RFP 25-175-Q Opening Tab Sheet.pdf
PDF 59 KB Posted
- Attached to
- EWEB RFP 25-175-Q Warehouse Remodel Design
- Solicitation number
- S-P00140-00015086
- Issued by
- Lane County, Elmira CDP, Oregon
About this file
This is an Opening Tab Sheet for RFP 25-175-Q issued by the Eugene Water and Electric Board (EWEB) in Lane County, Oregon, documenting the receipt and evaluation of proposals for warehouse remodel design services. The solicitation seeks engineering consulting services to design the renovation of existing warehouse space into an operations crew room. Proposals were due on November 4, 2025, at 2:00 PM. Two firms submitted proposals: HBX Studio Architecture Inc and PIVOT Architecture. Both respondents completed all required submission elements, including the proposal form, contractual acceptance statement, termination for default statement, response to minimum qualifications, response to all evaluation criteria, and acknowledgment of the addendum. The proposals were opened by Kristin Kokkeler and witnessed by Wendy Lopez.
The document does not disclose specific pricing information, budget ranges, set-asides, or incumbent vendor details. No information regarding funding sources, contract term length, renewal options, or award timelines is provided in this opening tab sheet. The document serves solely as an administrative record confirming proposal receipt and completeness verification for both submitted responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REQ-10700-00147109 SP Notice~1.pdf | ||
| EWEB RFP 25-175-Q Warehouse Remodel Design Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Closing Date: 11/4/25 Closing Time: 2:00 PM
DESCRIPTION
HBX Studio
Architecture Inc PIVOT Architecture
Proposal Form (Section 6) Yes Yes Contractual Acceptance statement provided Yes Yes Termination for Default statement provided Yes Yes Response to Minimum Qualifications (Section 3) Yes Yes Response to all Evaluation Criteria (Section 4) Yes Yes Addendum acknowledged Yes Yes
Opened by: Kristin Kokkeler
Witnessed by: Wendy Lopez
TAB SHEET
25-175-Q Wareshouse Remodel Design Services
COMPANY NAMES
File details come from the government source that posted it. Updated .