This Request for Proposals (RFP 26-810) is issued by the City of Shreveport, Louisiana, specifically for SporTran, seeking qualified firms to design, fabricate, deliver, and install monument signage at three primary transit facilities: the Gateway Hub, Crossroads Hub, and Intermodal Terminal, along with one digital display-billboard sign at the Intermodal Terminal. The project scope includes site visits and field verification, final design drawings and structural calculations, permitting and regulatory approvals, fabrication and installation of three monument signs, and furnishing of one digital display sign with supporting infrastructure, controllers, communications equipment, and software. The contractor must also provide foundations, concrete work, electrical connections, utility coordination, site restoration, ADA compliance verification, startup and commissioning services, training for SporTran personnel, and comprehensive warranties and documentation. Proposals must be received by 3:00 p.m. CST on August 27, 2026. The selected contractor shall complete all work within 120 days from contract signing. The contract term is for one year from the date of award, with the City reserving the right to renew for four additional one-year increments at mutually agreeable terms.
The total estimated expenditure for this project is $300,000. Pricing shall be firm for the initial contract term, with any subsequent increases limited to documented cost increases or the appropriate CPI or PPI, whichever is lower. Proposals will be evaluated based on understanding of project requirements (0-25 points), experience and qualifications (0-25 points), design quality and innovation (0-20 points), project management and timeline (0-15 points), and cost effectiveness (0-15 points), with the lowest responsive cost proposal receiving the maximum 15 cost points and other proposals scored proportionally. A Fair Share goal of 25% participation by small disadvantaged businesses (FSC, S/DBE, or DBE firms) is required, with documentation of good faith efforts if the goal cannot be met. The project is federally funded through FTA (Federal Transit Administration), requiring compliance with Buy American Act certification, FTA contract provision guidelines, and lobbying certifications. Insurance requirements include Commercial General Liability ($1,000,000 combined single limit), Comprehensive Auto Liability ($500,000 combined single limit), Workers Compensation, and Builders Risk Insurance. Contractors must also comply with all Fair Share documentation requirements, including completion of Forms 1-4 within 72 hours of being designated the apparent lowest bidder.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Shreveport
REQUEST FOR PROPOSALS RFP 26-810
DESIGN, CREATION AND INSTALLMENT OF MONUMENT SIGNAGE AT W. SHV
HUB, EAST SIDE HUB, AND INTERMODAL TERMINAL
INDEX
Page Numbers
Proposal Invitation 2
General Information - Part I 3-4
Introduction - Part II 5-7
Scope of Work - Part III 8
Evaluation Criteria - Part IV 9
Submission Requirements - Part V 10
NOTE: All items listed in Part V must be submitted with your proposal
Index of reference items not included herein that is incorporated by reference with the same force and effect as if set forth in full text. Should any of these be in conflict with those listed herein, the more stringent will apply.
The General Contract Clauses (Section 20), the Standard Instructions/Conditions for Request for Proposals (Section 30) will no longer be incorporated in solicitations but will be incorporated by reference in the City of Shreveport (hereinafter the City) book of Standard Solicitation Instructions / Provisions and General Contract Clauses; which are available at www.shreveportla.gov (click on Business, then on Bids & RFPs). If you do not have a computer, you can use one of the public use computers that are available at the Shreve Memorial Library or at most library branches.
EXHIBITS
NARRATIVE ON THE APPROACH TO THE SCOPE OF WORK A-11
SCHEDULE OF EVENTS B-12
OFFERORS EXPERIENCE C-13
PERSONNEL STAFFING D-14
*COST PROPOSAL E-15 -16
FORMAT FOR THE RETURN ENVELOPE F-17
*Required for all RFPs
APPENDIX
#1- FAIR SHARE FORMS 1-4 (Must be furnished with your proposal) 18-29
#2- ADJUDICATED OR LIEN PROPERTY AFFIDAVIT (Do not furnish with your proposal) 30
#3- FELONY CONVICTION / E-VERIFY AFFIDAVIT (Must be furnished with your proposal) 31
#4- INSURANCE 32-36
#5- FTA CONTRACT PROVISION GUIDELINES (Must be furnished with your proposal) 37-51
#6- BUY AMERICAN, BUY AMERICA ACT CERTIFICATION (Must be furnished with your proposal) 52-54
#7- LOBBYING CERTIFICATION (Must be furnished with your proposal) 55
#8- DRAWINGS – MONUMENT SIGNS 56-59
The Felony Conviction/E-Verify (Appendix 3) must be submitted with your proposal. Revised 12-05-17 http://www.shreveportla.gov/
CITY OF SHREVEPORT-PURCHASING DIVISION
P.O. BOX 31109 SHREVEPORT, LOUISIANA 71130-1109 Suite 610, 505 TRAVIS SHREVEPORT, LA 71101-3042
Phone 318/673-5450 web site: www.shreveportla.gov Fax 318/673-5408
July 28, 2026
RFP 26-810
MUST BE RECEIVED NOT LATER THAN 3:00 P.M. (CST) ON: August 27, 2026
PROPOSAL TITLE: Design, Creation and Installment of Monument Signage at W. SHV Hub, East Side Hub, and Intermodal Terminal
You are invited to submit proposals in accordance with the requirements of this solicitation which are contained herein.
In order for your proposal to be considered, it must be received in the Purchasing office not later than the date and time as listed above. Solicitation documents are posted on BidNetDirect. To view the general RFP information and receive notices by email, register with BidNetDirect. Registration is free. Solicitation documents are also available at www.shreveportla.gov/Solicitations. BidNetDirect shall be the official source of solicitation documents.
It shall be the responder’s responsibility to make inquiry as to the addenda issued. All inquiries pertaining to this RFP shall reference RFP number as shown above. Paper proposals received by the Purchasing Office after the time specified will be documented and then returned to the Offeror unopened. Due to the possibility of negotiation with all Offerors, the identity of any Offeror or the contents of any proposal will not be public information until after the contract award is made.
Paper proposals and modifications received in response to this Request for Proposals shall be time stamped upon receipt and secured in the Purchasing Division until the established due date. Attendance by the submitter on the established due date is unnecessary because submittals will be opened at a later time in the presence of a procurement employee or selection committee member.
The proposals must be signed in ink by an official authorized to bind the Offeror, and it shall contain a statement to the effect that the proposal is firm for a period of at least 120 days from the closing date for submission of proposals. Paper proposals must be submitted using the envelope format as provided in this solicitation document in a sealed opaque envelope/container showing the above proposal title, number, opening date, time of opening and appropriate license number(s) on the outside of the envelope or if a sealed container is used, then all this information shall be shown on the top of the container. The City does not accept faxed or emailed responses for formal solicitations.
All submittals (see Part V, Submission Requirements) received in response to this Request for Proposals will be rated by the City’s Selection Committee, based upon the Evaluation Criteria as listed in Part IV. If the best Offeror is clearly identified from the point summary, there will not be a need for oral presentations. If not, then an oral presentation from a minimum of two (the highest rated) firms shall be required. This solicitation does not commit the City to award a contract, to pay any costs incurred in the preparation of a proposal, or to procure or contract for the articles of goods or services.
The City reserves the right to accept or reject any or all proposals received as a result of this request, to waive informalities, to negotiate with all qualified Offerors, or to cancel in part or in its entirety this proposal, if it is in the best interest of the City to do so.
City of Shreveport
Renee Anderson, MBA, CPPO, CPPB, NIGP-CPP Purchasing Agent
Important- If you consider the specifications as restrictive or have a problem with this document, please contact the Purchasing Agent at least five days before the proposal opening at (318) 673-5457.
http://www.shreveportla.gov/Solicitations
PART I
GENERAL INFORMATION
1.0 Proposals will be considered as specified herein or attached hereto under the terms and conditions of this proposal.
2.0 Proposals must be made in the official name of the firm or individual under which business is conducted (showing an official business address) and must be signed in ink by a person duly authorized to legally bind the person, partnership, company, or corporation submitting the proposal.
3.0 Offerors are to include all applicable requested information and are encouraged to include any additional information they wish to be considered.
4.0 It is up to you to make sure that all the information requested is returned to us by using the envelope format shown in this package.
5.0 Each Proposer shall submit one (1) signed original response. Five (5) additional copies of the proposal should be provided, as well as one (1) redacted copy, if applicable (See Section 8.0) and a searchable electronic copy on USB flash drives.
5.1 Proposals should be sent to:
5.1.1 City of Shreveport
5.1.2 Office of The Purchasing Agent
5.1.3 Government Plaza-Suite 610
5.1.4 505 Travis Street
5.1.5 Shreveport, LA 71101-3042
6.0 QUESTIONS
6.1 Offerors requiring additional information may email or fax their questions so that they will be received at least five (5) working days prior to proposal opening to:
6.2 Email debra.walker@shreveportla.gov or fax Debra Walker at 318-673-5408.
6.3 Answers to questions received that should change and/or clarify this solicitation will be provided in writing to all Offerors via an amendment.
7.0 EXPENDITURE
7.1 Total Estimated Expenditure: $300,000.00
8.0 CONFIDENTIAL INFORMATION, TRADE SECRETS, AND PROPRIETARY INFORMATION
8.1 The designation of certain information as trade secrets and/or privileged or confidential proprietary information shall only apply to the technical portion of the proposal. The financial proposal will not be considered confidential under any circumstance. Any proposal copyrighted or marked as confidential or proprietary in its entirety may be rejected without further consideration or recourse.
8.2 For the purposes of this procurement, the provisions of the Louisiana Public Records Act (La. R.S. 44.1 et.
seq.) shall be in effect. Pursuant to this Act, all proceedings, records, contracts, and other public documents relating to this procurement shall be open to public inspection. Proposers are reminded that while trade secrets and other proprietary information they submit in conjunction with this procurement may not be subject to public disclosure, protections must be claimed by the Proposer at the time of submission of its Technical Proposal.
Proposers should refer to the Louisiana Public Records Act for further clarification.
8.3 The Proposer shall clearly designate the part of the proposal that contains a trade secret and/or privileged or confidential proprietary information as “confidential” in order to claim protection, if any, from disclosure. The Proposer shall mark the cover sheet of the proposal with the following legend, specifying the specific section(s) of the proposal sought to be restricted in accordance with the conditions of the legend:
8.4 “The data contained in pages _____ of the proposal have been submitted in confidence and contain trade secrets and/or privileged or confidential information and such data shall only be disclosed for evaluation purposes, provided that if a contract is awarded to this Proposer as a result of or in connection with the submission of this proposal, the City of Shreveport shall have the right to use or disclose the data therein to the extent provided in the contract. This restriction does not limit the City of Shreveport’s right to use or disclose data obtained from any source, including the Proposer, without restrictions.”
mailto:debra.walker@shreveportla.gov
8.5 Further, to protect such data, each page containing such data shall be specifically identified and marked
“CONFIDENTIAL”.
8.6 If the Proposer’s response contains confidential information, the Proposer should also submit a redacted copy of their proposal along with their original proposal. When submitting the redacted copy, the Proposer should clearly mark the cover as such - “REDACTED COPY” - to avoid having this copy reviewed by an evaluation committee member. The redacted copy should also state which sections or information has been removed. The proposer should also submit one (1) electronic redacted copy of its proposal on a USB flash drive. The redacted copy of the proposal will be the copy produced by the City if a competing proposer or other person seeks review or copies of the Proposer’s confidential data.
8.7 If the Proposer does not submit the redacted copy, it will be assumed that any claim to keep information confidential is waived.
8.8 Proposers must be prepared to defend the reasons why the material should be held confidential. By submitting a proposal with data, information, or material designated as containing trade secrets and/or privileged or confidential proprietary information, or otherwise designated as “confidential”, the Proposer agrees to indemnify and defend (including attorney’s fees) the City and hold the City harmless against all actions or court proceedings that may ensue which seek to order the City to disclose the information.
8.9 The City reserves the right to make any proposal, including proprietary information contained therein, available to other agencies or organizations for the sole purpose of assisting the City in its evaluation of the proposal. The City shall require said individuals to protect the confidentiality of any specifically identified proprietary information or privileged business information obtained as a result of their participation in these evaluations.
9.0 Additionally, any proposal that fails to follow this section and/or La. R.S. 44:3.2.(D)(1) shall have failed to properly assert the designation of trade secrets and/or privileged or confidential proprietary information and the information may be considered public records.
Part II
INTRODUCTION
1.0 INTENT
1.1 SporTran is seeking qualified firms to design, fabricate, deliver, and install high-quality monument signage at three of its primary passenger facilities: the Gateway Hub, the Crossroads Hub, and the Intermodal Terminal.
In addition, SporTran seeks the installation of one (1) digital display -billboard sign at the Intermodal Terminal to enhance facility viability, communications, and provide real-time transit information.
1.2 This project is intended to improve facility identification, strengthen the agency’s brand presence, enhance customer wayfinding, and provide a consistent visual identity across key transit locations. The new signage will serve as permanent gateway features that reflect SporTran’s commitment to safety, innovation, accessibility, and exceptional public transportation service.
1.3 The selected contractor shall provide a turnkey solution that includes all engineering, permitting, fabrication, delivery, installation, testing, and commissioning necessary to complete the project in accordance with applicable federal, state, and local requirements.
2.0 PROJECT OVERVIEW
2.1 SporTran will install new monument signage at the following facilities:
2.1.1 Gateway Hub
2.1.2 Crossroads Hub
2.1.3 Intermodal Terminal
2.2 Additionally, the project includes one (1) new digital display -billboard sign at the Intermodal Terminal capable of displaying passenger information, service announcements, emergency messaging, public notices, and agency communications.
2.3 Each monument sign shall complement SporTran’s existing architectural aesthetics while incorporating modern, durable materials designed for long-term outdoor use. The completed project shall establish a consistent branding standard across all three facilities while improving visibility for passengers, visitors, and the surrounding community.
2.4 The Contractor shall furnish all labor, supervision, equipment, materials, transportation, permits, inspections, utilities, traffic control, restoration, warranties, and other incidental services necessary to provide a complete operational installment.
3.0 TERM OF CONTRACT
3.1 Term of any contract resulting from this solicitation shall be for one year from the date of award, unless terminated or extended in accordance with the provisions listed herein. The City of Shreveport reserves the right to renew any resultant contract(s), if mutually agreeable with the consultant, for four additional years in one-year increments with price changes limited to Price Changes paragraph below, unless prices are requested for a longer period in this RFP.
4.0 PRICE CHANGES
4.1 Prices will be firm for the contract term as specified in paragraph 3 above. After the term of the contract, the Consultant may request price increases that are limited to the increase in the Consultants actual documented cost of doing business or the appropriate CPI or PPI, whichever is lower. Written requests for price increases must be sent by Certified Mail-Return Receipt Requested. The City reserves the right to accept or reject the price increase within fifteen days after receipt of the request. Should the City reject the price increase, the City reserves the right to cancel the contract and award to the next best Offeror or to solicit new proposals. No increase will be effective until approved in writing by the Purchasing Agent. Any decrease in the cost of the contract items shall be forwarded to the Purchasing Office with immediate inception into the contract. Any decrease in pricing shall not be less than the appropriate CPI or PPI.
5.0 AWARDS
5.1 An award resulting from this request shall be awarded to the responsive and responsible Offeror whose Proposal is determined to be most advantageous to the City, taking into consideration price and the evaluation factors set forth in the RFP; however, the right is reserved to reject any and all proposals received, to waive any informalities, and in all cases the City will be the sole judge as to whether an Offerors proposal has or has not satisfactorily met the requirements of this RFP.
6.0 INSURANCE REQUIREMENTS
6.1 The Contractor shall provide evidence of adequate Liability, Automobile and Worker’s Compensation coverage to protect himself and the City of Shreveport.
7.0 BRAND NAMES (La. R.S. 38:2212 F-2)
7.1 Wherever in the specifications the name of a certain brand, make, manufacturer, or definite specification is utilized, they are used only to denote the quality standard of the product desired and that they do no restrict Offerors to the specific brand, make, manufacturer, or specification named; that they are used only to set forth and convey to prospective Offerors the general style, type, character, and quality of the product desired; and that equivalent products will be acceptable.
7.2 It shall be the responsibility of the Purchasing Agent and the professionally employed architect or engineer to determine what is considered an equivalent product on any, and all projects in which they have been legally employed to perform professional services.
8.0 SAMPLES
8.1 Samples may be required at anytime during the evaluation / approval process, and must be submitted free of expense, unless otherwise specified in accordance with the conditions and instructions in the body of this proposal notice.
9.0 PURCHASE ORDER REQUIREMENT
9.1 The City of Shreveport shall not be responsible for invoices exceeding $1,000 that do not have a written purchase order covering them.
10.0 PUBLIC ACCESS TO PROCUREMENT INFORMATION
10.1 Proposals will be available for public inspection at the time and date approved by the Purchasing Agent.
11.0 PAYMENTS DUE THE CITY
11.1 Section 26-211 of the City’s Code of Ordinances requires the following:
11.1.1 On every contract to which the City is a party and for which written specifications are prepared, the specification shall include the requirement that before the contract is awarded the contractor shall pay all taxes, licenses, fees, and other charges which are outstanding and due to the City.
11.1.2 No contract to which the city is a party shall be awarded to any person who:
Has not paid all taxes, licenses, fees and other charges which are outstanding and due the city, or owns any property which is adjudicated to the city, or which has demolition liens, grass cutting liens, or any other property standards liens on it, or owns more than 25% of a legal entity that owns any property which is adjudicated to the city, or which has demolition liens, grass cutting liens, or any other property standards liens on it.
11.1.3 For purposes of this section, Own shall mean to be the last record owner of property prior to a tax sale or adjudication.
11.1.4 Bids/proposals will not be accepted from, or contract awarded to any person, firm, or corporations which have at any time failed to execute a contract that has been awarded to them by the City, or which is in arrears to the City upon debt or contract, or which is a defaulter as surety or otherwise upon any obligation to the City.
12.0 ASSIGNMENT
12.1 This contract shall not be assigned without the prior written consent of the city through its Mayor.
13.0 UNSATISFACTORY WORK
13.1 The City shall not be obligated to pay for unsatisfactory work.
14.0 COMPLIANCE WITH CIVIL RIGHTS LAW
14.1 By submitting and signing this bid, bidder agrees to abide by the requirements of the following as applicable:
Title VI and VII of the Civil Rights Act of 1964, as amended by the Equal Opportunity Act of 1972, Federal Executive Order 11246, Federal Rehabilitation Act of 1973, as amended, the Veterans Readjustment Assistance Act of 1974, Title IX of The Education Amendments of 1972, the Age Act of 1975, and bidder agrees to abide by the requirements of the Americans with Disabilities Act of 1990. Bidder agrees not to discriminate in its employment practices and will render services under any contract entered into as a result of this solicitation without regard to race, color, religion, sexual orientation, national origin, veteran status, political affiliation, or disabilities. Any act of discrimination committed by the bidder, or failure to comply with these statutory obligations when applicable, shall be grounds for termination of any contract entered into as a result of this solicitation.
15.0 JOINT VENTURE
15.1 If the Proposer is a joint venture, provide the following information:
15.1.1 Date of formation
15.1.2 Name and address of each venture partner
15.1.3 Principals of each venture partner
15.1.4 Venture partner holding the majority interest in the venture and its percentage of interest
15.1.5 Proposer shall include a copy of the Joint Venture agreement as an attachment to proposal. Such attachment shall not count in the page limit.
PART III
SCOPE OF WORK
1.0 The selected Contractor shall provide all services necessary to complete the project, including but not limited to:
1.1 Conduct site visits and field verification at all three SporTran facilities.
1.2 Prepare final design drawings, structural calculations (if required), shop drawings, and material submittals for SporTran approval.
1.3 Obtain all permits, inspections, and regulatory approvals required for construction and installation.
1.4 Fabricate and install three (3) monument signs located at:
1.4.1 Gateway Hub
1.4.2 Crossroads Hub
1.4.3 Intermodal Terminal
1.5 Furnish and install one (1) digital display -billboard sign at the Intermodal Terminal, including all supporting infrastructure, controllers, communications equipment, software, and electrical connections necessary for full operation.
1.6 Provide all required foundations, concrete work, structural supports, underground conduit, wiring, electrical service connections, and related site improvements.
1.7 Coordinate all utility locates and protect existing infrastructure during construction.
1.8 Restore all disturbed pavement, landscaping, sidewalks, irrigation systems, and other site features to equal or better condition.
1.9 Ensure all signage is fully compliant with applicable ADA requirements, local building codes, electrical codes, and all applicable federal, state, and local regulations.
1.10 Coordinate installation activities to minimize disruption to transit operations and maintain safe pedestrian and vehicular access throughout construction.
1.11 Perform startup, testing, programming, and commissioning of the digital sign and associated equipment.
1.12 Provide comprehensive training for SporTran personnel on operation, programming, and routine maintenance of the digital display system.
1.13 Furnish complete operation manuals, maintenance documentation, warranties, as-built drawings, and all manufacturer documentation upon project completion.
1.14 Provide a minimum two-year warranty covering workmanship, installation, and materials, along with manufacturer warranties for all equipment and digital display components.
1.15 The project shall be delivered as a complete turnkey installation. Any labor, materials, equipment, or incidental work not specifically identified but necessary to provide a fully functional, code-compliant, and operational signage system shall be included in the Contractor’s proposal.
1.16 Contractor will have 120 days from contract signing to complete job.
PART IV- EVALUATION CRITERIA
RFP#: 26-810 Title of RFP: Design, Creation, and Installment of Monument Signage W. SHV Hub, Eastside Hub, and Intermodal Terminal
Evaluator: Phone #:
Date: Company Name:
DESCRIPTION
POINT
RANGE
POINTS
ASSIGNED
Understanding of Project Requirements:
• Clarify and completeness in addressing the project goals.
• Demonstrated understanding of the needs of W. SHV Hub, Eastside Hub, and Intermodal Terminal.
0-25
Experience and Qualifications:
• Relevant experience in similar projects or installations.
• Qualifications of the team members who will be directly involved in the project.
0-25
Design Quality and Innovation:
• Creativity and uniqueness of the proposed design.
• Adherence to safety and accessibility standards.
0-20
Project Management and Timeline:
• Detailed project management plan and timeline for completion.
• Strategies for managing risks and ensuring timely delivery.
0-15
*5
Cost Effectiveness:
• Overall cost proposal, including itemized estimates for materials, labor, and installation.
• Value for money considering quality and durability.
0-15
TOTAL POINTS 100 POINTS
*The points for cost shall be furnished by the Purchasing Agent, based upon the standard formula as listed below: Fee schedules, including total life cycle costs (when applicable), will be scored by applying the maximum number of points permissible to the responsible firm submitting the lowest responsive fee. All other Offerors are prorated points, by determining the percentage of differential between the low Offerors responsive total and cost and each of the other Offerors total cost, and then applying the percentage of differential accordingly.
PART V
PROVIDE SUBMISSION REQUIREMENTS IN THE FOLLOWING FORMAT
Proposals submitted in the prescribed format and with properly completed exhibit forms, as provided herein, will be evaluated for contract award.
1.0 SUBMISSION REQUIREMENTS & CHECKLIST
1.1 To achieve a uniform review process and allow for adequate comparability, the proposals must be organized in the manner specified below:
1.1.1 A Table of Contents - clearly identify the material, by section and page number.
1.1.2 A Letter of Transmittal - limit to four printed pages.
1.1.3 __ Provide number of years in business, office location, email address, and financial stability of company.
1.1.4 __ Briefly state your firm’s understanding of the work to be done and make positive commitment to perform the work.
1.1.5 __ Identify your proposal’s principal strengths and weaknesses.
1.1.6 __ Give the names of the persons who will be authorized to make representations for your firm, their titles, addresses, and telephone numbers.
1.1.7 __ State whether or not your firm has been involved in any litigation and/or has been disqualified by any agency within the past five (5) years, because of your performance. Explain fully if your firm has been involved in any litigation and/or has been disqualified.
1.1.8 __ Indicate the number and dates of amendments that you have received. (end of transmittal letter)
1.2 Provide narrative on the approach to the scope of work (proposed project plan) using the format of Exhibit A.
1.3 Submit Schedule of Events using the format of Exhibit B.
1.4 Document five Offerors of prior similar projects with name, address, and phone number of a contact with whom City can discuss Offerors past performance using the format of Exhibit C.
1.5 Submit qualifications of personnel that will work on this project using the format of Exhibit D.
1.6 Submit cost proposal using Exhibit E.
1.7 Provide completed Fair Share forms 1-4, (Appendix 1) which include the amount and percentage of commitment.
1.8 Submit Appendix #3 - FELONY CONVICTION/E-VERIFY.
1.9 Submit Appendix #5 – FTA CONTRACT PROVISION GUIDELINES.
1.10 Submit Appendix #6 – BUY AMERICAN, BUY AMERICA ACT CERTIFICATION.
1.11 Submit Appendix #7– LOBBYING CERTIFICATION.
1.12 Provide proof of Commercial Driver’s License for all operators who will be performing services under this proposal.
1.13 List any exceptions to this RFP (and/or the City’s Standard Agreement).
1.14 Provide list of sub-contractors and state years of experience of your firm and each sub-contractor for this type of work.
1.15 Other information and materials which the Offeror wishes to submit in support of this proposal, qualification, etc.
RFP NO. 26-810 EXHIBIT A
PAGE of
NARRATIVE ON THE APPROACH TO THE SCOPE OF WORK
Proposals should respond to the Scope of Work point by point by numeric reference.
RFP NO. 26-810 EXHIBIT B
SCHEDULE OF EVENTS
The Offeror should briefly describe each step of the schedule of events in its proposed plan of action to accomplish the scope of work in a sequential manner, identifying the specific assignment of key personnel and the time required to complete each step. This form should be completed, in addition to the Offerors narrative description of its proposed plan of action.
Step # Schedule of Events Time Required Person Assignment
RFP NO. 26-810
EXHIBIT C
PAGE of
1.0 OFFERORS EXPERIENCE
1.1 Contract Title:
1.1.1 Contract Period: From To
1.1.2 Geographic Area Serviced:
1.1.3 Scope of Work:
1.1.4 References:
1.1.5 Contracting Office:
1.1.5.1 Title:
1.1.5.2 Address:
1.1.5.3 City: State Zip
1.1.5.4 Telephone # (s):
2.0 OFFERORS EXPERIENCE
2.1 Contract Title:
2.1.1 Contract Period: From To
2.1.2 Geographic Area Serviced:
2.1.3 Scope of Work:
2.1.4 References:
2.1.5 Contracting Office:
2.1.5.1 Title:
2.1.5.2 Address:
2.1.5.3 City: State Zip
2.1.5.4 Telephone # (s):
3.0 OFFERORS EXPERIENCE
3.1 Contract Title:
3.1.1 Contract Period: From To
3.1.2 Geographic Area Serviced:
3.1.3 Scope of Work:
3.1.4 References:
3.1.5 Contracting Office:
3.1.5.1 Title:
3.1.5.2 Address:
3.1.5.3 City: State Zip
3.1.5.4 Telephone # (s):
4.0 OFFERORS EXPERIENCE
4.1 Contract Title:
4.1.1 Contract Period: From To
4.1.2 Geographic Area Serviced:
4.1.3 Scope of Work:
4.1.4 References:
4.1.5 Contracting Office:
4.1.5.1 Title:
4.1.5.2 Address:
4.1.5.3 City: State Zip
4.1.5.4 Telephone # (s):
5.0 OFFERORS EXPERIENCE
5.1 Contract Title:
5.1.1 Contract Period: From To
5.1.2 Geographic Area Serviced:
5.1.3 Scope of Work:
5.1.4 References:
5.1.5 Contracting Office:
5.1.5.1 Title:
5.1.5.2 Address:
5.1.5.3 City: State Zip
5.1.5.4 Telephone # (s):
RFP NO. 26-810 EXHIBIT D
PERSONNEL STAFFING
1.0 (Name)
(Title)
2.0
3.0
4.0
5.0
STAFF MEMBER BACKGROUND AND EXPERTISE OF PERSONNEL
RFP NO. 26-810 EXHIBIT E
COST PROPOSAL
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL PRICE
MATERIALS
1 Traditional Sign (Gateway Hub) $ $
1 Traditional Sign (Crossroad Hub) $ $
1 Digital Sign (Intermodal) $ $
1 Traditional Sign (Intermodal) $ $
SUB-TOTAL (MATERIALS) $
LABOR
1 Design and Engineering $ $
1 Installation $ $
1 Project Management $ $
SUB-TOTAL (LABOR) $
OTHER COSTS
1 Permits and Fees $ $
Contingency (5% of Total) $
ACKNOWLEDGEMENT
______ (initial)
______ (initial)
OFFERORS CERTIFICATIONS
Has a federal agency or a federally certified state or local agency performed any review of your accounts or records in connection with any grant or contract within any grant or contract within the past twelve months?
YES NO (IF YES GIVE NAME, ADDRESS, AND TELEPHONE NUMBER OF REVIEWING
OFFICE.)
1.0 In compliance with this Request for Proposal, and subject to all conditions thereof, the undersigned agrees:
1.1 This proposal, as stated, is open for acceptance for a period of 120 calendar days from date of opening; and
1.2 To furnish all services, materials, and equipment necessary and incidental to perform the proposed project;
1.3 That this proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal.
1.4 Acting on behalf of the Offeror, this is to attest that the undersigned is a duly authorized representative of the below captioned firm, corporation, or business.
1.5 By signing this document, the Offeror understands and agrees that the identity of any Offeror or the contents of any proposal will not be public information until after the contract award is made.
1.6 If awarded a contract/purchase order, my company understands and agrees to provide the sub consultant information as listed in GENERAL CONTRACT PROVISIONS (www.shreveportla.gov/bids/bids.htm), paragraph 16, SUBCONTRACTOR TRACKING. I hereby certify that sub consultant(s) (would/would not) be used.
RFP NO. 26-810 EXHIBIT E (Cont’d.)
1.7 In accordance with the Fair Share Requirements of this RFP, the Offeror assures the City that he or she will meet or exceed the Fair Share goal, or if cannot meet the required goal, the Offeror will assure the City that he or she will document good faith efforts made toward meeting the goal requirement in accordance with the fair share requirements.
Fair share goal for this project is 25%.
Signature Offerors Representative Title authorized to enter into contract with the City of Shreveport
Company
Authorized Signature (typed/printed) State Contractors License Number
Telephone Fax Number
Emergency Number(s) Date
Email Address Offerors Federal Employer I.D. Number
FROM:
*License #
*State Contractors License Number or Insert EXEMPTION, IF NOT REQUIRED.
PLEASE RUSH TO:
CITY OF SHREVEPORT
OFFICE OF THE PURCHASING AGENT
505 Travis Street, Suite 610
SHREVEPORT, LOUISIANA 71101-3042
SEALED PROPOSAL FOR:
RFP Number: 26-810
Project Name: DESIGN, CREATION, AND INSTALLMENT OF MONUMENT SIGNAGE
AT W. SHV HUB, EASTSIDE HUB, AND INTERMODAL TERMINAL
Opening Date/Time:
Attention: Use this format on the outside of your container when responding with a paper proposal.
We do not accept faxed responses for formal solicitations! Revised 12-15-11
EXHIBIT F
CITY OF SHREVEPORT
Section 40-Fair Share Requirements (Revised 10-28-2024) Applies to IFB, RFP, RFS, and RFQ Documents except when a Commodity Purchase or if for the Airport.
1.0 DEFINITIONS
1.1 Bid-shall mean bid for IFBs, proposal for RFPs, and quote for RFQs.
1.2 Contractor-shall mean prime contractor for IFBs, RFPs, and RFQs. For RFSs, Contractor shall mean Prime Consultant.
1.3 Offeror-shall mean a person who submits an RFP.
1.4 Subcontractor-shall mean subcontractor for IFBs, and RFQs. For RFSs, Subcontractor shall mean Sub consultant.
1.5 FSC-is Fair Share Certified (specific to City-Funded Projects and included in the Fair Share computation).
Fair Share Certification applications may be obtained as follows:
1.6 Contact 318-673-5017
1.6.1 Fair Share Office
1.6.2 505 Travis Street, Suite 260
1.6.3 Shreveport, LA 71101
1.6.4 FSC Application Affidavits maybe downloaded at:
https://www.shreveportla.gov/DocumentCenter/View/21385/10072022---Fair-Share-Application
DBE-is Disadvantaged Business Enterprise (specific to Federally-funded Projects - generally FAA, DOTD or FTA projects).
1.7 S/DBE-is Small Disadvantaged Business Enterprise (again, specific to Federally-Funded Projects - a group that is defined by the Government as "presumptively disadvantaged" by provisions of CFR 49). DBE applications may be obtained as follows: http://www8.dotd.louisiana.gov/UCP/UCPdownloads.aspx
1.8 City of Shreveport Vendor Applications may be downloaded at: https://www.shreveportla.gov/780/Section- 800.
2.0 PURPOSE OF THE PROGRAM
2.1 The City of Shreveport has implemented this program to ensure that their construction and service contracts provide employment and growth opportunities for small disadvantaged businesses.
2.2 Therefore, when the goal has not been met, prime contractors are required to submit proof showing that good faith efforts have been made to contract with FSC, S/DBE or DBE subcontractors.
2.3 All efforts must be documented.
2.4 Direct commodity purchases made by the City of Shreveport are exempt from the program.
3.0 FAIR SHARE CONTRACT CLAUSES
3.1 The following Fair Share Contract Clauses and Good Faith Effort Requirements are only a small part of the Fair Share Program.
3.1.1 The Fair Share Program full text and forms that will be needed are posted in the Purchasing Office, or available upon request, or available on our web site at www.shreveportla.gov, and are incorporated by reference in all solicitation documents with the same force and effect as if set forth in full text.
3.1.2 ANY DEVIATIONS FROM THE FAIR SHARE REQUIREMENTS LISTED HEREIN MUST BE CLEARLY
IDENTIFIED WITH EACH SOLICITATION RESPONSE.
3.1.3 PLEASE CALL THE FAIR SHARE OFFICE AT (318) 673-5017 OR THE PURCHASING DIVISION AT (318)
673-5450 IF YOU HAVE ANY QUESTIONS.
APPENDIX 1
http://www.ci.shreveport.la.us/pdf/bids/sect40.pdf https://www.shreveportla.gov/DocumentCenter/View/21385/10072022---Fair-Share-Application http://www8.dotd.louisiana.gov/UCP/UCPdownloads.aspx https://www.shreveportla.gov/780/Section-800 https://www.shreveportla.gov/780/Section-800
3.2 Prompt Payment Clause
3.2.1 The City of Shreveport will, after acceptance of goods or services and the receipt of a proper invoice from the contractor, process request for payment, said payment to be paid within thirty (30) days.
3.2.2 Prime contractors shall then be required to ensure payment is made to any designated small or disadvantaged business (subcontractors), within fifteen (15) business days of receipt of payment to the prime contractor from the City.
3.2.3 Upon satisfactory completion of a contract, the City and/or prime contractor will ensure that any retainage payments are returned within thirty (30) business days.
3.2.4 Failure to comply with the terms of this requirement may be grounds for termination of the contract by the City.
3.3 Affirmative Action Clause
3.3.1 The contractor, sub recipient, or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract.
3.3.2 The contractor shall carry out applicable requirements of the appropriate funding guidelines for each contract.
Failure by the contractor to carry out these requirements is a material breach of the contract which may result in the termination of this contract or such other remedy as the City deems appropriate.
3.4 Participation of Small Disadvantaged Business Concerns
3.4.1 It is the policy of the City of Shreveport that all prime contractors and service providers utilize qualifying small, disadvantaged business concerns.
3.4.2 The City has set a goal of 25% for participation of these said business concerns in all City-let contracts and/or purchases.
3.4.3 Specific goals are set on federally funded contracts as determined by the regulating federal agency and language to that effect shall be included in those contracts.
3.4.4 Failure by a contractor or service provider to include these designated businesses could constitute breach of contract and result in remedial action.
3.4.4.1 Assurance of utilization of FSC, S/DBE, and DBE subcontractors is given through FSC FORM 4, Letter of Intent.
3.5 Subcontractor Payment Certification
3.5.1 Every contract by the City for the performance of work will contain a provision requiring the prime contractor to certify in writing that all subcontractors and suppliers have been paid for work and materials from previous progress payments received (less any retainage) by the prime contractor prior to receipt of any further progress payments.
3.5.2 In the event a contractor is unable to pay subcontractors or suppliers until it has received a progress payment from the City, the prime contractor shall pay all subcontractors or suppliers funds due, from said progress payments within forty-eight hours of receipt of payment from the City.
3.5.3 During the contract and upon completion of the contract, the City of Shreveport may request documentation to certify payments to subcontractors or suppliers. This provision in no way creates any contractual relationship between any subcontractor and the City of Shreveport or any liability on the City of Shreveport for the contractor’s failure to make timely payment to the subcontractor.
3.6 Fair Share Certified (FSC), S/DBE or DBE PARTICIPATION-GOOD FAITH EFFORT REQUIREMENTS
3.7 PRE-BID EFFORTS REQUIRED REGARDING FAIR SHARE, S/DBEs or DBEs
3.8 Bidders are required to contact, and make good faith efforts to contract with City and Louisiana Unified Certification Program (LAUCP) Certified FSC, S/DBE or DBE firms for each division of work identified in these documents which will be performed by a subcontractor.
3.9 A list of FSC, S/DBE or DBE contractors specializing in the divisions of work identified for subcontracting on this project can be found at the following Web Sites…City Projects:
https://www.shreveportla.gov/141/Online-Database Federal Projects: http://www8.dotd.louisiana.gov/ucp/
3.10 These requirements are contractual obligations and are included in all contracts.
https://www.shreveportla.gov/141/Online-Database http://www8.dotd.louisiana.gov/ucp/
3.11 Failure to comply may result in a finding of breach of the contract, disqualification of the bidder to bid on future contracts, or a claim for damages.
3.12 Who to contact
3.12.1 For each division of work identified in these documents that will be performed by a subcontractor, Bidders must contact:
3.12.2 Every FSC, S/DBE or DBE firm that attended the pre-bid meeting (if one was held) which specializes in a division of work that will be subcontracted, and
3.12.3 In addition to the above, a minimum of five (5) other FSC, S/DBE or DBE firms.
3.12.4 If there are less than 5 firms listed for a particular division of work, all of the subcontractors in that division must be contacted.
3.13 When to contact
3.13.1 All Bidders must provide project information to FSC, S/DBE, or DBE firms in sufficient time to permit the firm to have an equal opportunity to compete for work that the successful bidder will subcontract together with the date and time that subcontractor’s bids are due.
3.13.2 The first documented contact with each FSC, S/DBE, or DBE firm must be at least seven (7) working days before bid opening.
3.14 How to contact
3.14.1 First contact: Bidders shall contact FSC, S/DBE or DBE subcontractors by Email or Fax to advise them of potential subcontracting opportunities.
3.14.2 Follow-up: Bidders shall follow up with Email, Fax and or Phone to each FSC, S/DBE, or DBE firm contacted to determine if a bid will be submitted or if further information is required.
3.14.3 A firm need not be contacted if that firm responds to the first contact with a statement that the firm will not bid on this project.
3.15 What information must be provided
3.15.1 The apparent lowest construction/service provider bidder shall be required to complete/submit Fair Share Forms 1 through 4 within 72 hours after notification. If additional information is needed, it must be turned in within 24 hours or the bid will be declared as non-responsive when additional time is not approved by the Fair Share office.
4.0 ADDITION/REPLACEMENT OF SUBCONTRACTORS AFTER SUBMISSION
4.1.1 The successful bidder will not be permitted to add or replace a subcontractor without the consent of the DBE Compliance Manager and/or the Fair Share Office and the Originating Department.
4.1.2 If any subcontractor is added or replaced after the contract award, the contractor shall make good faith efforts to contract with another FSC, S/DBE, or DBE for the work to be performed by that subcontractor.
4.1.3 Documentation of these efforts is required and must be submitted to the Purchasing Agent and the Fair Share Office on FSC FORM 2.
5.0 DOCUMENTATION OF GOOD FAITH EFFORTS
5.1 FAIR SHARE DOCUMENTS TO BE SUBMITTED BY THE APPARENT LOWEST
CONSTRUCTION/SERVICE PROVIDER BIDDER.
5.1.1 COMPLIANCE AGREEMENT-FSC FORM 1. Submit completed FSC FORM 1.
5.1.2 UTILIZATION/CONTRACT TRACKING-FSC FORM 2. Submit FSC FORM 2 showing all subcontractors/all sub-subcontractors to be used on this contract and use for any changes also. Note: Construction Bidders, including 100% Fair Share/DBE, must turn in this form showing all subcontractors to be used on this contract.
5.1.3 PROJECT CONTACT SHEET-FSC FORM 3. Submit FSC FORM 3 showing a completed log of contacts with FSC, S/DBE, or DBE firms.
5.1.4 LETTER OF INTENT-FSC FORM 4. Submit a signed FSC FORM 4, Letter of Intent indicating FSC, S/DBE and DBE Subcontractors and Sub-Subcontractors along with the scope of work to be performed and price/cost of goods or services to be performed by the Subcontractor. There must be a separate Letter of
Intent for each FSC, S/DBE or DBE Subcontractor or Sub-subcontractor. This letter of Intent must be submitted within 72 hours of the bidder being designated as “the apparent lowest construction/service provider bidder”, or his/her bid will be declared non-responsive.
5.1.5 Failure to submit these documents shall make a bid non-responsive and the apparent lowest bidder ineligible to receive an award of the contract.
5.1.6 The Purchasing Agent and/or the DBE Compliance Manager and/or the Fair Share Office shall have the right to seek clarification to assure good faith effort compliance.
6.0 DOCUMENTS TO BE SUBMITTED AFTER CONTRACT AWARD.
6.1.1 MONTHLY SUBCONTRACTOR PAYMENT UTILIZATION REPORT-FSC FORM 5: All subcontractors (including FSC, S/DBE, or DBE firms) and second tier subcontractors shall be reported on the FSC FORM 5 as well as contract amounts and payments.
6.1.2 Copy of email or fax sent to FSC, S/DBE, or DBE firms: When requested, provide one copy of the email or fax sent to FSC, S/DBE or DBE firms to solicit bids for this project. If more than one form of email or fax was sent, submit a copy of each form sent.
6.2 Optional Good Faith Efforts
6.2.1 Contractors should consider efforts such as:
6.2.2 Did the contractor advertise in general circulation, trade association, and small disadvantaged-focus media concerning subcontracting opportunities?
6.2.3 Did the contractor provide written notice to a reasonable number of specific FSC, S/DBEs, or DBEs that interest in the contract was being solicited, in sufficient time to allow the FSCs, S/DBEs, or DBEs to participate effectively? (NOTE: It is recommended that certified mail be used to provide documentation).
6.2.4 Did the contractor follow up initial solicitations of interest by contacting FSC, S/DBEs or DBEs to determine certainty whether the FSCs, S/DBEs or DBEs were interested?
6.2.5 Did the contractor select portions of the work to be performed by FSCs, S/DBEs, or DBEs, including, where appropriate, breaking down contracts into economically feasible units to facilitate participation?
6.2.6 Did the contractor provide interested FSCs, S/DBEs, or DBEs with adequate information about the plans, specifications, and requirements of the contract?
6.2.7 Did the contractor negotiate in good faith with interested FSCs, S/DBEs, or DBEs, not rejecting them as unqualified without sound reasons based on a thorough investigation of their capabilities?
6.2.8 Did the contractor make efforts to assist interested FSCs, S/DBEs, or DBEs in obtaining bonding, lines of credit, or insurance required by the recipient or contractor?
6.2.9 Did the contractor effectively utilize the services of available community organizations; contractors’ groups;
local, state, and federal business assistance offices; and other organizations that provide assistance in the recruitment and placement of FSCs, S/DBEs, or DBEs?
END
COMPLIANCE AGREEMENT-FSC FORM 1
RFP Number: 26-810 (Revised 9-10-07)
By signing this document, the bidder hereby certifies, understands, and affirms that:
1.0 It has not discriminated against any FSC, S/DBE, or DBE firms in awarding subcontracts for this project.
2.0 The good faith efforts requirements are contractual obligations that must be fulfilled whether or not listed on these forms.
3.0 The apparent lowest construction/service provider bidder shall be required to complete/submit Fair Share Forms 1 through 4 within 72 hours after notification. If additional information is needed, it must be turned in within 24 hours or the bid will be declared as non-responsive when additional time is not approved by the Fair Share office.
4.0 Failure to provide information may result in a loss of the bidder’s bid bond.
5.0 Replacement of a subcontractor during contract performance without: a) obtaining the prior written consent of the DBE Compliance Manager and/or the Fair Share Office and the originating department; and b) subsequent good faith efforts in selection of a replacement; is prohibited and a breach of contract. See UTILIZATION/CONTRACT TRACKING-FSC FORM 2 AS REQUIRED FOR ALL SUBS/SUB of SUBS.
6.0 Consideration was given to waiving bonding requirements for FSC, S/DBE, or DBE subcontractors.
And, Executes this Compliance Agreement as:
Company Name:
Address:
Phone Number: FAX Number:
By:
Signature of Authorized Owner or Representative Title Date
Print Name:
UTILIZATION/CONTRACT TRACKING-FSC FORM 2
This multipurpose form is used to list all types of subs and changes to their status for Fair Share and Contract Tracking Reporting. (Revised 10/28/2024)
1. IFB/RFP/RFS/RFQ # (Circle 1) 26-810_ 2. Project Name ____________________________________ ________
3. Prime Contractor___________________________ 4.Bid Amount of Total Project ($) ________________________
5. Prime Contractor’s Federal Tax ID # ________________________ Change Order? Yes or No C/O # ________
List all Subcontractors (copy as needed)
“Only Fair Share or DBE companies to be listed”
Status – Circle all that apply
Type of work to be performed
Subcontracted Amount $ + or (--)
Federal I.D. # __________________________________
Company _____________________________________
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
E-Mail ________________________________________
State Class/License #
FSC, DBE
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
Name _______________________________________
Address ______________________________________
Phone # ______________________________________
Fax #_________________________________________
Prime Contractor’s Signature ______________________ Date: _________ Phone: ____________________________
Project Mgr. Signature: __________________Date: ______ Fair Share Office Approval: ____________ Date: ______
PROJECT CONTACT SHEET-FSC FORM 3
(Revised 10-28-2024)
Name of Project: _____________________________________ Bid Number: ___________________
Bidder’s Name: ____________________________________________________________________
Bidders should record their contacts with potential FSC or DBE subcontractors through use of this log. Additional forms may be copied if needed.
Name of Subcontractor
Only Fair Share or DBE companies to be listed
Type of Contact(s) “Email or Fax Required”
Date & Time of Contact
Person making/receiving call or other communications
Contact made?
Yes/No
Quote received Amount
Quote accepted, rejected, Non- Responsive
Comments
Bid # ________PROJECT# _________ FSC FORM 4
Fair Share /…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .