RFP_25_019_Addendum_No_1.pdf
PDF 37 KB Posted
- Attached to
- Design / Build: Walnut Grove Trail Reroute
- Solicitation number
- PE-60899-NONST-2026-000000068
- Issued by
- Barrow County, Georgia
About this file
This document is Addendum No. 1 to RFP 25-019 issued by the City of Cartersville for a design-build project involving the Walnut Grove Trail Reroute. The project requires design and construction of an 8-foot wide, 5-inch thick concrete trail approximately 2,010 feet in length located behind the Cartersville Water Treatment Plant, along with a footbridge across Pettit Creek. The footbridge will be constructed as a 60-foot by 8-foot wide timber boardwalk with HDPE decking and concrete abutments, maintaining a 75-foot buffer from the creek. The scope includes all clearing, grading, finishing work, and erosion control. The official proposal submission deadline is January 13, 2026, at 10:00 AM, superseding any conflicting submission times referenced elsewhere in the RFP documentation.
This addendum serves to clarify and correct portions of the original RFP 25-019. All respondents are responsible for incorporating the information contained within this addendum into their proposals. All other terms and conditions of the RFP remain unchanged unless specifically stated in this addendum. No pricing information, set-asides, award dates, or contract term details are specified in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
RFP 25-019
Design / Build: Walnut Grove Trail Reroute
| This | Addendum | is | issued | to | clarify | and | correct | portions | of | RFP | 25-019. | All | respondents | are |
| responsible | for | reviewing | this | Addendum | and | incorporating | the | information | herein | into | ||||
| their | proposals. | All | other | terms | and | conditions | of | the | RFP | remain | unchanged | unless | ||
| specifically | stated. |
1. Correction to General Description The thickness of the concrete trail has been corrected.
Section 1. General Description shall read as follows:
| The | City | of | Cartersville | is | soliciting | proposals | from | design-build | firms | to | design | and | ||||
| construct | the | Walnut | Grove | Trail | Reroute | behind | the | Cartersville | Water | Treatment | Plant. | |||||
| The | project | is | to | include | an | 8-foot | wide, | 5-inch | thick | concrete | trail | with | approximately | |||
| 2,010 | feet | in | length, | along | with | a | footbridge | across | Pettit | Creek. | The | trail | will | maintain | a | 75- |
| foot | buffer | from | the | creek. | The | footbridge | will | consist | of | a | 60-foot | by | 8-foot | wide | timber | |
| boardwalk | with | HDPE | decking | and | concrete | abutments. | The | project | will | include | all | clearing, | ||||
| grading, | and | finishing | work | with | erosion | control. |
2. Clarification of Proposal Submission Deadline A discrepancy was identified regarding the proposal submission time.
| Although | the | RFP | references | two | different | submission | times, | the | official | and | correct |
| deadline | is | as | follows: |
Proposals are due January 13, 2026, at 10:00 AM.
| This | deadline | applies | to | all | locations | where | the | submission | time | is | referenced | within | the |
| RFP. | Any | references | to | 11:00 | AM | should | be | disregarded. |