RFP 26_01 Addendum 1.pdf
PDF 831 KB Posted
- Attached to
- Water Plant Generator
- Solicitation number
- PE-60855-NONST-2026-000000013
- Issued by
- Barrow County, Georgia
About this file
This is an addendum to a Request for Proposals (RFP 26-01) issued by the City of Adairsville, Georgia for a Water Plant Generator project. The project involves the purchase and installation of an automatic backup generator system to power the Lewis Springs Water Plant located at 87 Twin Bridges Road, Adairsville, Georgia 30103. The scope of work includes procurement and installation of a new 500KW diesel backup generator system with all necessary components, including a concrete slab foundation, level 1 metal sound enclosure, and a 2500-gallon fuel tank with rupture basin. The City will conduct on-site meetings on February 12, 2026 from 9:00 a.m. to 11:00 a.m. and February 18, 2026 from 9:00 a.m. to 11:00 a.m. at the project location. All project inquiries must be submitted in writing to Jody Maffetone at jmaffetone@adairsvillega.net no later than February 20, 2026 at 4:00 p.m. local time, with responses provided via addendum.
The addendum does not specify pricing terms, set-asides, or other financial details regarding the project budget or funding sources. No information is provided regarding contract term, renewal options, incumbent contractors, or award dates in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 26_01 Water Plant Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Adairsville – RFP 26-01 Addendum 1
City of Adairsville
RFP 26-01
Addendum 1
Water Plant Generator
Project Location:
87 Twin Bridges Rd
Adairsville, GA 30103
City of Adairsville – RFP 26-01 Addendum 1
Additional Information
The City of Adairsville will conduct on site meetings at 87 Twin Bridges Adairsville, GA 30103 on the following dates and times:
February 12, 2026 9am-11am
February 18, 2026 9am-11am
All project inquiries shall be made in writing to Jody Maffetone at jmaffetone@adairsvillega.net no later than February 20, 2026 at 4:00 pm local time. All questions received will be answered via an addendum.