RFP 26_02 Windwood Hollow Playground Surface Replacement
This is a Request for Proposals (RFP) issued by the City of Dunwoody, Georgia, for the removal and replacement of the existing Pour-In-Place (PIP) playground safety surface at Windwood Hollow Park, located at 4865 Lakeside Drive, Dunwoody, GA 30360. The project scope includes complete removal of the current PIP surface and installation of a new safety surface system meeting ASTM F1951 standards for playground impact attenuation. The RFP seeks qualified and experienced contractors capable of executing this specialized playground resurfacing work. Specific response and due dates, site visit information, mandatory bidders' conferences, and contract award timelines are contained within the solicitation documents and should be reviewed in detail for scheduling compliance and submission requirements.
The RFP establishes pricing terms and evaluation criteria for contractor selection based on qualifications, experience with similar PIP playground projects, proposed methodology, timeline, and cost competitiveness. Potential bidders should review all specifications regarding material standards, installation requirements, and warranty provisions. The project funding source, budget parameters, and any local or federal set-aside provisions applicable to small business, minority-owned, or women-owned enterprises should be confirmed through the complete RFP documentation. Interested contractors must carefully review all addenda, technical specifications, and contract terms prior to submission to ensure full compliance with the City's requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal (RFP) 26-02 Playground Pour-In-Place (PIP) Surface Replacement
Windwood Hollow Park – City of Dunwoody
1. Project Overview The City of Dunwoody is soliciting proposals from qualified and experienced contractors for the removal and replacement of the existing Pour-In-Place (PIP) playground safety surface at Windwood Hollow Park, located at 4865 Lakeside Drive, Dunwoody, GA 30360.
The project includes demolition of the existing PIP surface, installation of a new PIP system, removal of existing plastic playground borders, installation of new concrete curbing, and verification of subgrade and drainage conditions. All work must comply with applicable safety and fall-height standards.
1.1 Project Dates:
Date of Issue: February 20, 2026 Site Visit: February 27, 2026 Last Day to Submit Questions: March 6, 2026 Request for Proposal Due Date: March 20, 2026 at 2pm Proposal Copies Required: 1 original, 1 copy, and electronic copy on USB drive Submission Location: Dunwoody City Hall, 4800 Ashford Dunwoody Rd. Attn: John Gates
2. Site Information
• Owner: City of Dunwoody
• Project Location: Windwood Hollow Park 4865 Lakeside Drive Dunwoody, GA 30360
• Approximate Surface Area: 6,750 square feet o Final square footage must be field-verified by the contractor prior to bid submission.
• Existing Conditions:
o Current PIP surface to be removed and replaced.
o Existing playground equipment will remain in place and must be protected.
o Existing plastic playground borders to be removed and replaced with new concrete curb.
3. Scope of Work
3.1 Demolition & Removal
• Remove and properly dispose of the existing PIP surface.
• Remove existing plastic playground borders.
• Protect all existing playground equipment throughout the project.
3.2 Subgrade & Drainage Verification
• Inspect and verify that the existing subgrade is suitable for new PIP installation.
• Inspect and verify that existing drainage lines are functional and adequate.
• Report any deficiencies to the City of Dunwoody prior to installation.
• Provide recommendations and pricing for any required remediation.
3.3 Installation of New Concrete Curb
• Install new 6-inch concrete curb around the playground perimeter to replace existing plastic borders.
• Concrete shall be 3000 PSI minimum strength.
• Curb dimensions and finish must meet City of Dunwoody standards.
3.4 Installation of New PIP Surface
• Provide and install a new PIP safety surface meeting or exceeding ASTM, CPSC, and ADA requirements.
• Surface must meet fall-height requirements for all existing playground equipment.
• Contractor must perform post-installation fall-height testing and provide documentation.
• Provide material samples for approval, including a 50/50 blend of selected color and black.
• Ensure seamless integration around existing equipment posts and footings.
4. Material Requirements
• Two-layer PIP system (base layer + wear layer).
• UV-stable EPDM or TPV wear layer.
• Binder and rubber components must meet manufacturer specifications.
• Final color blend: 50% selected color / 50% black, subject to City approval.
5. Safety & Compliance All work must comply with:
• ASTM F1292 (Impact Attenuation)
• ASTM F1951 (Accessibility)
• ASTM F2479 (PIP Surfacing Guidelines)
• CPSC Public Playground Safety Handbook
• ADA accessibility requirements
Contractor must:
• Conduct field testing upon completion
• Provide written certification of compliance
• Provide warranty information for materials and installation
6. Contractor Qualifications Proposers must demonstrate:
• Minimum of 5 years of experience installing PIP playground surfacing
• Experience working around existing playground equipment
• Proof of insurance and required licensing
• References for at least three similar projects completed within the last five years
7. Proposal Requirements Proposals must include:
• Field-verified square footage
• Detailed project approach and timeline
• Itemized cost proposal (demolition, curb installation, PIP installation, testing, etc.)
• Material data sheets and sample submittals
• Warranty information
• Identification of subcontractors (if applicable)
• Proposed schedule and estimated duration
8. Evaluation Criteria Proposals will be evaluated based on the following weighted criteria:
1. Contractor Experience and Qualifications – 35%
2. References and Past Performance – 35%
3. Cost – 30%
| Request for Proposal (RFP) 26-02 |
| Playground Pour-In-Place (PIP) Surface Replacement |
| Windwood Hollow Park – City of Dunwoody |
| 1. Project Overview |
| 2. Site Information |
| 3. Scope of Work |
| 3.1 Demolition & Removal |
| 3.2 Subgrade & Drainage Verification |
| 3.3 Installation of New Concrete Curb |
| 3.4 Installation of New PIP Surface |
| 4. Material Requirements |
| 5. Safety & Compliance |
| 6. Contractor Qualifications |
| 7. Proposal Requirements |
| 8. Evaluation Criteria |
| 1. Contractor Experience and Qualifications – 35% |
| 2. References and Past Performance – 35% |
| 3. Cost – 30% |
File details come from the government source that posted it. Updated .