RFP 26_04 Water Plant Generator RFP Package.pdf

PDF 4 MB Posted

Attached to
Water Plant Generator
Solicitation number
PE-60855-NONST-2026-000000014
Issued by
Barrow County, Georgia

About this file

RFP 26-04 Water Plant Generator - City of Adairsville

This Request for Proposal (RFP) is issued by the City of Adairsville, Georgia for the purchase and installation of a 500 kilowatt diesel generator at the Adairsville Water Plant located at 87 Twin Bridges Road, Adairsville, Georgia 30103. The scope of work includes excavation and concrete pad construction, purchase and installation of a 500 kilowatt, 480/277 volt, three-phase diesel generator in a weather-proof sound enclosure with a 2,500-gallon fuel tank, crane provision for unloading and placement, electrical conduit and wiring installation to the existing automatic transfer switch, system startup and testing, operator training, and initial fuel supply. A mandatory pre-bid conference will be held on April 28, 2026 at 10:00 a.m. at the project site. Sealed bids must be received by the City Clerk at Adairsville City Hall, 116 Public Square, Adairsville, Georgia 30103 no later than 2:00 p.m. on Tuesday, May 19, 2026. The contract allows ninety consecutive calendar days for completion from the Notice to Proceed. All questions regarding the RFP must be submitted in writing to the Engineer, Meg Mbugua, P.E. at meg@rindt.com no later than May 8, 2026 at 4:00 p.m. local time.

Bidders must submit a bid bond or certified check in an amount equal to five percent of the total bid price. The contract price is a lump sum with an allowance of fifty thousand dollars for correction of unforeseen utility conflicts and owner-initiated miscellaneous work. Liquidated damages of five hundred dollars per day will be assessed for each day of delay beyond the substantial completion date. Progress payments will be made monthly at ninety percent of completed work with ten percent retainage until fifty percent completion, after which retainage may be discontinued if work is satisfactory. All bidders must comply with Georgia's E-Verify work authorization requirements and provide evidence of Georgia contractor licensing. The City of Adairsville sales tax rate of seven percent must be included in all bid prices. A performance bond and payment bond, each equal to the contract price, will be required upon award. The successful bidder must execute the contract and deliver all required bonds and insurance documentation within fifteen days of the Notice of Award.

View the file

Other files

File Type Posted
00 11 13 Advertisement For Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Adairsville – RFP 26-04

City of Adairsville

RFP 26-04

Water Plant Generator

Project Location:

87 Twin Bridges Rd

Adairsville, GA 30103

April 2026 Adairsville Water Plant Generator Advertisement for Bid

00 11 13-1

DOCUMENT 00 11 13

ADVERTISEMENT FOR BID

CITY OF ADAIRSVILLE

WATER PLANT GENERATOR

87 TWIN BRIDGES RD, ADAIRSVILLE, GA 30103

Sealed bids for furnishing all materials, labor, tools, skills, equipment, and miscellaneous items necessary for the construction of the CITY OF ADAIRSVILLE WATER PLANT GENERATOR located in Bartow County, Georgia will be received and publicly read aloud by the CITY OF ADAIRSVILLE, herein referred to as the Owner, at Adairsville City Hall, Attn: Jordan Redd, 116 Public Square, Adairsville, GA 30103 handed to City Clerk, until:

Tuesday May 19th 2026, 10:00 A.M. Local time

The City Clerk will date and time stamp the bids received. Bids received after said time and date will not be considered by Owner and will be returned unopened.

The project includes all material, labor, and related appurtenances for complete construction as indicated on the Drawing and in these Contract Documents. The Work consists of the purchase and install of a

500KW generator at the Water Plant and includes the following:

Work to include the purchase and install of a 500KW Generator for the Water Plant, including building a concrete pad for the generator (excavation, re-compacting, and pouring slab); the purchase, install, and coordination of delivery and unloading of a 500kw, 480/277v/3-phase diesel generator in weather-proof sound enclosure with 2500-gallon tank; provision of a crane to unload and set the 500 kw generator; electrical conduits and wiring from generator to existing automatic transfer switch; start-up and testing of system after installation; training for system use; fuel for initial startup, testing and training purposes; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete working Generator at the Water Plant..

Bidding Package is available as part of this Solicitation and can also be obtained by contacting RINDT, Inc, by telephone at 770-427-8123 or emailing engineering@rindt.com.

Bidders shall inform themselves concerning Georgia Laws and comply with same. NOTE: The

Contractors Affidavit for Electronic Verification of Work Authorization Programs form (E-Verify) shall be executed and submitted as part of the bid package. Contractor’s Bid will be considered non-responsive without conformance to E-Verify requirements.

Questions about RFP:

All project inquiries regarding this RFP shall be made in writing to engineering@rindt.com or to Meg

Mbugua, P.E. at meg@rindt.com no later than 5/8/2026 at 4:00 pm local time. All questions received will be answered via an addendum.

The time allowed for Final Completion from the date of Notice to Proceed is 90 consecutive calendar days.

Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the Owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the mailto:engineering@rindt.com mailto:engineering@rindt.com mailto:meg@rindt.com

April 2026 Adairsville Water Plant Generator Advertisement for Bid

00 11 13-2

Owner in an amount equivalent to five percent (5%) of the total amount payable by the terms of the

Contract or, in lieu thereof, in the form of a certified check, cashier’s check, or cash in equal amount.

The Successful Bidder will be required to furnish performance and payment bonds with the executed

Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement.

Surety and insurance companies must be listed in the Federal Registry of Insurance Companies Circular

570, holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the

Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia.

All Bids will remain subject to acceptance for 60 days after the day of the Bid Opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.

Each bid must be submitted in a SEALED ENVELOPE, addressed to the Owner. Each sealed envelope containing a Bid must be plainly marked on the outside as, “RFP 26-04: Adairsville Water

Plant Generator”. If bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the City Clerk, at address previously given.

A mandatory pre-bid conference will be held at 10:00am local time on April 28th, 2026 at the Existing

Adairsville Water Plant (Project Site) located at 87 Twin Bridges Road, Adairsville, GA 30103.

The Owner reserves the right to reject any or all Bids, to waive formalities, and to re-advertise.

Meg Mbugua, PE Jody Maffetone

RINDT, Inc. Public Works Director, Adairsville meg@rindt.com jmaffetone@adairsvillega.net

(404)-807-3734 (770) 655-2007

END OF DOCUMENT

mailto:meg@rindt.com mailto:jmaffetone@adairsvillega.net

April 2026 Adairsville Water Plant Generator Instructions to Bidders

00 21 15 - i

DOCUMENT 00 21 15

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page

ARTICLE 1 – Defined Terms

ARTICLE 2 – Copies of Bidding Documents

ARTICLE 3 – Qualifications of Bidders

ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety

Program; Other Work at the Site

ARTICLE 5 – Bidder’s Representations

ARTICLE 6 – Pre-Bid Conference

ARTICLE 7 – Interpretations and Addenda

ARTICLE 8 – Bid Security

ARTICLE 9 – Contract Times

ARTICLE 10 – Liquidated Damages

ARTICLE 11 – Substitute and “Or-Equal” Items

ARTICLE 12 – Subcontractors, Suppliers, and Others

ARTICLE 13 – Preparation of Bid

ARTICLE 14 – Basis of Bid

ARTICLE 15 – Submittal of Bid

ARTICLE 16 – Modification and Withdrawal of Bid

ARTICLE 17 – Opening of Bids

ARTICLE 18 – Bids to Remain Subject to Acceptance

ARTICLE 19 – Evaluation of Bids and Award of Contract

ARTICLE 20 – Bonds and Insurance

ARTICLE 21 – Signing of Agreement

ARTICLE 22 – Sales and Use Taxes

ARTICLE 23 – Retainage

ARTICLE 24 – Contractor affidavit for electronic verification of work authorization programs

00 21 15 - 1

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General

Conditions and Supplementary Conditions. Additional terms used in these Instructions to

Bidders have the meanings indicated below:

A. Issuing Office--The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

B. Apparent Low Bidder--The lowest Bidder at Bid Opening before the Bids have been evaluated. The Apparent Low Bidder may or may not be the Successful Bidder.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format, for the deposit sum, if any, stated in the advertisement or invitation to bid.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor

Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder's qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder's authority to do business in the state where the Project is located.

B. Bidder's state or other contractor license number, if applicable.

C. Subcontractor and Supplier qualification information; coordinate with provisions of Article

12 of these Instructions, "Subcontractors, Suppliers, and Others."

D. Other required information regarding qualifications.

3.02 A Bidder's failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder's qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder's representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION

OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

00 21 15 - 2

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental

Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the

Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner's authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner's Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the

General Conditions indicate, if an Owner safety program exists, it will be noted in the

Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the

Site by Owner or others (such as utilities and other prime contractors) and relates to the

Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

00 21 15 - 3

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to

Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by

Bidder; and (3) Bidder's safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the

Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid will constitute an incontrovertible representation by

Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the

Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the

Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

00 21 15 - 4

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to

Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 72 hours prior to the date for opening of

Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of

Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding

Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the

General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the

Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract

Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner's exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the

Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released, if requested by the respective Bidder.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening, if requested by the respective

Bidder.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial

Completion, or completion of the Work in readiness for final payment, are set forth in the

Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those "or-equal" or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by

Addendum. No item of material or equipment will be considered by Engineer as an "or-equal" or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids in the case of a proposed

00 21 15 - 5 substitute and 5 days prior in the case of a proposed "or-equal". Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer's decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner. Substitutes and "or-equal" materials and equipment may be proposed by Contractor in accordance with Paragraphs 7.04 and 7.05 of the

General Conditions after the Effective Date of the Contract.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of

"or-equal" or substitution requests are made at Bidder's sole risk.

11.03 If an award is made, Contractor shall be allowed to submit proposed substitutes and "or-equals" in accordance with the General Conditions.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 If required by the bid documents, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for those portions of the Work for which such identification is required.

A. If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity.

B. If Owner or Engineer, after due investigation, has reasonable objection to any proposed

Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder's Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the

Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the

Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.

12.04 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in

Supplementary Conditions 7.06.

ARTICLE 13 – PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.

Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

00 21 15 - 6

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then

Bidder may enter the words "No Bid" or "Not Applicable."

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature). The corporate address and state of incorporation shall be shown.

13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature). The official address of the partnership shall be shown.

13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

13.05 A Bid by an individual shall show the Bidder's name and official address.

13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

13.07 All names shall be printed in ink below the signatures.

13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.10 The Bid shall contain evidence of Bidder's authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder's state contractor license number, if any, shall also be shown on the Bid Form.

13.11 Each bid must be submitted in a sealed envelope bearing on the outside the name of the Bidder, address, and the name of the project for which the bid is submitted. Any bid not bearing the

Bidder's utility contractor's license number issued by the State of Georgia Construction Industry

Licensing Board, when required by State Law, may not be considered by the Owner. If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed as specified in the Bid Form. The Owner may reject any bid that is not properly prepared and accompanied by required certifications.

ARTICLE 14 – BASIS OF BID

14.01 Lump Sum: Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.

14.02 Unit Price:

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The "Bid Price" (sometimes referred to as the extended price) for each unit price Bid item will be the product of the "Estimated Quantity" (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding "Bid Unit Price" offered by the

Bidder. The total of all unit price Bid items will be the sum of these "Bid Prices"; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

00 21 15 - 7

14.03 Allowances: Include in the Contract Price the Allowance items and amounts as set forth in the

Bid Form.

ARTICLE 15 – SUBMITTAL OF BID

15.01 Bid Submittal Documents

A. The Bid Submittal must include ONE (1) original of the following documents:

1. Bid Form

2. Bid Bond

3. Bidder's Qualifications

4. Non-Collusion Affidavit of Prime Bidder

5. Partnership Certificate

6. Corporate Certificate

7. Individual Certificate

8. Contractors Certificate

9. Contractor E-Verify Form

B. The following documents will be completed after the Contract has been awarded:

1. Notice of Award

2. Agreement

3. Notice to Proceed

4. Performance Bond

5. Labor and Material Payment Bond

15.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents.

15.03 If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation "BID

ENCLOSED."

15.04 Bids received after the date and time prescribed for the opening of bids or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the

Bidder unopened.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a

Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.

00 21 15 - 8

ARTICLE 17 – OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. Bidders will be provided with a tabulation sheet for the purpose of the Bidder transcribing the amounts of Bids, as read aloud.

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but

Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If

Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the

Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner may reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid

Form or prior to the Notice of Award. For Unit Price Bids, Owner may reject any bid that contains unreasonable or disproportionate unit costs.

19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the

Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds and insurance. When the

Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within 30 days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the

General Conditions.

00 21 15 - 9

ARTICLE 22 – SALES AND USE TAXES

22.01 All sales and use taxes will be included in the Bid.

22.02 City of Adairsville sales tax is 7.0%.

ARTICLE 23 – RETAINAGE

23.01 Provisions concerning retainage are set forth in the Agreement.

ARTICLE 24 – CONTRACTOR AFFIDAVIT FOR ELECTRONIC VERIFICATION OF WORK

AUTHORIZATION PROGRAMS

24.01 All Bidders shall submit the E-Verify Form with their bid.

END OF DOCUMENT

April 2026 Adairsville Water Plant Generator Bid Form

00 41 13 - i

DOCUMENT 00 41 43

BID FORM

PROJECT IDENTIFICATION:

City of Adairsville, Georgia

Adairsville Water Plant Generator

Date:

SUBMITTED BY: (Full Name and Address)

(Telephone Number)

TABLE OF CONTENTS

Page

ARTICLE 1 – Bid Recipient

ARTICLE 2 – Bidder’s Acknowledgements

ARTICLE 3 – Bidder’s Representations

ARTICLE 4 – Bidder’s Certification

ARTICLE 5 – Basis of Bid

ARTICLE 6 – Time of Completion

ARTICLE 7 – Attachments to this Bid

ARTICLE 8 – Defined Terms

ARTICLE 9 – Bid Submittal

00 41 13 - 1

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

City of Adairsville

Attn: Jordan Redd

116 Public Square

Adairsville, Georgia 30103

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum No. Addendum, Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests, if any, of subsurface conditions at or adjacent to the Site and all drawings of physical conditions, if any, relating to existing surface or subsurface structures at the Site that have been identified in the

Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and

00 41 13 - 2 drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work;

(2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the

Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the

Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article, and that without exception the

Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.

00 41 13 - 3

ARTICLE 5 – BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

BID SCHEDULE:

ADAIRSVILLE WATER PLANT GENERATOR

Bidder agrees to perform all the construction as described in the request for proposal, the plan and the issued addenda for the following prices:

BASE BID WATER PLANT GENERATOR

Work to include the purchase and installation of a 500 kW Generator for the Water Plant, including construction of a concrete pad for the generator (excavation, re-compacting, and pouring slab); the purchase, installation, and coordination of delivery and unloading of a 500 kW, 480/277v/3-phase diesel

Generator in a weatherproof sound enclosure with 2,500-gallon tank; provision of a crane to unload and set the 500 kW generator; electrical conduits and wiring from generator to use existing automatic transfer switch; startup and testing of system after installation; training for system use; fuel for initial startup, testing, and training purposes; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete working Generator at the Water Plant.

Total Base Bid Price in Figures__________________________________________________________

Total Base Bid Price in Words: _________________________________________________________

ALLOWANCES

Allowance for correction of unforeseen utility conflicts, utility relocation, Owner initiated miscellaneous work, spare parts, special tools, SCADA coordinating.

Total Allowance Price: $50,000

TOTAL BID (BASE BID + ALLOWANCES):

TOTAL CONTRACT PRICE (BASE BID + ALLOWANCES) IN FIGURES

TOTAL CONTRACT PRICE (BASE BID + ALLOWANCES) IN WORDS:

The amount of Lump Sum Bid – Total Bid shall be shown in both words and figures. In case of a discrepancy, the amount shown in words shall govern.

The Contract will be awarded based on Total Contract Price Above.

ADDITIVE ALTERNATES SCHEDULE

Demolition of existing Generator inside the Water Plant Building, including all necessary electrical demolition work.

00 41 13 - 4

ARTICLE 6 – TIME OF COMPLETION

6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 7 – ATTACHMENTS TO THIS BID

7.01 The following documents are submitted with and made a condition of this Bid:

A. Bid Bond;

B. List of Project References;

C. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;

D. Contractor’s License No.: _______________________________;

E. Affidavit of Non-Collusion;

F. Required Bidder Qualifications; and

G. Contractor E-Verify Form.

ARTICLE 8 – DEFINED TERMS

8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

00 41 13 - 5

ARTICLE 9 – BID SUBMITTAL

BIDDER: [Indicate correct name of bidding entity]

By:

[Signature]

[Printed name]

(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

[Signature]

[Printed name]

Title:

Submittal Date:

Address for giving notices:

Telephone Number:

Fax Number:

Contact Name and e-mail address:

Bidder’s License No.:

(where applicable)

April 2026 Adairsville Water Plant Generator Bid Bond

00 43 13-1

DOCUMENT 00 43 13

BID BOND

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER:

City of Adairsville

116 Public Square

BID

Bid Due Date:

Description:

City of Adairsville Water Plant Generator

Work to include the purchase and installation of a 500 kW Generator for the Water Plant, including construction of a concrete pad for the generator (excavation, re-compacting, and pouring slab); the purchase, installation, and coordination of delivery and unloading of a 500 kW, 480/277v/3-phase diesel Generator in a weatherproof sound enclosure with 2,500-gallon tank; provision of a crane to unload and set the 500 kW generator; electrical conduits and wiring from generator to use existing automatic transfer switch; startup and testing of system after installation; training for system use; fuel for initial startup, testing, and training purposes;

all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete working Generator at the Water Plant.

BOND

Bond Number:

Penal sum Five (5) Percent of Bid

Penal sum $

(Words) (Figures)

Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid

Bond to be duly executed by an authorized officer, agent, or representative.

00 43 13-2

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: By:

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Title Title

Attest: Attest:

Signature Signature

Title Title

Note: Addresses are to be used for giving any required notice.

Provide execution by any additional parties, such as joint venturers, if necessary.

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this

Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding

Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the

Bidding Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding

Documents and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents

(or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable

00 43 13-3 promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of

Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United

States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

April 2026 Adairsville Water Plant Generator Qualifications Statement

00 45 13 - 1

DOCUMENT 00 45 13

QUALIFICATIONS STATEMENT

THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO

THE EXTENT PERMITTED BY LAWS AND REGULATIONS

1. SUBMITTED BY:

Official Name of Firm:

Physical Address:

Telephone:

Federal ID Number:

2. SUBMITTED TO: City of Adairsville

3. SUBMITTED FOR:

Owner: City of Adairsville

Project Name: City of Adairsville Water Plant Generator

TYPE OF WORK: Furnishing and installing all materials, labor, tools, skills, equipment, and miscellaneous items necessary for the construction project described in the Advertisement for Bid

(Document 00 11 13).

4. CONTRACTOR'S CONTACT INFORMATION

Contact Person:

Title:

Phone:

Email:

00 45 13 - 2

5. AFFILIATED COMPANIES:

Name:

Address:

6. TYPE OF ORGANIZATION:

SOLE PROPRIETORSHIP

Name of Owner:

Doing Business As:

Date of Organization:

PARTNERSHIP

Date of Organization:

Type of Partnership:

Name of General Partner(s):

CORPORATION

State of Organization:

Date of Organization:

Executive Officers:

- President:

- Vice President(s):

- Treasurer:

- Secretary:

00 45 13 - 3

LIMITED LIABILITY COMPANY

State of Organization:

Date of Organization:

Members:

JOINT VENTURE

Sate of Organization:

Date of Organization:

Form of Organization:

Joint Venture Managing Partner

- Name:

- Address:

Joint Venture Managing Partner

Joint Venture Managing Partner

00 45 13 - 4

7. LICENSING

Jurisdiction:

Type of License:

License Number:

Jurisdiction:

Type of License:

License Number:

8. CERTIFICATIONS CERTIFIED BY:

Disadvantage Business Enterprise:

Minority Business Enterprise:

Woman Owned Enterprise:

Small Business Enterprise:

Other ( ):

9. BONDING INFORMATION

Bonding Company:

Bonding Agent:

Contact Name:

Aggregate Bonding Capacity:

00 45 13 - 5

Available Bonding Capacity as of date of this submittal:

10. FINANCIAL INFORMATION

Financial Institution:

Account Manager:

11. CONSTRUCTION EXPERIENCE:

Current Experience:

List on Schedule A all uncompleted projects currently under contract (If Joint Venture list each participant's projects separately).

Previous Experience:

List on Schedule B all similar projects completed within the last 5 Years (If Joint

Venture list each participant's projects separately).

Has firm listed in Section 1 ever failed to complete a construction contract awarded to it?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

Has any Corporate Officer, Partner, Joint Venture participant or Proprietor ever failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

Are there any judgments, claims, disputes or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

12. SAFETY PROGRAM:

00 45 13 - 6

Name of Contractor's Safety Officer:

Include the following as attachments:

Provide as an Attachment…

This is the start of the file's text. The full file is on GovTribe.