RFP_25_019_Addendum_No_3.pdf
PDF 34 KB Posted
- Attached to
- Design / Build: Walnut Grove Trail Reroute
- Solicitation number
- PE-60899-NONST-2026-000000068
- Issued by
- Barrow County, Georgia
About this file
This is an Addendum No. 3 to RFP 25-019 issued by the City of Cartersville for a Design/Build project involving the Walnut Grove Trail Reroute. The addendum clarifies trail width requirements to ensure consistency with existing trail infrastructure and accommodate both pedestrian and bicycle use. The rerouted trail shall be constructed at a 10-foot width concrete standard, consistent with the existing trail segment being replaced and the Sam Smith Park Trail. All previous references to an 8-foot wide concrete trail in the original RFP and prior addenda are revised to reflect the 10-foot width requirement. All other specifications, including thickness, alignment, and materials, remain unchanged unless otherwise noted in subsequent communications.
Respondents to RFP 25-019 are responsible for reviewing and incorporating this addendum into their proposals. All other terms, conditions, and previously issued addenda remain in effect unless specifically modified by this clarification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 3
RFP 25-019
Design / Build: Walnut Grove Trail Reroute
| This | Addendum | is | issued | to | clarify | trail | width | requirements | for | RFP | 25-019. | All | |
| respondents | are | responsible | for | reviewing | this | Addendum | and | incorporating | the | ||||
| information | herein | into | their | proposals. | All | other | terms | and | conditions | of | the | RFP, | including |
| previously | issued | addenda, | remain | unchanged | unless | specifically | stated. |
1. Trail Width Requirement
| The | City | of | Cartersville | is | clarifying | the | required | trail | width | to | ensure | consistency | with |
| existing | trail | infrastructure | and | intended | use. |
| The | Walnut | Grove | Trail | Reroute | is | intended | to | accommodate | both | pedestrian | and | bicycle | |||
| use. | The | existing | trail | segment | being | replaced, | as | well | as | the | Sam | Smith | Park | Trail, | has |
| historically | accommodated | bicyclists | and | is | constructed | at | a | 10-foot | width. | Accordingly, | the | ||||
| rerouted | trail | shall | follow | the | same | standard. |
| All | references | to | an | 8-foot | wide | concrete | trail | within | the | RFP | and | any | prior | addenda | shall | be |
| revised | to | reflect | a | 10-foot | wide | concrete | trail. | All | other | specifications, | including | thickness, | ||||
| alignment, | and | materials, | remain | unchanged | unless | otherwise | noted. |