work that will be subcontracted, and
3.12.3 In addition to the above, a minimum of five (5) other FSC, S/DBE or DBE firms.
3.12.4 If there are less than 5 firms listed for a particular division of work, all of the subcontractors in that division must be contacted.
3.13 When to contact
3.13.1 All Bidders must provide project information to FSC, S/DBE, or DBE firms in sufficient time to permit the firm to have an equal opportunity to compete for work that the successful bidder will subcontract together with the date and time that subcontractor’s bids are due.
3.13.2 The first documented contact with each FSC, S/DBE, or DBE firm must be at least seven (7) working days before bid opening.
3.14 How to contact
3.14.1 First contact: Bidders shall contact FSC, S/DBE or DBE subcontractors by Email or Fax to advise them of potential subcontracting opportunities.
3.14.2 Follow-up: Bidders shall follow up with Email, Fax and or Phone to each FSC, S/DBE, or DBE firm contacted to determine if a bid will be submitted or if further information is required.
3.14.3 A firm need not be contacted if that firm responds to the first contact with a statement that the firm will not bid on this project.
4.0 ADDITION/REPLACEMENT OF SUBCONTRACTORS AFTER SUBMISSION
4.1.1 The successful bidder will not be permitted to add or replace a subcontractor without the consent of the DBE Compliance Manager and/or the Fair Share Office and the Originating Department.
4.1.2 If any subcontractor is added or replaced after the contract award, the contractor shall make good faith efforts to contract with another FSC, S/DBE, or DBE for the work to be performed by that subcontractor.
4.1.3 Documentation of these efforts is required and must be submitted to the Purchasing Agent and the Fair Share Office on FSC FORM 2.
5.0 DOCUMENTATION OF GOOD FAITH EFFORTS
5.1 FAIR SHARE DOCUMENTS TO BE SUBMITTED BY THE APPARENT LOWEST
CONSTRUCTION/SERVICE PROVIDER BIDDER.
5.1.1 COMPLIANCE AGREEMENT-FSC FORM 1. Submit completed FSC FORM 1.
5.1.2 UTILIZATION/CONTRACT TRACKING-FSC FORM 2. Submit FSC FORM 2 showing all subcontractors/all sub-subcontractors to be used on this contract and use for any changes also. Note: Construction Bidders, including 100% Fair Share/DBE, must turn in this form showing all subcontractors to be used on this contract.
5.1.3 PROJECT CONTACT SHEET-FSC FORM 3. Submit FSC FORM 3 showing a completed log of contacts with FSC, S/DBE, or DBE firms.
5.1.4 LETTER OF INTENT-FSC FORM 4. Submit a signed FSC FORM 4, Letter of Intent indicating FSC, S/DBE and DBE Subcontractors and Sub-Subcontractors along with the scope of work to be performed and price/cost of goods or services to be performed by the Subcontractor. There must be a separate Letter of Intent for each FSC, S/DBE or DBE Subcontractor or Sub-subcontractor. This letter of Intent must be submitted within 72 hours of the bidder being designated as “the apparent lowest construction/service provider bidder”, or his/her bid will be declared non-responsive.
5.1.5 Failure to submit these documents shall make a bid non-responsive and the apparent lowest bidder ineligible to receive an award of the contract.
5.1.6 The Purchasing Agent and/or the DBE Compliance Manager and/or the Fair Share Office shall have the right to seek clarification to assure good faith effort compliance.
6.0 DOCUMENTS TO BE SUBMITTED AFTER CONTRACT AWARD.
6.1.1 MONTHLY SUBCONTRACTOR PAYMENT UTILIZATION REPORT-FSC FORM 5: All subcontractors (including FSC, S/DBE, or DBE firms) and second tier subcontractors shall be reported on the FSC FORM 5 as well as contract amounts and payments.
6.1.2 Copy of email or fax sent to FSC, S/DBE, or DBE firms: When requested, provide one copy of the email or fax sent to FSC, S/DBE or DBE firms to solicit bids for this project. If more than one form of email or fax was sent, submit a copy of each form sent.
6.2 Optional Good Faith Efforts
6.2.1 Contractors should consider efforts such as:
6.2.2 Did the contractor advertise in general circulation, trade association, and small disadvantaged-focus media concerning subcontracting opportunities?
6.2.3 Did the contractor provide written notice to a reasonable number of specific FSC, S/DBEs, or DBEs that interest in the contract was being solicited, in sufficient time to allow the FSCs, S/DBEs, or DBEs to participate effectively? (NOTE: It is recommended that certified mail be used to provide documentation).
6.2.4 Did the contractor follow up initial solicitations of interest by contacting FSC, S/DBEs or DBEs to determine certainty whether the FSCs, S/DBEs or DBEs were interested?
6.2.5 Did the contractor select portions of the work to be performed by FSCs, S/DBEs, or DBEs, including, where appropriate, breaking down contracts into economically feasible units to facilitate participation?
6.2.6 Did the contractor provide interested FSCs, S/DBEs, or DBEs with adequate information about the plans, specifications, and requirements of the contract?
6.2.7 Did the contractor negotiate in good faith with interested FSCs, S/DBEs, or DBEs, not rejecting them as unqualified without sound reasons based on a thorough investigation of their capabilities?
6.2.8 Did the contractor make efforts to assist interested FSCs, S/DBEs, or DBEs in obtaining bonding, lines of credit, or insurance required by the recipient or contractor?
6.2.9 Did the contractor effectively utilize the services of available community organizations; contractors’ groups;
local, state, and federal business assistance offices; and other organizations that provide assistance in the recruitment and placement of FSCs, S/DBEs, or DBEs?
END
COMPLIANCE AGREEMENT-FSC FORM 1
Bid Number: _____________ (Revised 9-10-07)
By signing this document, the bidder hereby certifies, understands, and affirms that:
1.0 It has not discriminated against any FSC, S/DBE, or DBE firms in awarding subcontracts for this project.
2.0 The good faith efforts requirements are contractual obligations that must be fulfilled whether or not listed on these forms.
3.0 The apparent lowest construction/service provider bidder shall be required to complete/submit Fair Share Forms 1 through 4 within 72 hours after notification. If additional information is needed, it must be turned in within 24 hours or the bid will be declared as non-responsive when additional time is not approved by the Fair Share office.
4.0 Failure to provide information may result in a loss of the bidder’s bid bond.
5.0 Replacement of a subcontractor during contract performance without: a) obtaining the prior written consent of the DBE Compliance Manager and/or the Fair Share Office and the originating department; and b) subsequent good faith efforts in selection of a replacement; is prohibited and a breach of contract. See UTILIZATION/CONTRACT TRACKING-FSC FORM 2 AS REQUIRED FOR ALL SUBS/SUB of SUBS.
6.0 Consideration was given to waiving bonding requirements for FSC, S/DBE, or DBE subcontractors.
And, Executes this Compliance Agreement as:
Company Name:
Address:
Phone Number: FAX Number:
By:
Signature of Authorized Owner or Representative Title Date
Print Name:
UTILIZATION/CONTRACT TRACKING-FSC FORM 2
This multipurpose form is used to list all types of subs and changes to their status for Fair Share and Contract Tracking Reporting. (Revised 10/28/2024)
1. IFB/RFP/RFS/RFQ # (Circle 1) __________ 2. Project Name ______________________________________________
3. Prime Contractor___________________________ 4.Bid Amount of Total Project ($) ________________________
5. Prime Contractor’s Federal Tax ID # ________________________ Change Order? Yes or No C/O # ________
List all Subcontractors (copy as needed)
“Only Fair Share or DBE companies to be listed”
Status – Circle all that apply
Type of work to be performed
Subcontracted Amount $ + or (--)
Federal I.D. # __________________________________
Company _____________________________________
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
E-Mail ________________________________________
State Class/License #
FSC, DBE
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
Prime Contractor’s Signature ______________________ Date: _________ Phone: ____________________________
Project Mgr. Signature: __________________Date: ______ Fair Share Office Approval: ____________ Date: ______
PROJECT CONTACT SHEET-FSC FORM 3
(Revised 10-28-2024)
Name of Project: _____________________________________ Bid Number: ___________________
Bidder’s Name: ____________________________________________________________________
Bidders should record their contacts with potential FSC or DBE subcontractors through use of this log. Additional forms may be copied if needed.
Name of Subcontractor
Only Fair Share or DBE companies to be listed
Type of Contact(s) “Email or Fax Required”
Date & Time of Contact
Person making/receiving call or other communications
Contact made?
Yes/No
Quote received Amount
Quote accepted, rejected, Non- Responsive
Comments
Bid # ________PROJECT# _________ FSC FORM 4
Fair Share / Disadvantaged Business Enterprise Compliance Management
LETTER OF INTENT TO PERFORM AS A PRIME CONTRACTOR AND
UTILIZE A SUBCONTRACTOR/SUBCONSULTANT
[NOTE: Pursuant to the City of Shreveport’s Fair Share Program for Equal Business Opportunity, established by Ordinance No. 105, 1999, 7-27-99, DBE firms participating in the Program must have current certification status prior to award of a contract where they are counted towards subcontracting participation. If the City of Shreveport determines that a firm is not an eligible DBE firm, that firm is advised to immediately submit a completed certification application to the State of Louisiana, Department of Transportation and Development, LAUCP Section, P.O. Box 94245, Baton Rouge, LA 70804-9245 for consideration on subsequent projects.
1. Name of Project
2. Name of offeror/prime contractor
3. The undersigned is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify “supply” , “install” or “perform particular services”):
at the price of $
(Name of DBE/FSC Firm) (Date)
Circle one (Owner/Authorized Agent of DBE/FSC firm) Type or Print Name (Signature of Owner or Authorized Agent of DBE /FSC Firm)
(Phone Number) (Fax Number)
AFFIDAVIT OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .