RFP_24-001_Real_CA_Cannabis_Campaign.pdf

PDF 978 KB Posted

Attached to
RFP 24-001 CA Real Cannabis Campaign
Solicitation number
0000035722
Issued by
Alameda County, Alpine County, Amador County, Butte County, Calaveras County, Colusa County, Contra Costa County, Del Norte County, El Dorado County, Fresno County, Glenn County, Humboldt County, Imperial County, Inyo County, Kern County, Kings County, Lake County, Lassen County, Los Angeles County, Madera County, Marin County, Mariposa County, Mendocino County, Merced County, Modoc County, Mono County, Monterey County, Napa County, Nevada County, Orange County, Placer County, Plumas County, Riverside County, Sacramento County, San Benito County, San Bernardino County, San Diego County, San Francisco County, San Joaquin County, San Luis Obispo County, San Mateo County, Santa Barbara County, Santa Clara County, Santa Cruz County, Shasta County, Sierra County, Siskiyou County, Solano County, Sonoma County, Stanislaus County, Sutter County, Tehama County, Trinity County, Tulare County, Tuolumne County, Ventura County, Yolo County, Yuba County, Alameda City, Alpine Village CDP, Amador City, Amador Pines CDP, Sutter Creek City, Butte Creek Canyon CDP, Butte Meadows CDP, Butte Valley CDP, Rancho Calaveras CDP, Colusa City, Contra Costa Centre CDP, Auburn Lake Trails CDP, El Dorado Hills CDP, Placerville City, South Lake Tahoe City, Fresno City, Kingsburg City, Orange Cove City, San Joaquin City, Shaver Lake CDP, Blue Lake City, Humboldt Hill CDP, Imperial City, Alta Sierra CDP, China Lake Acres CDP, Glennville CDP, Inyokern CDP, Kernville CDP, Lake Isabella CDP, Lake of the Woods CDP, Lakeside CDP, Hidden Valley Lake CDP, Lakeport City, Lower Lake CDP, North Lakeport CDP, Upper Lake CDP, East Los Angeles CDP, Elizabeth Lake CDP, Lake Hughes CDP, Lake Los Angeles CDP, Lakewood City, Los Angeles City, Marina Del Rey CDP, Monterey Park City, San Marino City, Sierra Madre City, Bass Lake CDP, Madera City, Madera Acres CDP, Madera Ranchos CDP, Yosemite Lakes CDP, Corte Madera Town, Lucas Valley-Marinwood CDP, Marin City CDP, Lake Don Pedro CDP, Mariposa CDP, Mendocino CDP, Merced City, University of California-Merced CDP, Lake City CDP, Crowley Lake CDP, June Lake CDP, Mammoth Lakes Town, Mono City CDP, Twin Lakes CDP, Virginia Lakes CDP, Marina City, Monterey City, Napa City, Lake of the Pines CDP, Lake Wildwood CDP, Nevada City, Lake Forest City, Orange City, Kings Beach CDP, Bucks Lake CDP, Lake Almanor Country Club CDP, Lake Almanor Peninsula CDP, Lake Almanor West CDP, Lake Davis CDP, Plumas Eureka CDP, Canyon Lake City, Lake Elsinore City, Lakeland Village CDP, Lake Mathews CDP, Lake Riverside CDP, Lakeview CDP, Riverside City, Orangevale CDP, Sacramento City, Big Bear Lake City, Lake Arrowhead CDP, San Bernardino City, Silver Lakes CDP, Spring Valley Lake CDP, Alpine CDP, Imperial Beach City, Lake San Marcos CDP, Rancho San Diego CDP, San Diego City, San Diego Country Estates CDP, San Francisco City, Lake Nacimiento CDP, San Luis Obispo City, Emerald Lake Hills CDP, San Mateo City, South San Francisco City, Santa Barbara City, University of California-Santa Barbara CDP, Santa Clara City, Santa Cruz City, Lakehead CDP, Shasta CDP, Shasta Lake City, Sierra Brooks CDP, Sierra City CDP, Sierraville CDP, Lake Shastina CDP, Mount Shasta City, Sonoma City, Sonoma State University CDP, Monterey Park Tract CDP, Orange Blossom CDP, Sutter CDP, Yuba City, Lake California CDP, Rancho Tehama Reserve CDP, Tehama City, Trinity Center CDP, Trinity Village CDP, East Tulare Villa CDP, Tulare City, Mono Vista CDP, Phoenix Lake CDP, Pine Mountain Lake CDP, Sierra Village CDP, Tuolumne City CDP, Lake Sherwood CDP, West Sacramento City, Yolo CDP, Plumas Lake CDP, California

About this file

This is a Request for Proposal (RFP) Number 24-001 issued by the California Department of Cannabis Control (DCC) for the Real California Cannabis Campaign. The RFP seeks a full-service advertising agency to develop and implement a statewide media campaign aimed at educating adult-use cannabis consumers aged 21 and up about legal cannabis purchasing, the risks of unlicensed market purchases, and promoting responsible consumption. The contract is for a two-year period from August 26, 2025, through June 30, 2027, with an option to extend for an additional 12 months. Proposals are due by July 16, 2025, with estimated team evaluations in the week of July 22, 2025, interviews/presentations in the week of July 29, 2025, and an anticipated start date in the week of August 26, 2025.

The maximum budget for the contract is $2,400,000, and the selected contractor will be responsible for conducting formative research, developing creative concepts, producing multi-platform media content, managing media buys, and creating website and social media materials. The RFP requires bidders to be California-based, have at least 10 employees, and meet Disabled Veteran Business Enterprise (DVBE) participation of 3% of the total bid cost. Proposers must have experience in social cause marketing, behavior change advertising, outreach to adult-use cannabis consumers, marketing to multilingual and multi-ethnic audiences, and operating a full-service advertising agency with minimum annual gross billings of $6 million.

View the file

Other files

File Type Posted
Attachment_J_-_STD_204.pdf PDF
Attachment_A_-_Cost_Proposal_Worksheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: May 27, 2025

REQUEST FOR PROPOSAL (RFP)

Secondary Method

RFP No.: 24-001 Title: Real CA Cannabis Campaign Type of Contract: Consulting

NOTICE TO PROSPECTIVE PROPOSERS:

You are invited to review and respond to this Request for Proposal (RFP). In submission of your proposal, you must comply with the instructions and requirements found herein.

Note that all agreements entered into with the State of California will include by reference General Terms and Conditions that may be viewed at:

https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources- List-Folder/Standard-Contract-Language.

If you do not have Internet access, a hard copy can be provided by contacting the person listed below.

In the opinion of the California Department of Cannabis Control (DCC), this RFP is complete and without need of explanation. However, if you have questions or need any clarifying information, please contact the person listed below.

Please note that no verbal information given will be binding upon the State unless such information is issued in writing as an official addendum.

Questions regarding this RFP must be submitted via email to Ha Dang at acquisitions@cannabis.ca.gov. Question submissions are due no later than June 3, 2025 at 2:00 PM. Questions submitted will be answered via an addendum to the solicitation.

Sincerely, Ha Dang Acquisitions Unit Operations Branch Administrative Services Division acquisitions@cannabis.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language mailto:acquisitions@cannabis.ca.gov

Table of Contents

SECTION PAGE(S)

Key Action Dates 3

Submission of Proposal 3

Purpose and Description of Services A. Introduction and Background 4-6

B. Term of Contract 6

C. Option to Renew 6

D. Budget 6

E. Scope of Work 6-11

Qualification Requirements 11

Proposal Submittal Requirements 12

Proposal Requirements 13-14

Bid Requirements 14

Bidder Requirements 15

Evaluation and Selection 15-23

Award and Protest 24

Disposition of Bids 24

Agreement Execution and Performance 24

Preference Programs and Participation Requirements 25

Recycled Content Certification 25

Additional Requirements 25-31

Required Documents 32

Attachments A - Cost Proposal

B - CCC-4/2017

C - Contractor Status Form

D - Disabled Veteran Business Enterprise Declarations, Std. 843

E - Bidder Declaration, GSPD-05-105

F - Commercially Useful Function

G - Darfur Contracting Act Certification

H - Postconsumer-Content Certification

I - California Civil Rights Laws Attachment

J - Payee Data Record, Std. 204

Sample Contract Package

See Attachment

See Attachment

33-35

37-42

43-45

46-47

49-50

52-63

Key Action Dates

All proposers are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

RFP available to prospective bidders ................................................May 27, 2025 Written questions must be received by 4:00 PM PT ...........................June 3, 2025 Questions and Answers will be posted by 5:00 PM PT ....................... July 1, 2025 Emailed proposals must be complete and received no later than 2:00 PM PT ........................................................ July 16, 2025 Estimated date of team evaluations ..................................... Week of July 22, 2025 Interviews/Presentations...................................................... Week of July 29, 2025 Scoring ............................................................................. Week of August 5, 2025 Anticipated start date ...................................................... Week of August 26, 2025

Partial submission of proposal is unacceptable.

Submission of Proposal

1. Proposals must be submitted via email to acquisitions@cannabis.ca.gov. The subject line of the email must read as follows: Proposal Number, Your Organization’s Name. All Proposal documents must be in PDF format. As the identified point of contact, please obtain acceptable e-signature(s) from your company’s authorized representative.

Acceptable forms of e-signature include:

a. Scanned “Wet” Signature: Print and sign document(s) in ink, then scan an electronic copy in PDF format.

b. “Typed” Signature: If the signature field of the document is editable (e.g., the signature feature in Adobe Acrobat), then a typed signature is acceptable.

2. Proposals will not be accepted from Expatriate Corporations, and proposals from primes subcontracting with Expatriate Corporations will not be accepted.

3. If the proposal is made under a fictitious name or business title, the actual legal name of the proposer must be provided.

4. All proposals shall include the documents identified on the checklist entitled “Required Documents” on page 32. Proposals not including the required documents shall be deemed non-responsive.

5. All proposals must be submitted for the performance of all the services described herein.

Any deviation from the work specifications will not be considered and will cause a proposal to be rejected.

6. Questions regarding this RFP must be submitted to Ha Dang at acquistions@cannabis.ca.gov mailto:acquistions@cannabis.ca.gov

Purpose and Description of Services

Introduction and Background Former Governor Jerry Brown signed the Medical Cannabis Regulation and Safety Act (MCRSA) into law effective January 1, 2016. MCRSA established a licensing and regulatory structure for the cultivation, manufacturing, transportation, storage, distribution, and sale of medicinal cannabis in California. MCRSA delegated licensing responsibilities to three agencies to regulate the cannabis industry by January 1, 2018; the California Department of Public Health, which licensed manufacturers of cannabis products, such as edibles; the Department of Consumer Affairs, which housed the Bureau of Cannabis Control and licensed transporters, distributors, dispensaries, and testing laboratories; and the California Department of Food and Agriculture, which licensed cultivators and established a track-and-trace program.

On November 8, 2016, California voters passed Proposition 64, the Adult Use of Marijuana Act (AUMA) and on June 27, 2017, Governor Brown signed the Medicinal and Adult-Use Cannabis Regulation and Safety Act (MAUCRSA), creating a single regulatory system for commercial cannabis activity that prioritized consumer and public safety, and tax compliance.

The Department of Cannabis Control (DCC) was formed in July 2021 by Governor Gavin Newsom by merging the three state programs previously responsible for regulating commercial cannabis activity. The DCC licenses and regulates commercial cannabis activity within California and works closely with all stakeholders, including businesses and local jurisdictions to create a sustainable legal cannabis industry and a safe and equitable marketplace. The DCC develops and implements progressive cannabis policies with robust protections for public health, safety, and the environment.

The Public Affairs Division at DCC is responsible for developing DCC communication, public engagement, and media relations strategy. To establish public trust in DCC’s work and the commercial cannabis industry, the Public Affairs team works closely with all DCC divisions to provide up to date and accurate information to California licensees, applicants, and consumers. The Public Affairs team is responsible for managing all statewide communications campaigns, including the Real California Cannabis Campaign advertised herein.

1. Purpose

DCC is soliciting proposals from qualified full-service advertising agencies (“Contractor”) located and licensed to do business in California that possess the knowledge, expertise, and experience in developing, implementing and evaluating a strategic, statewide media Real California Cannabis campaign. Proposals must address all of the services described in the “Scope of Work” section.

The selected Contractor is responsible for creating a statewide media campaign based on the “Scope of Work” section. This solicitation herein after will be referred to within this document and any appendices as Request for Proposal 24-001.

DCC intends to make a single contract award to the most responsive and responsible agency offering the highest scoring bid. This procurement is open to all eligible agencies that meet the qualification requirements, including commercial businesses, nonprofit organizations, State or public universities (including auxiliary organizations) and other entities.

2. Background

DCC requires the services of a Contractor to extend the Real California Cannabis (RCC) campaign. This will be done through a statewide communications and education campaign that focuses on empowering consumers with information that will help them understand the benefits of purchasing from the legal cannabis market and the harms of purchasing from the illegal, unlicensed market, including the dangers to public health and safety. This campaign will support DCC’s collaborative interactions with its cannabis licensees and uplift the positive impacts the licensed cannabis industry has on public safety.

Consumers will greatly benefit from enhanced education associated with the legal cannabis market to shift consumer buying habits toward the legal market and away from unlicensed sources. DCC proposes to utilize an educational awareness marketing campaign that builds and improves upon RCC. The campaign would provide consumers (both California residents and tourists) basic information needed to support purchases of cannabis through the regulated market and deter the use of untested and unsafe product obtained from unlicensed sources. It will also provide consumers with basic information about responsible use and consumption.

3. Goals and Objectives

DCC is seeking a dynamic advertising Contractor with strong brand growth capabilities to produce and implement a factually accurate and culturally appropriate statewide cannabis education and legal consumption campaign.

The media campaign must be multi-platform and responsive to changes in the media marketplace and consumer behavior with the goal of educating California adult-use cannabis consumers, age 21 and up, the risks and consequences of purchasing unlicensed cannabis, benefits of purchasing from DCC licensed retailers, and positively influence social norms, behaviors, knowledge, and attitudes for RCC’s brand.

The media campaign's goal is raising awareness, providing education, and promoting responsible, legal purchase of cannabis.

DCC may modify and/or identify additional target groups as needed. Other priority goals, strategies, and objectives may evolve over the course of this contract.

Given California’s rich diversity, DCC places great emphasis on multicultural, multi-ethnic, and multi-lingual advertising and outreach strategies that maximize reach and impact to targeted populations. The Contractor must be strategic, adaptable to challenges and opportunities, and must have strong project management skills.

The Contractor will conduct formative research on cannabis-related knowledge, attitudes, perceptions, and social norms among adult-use cannabis consumers. The Contractor will translate the findings into actionable campaign messaging, creative concepts, and outreach strategies to inform both the media campaign and cannabis-related outreach and education initiatives at the local and state levels. This research should include, at minimum, facilitated focus groups segmented by priority audiences and key demographics within segments and may also include additional qualitative or quantitative methods such as in-depth interviews and/or surveys. Formative research must be adequate in scope and breadth to capture major beliefs, attitudes, and knowledge around cannabis use in each priority audience segment.

Given the demographic diversity of California, formative research activities should aim to achieve theoretical saturation to ensure that the qualitative data collected is relatively generalizable to the priority audiences.

Term of Contract The term of this contract is August 26, 2025, or upon DGS approval, whichever is later, through June 30, 2027. The agreement term may change if DCC makes an award earlier than expected or if DCC cannot execute the agreement in a timely manner due to unforeseen delays.

Option to Renew DCC reserves the right to amend the resulting agreement for not more than one (1) year and add not more than thirty (30%) of the original value. Consistent with the terms and conditions of the original solicitation, and upon mutual consent, DCC and the Contractor may execute written amendments to this Agreement.

The resulting contract will be of no force or effect until it is signed by both parties and approved by DGS, if required. The Contractor is hereby advised not to commence performance until all approvals have been obtained. If performance commences before all approvals are obtained, said services may be considered to have been volunteered if all approvals are not obtained.

Budget The maximum amount allocated for these services for the full two-year contract with an option to extend for an additional 12 months will be $2,400,000.00 (***Two Million Four Hundred Thousand Dollars and Zero Cents***). Any proposals over this amount will be deemed non-responsive.

Travel costs shall be reimbursed at State rates, which can be found at:

http://www.calhr.ca.gov/employees/Pages/travel-reimbursements.aspx

Scope of Work

Objective 1 - Strategic Planning

1. Overall

Provide a total market media strategy plan and project management across the campaign aimed at educating California Adult-use Cannabis Consumers age 21 and up on how to purchase legally.

2. Strategy Development http://www.calhr.ca.gov/employees/Pages/travel-reimbursements.aspx

a. Conceptualize, develop, implement, monitor, and evaluate a strategic, integrated statewide media campaign. The campaign should include population-based strategies and customized efforts to reach the priority audience.

b. Educate and influence social norms, behaviors, knowledge, and attitudes for the priority audience.

c. Prepare and submit plans including detailed deliverables, a timeline, and budget.

d. Develop and execute a plan for incorporating existing advertising, public relations, real.cannabis.ca.gov site and RCC Search Tool, retailer RCC QR Codes, and other RCC assets that align and can be supported by current DCC substantiation into the Real California Cannabis Campaign. Also identify existing assets from other local, state, or national and international campaigns for possible inclusion. Placement of existing assets should occur within 6 months following contract execution and should occur concurrent to the development of new assets.

Objective 2 – Background Discovery

1. Campaign Assessment

a. Review RCC brand strategy, style, tone, assets, and past performances to inform the messaging and design style of the Real California Cannabis Campaign.

b. Review local, state, national and international cannabis education media campaigns and assets. Provide DCC with a Campaign Assessment Report and presentation that identifies relevant local, state, and national and international cannabis campaigns. The report should include high-level analyses of priority audiences, strategic approaches, messaging strategies, and key takeaways.

Objective 3 - Media Creative and Placement

1. Creative Concept Development

a. Develop a creative brief, including creative challenges, insights, deliverables, and success metrics, for the priority audience or campaign as appropriate.

b. Develop demographic appropriate, scientifically accurate key messages and creative concepts for digital, out-of-home, social, and video for the priority audience as determined by DCC.

c. Manage the development, testing, production, and placement of in-language and culturally appropriate communication assets, including translation services in Spanish and/or additional languages, as identified by DCC. Develop a briefing presentation for DCC leadership review with proposed scripts, illustrations, storyboards, animatics, and potential campaign icons to be tested.

2. Creative Concept Testing

a. Prior to conducting creative concept testing, submit all materials (e.g., moderator’s guides, screening survey, consent, and assent forms, scripts and/or story boards/animatics) in advance to DCC for approval and direction.

b. Develop and provide to DCC a Creative Concept Testing report and presentation that presents the findings from all creative concept testing activities. The report should include the strengths and weaknesses of the specific concepts tested with the priority audience, suggested modifications based on learnings, and recommendations for final creative messaging assets including branding, icons, and central messaging.

3. Media Plan and Buy

a. Develop and execute a multi-platform, integrated digital media strategy of paid advertising that is cost efficient, maximizes outreach to target markets, and is responsive to changes in the media marketplace and consumer behavior. Work with DCC to ensure synergy with public relations and community engagement.

b. Work with media outlets to review and approve cannabis related advertising content that complies with CCR Article 4: Posting and Advertising.

c. Work with DCC to develop an effective paid, earned and organic social media presence that complements and augments other media activities.

d. Incorporate new media platforms arising from the emergence of new, culturally appropriate, and wide-spread social networking technology.

e. Develop strategies, provide market research, and make recommendations for media placement, media buy, and message timing. The campaign should include population-based strategies and customized efforts to reach the priority audiences.

f. Deliver timely and impactful messaging using specified media (i.e., connected TV, digital, out-of-home, social, and influencers).

g. Time and design specific messaging for cannabis focused days such as 4/20 and Green Wednesday (the day before Thanksgiving day).

h. Implement media buys that utilize maximum negotiating methods to leverage deep discounts, bonus weight, media partnerships, and/or other added-value opportunities, which must be at 20% or more of total campaign media buy.

i. Consistently check and adjust media strategies, key messaging, and priority audience based on consumer research, public health recommendations, and/or scientific advancements.

4. Campaign Production

a. Secure the most cost-effective licensing buyouts and talent agreements.

b. Creative production should emphasize no or minimal live action production shoots using the least amount of principal talent.

c. Obtain legal review and network clearance of ads prior to production.

d. Provide graphic design, copywriting, editing, and related services needed for campaign assets. Content shall be designed to optimize the user’s experience across media platforms.

e. Provide social media content creation, curation, and expertise to optimize the user’s experience across relevant social media platforms.

f. Provide translation and adaptation services and coordination to reach the Spanish language target audiences.

g. Deliver masters of all produced advertising in requested formats (e.g., native files) to DCC, for the purpose of archiving and other legal uses.

https://govt.westlaw.com/calregs/Browse/Home/California/CaliforniaCodeofRegulations?guid=ICC472120543B11ECAE2D000D3A7C4BC3&originationContext=documenttoc&transitionType=Default&contextData=(sc.Default)

h. All copyrights, in all media content, in perpetuity, remain the property of DCC. All materials, websites, social media, etc. developed by the contractor for DCC will remain the property of DCC upon conclusion of the contract.

i. Ensure all design and outreach materials meet the American with Disabilities Act (ADA) standards.

5. Campaign Website and Social Media Content and Materials

a. Upon review and DCC approval, develop extensive educational content, targeting adult-use cannabis consumers for the real.cannabis.ca.gov website and landing pages.

b. Create content and graphics to support campaign webpages and social media postings on a regular and ongoing basis.

c. Print and mail RCC QR Code window cling, and information packages to newly licensed retailers and licensed retailers who have not previously received packages. See Attachment A: Real California Cannabis QR Package Materials for reference.

d. Ensure all website materials and social media content meet the American with Disabilities Act (ADA) standards.

e. Provide culturally appropriate translation and adaptation services in Spanish and/or additional translations, as indicated by DCC. The Contractor must provide in-language communication assets.

Objective 4 - Media Evaluation

1. Campaign Monitoring and Evaluation

a. Develop a monitoring plan for keeping DCC appraised of all advertising and public relations activities, current contractor personnel, and an evaluation of the effectiveness and cost efficiency of these activities. Project management activities from the Contractor and subcontractors shall include the following, at a minimum with additional reporting required at the discretion of DCC during peak activity periods:

i. Implement project management systems or platforms to track all advertising and public relations contract activities.

ii. A list of open work orders, projects and timelines, including but not limited to, planning; research; creative development and production;

substantiation, pre- and post-testing of ads; usage fees, advertising traffic and placement; and technical assistance.

iii. Status of progress and accomplishments for each work order and project.

iv. Description of steps remaining for completion of each work order and project, and the date each step will be completed.

v. The names of primary and alternate Contractor, subcontractor, and DCC employees assigned to coordinate and implement the work order or project.

vi. Conduct regular status and insight meetings regarding advertising campaign activities. Any subcontractors providing ethnic-targeted, or other specialized advertising, shall participate directly in calls.

vii. Develop and implement a plan to ensure advertising content is consistent with and complementary to DCC social media content.

b. Report on the campaign’s implementation and outcomes, including media monitoring and optimization, summarized quarterly media buy reports and post-analysis, and a summary evaluation of the effectiveness of media placement.

c. Detailed reports of media placement to be provided quarterly in a spreadsheet, upon request, that shall provide detailed information on actualized media.

i. Total impressions delivered, as applicable to each advertising medium.

ii. ii. Actual rating delivered, as applicable for broadcast media.

iii. iii. Priority audience demographics e.g., age, gender, racial/ethnic group used for planning and reconciling media performance.

iv. iv. Details by the vendor, network, or station for each Designated Market

Area (DMA), as applicable.

v. v. Dayparts by market, as applicable. Days aired and time(s) of day, upon request.

vi. vi. For digital, click-through rates, cost per click, or the agreed upon key performance indicator.

vii. Third party measurement and detailed viewer data, when available and requested by DCC.

d. Provide detailed media monitoring analysis designed to evaluate campaign reach, to DCC.

e. All focus group and online research materials and reports.

f. Post-buy report.

g. Key website, RCC Search Tool, RCC QR Code, and digital and social media metrics.

2. 2) Project Reporting

a. Prepare, submit, and maintain ongoing campaign reports and timeline.

b. Contractor shall submit quarterly progress reports and attend meetings with

DCC personnel at intervals determined by DCC. Progress reports and meetings will be held to determine whether the project is on schedule, provide communication of findings, and afford occasions for airing difficulties or issues encountered so that remedies can be developed quickly.

c. Develop a timely project-specific wrap-up report for all media activities as requested, detailing the effort from implementation to the results, including recommendations for continued leveraging of the activity.

d. Prior to the conclusion of this agreement, Contractor shall hold a final meeting at which Contractor shall present any findings, conclusions, and recommendations.

Objective 5 - Project Management & Personnel Services

1. Project Management

a. In collaboration with DCC, maintain and monitor a system for substantiating facts, ensuring facts used in the campaign are valid and consistent with DCC-driven scientific data and are approved by DCC. Provide copies of scientific studies, research, and calculations used in advertisements or promotions.

Ensure the validity of the facts and consistency of their use.

b. Provide technical assistance and training to DCC and partner organizations.

2. Personnel Services

a. Responsible for the entirety of the contract term for managing and monitoring all campaign activities, current personnel and subcontractor teams and vendors, as needed, which have:

i. Extensive knowledge of the diverse California media market, and the ability to manage strategic public relations and advertising development, testing, production, and placement, including translation services in Spanish and/or additional languages indicated by DCC.

ii. Specialty advertising services and knowledge, including but not limited to, digital, campaign landing pages, SEO/SEM, and social media strategy and production services.

Qualification Requirements Failure to meet the following requirements by the proposal submission deadline will be grounds for DCC to deem a Proposer nonresponsive. Evaluators may choose not to thoroughly review or score proposals that fail to meet these requirements.

1. In submitting a proposal, each Proposer must certify and prove that it possesses qualification requirements by providing a portfolio and references to the following:

a. At least three (3) consecutive years of experience of the type(s) listed below. All experience must have occurred within the past five (5) years. It is possible to attain the experience types listed below during the same time period. Proposers must have experience in:

i. social cause marketing and/or public health advertising.

ii. behavior-change marketing/advertising.

iii. outreach to the campaign’s priority audience adult-use cannabis consumers age 21 and up.

iv. marketing/advertising to multi-lingual, multi-ethnic audiences

v. operating, full-service, advertising and/or public relations agency with minimum annual gross billings of $6 million, which may include media placement billings for agency clients completed by an external media buying service.

b. Have a minimum of ten (10) employees and a California-based office.

c. No active conflict of interest with tobacco, e-cigarette, cannabis, pharmaceutical or opioid companies. Please explain if your agency works in the alcohol sector.

d. Proposers must achieve Disabled Veteran Business Enterprise (DVBE) participation. Participation must meet or exceed 3-percent of the total proposed cost.

California Law requires Disabled Veteran Business Enterprise (DVBE) participation. DCC policies require DVBE participation of 3-percent on all contracts exceeding $5,000. All Proposers, including out-of-state firms must comply with California’s DVBE participation requirements. Proposals without a minimum 3-percent participation from a DVBE Certified prime or subcontractor will be deemed non-responsive.

e. Corporations must certify they are in good standing and qualified to conduct business in California.

f. Nonprofit organizations must certify their eligibility to claim nonprofit status.

g. Proposers must have a past record of sound business integrity and a history of being responsive to past contractual obligations.

h. Proposers must certify they are financially stable and solvent and have adequate cash reserves to meet all financial obligations while awaiting reimbursement from the State.

i. Proposers must certify their proposal response is not in violation of the requirements of the Darfur Contracting Act of 2008, Public Contract Code Sections 10475, et seq.; Stats. 2008, Ch 272.

j. Proposers must certify their proposal response is not in violation of Public Contract Code (PCC) Section 10365.5 and, if applicable, must identify previous consultant services contracts that are related in any manner to the services, goods, or supplies being acquired in this solicitation.

k. Proposers must agree to contain their indirect costs at a percentage rate not to exceed 20% of the total amount.

Proposal Submittal Requirements

1. Proposals must be submitted for the performance of all the services described herein. Any deviation from the work specifications will not be considered and will cause a bid to be rejected.

2. A proposal may be disqualified if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. At its discretion, the DCC may waive any immaterial deviations in a solicitation. The DCC’s waiver of immaterial defect shall in no way modify the RFP document or excuse the proposal from full compliance with all requirements if awarded the agreement.

3. Costs incurred for developing proposals in anticipation of award of the Agreement are entirely the responsibility of the proposer and shall not be charged to the State of California.

4. A proposer may modify a proposal after its submission by withdrawing its original proposal and resubmitting a new proposal prior to the submission deadline. Proposer modifications offered in any other manner, oral or written, will not be considered.

5. A proposer may withdraw its proposal by submitting a written withdrawal request to the DCC, signed by the proposer or an authorized agent of their firm. A proposer may thereafter submit a new proposal prior to the submission deadline. Proposals may not be withdrawn without cause subsequent to the submission deadline.

6. The DCC may modify this RFP prior to the date fixed for submission of proposals by posting an addendum to the original bid package on Cal eProcure.

7. The DCC reserves the right to reject all proposals. The CDFA is not required to award an Agreement.

8. Before submitting a response to this solicitation, proposers should review, correct all errors and confirm compliance with the RFP requirements.

https://www.caleprocure.ca.gov/pages/Events-BS3/event-search.aspx

9. Where applicable, proposer should carefully examine work sites and specifications. No additions or increases to the agreement amount will be made due to a lack of careful examination of work sites and specifications.

10. The DCC does not accept alternate contract language from a prospective contractor. A proposal with such language will be considered a counter proposal and will be rejected.

The State’s General Terms and Conditions are not negotiable.

Proposal Requirements

All proposals must be submitted in accordance with the outline indicated below. Submitting the proposal in this format assures you that the Evaluation Committee will not overlook important information contained in the proposal.

NOTE: Failure to provide the following information or an explanation as to why the information was not submitted could deem your proposal “technically non-compliant” and therefore, not considered for award.

1. Nature of firm’s services and activities. Provide a description of the nature of the firm’s services and activities. Note when the business was established, brief history and location.

2. Description. Overall description of techniques, approaches and methods to be used in performing the services.

3. Work Plan or Schedule. Each major task must indicate all necessary subtasks and identify specific total hours, commencement dates and completion dates by which progress can be measured and payments made.

4. Identification of Project Manager. Identify the Project Manager who will manage the contract work. Document a required minimum of five (5) years education and experience that this person has in the same area of expertise required by this RFP.

5. Resumes. Provide resumes for each individual, including the lead personnel and supporting personnel to be employed for this project. Include education, experience and expertise with pertinent information demonstrating qualifications for this RFP. Do not exceed two (2) pages per person.

6. Organization Chart. Submit an organization chart showing the hierarchy of key personnel to be working on this project. Chart must show the relationship between project manager and key personnel of the firm and all other parties (subcontractor[s]) to this proposal.

7. References. Prime contractor shall provide in its proposal a minimum of three (3) reference letters from firms for which services were performed by the prime contractor. Each letter must include name of firm, contact person, address, phone number, must be on the firm’s letterhead, and must include a description and assessment of services performed by the prime contractor. Services performed by the prime contractor shall be similar to the services requested in this RFP. Contractor should not provide reference letters from Department staff if those employees are anticipated to be on the Evaluation Team. DCC employees listed as references shall be recused from the evaluation process.

8. Subcontractors. When subcontractors are used, include the following:

A. identification of those persons or firms.

B. resumes of each major subcontract participant.

C. the portions and monetary percentages of the work to be done by the subcontractors.

D. how they were selected and why.

E. description of how subcontracted work will be controlled, monitored and evaluated.

9. Cost Proposal. Shall include a detailed breakdown showing how the costs were determined. A Cost Proposal must be submitted for each contract year and any Options to Renew. A proposal missing Costs Proposals for the term of the contract and any options will be deemed non-responsive. An Excel spreadsheet with the required format is provided as a separate attachment to this RFP.

10. Samples by Prime Proposer. Include samples of similar types of contracts on work performed that were successfully conclusive and list the contractor’s name, contact information, address, phone number, person to contact, term dates, and services performed. A minimum of three (3) samples of prior projects of a similar nature are required to be submitted.

11. The proposal must include all items as outlined above and the documents listed on the Required Documents page.

Bid Requirements A. Proposals must be submitted for the performance of all the services described herein. Any deviation from the work specifications will not be considered and will cause a bid to be rejected.

B. A proposal may be rejected if it is conditional or incomplete, or if it contains any alterations of form or other irregularities of any kind. The State may reject any or all proposals and may waive any immaterial deviation in a solicitation. The State's waiver of immaterial defect shall in no way modify the RFP document or excuse the proposal from full compliance with all requirements if awarded the agreement.

C. Costs incurred for developing proposals in anticipation of award of the Agreement are entirely the responsibility of the proposer and shall not be charged to the State of California.

D. A proposer may modify a proposal after its submission by withdrawing its original proposal and resubmitting a new proposal prior to the submission deadline. Proposer modifications offered in any other manner, oral or written, will not be considered.

E. A proposer may withdraw its proposal by submitting a written withdrawal request to the State, signed by the proposer or an authorized agent of their firm. A proposer may thereafter submit a new proposal prior to the submission deadline. Proposals may not be withdrawn without cause subsequent to the submission deadline.

F. The awarding agency may modify this RFP prior to the date fixed for submission of proposals by the issuance of an addendum to all parties who received an original RFP package.

G. The awarding agency reserves the right to reject all proposals. The agency is not required to award an Agreement.

H. Before submitting a response to this solicitation, proposers should review, correct all errors and confirm compliance with the RFP requirements.

I. Where applicable, proposer should carefully examine work sites and specifications. No additions or increases to the agreement amount will be made due to a lack of careful examination of work sites and specifications.

J. The State does not accept alternate contract language from a prospective contractor. A proposal with such language will be considered a counter proposal and will be rejected.

The State’s General Terms and Conditions are not negotiable.

Bidder Requirements The Contractor shall perform a commercially useful function relevant to this solicitation and provide services or goods that contribute to the fulfillment of the contract requirements.

To be considered responsive, the contractor/subcontractor:

A. Is responsible for the execution of a distinct element of the work of the contract.

B. Carries out the obligation by actually performing, managing or supervising the work involved.

C. Performs work that is normal for its business services and functions.

D. Is not further subcontracting a portion of the work that is greater than that expected to be subcontracted by normal industry practices.

E. Is responsible, with respect to products, inventories, materials, and supplies required for the contract, for negotiating price, determining quality and quantity, ordering, installing, if applicable, and making payment.

A contractor, subcontractor, or supplier will not be considered to perform a commercially useful function if the contractor’s, subcontractor’s, or supplier’s role is limited to that of any extra participation in a transaction, contract, or project through which funds are passed through solely to be qualified to submit a proposal or awarded the contract.

Evaluation and Selection

A multiple stage evaluation process will be used to review and/or score technical proposals.

DCC will reject any proposal that is found to be nonresponsive at any stage of evaluation.

1. Stage 1 – Required Attachment/Certification Checklist review

a. In this review stage, DCC will compare the contents of each proposal to the claims made by the Proposer on the Required Attachment/Certification Checklist to determine if the Proposer’s claims are accurate.

b. If deemed necessary, DCC may collect additional documentation (i.e., missing forms, missing data from RFP attachments, missing signatures, etc.) from a Proposer to confirm the claims made on the Required Attachment/Certification Checklist and to ensure that the proposal is initially responsive to the RFP requirements.

c. If a Proposer’s claims on the Required Attachment/Certification Checklist cannot be proven or substantiated, the proposal will be deemed nonresponsive and rejected from further consideration.

2. Stage 2 – Narrative proposal evaluation/scoring

a. Proposals that appear to meet the basic format requirements, initial qualification requirements and contain the required documentation, as evidenced by passing the Stage 1 review, will be submitted to a rating committee.

b. Raters will individually and/or as a team review, evaluate and numerically score proposals based on the proposal’s adequacy, thoroughness, and the degree to which it complies with the RFP requirements.

c. DCC will use the following scoring system to assign points. Following this chart is a list of the considerations that raters may take into account when assigning individual points to a technical proposal.

Points (10)

Points (20)

Interpretation General basis for point assignment

0 0 Non- Responsive

Proposal response (i.e., content and/or explanation offered) does not speak to the question.

2 4 Inadequate Proposal response (i.e., content and/or explanation offered) is inadequate or does not meet DCC’s needs/requirements or expectations. The omission(s), flaw(s), or defect(s) are significant and unacceptable.

4 8 Barely Adequate

Proposal response (i.e., content and/or explanation offered) is barely adequate or barely meets DCC’s needs/requirements or expectations. The omission(s), flaw(s), or defect(s), are inconsequential and acceptable.

6 12 Moderately Adequate

Proposal response (i.e., content and/or explanation offered) is moderately adequate or somewhat meets DCC’s needs/requirements or expectations. The omission(s), flaw(s), or defect(s), are inconsequential and acceptable.

8 16 Fully Adequate Proposal response (i.e., content and/or explanation offered) is fully adequate or fully meets DCC’s needs/requirements or expectations. The omission(s), flaw(s), or defect(s), if any, are inconsequential and acceptable.

10 20 Excellent or Outstanding

Proposal response (i.e., content and/or explanation offered) is above average or exceeds DCC’s needs/requirements or expectations. Weaknesses are minimal and not material in nature. Proposer offers one or more enhancing feature, method or approach that will enable performance to exceed DCC’s basic expectations.

d. In assigning points for individual rating factors, raters may consider issues including, but not limited to, the extent to which a proposal response:

1) is lacking information, lacking depth or breadth or lacking significant facts and/or details, and/or

2) is fully developed, comprehensive and has few, if any weaknesses, defects or deficiencies, and/or

3) demonstrates the Proposer understands DCC’s needs, the services sought, and/or the contractor’s responsibilities, and/or

4) illustrates the Proposer’s capability to perform all services and meet all scope of work requirements, and/or

5) If implemented, will contribute to the achievement of DCC’s goals and objectives, and/or

6) Demonstrates the Proposer’s capacity, capability and/or commitment to exceed regular service needs (i.e., enhanced features, approaches, or methods; creative or innovative business solutions).

e. Below are the point values and weight values for each rating category that will be scored.

K. Proposals, excluding the Cost Section, will be scored on a scale of 0 to 600 points, as follows:

Rating Category Points X Weight = Total Narr. %

Executive Summary 50 X 0.5 = 25 4.2% Agency Capability 130 X 1.5 = 195 32.5% Project Personnel 70 X 2.0 = 140 23.3% Work Plan 80 X 2.5 = 200 33.3% Management Plan 30 X 1.0 = 30 5.0% Facilities and Resources 10 X 1.0 = 10 1.7%

Narrative Grand Total 600 100.0%

L. DCC will consider a proposal technically deficient and not responsible if the proposal earns a score that is less than 420 points. Proposals deemed not responsible will not advance to Stage 3.

3. Stage 3 –Scoring the Cost Section

a. Proposers that earned a passing score in Stage 2 will have the Cost Section of their proposal scored and/or evaluated according to the process described herein.

b. The proposal offering the lowest total cost earns 300 cost points. The remaining proposals earn cost points through the cost conversion formula shown below.

Final calculations shall result in numbers rounded to two decimal places.

Bid Y Cost (Lowest Cost) x 300 (Possible cost points) = Cost score of Bid X Proposal Bid X Cost

c. Example for illustration purposes:

Lowest cost earns 300 points.

$23,000,000 (Lowest Cost) ÷ $24,900,000 (Bid X Proposal Cost) = .9237

.9237 X 300 points = 277.11 (Cost Section Score of Bid X Proposer)

4. Stage 4 – Interview Stage

DCC may choose to conduct oral interviews with all responsible Proposers that pass Stage 2 – Narrative proposal evaluation/scoring. DCC may, at its discretion, choose not to conduct oral interviews, at which point only Stage 2, 3, and 5 will be scored. The purpose of the oral interview is to assess and/or confirm:

a. Each Proposer’s understanding of DCC’s needs and the overall importance of the project.

b. The Proposer’s commitment to provide quality services in a timely manner.

c. The Proposer’s willingness and ability to establish effective working relationships with

State staff.

d. The capabilities and strengths of the Proposer’s management team.

e. The soundness and strengths of the Proposer’s approach to accomplish the objectives and manage the project to ensure successful completion of all Scope of Work requirements.

If oral interviews are held, DCC will evaluate the results of each oral presentation on a competitive basis by comparing the oral presentation responses of one Proposer to those of another Proposer. Proposers may earn 100 points for the oral interview stage. The earned oral interview points will be added to the Technical Proposal Score in the final score calculation.

If DCC chooses to conduct oral interviews, the length of each interview should not exceed one (1) hour. DCC anticipates that interviews will be held via Teams the week of June 9th, 2025. In addition to the Proposer’s official authorized representative(s), DCC may request the presence of primary and/or key project personnel to attend the interview. If applicable, DCC will mail, email, or fax specific interview requirement information to each of the affected Proposers. This interview is the Proposer’s opportunity to clarify their materials that they submitted in the RFP and is not an opportunity to present new material. Any attempt to do so will result in the disqualification of that Proposer.

7. ORAL INTERVIEW 100 points)

a. Professionalism of presenters and coherence of presentation.

b. Responses to questions.

c. Intangibles: Energy, creative thinking, attentiveness.

TOTAL SCORE: 100 Points

5. Stage 5 – Adjustments to Score Calculations for Bidding Preferences

a. DCC will determine which firms, if any, are eligible to receive a bidding preference (i.e., small business or non-small business subcontractor preference)

b. To confirm the identity of the highest scored responsive Proposer, DCC will adjust the total score for applicable claimed preference(s) for those Proposers eligible for bidding preferences. DCC will apply preference adjustments to eligible Proposers according to

State regulations following verification of eligibility with the appropriate office of the Department of General Services. More information about the allowable bidding preferences appears in the RFP section entitled, “Preference Programs”.

c. Small Business Preference Scoring Preference will be calculated as follows (as described in State Contracting Manual Volume 1, Section 8.21):

i. Calculate the “earned” score for all bidders.

ii. If the highest scored proposal is from a non-certified small business or microbusiness, then:

a) Calculate 5% of the highest responsible bidder’s total score.

b) Add the amount calculated above to the score of each of the certified small business or microbusinesses. This new amount is the total score.

c) Award of the contract must go to the bidder with the highest point count.

d) An example of applying the small business preference to an RFP Secondary follows:

Bidders (*Indicates certified small business)

Max Points

A* B

Stage 2 - Narrative Score 600 500 520

Stage 3 - Cost Score (cost points awarded are based on these bid amounts)

300 277.11 ($24.9M)

277.11 ($24.9M)

Stage 4 – Interview Score 100 80 90

Total “earned” points for each bidder

1000 857.11 887.11

Bidder B’s was the highest scored proposal, a non-certified small business or microbusiness. Therefore, points must be re-apportioned after application of the 5% calculation of B’s point score. B’s bid received 887.11 points. 5% of

887.11 is 44.36. All bids from certified small business or microbusinesses will receive 44.36 additional points. All bids from eligible non-small businesses will receive 44.36 additional points (see subsections d and e below).

Point awards prior to preference points 857.11 887.11 Small Business Preference points* 44.36 New Total after SB/Non-SB/NVSA Preference

901.47* 887.11

d. Nonprofit Veteran Service Agency Certification Scoring Scoring is the same as the Small Business Preference disclosed in Section (c) above.

(State Contracting Manual V1 Section 8.20.G)

e. Non-Small Business Preference Scoring Scoring is the same as the Small Business Preference disclosed in Section (c)above.

This preference is awarded to a non-small business bidder that commits to small business or microbusiness subcontractor participation of 25% of its bid price. Vendors committing this amount shall receive 5% of the highest responsive, responsible bidder’s total score before award preferences. A non-small business, which qualifies for this preference, may not take an award away from a certified small business. The small business regulations are located at 2 CCR 1896. (State Contracting Manual V1 Section 8.22)

f. Disabled Veteran Business Enterprise Scoring In accordance with section 999.5(a) of the Military and Veterans Code, an incentive will be given to bidders who exceed the DVBE program requirement.

For evaluation purposes only, the State shall apply an incentive to bids that propose California certified DVBE participation and confirmed by the State. The incentive points for awards based on high score awards are included in the sum of non-cost points and cannot be used to achieve any applicable minimum point requirements.

Confirmed DVBE Participation of:

Calculation with Interview:

Calculation without Interview:

4.5% and over 5% x 700 = 35 5% x 600 = 30

4% up to 4.49% 4% x 700 = 28 4% x 600 = 24

3.5% up to 3.99% 2% x 700 =14 2% x 600 = 12

g. Target Area Contract Preference Act (TACPA) Scoring Preference will be calculated as follows (as described in State Contracting Manual Volume 1, Section 8.30):

i. The TACPA preference will be scored through the following conditions:

a. 9% (combination of the 5% Worksite Preference with the maximum 4% Work Force Preference) up to $50,000

b. Corresponding preference percentage of the price…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .