RFP 240000001707 Michigan Indoor Radon Low-Income Mitigation Assistance Pilot Program.docx

DOCX document 155 KB Posted

Attached to
Michigan Indoor Low-Income Mitigation Assistance Pilot Prog.
Solicitation number
RFP 761 240000001707 2
Issued by
Michigan

About this file

This is a Request for Proposal (RFP) issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) for the Michigan Indoor Radon Low-Income Mitigation Assistance Pilot Program. The proposal requests qualified radon mitigation professionals certified by the National Radon Safety Board (NRSB) or National Radon Proficiency Program (NRPP) to establish and manage a pilot program providing radon mitigation solutions for low-income homeowners in two designated Michigan regions: the Upper Peninsula (covering Keweenaw, Iron, Baraga, Gogebic, Ontonagon, Houghton, and Dickinson counties with approximately 105,304 residents) and Flint in the Lower Peninsula (with approximately 32,306 low-income homeowners). The contractor must perform site inspections within seven days of homeowner notification, install mitigation systems within 14 days of approval, provide a minimum five-year warranty on fans and workmanship, and guarantee radon concentration reductions below the EPA action level of 4 pCi/l. Questions must be submitted by April 10, 2024, with proposal submissions due by 3:00 p.m. Eastern on April 30, 2024. The anticipated contract effective date is May 17, 2024, with an initial term through May 16, 2025, renewable for up to one additional one-year period at the State's discretion.

Contractors must provide itemized pricing for various mitigation system types including sub-slab depressurization, drain tile suction, sealed sump pump systems, and crawl space encapsulation, with pricing submitted in modifiable format (Microsoft Excel or Word). The State reserves the right to award multiple contracts to cover each region and is not obligated to accept the lowest-priced proposal. Proposals will be evaluated on a 100-point scale: Statement of Work Section 1 Requirements (35 points), Staffing (30 points), and Vendor Questions Worksheet (35 points); only proposals scoring 80 or more points will have pricing evaluated for award consideration. The program was allocated $175,000 in general state funds for fiscal year 2023 to supplement federal EPA State and Tribal Indoor Radon Grant (SIRG) funding, though federal funds cannot be used for mitigation activities. Eligible homeowners must occupy single-family dwellings as their primary residence, provide proof of ownership, maintain current property taxes, and demonstrate income eligibility through participation in designated low-income assistance programs. Service level agreements require $100 per occurrence for the first five missed delivery deadlines in a calendar year and $500 per occurrence thereafter, with extenuating circumstances subject to State review.

View the file

Other files

File Type Posted
RFP 24-1707 MI Indoor Radon Pilot Q & A.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement proposal instructions Department of Environment, Great Lakes, and Energy Michigan Indoor Radon Low-Income Mitigation Assistance Pilot Program Request for Proposal No. 240000001707 Solicitation Manager Name: Lisa VanOstran Direct Phone: 517-599-7680 Email: vanostranl@michigan.gov

This is a Request for Proposal (RFP) for:

Michigan Indoor Radon Low-Income Mitigation Assistance Pilot Program

RFP Timeline

Event
Time
Date
RFP issue date
N/A
Wednesday, March 27, 2024
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
Wednesday, April 10, 2024
Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
Tuesday, April 16, 2024
NOTICE: SIGMA VSS SYSTEM DOWN

(Down time allows for cutover from SIGMA 3.11 to SIGMA 4.)

From: Thursday, April 18, 2024, at 4:00 p.m. Eastern
To: Wednesday, April 24, 2024, by noon Eastern
Proposal deadline*
3:00 p.m. Eastern
Tuesday, April 30, 2024
Anticipated contract begin date
N/A
Friday, May 17, 2024

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the RFP Structure and Documentation table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B – Pricing
Pricing for goods and services sought by the State through this RFP
Bidder to complete and submit by proposal deadline
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.

4. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager at vanostranl@michigan.gov no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

5. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). If you have issues submitting your response to this RFP, please email your proposal package to vanostranl@michigan.gov by the deadline.

In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.

6. EVALUATION PROCESS. The State will evaluate each proposal based on the following factors:

Technical Evaluation Criteria
Weight
1.
Schedule A, Statement of Work, Section 1 Requirements
35
2.
Schedule A, Statement of Work, Section 2 Staffing
30
3.
Vendor Questions Worksheet
35
Total
100

Proposals receiving 80 or more technical evaluation points will have pricing evaluated and considered for award.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive. Failure to respond timely to requests for proposed changes to Contract Terms during ongoing negotiations may be cause for disqualification.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

7. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

8. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

9. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.

10. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who offers the best value to the State, as determined by the State. Best value will be determined by the bidder meeting the minimum point threshold and offering the best combination of the factors stated in the Evaluation Process section of this document, and price, as demonstrated by the proposal. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS or in the manner it was originally published

11. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.

If you wish to initiate a protest of the award, you must submit your written protest to the Solicitation Manager no later than 5:00 pm, 5 business days after posting the Award Recommendation and Evaluation Synopsis. The State reserves the right to adjust this timing and will publish any change.

Additional information about the protest process is available at DTMB - Programs and Policies (michigan.gov) under the “Bidder Protests” link.

12. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

13. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

14. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.

Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

i. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation.

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

confidential treatment form INSTRUCTIONS. Bidder must complete either Section 1 or Section 2 of this CT Form and sign where indicated. Do not complete both sections. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information.

Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form Instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal. If this section is completed, do not complete Section 2. CONFIDENTIAL TREATMENT IS REQUESTED.

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company

Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment. If this section is completed, do not complete Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.

The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material.

Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy”.

(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number.

Website address.

Number of years in business.

Number of employees.

Legal business name and address of parent company, if any.

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

Bidder affirms that any business types identified on its SIGMA VSS profile, including those eligible for Geographically Disadvantaged Business Enterprise (GDBE) and Michigan Supplier Community Program (MiSC), are valid.
Choose an item.
3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program
Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Choose an item.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.
Choose an item.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
Choose an item.

If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.

Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
Choose an item.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name.

Contact name.

Contact role at time of project.

Contact phone.

Contact email.

City.

State.

Zip.

1. Project name and description of the scope of the project.

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 2

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 3

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan.

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any).

Minimum wage paid to employees employed at locations within the State of Michigan.

Average wage paid to employees employed at locations within the State of Michigan.

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.

8. Labor, Antidiscrimination and Environmental Laws Compliance

Bidder must disclose any violations of state or federal labor, antidiscrimination and employment laws and regulations received within the past five years.

Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.

9. Supplier Diversity

Does your company have a supplier diversity program or training?
Choose an item.
Bidder agrees that if Bidder is awarded a contract with a dollar amount of $500,000 or greater from this RFP, Bidder shall provide a copy of their current EEO-1 demographic report provided that Bidder meets Federal requirements to file an EEO-1 report.
Choose an item.

10. Other

Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws.
Choose an item.
Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Choose an item.
Certification of Michigan Business - Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Choose an item.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Choose an item.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Choose an item.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Choose an item.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Choose an item.
Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Choose an item.

11. Response to State Requests

Bidder agrees to respond, by established deadlines, to all requests from the State including but not limited to, clarification requests, notices of deficiency, and proposed changes to Contract Terms.
Choose an item.

Contractor must enter company name here.

Schedule A – statement of work contract activities Michigan Indoor Radon Low-Income Mitigation Assistance Pilot Program

Request for Proposal No. 240000001707 This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.

BACKGROUND

Since the creation of the Michigan Indoor Radon Program (Program) in 1989 it has been funded through the U.S. Environmental Protection Agency (EPA) State and Tribal Indoor Radon Grant (SIRG) program. In fiscal year 2023 the Program was awarded $175,000 in general fund money to supplement the federal funding. Federal funds have limitations in use and cannot be used to perform mitigation, with very few minor exceptions. Throughout the history of the Program there have been challenges with promoting radon testing in low socio-economic communities. While testing for radon is relatively inexpensive (as little as $5-10) mitigation of radon can carry a much higher financial burden. The Program currently estimates a retrofit radon mitigation system can cost between $800-1,500. The Low-Income Mitigation Assistance Pilot Program is being developed to promote testing and mitigation in low-income communities. Initially, this pilot program will focus on two regions to determine true needs across the state and efficacy. Radon mitigation will enhance safe living environments for low-income homeowners and aligns with the state’s MI Healthy Climate Plan and Environmental Justice (EJ) Initiatives.

SCOPE

The Contractor will be responsible for establishing a pilot program that succeeds in providing radon mitigation solutions for low-income residents of Michigan. The pilot program will be focused in two state regions (see Geographical Regions section below). The State reserves the right to award multiple contracts to cover each region.

Geographical Regions Various criteria were utilized in the selection of pilot regions. These criteria include, but are not limited to, lung cancer rates, low-income population density, access to currently credentialed radon mitigation professionals, population density, and program partnerships.

Population and poverty rates pulled from US Census 2021 data. How the Census Bureau Measures Poverty Region 1 Michigan’s Upper Peninsula Counties (Population, Poverty Rate, Owner-occupied Rate):

Keweenaw (2,107, 10.7%, 88.9%) Iron (11,653, 15.4%, 84.1%) Baraga (8,215, 15.8%, 74.8%, 78.4%) Gogebic (14,361, 17.4%, 79.3%) Ontonagon (5,868, 11.7%, 89.4%) Houghton (37,313, 14.1%, 68.7%) City of Houghton # of Low-Income Homeowners: 3,723 (60.4%) Dickinson (25,787, 11.4%, 81.5%) City of Iron Mountain # of Low-Income Homeowners: 3,156 (63.0%) Total Population: 105,304 as of 2021 Region 2 Michigan’s Lower Peninsula City (Population, Poverty Rate): Flint (79,854, 35.5%) Owner-occupied housing unit rate: 55.1% # of Low-Income Homeowners: 32,306 (49.5%) Number of low-income homeowners is from 2020 data and is based on 80% area median income.

1. Requirements

1.1. General Requirements

The Contractor must be a certified mitigation professional in good standing with the National Radon Safety Board (NRSB) and/or the National Radon Proficiency Program (NRPP).

The Contractor will be required to provide the following for each eligible home:

Pre-Mitigation Responsibilities

· Perform a site inspection and provide a statement/scope of work with pre-mitigation photos, within 7 days of eligible homeowner notification, to EGLE and the homeowner. This activity may be done remotely via video chat or other appropriate means.

· Seek EGLE approval for any mitigations not meeting contractual pricing requirements for adjustments.

Mitigation Responsibilities

· Install radon mitigation system within 14 days of completed approval, pursuant to ANSI/AARST SGM-SF-2023 and the statement of work.

· A guarantee that mitigation systems will reduce radon concentrations below the EPA action level of 4 pCi/l. Homeowners will conduct a follow up test. Additional actions may be required if radon levels are not satisfactorily reduced.

· A minimum of 5-year warranty on the fan and workmanship.

· Obtain any permits required by local or state jurisdiction.

· Responsible for the removal of construction waste and debris generated during installation.

Post-Mitigation Responsibilities

· Provide photos of the installation to EGLE within 45 days of system administration.

· Crawl space cover/slab penetration/sump pit (or other suction point location(s))

· Labeling and monometer on system

· Fan

· Electrical connections

· Termination point

· Alarm system

· Bill sent to Radon@michigan.gov for payment through SIGMA.

Homeowner Requirements

Eligibility Requirements

· Must occupy the property as their primary (principal) place of residence and certify such occupancy by signing the application.

· Provide proof of ownership of the subject property.

· Shall be current on property taxes.

· Property cannot be listed for sale or under contract for sale.

· Only single-family unit dwellings are eligible.

· The home must be within one of the pilot program Geographical Regions.

· Provide proof of participation in one of the programs listed in the Income Requirements section.

· Radon test result for the subject property, completed within the previous 24 months, showing radon concentrations greater than 4 picocuries of radon per liter of air (>4 pCi/l). Test results shall be accurately conducted with a NRPP or NRSB approved method.

· A confirmatory short term charcoal test will be provided by the program and mailed to the applicant confirming eligibility. This will also allow conformity to national radon testing standards.

Restrictions

· Rental units and/or properties listed for sale are not eligible for this program.

· Homes with active mitigation systems currently installed are not eligible for this program.

· Homes with mitigation systems in need of repair are not eligible.

· Funding is limited therefore EGLE may prioritize mitigation. Prioritization will be based on factors that may include home occupancy rates, indoor radon levels and cost of mitigation. Applicants not receiving mitigation assistance will be placed on a wait list as a candidate in following fiscal years if they still meet the eligibility criteria. Applicants can request removal from the wait list at any time. Should future assistance be requested they will be required to reapply for the program and will lose their wait list priority.

· Ongoing mitigation operational costs will not be eligible for reimbursement.

· Subject property cannot be receiving financial assistance for radon mitigation from other sources.

Pre-Mitigation Responsibilities

· Must get Homeowners Association (HOA) approval, if applicable.

· Sign authorization for entry.

· Make the property available for inspection by mitigation contractor.

· Review and approve the scope of work.

Mitigation Responsibilities

· Make the property available for radon mitigation installation work.

· Sign the contractor scope of work document, acknowledging work was satisfactorily completed.

Post-Mitigation Responsibilities

· Perform follow-up radon testing, as provided by the radon contractor.

· No sooner than 7 days and no later than 30 days of mitigation system installation.

· Provide test results to EGLE within 45 days of system installation.

· Allows program access for the right to randomly inspect mitigation systems for compliance.

Income Requirements Homeowners need to demonstrate income eligibility by providing current, valid proof of participation in one of the programs listed below. Participation in other low-income programs will be reviewed by EGLE on a case-by-case basis to determine eligibility. This program is not conducting independent income verification and is not collecting financial information from the applicant.

· Low Income Households Water Assistance Program (LIHWAP)

· Family Independence Program/Temporary Assistance for Needy Families (FIP/TANF)

· Food Assistance Program/Supplemental Nutrition Assistance Program (FAP/SNAP)

· State Emergency Relief (SER)

· Social Security Supplemental Income (SSI)

· Michigan Housing Opportunities Promoting Energy Efficiency Program (MI-HOPE)

· Michigan Low Income Home Energy Assistance (LIHEAP)

· Child Development & Care (CDC)

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s) and indicate which pilot regions they are providing bids for:

2. Staffing

2.1. Contractor Representative

The Contractor must appoint at least one individual specifically assigned to State of Michigan accounts, who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least 30 calendar days before removing or assigning a new Contractor Representative.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must identify its Contractor Representative:

2.2. Customer Service Number

The Contractor must specify its toll-free number for the State to contact the Contractor Representative. The Contractor Representative must be available for calls during the hours of 8:00 am to 5:00 pm EST.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must identify its Customer Service Number:

2.3. Key Personnel

The Contractor must appoint at least one individual who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within 24 hours.

The State has the right to recommend and approve in writing the initial assignment, as well as any proposed reassignment or replacement, of any Key Personnel. Before assigning an individual to any Key Personnel position, Contractor will notify the State of the proposed assignment, introduce the individual to the State’s Project Manager, and provide the State with a resume and any other information about the individual reasonably requested by the State. The State reserves the right to interview the individual before granting written approval. In the event the State finds a proposed individual unacceptable, the State will provide a written explanation including reasonable detail outlining the reasons for the rejection. The State may require a 30-calendar day training period for replacement personnel.

Contractor will not remove any Key Personnel from their assigned roles on this Contract without the prior written consent of the State. The Contractor’s removal of Key Personnel without the prior written consent of the State is an unauthorized removal (“Unauthorized Removal”). An Unauthorized Removal does not include replacing Key Personnel for reasons beyond the reasonable control of Contractor, including illness, disability, leave of absence, personal emergency circumstances, resignation, or for cause termination of the Key Personnel’s employment. Any Unauthorized Removal may be considered by the State to be a material breach of this Contract, in respect of which the State may elect to terminate this Contract for cause under the Termination for Cause section of the Standard Contract Terms. It is further acknowledged that an Unauthorized Removal will interfere with the timely and proper completion of this Contract, to the loss and damage of the State, and that it would be impracticable and extremely difficult to fix the actual damage sustained by the State as a result of any Unauthorized Removal. Therefore, Contractor and the State agree that in the case of any Unauthorized Removal in respect of which the State does not elect to exercise its rights under Termination for Cause, Contractor will issue to the State the corresponding credits set forth below (each, an “Unauthorized Removal Credit”):

i. For the Unauthorized Removal of any Key Personnel designated in the applicable Statement of Work, the credit amount will be $25,000 per individual if Contractor identifies a replacement approved by the State and assigns the replacement to shadow the Key Personnel who is leaving for a period of at least 30-calendar days before the Key Personnel’s removal.

ii. If Contractor fails to assign a replacement to shadow the removed Key Personnel for at least 30-calendar days, in addition to the $25,000 credit specified above, Contractor will credit the State $833.33 per calendar day for each day of the 30-calendar day shadow period that the replacement Key Personnel does not shadow the removed Key Personnel, up to $25,000 maximum per individual. The total Unauthorized Removal Credits that may be assessed per Unauthorized Removal and failure to provide 30-calendar days of shadowing will not exceed $50,000 per individual.

Contractor acknowledges and agrees that each of the Unauthorized Removal Credits assessed above: (i) is a reasonable estimate of and compensation for the anticipated or actual harm to the State that may arise from the Unauthorized Removal, which would be impossible or very difficult to accurately estimate; and (ii) may, at the State’s option, be credited or set off against any fees or other charges payable to Contractor under this Contract.

The Contractor must identify the Key Personnel, indicate where they will be physically located, describe the functions they will perform, and provide current chronological résumés.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

A. The Contractor must identify all Key Personnel that will be assigned to this contract in the table below which includes the following:

1. Name and title of staff that will be designated as Key Personnel.

2. Key Personnel years of experience in the current classification.

3. Identify which of the required key personnel positions they are fulfilling.

4. Key Personnel’s roles and responsibilities, as they relate to this RFP, if the Contractor is successful in being awarded the Contract. Descriptions of roles should be functional and not just by title.

5. Identify if each Key Personnel is a direct, subcontract, or contract employee.

6. Identify if each Key Personnel staff member is employed full-time (FT), part-time (PT) or temporary (T), including consultants used for the purpose of providing information for the proposal.

7. List each Key Personnel staff member’s length of employment or affiliation with the Contractor’s organization.

8. Identify each Key Personnel’s percentage of work time devoted to this Contract.

9. Identify where each Key Personnel staff member will be physically located (city and state) during the Contract performance.

<Add more rows below as needed> 1.

Name 2.

Years of Experience in Current Classification 3.

Role(s) / Responsibilities 4.

Direct / Subcontract/ Contract 5.

% of Work Time 6.

Physical Location

B. The Contractor must provide detailed, chronological resumes of all proposed Key Personnel, including a description of their work experience relevant to their purposed role as it relates to the RFP.

Qualifications will be measured by education and experience with particular reference to experience on projects similar to that described in the RFP.

Bidder must provide the resumes and information as required above – either in this response box or identified here as an attachment to this RFP.

2.4. Organizational Chart

The Contractor must provide an overall organizational chart that details staff members, by name and title, and subcontractors.

Bidder must provide detailed information as required above – either in this response box or identified here as an attachment to this RFP.

2.5. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

· The legal business name; address; telephone number; a description of subcontractor’s organization and the services it will provide; and information concerning subcontractor’s ability to provide the Contract Activities.

· The relationship of the subcontractor to the Contractor.

· Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.

· A complete description of the Contract Activities that will be performed or provided by the subcontractor.

Bidder must provide detailed information as requested in the above requirement(s).

The legal business name, address, telephone number of the subcontractor(s).

A description of subcontractor’s organization and the services it will provide and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .