RFP_25-17-FAC (Fire Station 1 Floor _ Paint).docx
DOCX document 266 KB Posted
- Solicitation number
- RFP-25-17-FAC
- Issued by
- Boulder County, Lakewood City, Colorado
About this file
This is a Request for Proposal (RFP) issued by the City of Lafayette, Colorado for interior painting and flooring renovation at Fire Station #1, located at 401 N 111th Street. The project involves updating interior finishes in the station's offices, living quarters, training room, hallways, bedrooms, and kitchen, excluding the apparatus bay. The RFP was released on June 24, 2025, with proposals due by July 25, 2025 at 5:00 PM MT, and a mandatory walk-through scheduled for July 10, 2025 at 9:00 AM MT. The contract term is anticipated to begin around August 1, 2025 and end no later than December 15, 2025, with the station remaining fully operational during construction, requiring phased work and close coordination with staff.
The project requires flooring replacement using specific carpet and vinyl products from Aladdin Commercial and Brookline Mills, with designated colors and installations, and painting using low-VOC, commercial-grade paint. The evaluation criteria include timeline and coordination (20 points), material sourcing (20 points), minimizing station disruption (30 points), and pricing (30 points), with a total possible score of 100 points. The City reserves the right to award the contract to multiple offerors based on their ability to provide services for paint and flooring elements. Pricing must remain firm during the contract term and include all associated fees, with the City potentially awarding to different contractors for painting and flooring based on their individual capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPENDIX B - FLOOR PLAN.pdf | ||
| APPENDIX A - SAMPLE CONTRACT.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
RFP-25-17-FAC
Interior Painting and Flooring – City of Lafayette Fire Department: Station #1
Proposals must be uploaded to the Rocky Mountain E-Purchasing System, Bidnet®, at: https://www.bidnetdirect.com/Colorado/CityofLafayette
RFP Release Date: June 24, 2025 Proposal Due Date: July 25, 2025 | 5:00PM MT City of Lafayette 1290 South Public Road Lafayette, Colorado 80026
Contents
| REQUEST FOR PROPOSAL COVER SHEET & SIGNATURE PAGE | 4 | |
| NON-COLLUSION CERTIFICATE | 5 | |
| 1. | SECTION 1 – GENERAL INFORMATION | 6 |
| 1.1. | BACKGROUND, OVERVIEW, AND GOALS | 6 |
| Statement of Vision | 6 | |
| Statement of Values | 6 | |
| PURPOSE | 6 | |
| 1.2. | SCHEDULE OF ACTIVITIES | 6 |
| 1.3. | ADMINISTRATIVE INFORMATION | 7 |
| 1.3.I. | Official Means of Communication | 7 |
| 1.3.II. | Modification or Withdrawal of Proposals | 7 |
| 1.3.III. | Proposal Submission | 7 |
| 1.3.IV. | Addendum or Supplement to Request for Proposal | 8 |
| 1.3.V. | Oral Presentations/Site Visits | 8 |
| 1.3.VI. | Incurring Costs | 8 |
| 1.3.VII. | Confidentiality | 8 |
| 1.3.VIII. | Acceptance of RFP terms | 9 |
| 1.3.IX. | Independent Price Determination | 9 |
| 1.3.X. | Conflicts of Interest/Ethics | 9 |
| 1.3.XI. | Protested Solicitations and Awards | 10 |
| 1.4. | CONTRACT AND TERM | 10 |
| 2. | SECTION 2 – REQUIREMENTS AND SCOPE OF WORK | 10 |
| 2.1. | INSURANCE REQUIREMENTS | 10 |
| 2.2. | BONDS | 11 |
| 2.3. | MANDATORY SUBMISSION REQUIREMENTS | 11 |
| 2.4. | SCOPE OF WORK | 13 |
| 3. | SECTION 3 – EVALUATION METHODOLOGY & AWARD | 15 |
| 3.1. | EVALUATION PROCESS | 15 |
| 3.2. | EVALUATION COMMITTEE | 15 |
| 3.3. | PROPOSAL EVALUATION CRITERIA | 15 |
| 3.4. | DEMONSTRATIONS AND DISCUSSIONS | 16 |
| 3.5. | SINGLE PROPOSAL | 16 |
| 3.6. | AWARD | 16 |
| APPENDIX A – SAMPLE CONTRACT | 17 | |
| APPENDIX B – FLOOR PLANS | 18 |
Page 1 of 19 Rev. 9/2023
REQUEST FOR PROPOSAL COVER SHEET & SIGNATURE PAGE
RFP-25-17-FAC
Proposal Submission Deadline:
July 25, 2025 | 5:00PM MT Submit Sealed Proposals to: bidnetdirect.com/Colorado/CityofLafayette
Project Manager:
Mike Nielsen Mike.Nielsen@LafayetteCO.gov
Department Director Pete Bradshaw – Fire Chief
Procurement Manager:
Elizabeth Messner Elizabeth.Messner@lafayetteco.gov
Interior Painting and Flooring – City of Lafayette Fire Department: Station #1 The Request for Proposal Coversheet and Non-Collusion Certificate must be signed by the Offeror or an officer of the Offeror legally authorized to bind the Offeror to the proposal. Verifiable digital signatures are accepted.
Legal Company Name (Offeror):
Authorized Signature:
Typed/Printed Name:
Title:
F.E.I.N.
Company Address:
City: State: Zip:
Contact for clarifications:
Title:
Email Address:
Phone Number:
By signing this Request for Proposal Coversheet, the authorized agent acknowledges acceptance of all terms and conditions of this solicitation.
ONLINE PROPOSAL SUBMISSION: Offerors must be registered with the Rocky Mountain E-Purchasing System at https://www.bidnetdirect.com prior to the due date and time so that the proposal and other required information may be uploaded. Proposals sent by other methods will not be accepted.
Please be advised that telegraphic or electronic responses (Email, Fax, Drop Box, Etc.) CANNOT BE ACCEPTED as a sealed proposal. Vendors are urged to read these documents thoroughly before submitting a response.
NON-COLLUSION CERTIFICATE
The undersigned, being duly sworn, deposes and says that the person, firm, association, co-partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in the preparation and submission of a proposal to the City of Lafayette for consideration in the award of a Contract for Interior Painting and Flooring – City of Lafayette Fire Department: Station #1
(Offeror Name)
By: _______________________________________________ (Authorized Signature)
Title: _______________________________________________
1. SECTION 1 – GENERAL INFORMATION
1.1. BACKGROUND, OVERVIEW, AND GOALS
Statement of Vision Lafayette’s panoramic view of the Rocky Mountains inspires our view into the future. We value our heritage, our unique neighborhoods, a vibrant economy, and active lifestyles. We envision a future that mixes small town livability with balanced growth and superior city services.
Statement of Values We foresee a strong economy that is diverse and sustainable, attracts innovators, encourages a balance of big and small businesses, and meets the community’s needs.
We intend to shape the future through strengthening our voice on environmental stewardship and social issues, taking an active role in sustainability and strategic planning development, and facilitating leadership development and fresh thinking.
We strive to be a connected community that encourages cooperative relationships and inclusivity, expects accessibility and communication, nurtures resiliency, appreciates multiculturalism, and humanizes physical and social interactions within the City.
We support placemaking endeavors that stimulate historic preservation and the arts, encourage open space stewardship and networking of neighborhoods, and promote comprehensive planning and livability.
PURPOSE
The purpose of this project is to update the interior finishes—including flooring and paint—within the offices and living quarters of Fire Station #1 in Lafayette, Colorado. This project excludes work in the apparatus bay. The station will remain operational during construction, requiring phased work and close coordination with staff. Flooring and painting work will be performed in tandem, using pre-approved materials and similar color schemes to existing finishes.
1.2. SCHEDULE OF ACTIVITIES
| Activity |
| Date and Time |
| RFP Issued via Rocky Mountain E-Purchasing System/Bidnet |
| June 24, 2025 |
| Mandatory Walk-Through |
| July 10, 2025 | 9:00AM MT |
401 N 111th Street, Lafayette, CO 80026
| Prospective Vendors Written Inquiry Deadline (No questions will be accepted after this date and time.) |
| July 14, 2025 | 5:00PM MT |
| City’s Response to Written Inquiry |
| July 18, 2025 |
| Proposal Submission Deadline |
| July 25, 2025 | 5:00PM MT |
1.3. ADMINISTRATIVE INFORMATION
1.3.I. Official Means of Communication The RFP is published on the Rocky Mountain E-Purchasing System (Bidnet), so that proposals may be uploaded electronically to that system. The uploaded proposals are sealed by the system and can’t be viewed by the Procurement department or the evaluators until the due date and time have passed. This meets the Colorado procurement code requirement of “sealed proposals”.
The Procurement Manager will post notices that will include, but are not limited to, modifications to administrative or performance requirements, answers to inquiries received, clarifications to requirements, and the announcement of the apparent winning vendor.
No inquiries will be accepted after the date and time indicated in Section 1.2., Schedule of Activities. Where appropriate, inquiries should include references to any relevant Section/paragraph of the solicitation.
The only official response to an Offeror's inquiries are those responses that are published as a modification in Bidnet. Offerors should not rely on any other statements, whether written or verbal, that alter any specification or other term or condition of this RFP.
It is incumbent upon Offerors to monitor Bidnet carefully and regularly for any such postings prior to the proposal submission deadline, as this is the primary means for communicating any clarifications or changes to solicitation content, timeline and/or requirements.
1.3.II. Modification or Withdrawal of Proposals Proposals may be modified or withdrawn by an Offeror up to twenty-four (24) hours prior to the established due date and time. Withdrawal of an Offeror’s proposal after award is prohibited.
1.3.III. Proposal Submission Proposals must be uploaded to Bidnet at https://www.bidnetdirect.com/Colorado/CityofLafayette on or before the date and time indicated in the Schedule of Activities. Late proposals will not be accepted. It is the responsibility of the Offeror to ensure that the proposal is uploaded on or before the closing date and time.
The Request for Proposal Cover Page and the Non-Collusion Certificate must both be signed in ink or with a verifiable digital signature by the Offeror or an officer of the Offeror legally authorized to bind the Offeror to the proposal. The signed Cover Page and Certificate may be scanned and included with the uploaded proposal. Documents signed with DocuSign are acceptable.
1.3.IV. Addendum or Supplement to Request for Proposal In the event that it becomes necessary to revise any part of all of this RFP, an addendum notice will be published on Bidnet.
1.3.V. Oral Presentations/Site Visits The City may, it its sole discretion, request that Offerors make an oral presentation.
1.3.VI. Incurring Costs Offerors are solely responsible for all costs incurred as a result of responding to this solicitation, which may include, but is not limited to, proposal development and materials, meetings, presentations, or negotiations.
1.3.VII. Confidentiality Following the proposal submission deadline, individuals/entities may request from the City a list of the names of the responding Offerors. All other information related to the solicitation process will remain confidential until award.
Following the Notice of Intent to Award, all Offeror proposals will be open to public inspection with exception of information determined to be a trade secret or confidential or proprietary, per §24-72-200.1 et seq., C.R.S., as amended, Colorado Open Records Act.
An Offeror may submit, as a part of its proposal, a written request for classification of certain portions of the proposal as a trade secret or other confidential or proprietary information. Material for which the Offeror is requesting confidentiality shall be readily identifiable and separated from other portions of the proposal to facilitate public inspection of the non-confidential portion of the proposal. Commingling of confidential information and non-confidential information is not acceptable. Neither price information nor any information that will be included in a resulting Contract will be considered confidential.
The Offeror must include the rationale for any request to classify portions as a trade secret or confidential or proprietary, including references to the authority that allows for such treatment.
In no event shall an entire proposal be classified as confidential.
Any additional Offeror information, which many be a part of evaluation/negotiation process and for which an Offeror claims confidentiality, is subject to the same requirements and processes identified above.
1.3.VIII. Acceptance of RFP terms A proposal submitted in response to this RFP shall constitute a binding offer. The autographic signature of the Offeror or an officer of the Offeror legally authorized to execute contractual obligations shall include acknowledgement of this condition. The proposal, including pricing, shall allow for a minimum of 180 calendar days for acceptance by the City, unless otherwise specified in this solicitation.
A submission in response to this RFP acknowledges acceptance by the Offeror of all terms and conditions as set forth herein. An Offeror shall identify clearly and thoroughly any variations between its proposal and this RFP. Failure to do so shall be deemed a waiver of any rights to subsequently modify the terms of performance, except as outlined or specified in the RFP.
The contents of the proposal of the awarded Offeror will become contractual obligations under the awarded Contract. Failure of the awarded Offeror to accept these obligations may result in cancelation of the award to that Offeror.
1.3.IX. Independent Price Determination By its signature on the Cover Page and Certificate of Non-Collusion the Offeror certifies that the prices and other terms in the proposal have been arrived at independently without any consultation, communication, agreement with, or knowledge of the contents of the proposal by any other competing Offerors. For purposes of this paragraph, "consultation, communication, agreement with, or knowledge" does not include knowledge of prices or terms gained through availability of established price lists or catalogues made available to the public by the competing Offerors. No attempt has been made or will be made by the Offeror to induce any other person or firm to submit or not to submit a proposal for restricting competition per §6-4-101, C.R.S., et seq., (Colorado Antitrust Act of 1992) as amended.
1.3.X. Conflicts of Interest/Ethics The Offeror must disclose in its proposal any potential or actual conflict of interest in connection with a response to this solicitation. A conflict of interest may include, but is not limited to, access to any non-public information by the Offeror regarding the solicitation or its subject matter.
The Offeror acknowledges that even the appearance of a conflict of interest may be harmful to the City’s interests. The Offeror shall disclose in its proposal whether there currently is, or potentially could be, the appearance of a conflict of interest regarding this solicitation, its staff, any proposal subcontractors or partners, or any related business with the City.
Requirements set forth in this Section are continuing requirements throughout the solicitation process and, for the awarded Offeror, the Contract term, including any extensions.
1.3.XI. Protested Solicitations and Awards Any actual or prospective vendor or contractor who is aggrieved in connection with the solicitation or award of a contract may protest to the City’s Finance Department. The protest shall be submitted in writing to the Procurement contact listed above within seven (7) working days after such aggrieved person knows, or should have known, of the facts giving rise thereto (emphasis added).
With regard to the emphasized language above, it is important for Offerors to note that a challenge to the solicitation's requirements or specifications should be made within seven (7) working days of when the protestable item is known. In other words, if you believe that the solicitation contains a requirement you want to protest, the protest should be submitted within the seven (7) working day time period, even if that means it is filed during the time the solicitation is still open.
Announcement of the apparent winning vendor will be made via a posting on Bidnet. The requirement for timely submission of any protest (seven (7) working days) will begin no later than the first working day following posting of the award notice on Bidnet.
1.4. CONTRACT AND TERM
The City’s Sample GENERAL CONTRACT- LONG FORM(“Contract”) is included as Appendix A of this RFP. Any exceptions to the Contract documentation will be taken into consideration when evaluating proposals submitted. Offerors should submit any requested modifications in a redlined copy of the City’s Contract when submitting their proposal.
The City reserves the right to reject any or all proposed modifications.
The initial term of the awarded Contract is anticipated to begin on or around August 1, 2025 and end no later than December 15th, 2025.
The City may, within its sole discretion, choose not to exercise any option or extension term in the Contract for any reason. If the City chooses not to exercise any option or extension term, it may re-procure the goods and/or services in its sole discretion.
2. SECTION 2 – REQUIREMENTS AND SCOPE OF WORK
2.1. INSURANCE REQUIREMENTS
Offeror shall, at its own expense, keep in full force and effect during the term of any Contract resulting from this solicitation, and during the term of any extension or amendment to that Contract, insurance as stated below:
· Commercial General Liability Insurance with minimum combined single limits of One Million Dollars and No Cents ($1,000,000.00) for each occurrence and One Million Five Hundred Thousand Dollars and No Cents ($1,500,000.00) aggregate
· If professional services are provided, Professional Liability Insurance with limits of One Million Dollars and No Cents ($1,000,000.00) per claim and One Million Five Hundred Thousand Dollars and No Cents ($1,500,000.00) aggregate.
· Workers’ Compensation Insurance to cover all obligations imposed by applicable laws for all of the Offeror’s employees engaged in the performance of work under any Contract resulting from this solicitation, based on statutory limits prescribed by and in accordance with Colorado law. In the event any services are performed by a subcontractor, the Offeror shall require such subcontractor to provide workers’ compensation insurance for its employees.
· Comprehensive Automotive Liability Insurance for the duration of any Contract resulting from this solicitation, covering all owned, non-owned, and hired vehicles used in connection with the work performed by or on behalf of the Offeror under that Contract, in an amount not less than Five Hundred Thousand Dollars and No Cents ($500,000.00) combined single limit per occurrence for bodily injury and property damage.
2.2. BONDS
The following bonds are required for all contracts for construction, repair, or remodel of any public building or any public works for $50,000 or more. If the price is under $50,000 bonds are not required.
Each bid shall be accompanied by a bid guarantee bond, or certified cashier's check made payable City of Lafayette in an amount not less than five (5) percent of the amount of the bid as a guarantee that the bidder will execute the Contract, if awarded. The bond shall be forfeited to the City if a bid is accepted and the bidder fails to sign a contract within fifteen (15) days of acceptance The bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and Payment Bond acceptable to the City of Lafayette for 100% of the Contract Price for each bond, in accordance with the requirements of the Contract Documents.
2.3. MANDATORY SUBMISSION REQUIREMENTS
· Signed Request for Proposal Cover Sheet and Non-Collusion Certificate/Cover Letter
· Proposal - Provide a written narrative that defines the methods and means by which the proposing firm will perform the Scope of Work outlined in this RFP. An enhancement to the Scope of Work may be submitted on a separate sheet.
· Describe how the Offeror’s experience and capabilities make it the ideal candidate to perform the work. Describe experience with similar projects.
· Indicate key personnel who will be assigned to the project and describe their experience.
· Describe the proposed plan to not disrupt the Fire Station Operations while work is being performed.
· Offer shall describe how they will accomplish the Scope of Work detailed in Section 3.3 of this solicitation.
· Confirm the ability to source and use the materials described in the scope
· Provide a project timeline
· Pricing - include proposed pricing for flooring and for painting as two separate costs. Offeror may provide pricing for both project elements (paint and flooring) or for only one element (paint or flooring). The City reserves the right to award the project to more than one Offeror based on each Offeror’s ability to provide the services in the scope for each element of the project.
· Proposed pricing must remain firm during the initial term of the Contract. Pricing must include any fees associated with the delivery of the goods or services, including, but not limited to, shipping, installation, travel, or other implementation costs. The proposed price shall be exclusive of any Federal or State taxes from which the City is exempt by law.
· Licenses – List all licenses, certifications and bonding of personnel employed by Contractor.
· Insurance Information/statement affirming ability to meet or exceed all insurance requirements as outlined in this RFP and the sample contract
· Bid Bond, if required per Section 2.2 of this solicitation.
· At least three (3) reference contacts for similar projects, including names and contact information for individuals who can speak to the team’s qualifications.
· A Customer Support/Staffing Plan detailing all personnel and subconsultants proposed for assignment to the Project team. Identify the names and experience of staff dedicated to addressing issues that may arise during the term of a contract with the City.
· All key personnel identified in the Staffing Plan shall remain on the team for the duration of the procurement process and execution of the project. If circumstances require a change in the Staffing Plan, it must be submitted in writing to the City, who shall have sole discretion to determine whether to authorize the change, recognizing that certain circumstances may occur that are beyond control. Unauthorized changes to the Staffing Plan during the procurement process may result in disqualification of a proposal or termination of the contract.
· Completed W-9
· Please provide company information, including answers to the below:
· How long has the company been in business in this name and any previous names that the company has operated under?
· What are the standard services that the company provides?
· Has the company been involved in any litigation or lawsuits in the last five (5) years? If yes, please describe.
· Has the company been involved in a bankruptcy or reorganization proceeding? If yes, please describe.
· Has the company been refused any surety, bond, or liability insurance in the past ten (10) years? If yes, please describe.
· Has the company, or any officer or partner, even failed to complete a contract? If yes, please describe.
Proposals will be considered only from firms or individuals that are well established in an appropriate field, who are financially responsible, and who have the resources and ability to provide services in a professional and timely manner. The City may request additional information as deemed necessary. The City reserves the right to obtain financial data or other supplemental information concerning the firm and/or its subcontractors. Failure to provide such information may result in the proposal being considered non-responsive.
2.4. SCOPE OF WORK
· Scope of Work
· Project: Interior Painting and Flooring – City of Lafayette Fire Department Station #1
· Location: 401 N 111th Street, Lafayette, CO 80026
· Prepared for: City of Lafayette
· Area: APPENDIX B – FLOOR PLAN
· Project Overview The purpose of this project is to update the interior finishes—including flooring and paint—within the offices and living quarters of Fire Station #1 in Lafayette, Colorado. This project excludes work in the apparatus bay. The station will remain operational during construction, requiring phased work and close coordination with staff. Flooring and painting work will be performed in tandem, using pre-approved materials and similar color schemes to existing finishes.
· Work to Be Completed & General Requirements All work must comply with applicable OSHA and safety standards.
The station will remain fully operational; contractors must coordinate closely with station personnel to avoid disruption.
· All work is limited to offices, training room, hallways, living quarters, bedrooms, & kitchen, areas, with the apparatus bay and connected utility rooms (on the south end of the building) not in scope.
· The City of Lafayette will handle all furniture removal and replacement.
· Work shall be completed in phases, with coordination around operations, flooring removal, painting, and flooring re-installation.
· Flooring Scope
· Areas and Materials:
· Front Offices and Training Room:
Material: Carpet Product: Aladdin Commercial, Cognitive Plank Collection Color: Complex Reasoning | 879 Insightful
· Rear Bedroom:
Material: Carpet Product: Aladdin Commercial, Cognitive Plank Collection Color: Complex Reasoning | 559 Perception
· All Hallways, Kitchen, Living Room, Rear Office Area:
Material: Vinyl Product: Brookline Mills, Resilient Color: 707 Grounded
· Installation Details:
· Remove and dispose of all existing flooring in designated areas.
· Prepare all subfloors for new surface installation.
· Install materials according to manufacturer’s specifications.
· Install appropriate transitions, adhesives, and cove base where required.
· Protect surrounding areas and maintain safe access during operations.
· Coordinate flooring phases with painting work to avoid damage to newly installed surfaces.
· Painting Scope
· Prepare interior wall and ceiling surfaces by patching, sanding, and priming as needed.
· Apply low-VOC, commercial-grade paint to walls, ceilings, trim, and door frames in all designated rooms.
· Color selection to match or closely resemble existing paint colors (final approval through sample cut sheets & swatches by City of Lafayette post bid award).
· Protect all adjacent surfaces, including newly installed flooring, during painting.
· Touch-up and final detailing as necessary following flooring work.
· Scheduling and Coordination
· Contractor will provide a detailed project schedule showing phased work areas and timeline.
· Daily check-ins with the station supervisor and/or City project contacts are required.
· Contractor must plan work to accommodate daily operations, response readiness, and shift rotations with a daily start time of no earlier then 7:30AM and daily end times subject to negotiation as the project progresses.
· All materials must be stored safely out of the way of the daily operations, especially as it relates to the safety and readiness of a first responder operation, with work areas left clean, clear, and organized at the end of each day (please include end of day clean up and storage of work materials & tools to ensure personnel safety throughout the low light hours).
· Use dust control barriers and floor protection to prevent contamination of active-use areas.
· Maintain a clean and organized job site at all times.
· Final cleaning will include removal of all construction-related debris and protective materials.
· Final walk-through and punch list review will be completed with multiple stake holders from the City of Lafayette.
· Deliverables
· Project timeline and phasing plan.
· Daily progress updates.
· Manufacturer specifications and warranty documentation for all installed products.
· Final acceptance walkthrough with completion verification.
3. SECTION 3 – EVALUATION METHODOLOGY & AWARD
3.1. EVALUATION PROCESS
A comprehensive, thorough, complete, and impartial evaluation of each proposal received will be conducted. The award shall be made to the responsible Offeror whose proposal is determined to be the most advantageous to the City, taking into consideration the price and evaluation factors set forth in this Request for Proposal.
3.2. EVALUATION COMMITTEE
An Evaluation Committee will be established utilizing measures to ensure the integrity of the evaluation process. These measures include the following:
· Selecting committee members who do not have a conflict of interest regarding this solicitation.
· Facilitating the independent review of proposals.
· Requiring the evaluation of the proposals to be based strictly on the content of the proposals.
· Ensuring the fair and impartial treatment of all Offerors.
The objective of the Evaluation Committee is to conduct reviews of the proposals that have been submitted, to hold frank and detailed discussions among themselves, and to recommend an Offeror for award.
3.3. PROPOSAL EVALUATION CRITERIA
· The City will evaluate proposals to determine if each Offeror meets all mandatory qualification requirements; provided, however, that the City has the authority to waive non-material mandatory requirements in certain circumstances. The mandatory qualification requirements are scored on a Met/Not Met basis and only those proposals found to meet all mandatory requirements, other than non-material mandatory requirements waived by the City, can be considered for a Contract resulting from this solicitation.
· Proposals will be evaluated by the Evaluation Committee using the evaluation criteria listed below. The evaluators will consider whether the Scope of Work requirements in the solicitation have been addressed, and they will review the capabilities of the Offeror, as well as the quality of the approach proposed, the price, and any other aspect determined relevant to the evaluation criteria.
· The evaluation criteria to be used in evaluating the proposals are as follows (and are listed in no particular order):
| Stated Timeline and Coordination of Paint and Flooring Removal/Replacement |
| 20 points |
| Ability to Source and use the Stated Materials List Provided |
| 20 points |
| Proposed plan to not Disrupt the Fire Station Operations |
| 30 points |
| Price |
| 30 points |
| TOTAL SCORE |
| 100 points |
3.4. DEMONSTRATIONS AND DISCUSSIONS
The Evaluation Committee may, if it deems necessary, request clarifications, conduct discussions or oral presentations, or request best and final offers. Discussions may be held with responsible offerors whose proposals are determined to be reasonably susceptible to be selected for award to:
a. Promote understanding of the City’s requirements and the Offerors’ proposals; and
b. Facilitate a Contract that will be most advantageous to the City taking into consideration price and the other evaluation factors set forth in the request for proposals.
The Evaluation Committee may adjust its scoring based on the results of such activities. However, proposals may be reviewed and determinations made without such activities. Offerors should be aware that the opportunity for further explanation might not exist; therefore, Offerors should ensure that their submission is complete, and are encouraged to submit their best possible proposal, including pricing.
3.5. SINGLE PROPOSAL
If only one bid or proposal is received in response to a solicitation, an award may be made to the single bidder or Offeror if the procurement official finds that the price submitted is fair and reasonable and that other prospective bidders or Offerors had reasonable opportunity to respond.
3.6. AWARD
A Notice of Intent to Award will be published on Bidnet.
The award determination is ultimately a business decision that will reflect an integrated assessment of the relative merits of the proposals received, using the factors set forth in Section 3.3. The City intends to award Contract(s) to the Offeror(s) whose proposal(s), conforming to the solicitation, will be most advantageous to the City, price and other factors considered.
The City reserves the right to award to multiple offerors if is determined to be in the best interest of the City.
APPENDIX A – SAMPLE CONTRACT
APPENDIX B – FLOOR PLANS
image1.png image3.png image2.jpeg
File details come from the government source that posted it. Updated .