RFP 23-0259 DNR Ortonville Shooting Range Bench Modifications.pdf

PDF 492 KB Posted

Attached to
DNR Ortonville Range Bench Leg Modifications-New Steel Legs
Solicitation number
RFP 751 230000000259 1
Issued by
Michigan

About this file

This is a Minor Construction Project Bid Package issued by the Michigan Department of Natural Resources (DNR) Procurement Services for bench leg modifications at the Ortonville Shooting Range in Lapeer County, Michigan. The project scope requires the removal and replacement of 62 existing concrete block shooting bench legs with fabricated steel legs beneath 26 shooting benches at the facility located at 5380 Sawmill Lake Road, Ortonville, Michigan. The contractor must remove the concrete benchtops, dispose of existing block legs offsite, and install new steel tube legs fabricated from 2.5" x 2.5" x 3/16" square steel tubing with welded base plates and mounting hardware. The benches must maintain current ADA compliance with 31-33 inches of height and 28 inches of legroom, remain level to each other, and support up to 2,000 pounds of weight per leg pair. Site visits are available Thursday through Sunday from 9:30 a.m. to 4:30 p.m. at Ortonville Shooting Range and at the Dansville facility (for reference examples) through December 18, 2022. The bid opening is scheduled for Friday, November 18, 2022, at 2:00 p.m. Eastern Time. Upon contract acceptance, the contractor must complete all onsite work within two weeks, between December 15, 2022, and April 15, 2023.

Bid security is not required; however, performance and payment bonds are mandatory if the bid amount exceeds $50,000, with bond costs included in the base proposal sum. Award will be based on the lowest responsive and responsible bid that does not exceed available funding. Bid Alternate #1 offers an upgrade option for hot-dipped zinc galvanizing of the steel legs instead of oil-based paint, with the additional cost to be added to the base proposal sum if selected and budget allows. The contractor is responsible for all necessary permits, insurance (including $2 million general liability and workers' compensation coverage with a waiver of subrogation), and compliance with Michigan labor and safety regulations. Payment will be made in one lump sum upon project completion and final state acceptance, though a single progress payment up to 50 percent of contract value may be requested during construction. The contractor must provide a one-year warranty on all materials and workmanship and submit a guarantee form (PR-1628E) prior to final payment. All contractors must register with the state's electronic funds transfer system before contract award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 PR1625 (Rev. 4/2020)

Michigan Department of Natural Resources – Procurement Services

MINOR CONSTRUCTION PROJECT BID PACKAGE

Issued by Authority of The Michigan Department of Natural Resources.

This is an invitation for a bid for furnishing labor, material, supplies and equipment to complete the project detailed on the Proposal and Contract Form and in the attached specifications. Bid Security is not required for this Bid. Performance bond and payment bond are not required for this project unless Bid Amount is greater than $50,000.00. See Item #24 under General Conditions.

The State reserves the right to award to that responsive and responsible bidder offering the best value to the State for the quality of the service to be supplied, conformity with specifications and suitability to the requirements of the State, or to reject any and all bids in whole or in part if the best interest of the State will be served.

It is the vendor’s responsibility to read, understand and follow the Instructions To Bidders, General Conditions and General Requirements included in this bidding document.

Questions regarding these terms should be directed to: Questions regarding the project should be directed to:

The Issuing Officer

PATRICK AVENDT

Telephone

(517) 388-6265

Site Contact/Project Manager’s Name Sean Duffy

Address:

PROCUREMENT SERVICES

MICHIGAN DEPARTMENT OF NATURAL RESOURCES

CONSTITUTION HALL – 3rd FLOOR

525 WEST ALLEGAN STREET

P.O. BOX 30028

LANSING, MICHIGAN 48909 (This ZIP for P.O. Box only.)

(Street Address ZIP is 48933.)

Telephone:

517-202-3055

E-Mail Address Duffys@michigan.gov

Division/Office Name

DNR Shooting Ranges

Field Unit Name

Range Warehouse

Street Address of Park Headquarters 9870 West Stoll RD.

City, State, ZIP Haslett, MI 48840 This Bid Package contains: A. This instructional cover sheet.

B. The “Proposal and Contract for DNR” (PR1625).

C. Instructions to Bidders, General Conditions, General Requirements.

D. Technical specification and other attachments, if any required.

THE ATTACHED CONTRACT DOCUMENTS ARE FOR: Bid Number: RFP 230000000259 PROJECT LOCATION (location where the work is being done) Ortonville Shooting Range 5380 Sawmill Lake Rd, Ortonville, MI 48462

COUNTY

Lapeer

NAME OF CONSTRUCTION PROJECT

Ortonville Shooting Range Bench Leg Repair & Replacement

MANDATORY PRE-BID OPEN HOUSE, IF REQUIRED:

Ortonville Shooting Range is available for site visits between 9:30am – 4:30pm Thursday-Sunday to view where construction will take place. If desired, existing bench legs of a similar design can be viewed at the Dansville shooting range Fridays, Saturdays, Sundays from 9:30am – 4:30pm until the range is closed for the season December 18, 2022.

BID OPENING: DATE

FRIDAY, NOV. 18, 2022

TIME (Local Time)

2:00 P.M. EASTERN

TO BID FOR THIS WORK, SUBMIT A PROPOSAL FOLLOWING THE INSTRUCTIONS BELOW.

1) Complete the “bidder’s” portion on the “Proposal and Contract for DNR” (PR1625).

• DO NOT change the bid form or qualify the bid. Only bid on the contract as written. If the bidder wishes to alter the bid price, it may be done by sending in the amount of change (addition or reduction) to the original bid by the bid opening time. The original bid sum must not be revealed. Bid prices must be good for sixty days.

2) If an Addendum was issued, confirm receipt by returning a signed copy of the Addendum and acknowledging it on the Bid Form.

3) Submit completed copy of the “Proposal and Contract for DNR” (Form 1625) by the due date and time, by hand delivery, U.S. mail, courier, e-mail or fax to the Project Manager listed on the Bid Form.

4) On the mailing envelope, e-mail subject line or fax cover sheet, please identify the following:

a) Project Name b) Bid date and time

• It is the responsibility of the bidder to ensure that correctly identified bids are delivered on time. The Michigan DNR cannot be responsible for mail, e-mail, and faxes not delivered to the correct party by the due date and time.

• This bid is not a public, sealed bid opening. The Project Manager is only legally obligated to reveal bid prices at the time of recommendation to award.

2 PR1625 (Rev. 5/2020)

Michigan Department of Natural Resources – Procurement Services

PROPOSAL AND CONTRACT FOR DNR

Submittal of this information constitutes a valid proposal as required by

Authority of Act 431, PA 1984 to provide the services as specified.

BID OPENING DATE and TIME CONTACT INFORMATION FOR EXAMINATION OF PREMISES AND WORKING CONDITIONS AT THE SITE

FRIDAY, NOV. 18, 2022

2:00 P.M. EASTERN

Site Contact/Project Manager’s Name Charlie Brauer

Telephone

(248) 627-5569

Site Contact/Project Manager’s E-Mail Address brauerc@michigan.gov

BID NUMBER

RFP: 230000000259

DEPARTMENT(751):

DNR – MOD

DIVISION/OFFICE NAME

SHOOTING RANGES

FIELD UNIT NAME

Ortonville Shooting Range

PROJECT LOCATION (WORK SITE) Ortonville Shooting range 5380 Sawmill Lake Rd, Ortonville, MI 48462

PROJECT NAME

Ortonville Bench Leg Repair & Replacement

SCOPE OF WORK: The Work to be completed under this contract includes furnishing all labor, materials, and equipment to: remove and replace the existing concrete block shooting bench legs at the DNR’s Ortonville Shooting Range facility with fabricated steel legs. This includes the removal and proper disposal of 62 concrete block bench legs to an offsite location and fabrication and installation of 62 replacement steel legs as specified herein at the Ortonville Shooting Range, Oakland County, Michigan. Bid Alternate #1: To be completed at the time of bid open otherwise bid may be rejected as being in complete. (next page.)

Time of Completion: Upon acceptance of the proposal and contract by the State, the contractor agrees to complete all work between December 15, 2022 and April 15, 2023. The contractor must complete all onsite work within two (2) weeks from mobilization/commencement of work onsite.

Bidder’s Section: (See attached instructions to Bidders, General Conditions and General Requirements.)

DO NOT alter or qualify this Proposal and Contract. This Proposal may be rejected if this form is altered or qualified.

BIDDER ‘S NAME AND COMPLETE ADDRESS TELEPHONE E-MAIL ADDRESS

STREET ADDRESS MICHIGAN VENDER CODE:

CITY, STATE, ZIP

Base Proposal Sum $ (This figure shall be valid for a period of sixty (60) days from the Bid Opening Date.)

NOTE: BID GUARANTEE & BONDS ARE NOT REQUIRED ON THIS PROJECT UNLESS BID AMOUNT IS OVER $50,000.

Bidder Acknowledges receipt of the following addenda: Dated:

We propose to furnish all labor, materials, equipment, tools, and services required to complete the work in accordance with the specifications and conditions contained herein in consideration of the sum(s) stated above and agree that this document and attached General Terms and Requirements will constitute the contract if accepted by the State.

Signatures and Authorizations: Bids may be rejected as being incomplete without this authorization.

BIDDER'S SIGNATURE (s) DATE

Corporations shall include with the bid, a copy of the resolution giving the person signing the bid, power to bind the company in a legal contract.

Partnerships may have all partners sign this “Proposal and Contract for DNR” (Form PR1625) or may submit a Power of Attorney.

WITNESS' SIGNATURE DATE

Sole proprietorships need only to have their signatures witnessed.

Submit a signed, dated, and witnessed copy of this Proposal To: ACCEPTANCE: THIS PROPOSAL IS

ACCEPTED BY THE STATE OF MICHIGAN

PATRICK AVENDT, DNR BUYER

avendtp@michigan.gov

DNR ISSUING OFFICER’S SIGNATURE DATE

WITNESS' SIGNATURE DATE

DEPT. OF NATURAL RESOURCES

ORTONVILLE SHOOTING RANGE

SHOOTING BENCH LEG MODIFICATIONS

BID ALTERNATE

I. GENERAL

A. The Base Proposal Sum is solicited and the amount is to be inserted by the Bidder in the blank space provided on the PROPOSAL AND CONTRACT form. The Base Proposal Sum shall cover all portions of Work, including all incidentals, for the satisfactory completion of the Scope of Work by the indicated Completion Date. Award of Contract, if made, will be to the Bidder whose Base Proposal Sum is to the best interest of the State. Do Not Alter This Bid Form.

BID ALTERNATE #1 – UPGRADE FINISH ON WELED STEEL LEGS

Instead of being painted with an oil-based exterior paint, Contractor will provide legs that have been hot-dipped in zinc after drilling and welding top and bottom plates to leg. $______________________________ Amount to be ADDED TO the Base Proposal Sum

II. BASIS OF AWARD OF CONTRACT

A. Award of Contract will be based upon the lowest Base Proposal Sum received from a responsive and responsible bidder, provided the figure does not exceed available funding.

B. Bid Alternate #1: It is the intent of the Owner to purchase the best possible product for these modifications to the shooting benches, while staying within budget.

1. The Owner will exercise Bid Alternate #1 and award the contract Base Proposal Sum with the additional amount of Bid Alternate #1 added, provided such a sum does not exceed available funding.

3 PR1625 (Rev.5/2020)

INSTRUCTIONS TO BIDDERS

1. Preparation of Bid: Execute bid fully and properly.

Submit in duplicate on this form in a sealed envelope to this office. Alternatively, bid may be e-mailed or faxed to the Project Manage by the due date and time.

2. Signatures: All bids, notifications, claims, and statements must be signed as follows:

a. Corporations: Signature of official shall be accompanied by a certified copy of the resolution of the Board of Directors authorizing the individual signing to bind the corporation.

b. Partnerships: Signature of one partner shall be accompanied by a certified copy of the power of attorney authorizing the individual signing to bind all partners. If bid is signed by all partners, no authorization is required.

c. Individual: No authorization is needed. Each signature must be witnessed.

3. The bidder acknowledges the right of the owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition. the bidder recognizes the right of the owner to reject a bid:

a. if the bid is in any way incomplete or irregular;

b. if the bidder's performance as a contractor was unsatisfactory under a prior contract for the construction, repair, modification or demolition of a facility with the owner, or a contractor in privity of contract with the owner, which was funded, directly or indirectly, by the owner;

4. It is the intent of the owner to award a contract to the lowest responsible bidder, provided the bid has been submitted in accordance with the requirements of the bidding documents, and does not exceed the funds available.

5. Individuals needing special services to fully participate in the bidding process due to a physical challenge may contact the building superintendent or the facility manager.

6. Electronic Funds Transfer Payment Public Act 533 of 2004 requires all vendors doing business with the State of Michigan to receive payment by electronic funds transfer (EFT) for services and goods provided to the State. Please log on to the contractor and payment website at www.michigan.gov/sigmavss to register your company or you may contact the Vendor Help Desk toll-free at 888-734-9749. Contract cannot be awarded until the EFT registration process is fully complete.

7. Interpretation of Contract Documents: If any person contemplating submitting a bid for this project is in doubt as to the true meaning of any part of the drawings, specifications or other contract documents, he/she may submit a written request to the director for an interpretation not later than nine days prior to due date of bids. The person submitting the request will be responsible for its prompt delivery. An interpretation of the documents will be made by the requesting office and an addendum issued and mailed or delivered to each person who has received a set of drawings and specifications. All addenda issued shall be made a part of the contract requirements. The state will not be responsible for any other explanation or interpretation of the contract documents.

8. Substitution of Materials: Any bidder wishing to use manufacturers or materials other than those specified shall submit a written request to the director not later than nine days prior to due date for bids. Request shall be accompanied by product data to permit evaluation and comparison with specified products or materials. The person submitting the request will be responsible for its prompt delivery. An examination and evaluation of product data will be made by the state unit and, if found acceptable, an addendum will be issued and mailed or delivered to each person who has received a set of drawings and specifications. All addenda issued shall be made a part of the contract requirements.

9. Time of Completion: Upon acceptance by the state of the Proposal and Contract, the contractor agrees to complete all work required in the time frame required on the Proposal and Contract.

10. Michigan Products and Recycled Products: All contractors and suppliers are encouraged to provide Michigan-made products and/or recycled products whenever possible where price, quality, and performance are equal to, or superior to, non-Michigan products and the requirements of the contract documents.

11. Rejection: The state reserves the right to reject any bids and to waive any defects in bids.

12. Contract: Upon acceptance by the state, this document will constitute the contract and the executed duplicate will be returned to the contractor. The contract shall not be in force until the contractor has complied with all of the requirements of insurance.

GENERAL CONDITIONS

1. Definitions: "State", the State of Michigan; "Director", the director of the State Unit or his/her authorized representative; "State Unit", any state department, board, commission or institution; "Contractor", the bidder whose proposal is accepted by the state; "Notification", written notice delivered in person or by mail; "Contract Documents", this document and supplemental specifications and drawings.

2. Unfair Labor Practice: Public Act No. 278 of 1980 prohibits the state from awarding a contract or subcontract to an employer who has been found in contempt of court by a Federal Court of Appeals, on not less than three occasions involving different violations during the preceding seven years, for failure to correct an unfair labor practice as prohibited by Section 8 of Chapter 372 of the National Labor Relations Act, 29 U.S.C. 158. A contractor http://www.michigan.gov/sigmavss

4 PR1625 (Rev.5/2020) for the state may not, in relation to that contract subcontract with such an employer.

3. Safety Regulations: The contractor shall conform to the "General Safety Rules and Regulations" for the construction industry, as prescribed by the Construction Safety Commission, Department of Labor and Economic Opportunity, Occupational Safety and Health Administration, Lansing, Michigan, and the Occupational Safety and Health Standards of the United States Department of Labor. This shall be made a condition of each subcontract entered into pursuant to the contract.

4. Taxes: The contractor shall include and be deemed to have included in the bid and contract price all Michigan sales and use taxes currently imposed by legislative enactment and as administered by the Michigan Department of Treasury's Revenue Division on the bid date.

5. Nondiscrimination: For all State Contracts for goods or services in amount of $5,000 or more, or for Contracts entered into with parties employing three or more employees; in connection with the performance of Work under this Contract, the Contractor and its Subcontractors and Suppliers must comply with the following requirements:

a. Not to discriminate against any employee or applicant for employment because of race, color, religion, national origin, age, sex, height, weight or marital status and take affirmative action to ensure that applicants are employed and the employees are not subject to such discrimination. Such action must include, but is not be limited to, the following:

employment, upgrading, demotion or transfer;

recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training.

b. To state in all solicitations or advertisements for employees that all qualified applicants will receive consideration for employment without regard to race, color, religion, national origin, age, sex, height, weight or marital status.

c. To send, or have its collective bargaining representative send, each labor union or representative of workers with which there is a collective bargaining agreement or other contract or understanding, a notice advising the labor unions or workers' representative of the commitments under this provision.

d. To comply with the Elliot-Larsen Civil Rights Act, 1976 PA 453, as amended , MCL 37.2201 et seq.; the Michigan Persons With Disability Civil Rights Act, 1976 PA 220, as amended, MCL 37.1101 et Seq.;

and all published rules, regulations, directives, and orders of the Michigan Civil Rights Commission (MCRC) which may be in effect on or before the date of Bid opening.

e. The Contractor must furnish and file compliance reports within the times, and using the forms prescribed by the MCRC. Compliance report forms may also elicit information as to the practices, policies, programs, and employment statistics of the Contractor and Subcontractors. The Contractor must permit access to Records by the MCRC and its agent for purposes of ascertaining compliance with the Contract and with rules, regulations, and orders of the MCRC.

f. If, after a hearing held under its rules, the MCRC finds that the Contractor has not complied with the nondiscrimination requirements of the Contract Documents, MCRC may, as part of its order, certify its findings to the Administrative Board of the State of Michigan, which may order the cancellation of the Contract and/or declare the Contractor ineligible for future contracts with the State until the Contractor complies with the MCRC’s order.

6. Conflicts and Omissions: The intent of the contract documents is to provide everything necessary for the proper execution of the work. In case of conflict, the work shall not proceed until a decision has been agreed upon by all parties concerned.

7. Royalties, Patents, Notices, and Fees: Contractor shall give all notices and pay all royalties, building permits, and fees. He/she shall defend all suits or claims for infringement of any patent rights and shall save the state harmless from loss on account thereof. He/she shall comply with all laws, ordinances, and codes applicable to any portion of the work.

8. Examination of Premises: Bidder shall familiarize himself/herself with local conditions affecting the job.

He/she shall take his/her own measurements and be responsible for the correctness of same. Bidder shall be held to have made such examinations and no allowances will be made in his/her behalf by reason of error or omission on his/her part. If any part of the contractor’s work depends for proper results upon existing work or the work of another contractor, the contractor shall notify the director before commencing work of any defects that will affect the results. Failure to so notify the director will constitute his/her acceptance of the conditions.

9. Working Conditions: All work shall be done in accordance with all regulations governing the state unit wherein the work is to be performed and with minimum possible interference with the proper functioning of the activities of that state unit. Materials, tools, equipment, etc., shall be confined so as not to unduly encumber the premises. Each bidder shall be held to have visited the site and checked with the authorities the working conditions and the methods of carrying out the work and to have included in his/her proposal all costs for meeting such working conditions.

10. Materials: Unless otherwise specified, all materials shall be new and of the best grade of the representative kinds for the purpose.

a. Whenever material, an item of equipment, or a system is described by a performance specification, written as a proprietary product, or uses the name of a manufacturer or vendor, the term "or equal' if not inserted, shall be implied.

5 PR1625 (Rev.5/2020)

11. Permits: The Contractor is responsible for all necessary permits for this project, unless otherwise indicated on the Bid Form, Technical Specifications, or Drawings.

All work shall be executed in accordance with the State of Michigan‘s Construction Codes, except where work is specified or shown to be above such standard. The work shall be executed in conformity with the drawings and these specifications.

If the contractor performs any work knowing it to be contrary to the State of Michigan‘s Construction Codes, the contractor shall assume full responsibility and shall bear all attributable costs.

12. Employees and Superintendence: Contractor shall enforce good order among his/her employees and shall not employ on the work any disorderly, intemperate, or unfit person or anyone not skilled in the work assigned to him/her. Contractor or a competent person having authority to act for him/her shall be at the work at all times. He/She shall have the plans and specifications available on the site at all times.

a. Michigan Residency: Pursuant to 1988 PA 504, 50 percent of the persons working on this project and employed by the prime contractor or subcontractors shall have been residents of the State of Michigan for not less than one year before beginning work.

13. Other Contracts: The state may let other contracts in connection with the work and the contractor shall properly connect and coordinate his/her work with the work of such other contractors. The state shall not be liable for any damages or increased costs occasioned by the failure of other contractors to execute their work as may be anticipated by these documents.

14. Protection: The contractor shall be responsible for the protection of state property during the period of construction and shall exercise care to prevent damage to structures, utility services, storm and sanitary drainage systems, lawns, trees, plant material, fences, walks, drives, roadways, and other improvements in and adjacent to the area of work under the contract.

15. Insurance: No work connected with this contract shall be started until the contractor has submitted original signed certificates of insurance covering general liability and workers' compensation indicating (a) all workers are insured to protect him/her from claims for damages for personal injury or death which may arise from operations under this contract as required by Michigan statute. The certificate must indicate a waiver of subrogation in favor of the State for the workers’ compensation. And that (b) he/she has the following liability insurance coverage:

Commercial General Liability limits shall be $2,000,000.00 each occurrence, $2,000,000.00 general aggregate, $2,000,000.00 products and completed operations aggregate, $1,000,000.00 personal and advertising injury. Commercial Automobile Liability limits shall be $2,000,000.00 combined single limit, $1,000,000 Each Occurrence Limit, $500,000 Fire Damage Limit (any one fire). All of the above insurance shall be maintained during the life of this contract.

Partial payments shall not relieve the contractor from full responsibility for any damage which may result from any cause including fire or other casualty until completion of the contract and final payment. Any casualties shall not relieve the contractor from performing the contract.

Insurance Companies must have a rating of “A—” or better as listed by A.M. Best Company. The State of Michigan, its departments, divisions, agencies, offices, commissions, officers, employees, and agents must be named as an additional insureds on the certificate.

16. Michigan Right-to-Know Law: All contractors must conform to the provisions of the Michigan Right-to-Know Law, 1986 PA 80 which requires employers to:

a. develop a communication program designed to safeguard the handling of hazardous chemicals through labeling of chemical containers and development and availability of Material Safety Data Sheets;

b. provide training for employees who work with these chemicals.

c. develop a written hazard communications program.

17. Changes: Contractor shall make changes in the contracted work only as ordered in writing by the director.

18. Inspection: Contractor shall at all times permit and facilitate inspection of the work by the director. The state unit will designate an inspector for this contract. It will be the responsibility of this contractor to notify the inspector of the date operations are to start and to contact the inspector periodically during the course of the work to ensure that work is being performed in accordance with the conditions of this contract.

19. Termination for Breach: The state may terminate this contract when violations are not stopped immediately and corrected within a reasonable length of time after notification by the director or when the approved progress schedule is not met because of failure of the contractor to prosecute the work. In the event of such termination, the state may complete the contracted work and the contractor will be liable for any excess cost occasioned the state thereby and in such case the state may take possession of and utilize in completing the work such materials and equipment as may be on the site and necessary.

20. Clean Up: Contractor shall at all times keep the premises free from accumulations of waste material or rubbish caused by his/her employees or work and at the completion of the work. he/she shall remove all his/her waste, tools, equipment, staging and surplus materials from the structure and grounds and leave his/her work clean and ready for use.

21. Guarantee: Contractor shall furnish the state with a written guarantee to remedy any defects due to faulty materials or labor which appear in the work within one year from the date of final acceptance by the state.

22. Payment: Payment for the work will be made in one sum at the completion of the contract except that a single progress payment may be made at any time during the construction period for the value of the work completed, 6 PR1625 (Rev.5/2020) except in no case shall the amount of the payment exceed 50 percent of the value of the contract. If contractor expects to request partial payment, he/she shall submit a schedule of costs and quantities of the various parts of the work aggregating the total contract sum, such as the director may request. When requested, the contractor shall submit a statement based upon this schedule, itemized and supported as the director may require. Contract will not be considered complete until the work has been accepted as final by the state unit and the director and the attached "Guarantee and Statement” (DMB-437) has been completed and signed by the contractor. Payments will be made within 30 days after the Director has certified to the Owner that work is in place in the portion of the facility covered by the applicable request for payment in accordance with the Contract documents. Processing of progress payments by the Owner may be deferred by the Owner until Work having a prior sequence, as provided in the Contract documents, is in place and is approved. Each Application of Payment shall certify that all monies owed by the Contractor to Subcontractors and Suppliers for which payment previously has been sought have been paid from the payments received.

23. Protection of Utility Services: It is a requirement of this Contract, in accordance with Public Act 53 of 1974, as amended, that the Contractor give notice of construction intent to public utilities. "Miss Dig" (telephone number 1-800-482-7171, toll free) shall be notified a minimum of 72 hours (three working days) prior to construction activities. The Contractor shall provide for the protection of all public utility underground and above ground facilities that are to remain. Damage to any such utility services resulting from the Contractor's operations shall be repaired or replaced by the Contractor without additional cost to the State.

24. Bid Security is not required for this Bid. However, a Performance Bond and Payment Bond are required for all bids greater than $50,000. The Bidder’s expense of these bonds must be included in the Base Proposal Sum. Bonds will not be paid for separately. Bonds are obtained by the successful bidder after award of contract. Bonds must be on State of Michigan approved forms. The Performance Bond and Payment Bond must remain in effect from the date of Contract Award until final completion of the Work or the end of Correction Period, whichever comes later. The surety bonds required for a Construction Contract will not be accepted by the State of Michigan unless the surety bonding company is listed in the current United States Government, Department of Treasury’s, Listing of approved sureties (bonding/insurance companies), Department Circular 570. Copies of the current Circular listing may be obtained through the internet web site at http://www.fms.treas.gov/c570/c570.html.

Insurers must have an “A-“ A.M. Best Company Rating and a Class VII or better financial size category as shown in the most current A.M. Best Company ratings.

Insurance must be provided by insurers authorized by the Department of Insurance and Financial Services (DIFS) to do business as an insurer in Michigan. The insurance company and must attach evidence of the authorization. These certificates must specify the Project File No., Index No., Project Title, and a description of the Project. The Contractor agrees that insurance coverage afforded under the policies as such coverage relate to the State under this Contract as determined by the Contractor will not be modified or canceled without at least thirty calendar days prior written notice to the State. The latest A.M. Best’s Key Ratings Guide and the A.M. Best’s Company Reports (which include the A.M. Best’s Ratings) are found at: http://www.ambest.com. The Contractor must not perform any part of the Work unless the Contractor has all the required insurance in full force and effect.

GENERAL REQUIREMENTS

1. The state unit will provide the following work:

a. State Salvage: The state reserves the right to salvage certain items and equipment. Such items will be identified to the bidder at the time of his/her inspection of the proposed work. Salvaged items will be removed by state prior to commencement of work under the contract.

b. Moving Furnishings and Equipment: The contractor shall give timely notice to state unit of all furnishings, window covering and movable equipment that will interfere with his/her work or which the contractor cannot protect with coverings of paper, plastic, drop cloths or clean tarpaulin. The contractor shall furnish, install. maintain and remove all coverings used to protect furnishings. window coverings and movable equipment.

2. Project Coordination:

a. Prior to beginning work the contractor shall meet with the state unit and arrange the schedule for the project.

Once the project is started, it shall be carried to completion without delay.

b. Any building utility service interruptions or outages required by the contractor in performing the work shall be prearranged with the staff of the state unit and shall occur only during those scheduled times.

3. Cutting and Patching:

a. The contractor shall do all cutting, fitting or patching of the work that may be required to make its several parts fit together properly or make new work join with the existing structure. The contractor shall take proper precautions so as not to endanger any existing work.

The contractor shall not cut or alter existing structural members or foundations.

b. Holes or openings cut in exterior walls and roofs for installation of materials or equipment shall be waterproofed by appropriate, approved materials and methods.

c. All adjacent finished surfaces that are damaged by the new work shall be patched with materials matching existing surfaces. Joints between patched and existing http://www.fms.treas.gov/c570/c570.html http://www.ambest.com/

7 PR1625 (Rev.5/2020) material shall be straight smooth and flush. All patching material shall be applied by workers skilled in its installation.

4. Mechanical Alteration Procedures:

a. All work which will necessitate shutting down of existing mechanical equipment or systems shall be made at such time as will not interfere with the normal use of the existing building.

b. Any cutting of floors, walls, roofs or ceilings required to run new work or remove old shall be performed by the contractor requiring same and all patching on his/her work shall be done by the contractor to full satisfaction of the state unit.

c. All piping in existing building shall be run concealed as far as practical in pipe spaces, ceiling spaces, tunnels, crawl spaces or similar areas, except as approved or directed by the state unit.

5. Project Meetings:

a. Preconstruction Conferences: The state unit may schedule a preconstruction conference to be attended by the, state unit staff, and the contractors. Once the project has been started, the contractor shall carry it to completion without delay.

b. Meetings: The state unit may schedule meetings to be held on the job site whenever needed to supply information necessary to prevent job interruptions, to observe the work or to inspect completed work. The contractor shall be represented at each meeting by persons with full authority to act for the contractor in regard to all portions of the work.

6. Shop Drawings and Project Data:

a. Before the delivery of any material or equipment to the job site, the contractor shall submit to the state unit a complete list of material suppliers, subcontractors, and brand names of all materials proposed to be used in the project.

b. The contractor shall check and verify all field measurements and shall submit to the state unit a minimum of five copies of shop drawings, product data catalogs, material schedules, safety data sheets, etc. Following examination by the state unit, three copies will be retained for the state's use and the remaining copies will be returned to the contractor with indication of approval or with notations for correction.

7. Temporary Utilities:

a. The contractor shall furnish and install all temporary facilities and controls required by the work, shall remove them from state property upon completion of the work, and the grounds and existing facilities shall be restored to their original condition.

b. Water and electricity will be available in the area where work will be performed. The contractor will not be charged for reasonable use of these services for construction operation. The contractor shall pay costs for installation and removal of any temporary connections including necessary safety devices and controls. Use of services shall not disrupt or interfere with operations of the state unit.

c. Temporary Sanitary Facilities: The state unit will designate a permanent toilet facility on the premises for use by a personnel employed in the work. The contractor shall repair any damage to the toilet facility caused by his/her employees.

d. Heating units if required shall be of type approved by the state unit. Equipment and surroundings shall be kept clean and in safe condition All direct fired space heaters, if used, shall be vented directly to the outside.

The contractor shall pay for all fuel and/or electricity used for temporary heat.

8. Construction Aids:

a. The contractor shall furnish, install, and maintain as long as necessary and remove when no longer required, safe and adequate scaffolding, ladders, staging, platforms, chutes, railings, hoisting equipment, etc., as required for proper execution of the work. All construction aids shall conform to federal, state, and local codes or laws for protection of workers and the public.

b. Debris Chute: The contractor shall use a chute to lower debris resulting from his/her work. The chute shall be the enclosed type with its discharge directly into the truck.

9. Barriers and Enclosures: The contractor shall furnish, install and maintain as long as necessary and remove when no longer required adequate barriers, warning signs or lights at all dangerous points throughout the work for protection of property, workers and the public. The contractor shall hold the State of Michigan harmless from damage or claims arising out of any injury or damage that may be sustained by any person or persons as a result of the work under the contract.

10. Contract Close Out:

a. Substantial Completion: The contractor shall notify the state unit when the work will be substantially complete and ready for inspection and preparation of a list of minor replacement, correction and adjustment items. The contractor shall be represented on the job site at the time this inspection is made and thereafter shall complete all work by the date set for final acceptance by the owner.

b. Cleaning:

(1) Regular Cleaning: All scrap or removed material, debris or rubbish shall be regularly removed from the project at the end of each working day. No discarded material shall be deposited on the grounds of the state unit without the express permission of the physical plant engineer or administrative officer. No salvage or surplus material may be sold on the premises of the state unit.

8 PR1625 (Rev.5/2020)

(2) Final Cleaning: Just prior to final acceptance by the state unit, the contractor shall clean all of the work and existing surfaces, building elements and contents that were soiled by his/her operations and make repairs for any damage or blemish that was caused by the work.

11. Project Record Documents: The contractor shall furnish to state unit with the request for final payment reproducible drawings or plans, and any sections or details necessary, clearly showing the actual path and location of material and equipment installed in this project.

12. Warranties: Unless otherwise specified in these documents, the contractor shall provide a minimum one

(1) year warranty on all materials, labor, workmanship, etc. that shall cover the entirety of this project. The contractor shall forward to the state unit Form PR-1628E covering statements concerning guarantee and indebtedness, and any other special warranties or requirements of the contract documents.

Department of Natural Resources

Ortonville Bench Leg Repair and Replacement

Ortonville Shooting Range 5380 Sawmill Lake Rd, Ortonville, MI 48462

Background:

The objective of this project is to remove 62 existing block legs under 26 Shooting benches at Ortonville Shooting range and replace them with new steel legs. Legs will be fabricated of square steel tube, the existing tops will be saved and re-utilized. Due to the poor condition of the existing block legs, that are both cracking and chipping, it is in the best interest of the DNR Shooting Ranges to replace the legs now. By replacing at this point, we are removing a potential future safety concern and preventing a potentially more costly and lengthy repair/closure in the future. Currently the existing legs meet the requirements for a worksurface/table for the Americans with Disabilities Act (ADA). This standard must be retained with the installation of new legs.

Scope of Work:

1.) Removal of 26 concrete benchtops to be re-used. Currently the tops are mortared to the legs with each top sharing 2 legs at the seams of adjacent benches, they will need to be chipped off, then lifted. We estimate the tops to weigh between approximately 800- 1000 lbs. each. They are stabilized with mesh and rebar throughout.

2.) If any tops are damaged in the process, they will need to be replaced by the contractor, at contractor’s expense and be made to the existing dimensions of the current benches, including having rebar and mesh installed throughout for proper support, and safety.

3.) Removal of 62 existing blocks legs, this includes the proper disposal of all existing leg materials to an offsite location by contractor. Some legs are filled or partially filled block and may require the concrete slab underneath to be leveled or ground down flush to attach future metal legs.

4.) Metal legs will be attached to the existing concrete slab with at least 4 concrete anchors per each leg.

5.) When tops are replaced onto the new legs, they will be drilled and have stainless steel carriage bolts connecting the bench tops to the mounting plates or galvanized based on leg material used to prevent corrosion. PVC/PEX or other tubing materials will be inserted into the drilled hole as a spacer, they may be left slightly longer than benchtop depth to act as a washer, in addition, a soft washer may be used. This is advised to prevent concrete tops from cracking while still allowing adequate torque to secure the tops firmly in place. A lock washer and nut shall be used on the underside of the mounting plates.

6.) The legs must be able to support the shared weight of two tops or up to 2,000lbs of weight.

7.) The benches and legs will be installed in such a way that the tops remain level to each other with no gap between them, with minimal variance from top to top.

Understanding that up to ¼ inch of variance may currently exist and slight differences of this level are acceptable. Seams between benches will be caulked with a weatherproof sealer matching the concrete color.

8.) Currently measuring from the ground or pad to the top of benches gives approximately 31 ½” – 33” allowing for 28 inches of legroom to meet ADA guidelines. This must be maintained.

9.) Leg’s may be made to a universal length or may be made to fit positions based on needed height to maintain a level surface across the bench tops, however they still must conform to the specifications set forth by the Americans with Disabilities Act.

10.) Once work onsite has commenced the contractor must complete the project within 14 days/two weeks.

Installation/leg details

1.) Legs will be made of at least 2.5” X 2.5” X 3/16” square steel tubing, base plates will be welded completely around the exterior of the tube/plate union. Base Plates will be a minimum 3/16” in thickness. Legs will be painted or finished smoothly in an oil based, outdoor rated paint, in accordance with the manufacturer’s directions, Rustoleum or approved equal.

2.) Base plates dimensions for going into the concrete tops shall properly support and allow for adequate overlap of two benches. The top plate will be at least 8” X 10” X 3/16” and the bottom mounting plate will be at least 8” X 8” X 3/16”, contractor may choose to fabricate larger mounting plates to allow for proper support and spacing of carriage bolts from edge of benchtops, and to prevent tops from cracking. Contractor should work with onsite DNR Staff for placement of the legs, if possible, to prevent the location of the bolts from being an obstruction to our patrons’ use.

Disposal/Clean up

1.) The contractor will be responsible for the proper disposal offsite of any materials (new/old) related to the project that the facility does not desire to retain.

2.) The Site of the project including the surrounding area will be cleaned and free from any debris related to the project.

3.) The Site of the project will be restored to as good of condition as found before work commenced or better. If equipment used by the contractor damages any existing sidewalks, slabs, concrete, or fixtures. They will be repaired by the contractor at their expense.

4.) The site of the project will be restored to as good of condition as found before work commenced or better. If equipment creates ruts in grassed or lawn areas, they will be leveled with clean topsoil, and contractors grade grass seed will be planted in those areas, covered by loose straw.

Bid Alternate #1

See Bid Alternate Form to be completed at the time of bid submittal.

Overview of site location, and best paths to commence work.

Example of ADA requirements, note that a 30-inch width between bench legs also must be present. For reference only, please refer to Americans with Disabilities Act Standards.

FOR REFERENCE USE ONLY: Example of described bench legs used at the Dansville Shooting Range, 1819 Kelly Rd., Mason, MI 48854.

**NEWLY CONSTRUCTED BENCH LEGS WILL NOT HAVE THE SWINGOUT SEAT.

DNR Ortonville Shooting Range Bench Modifications Contract
DNR Ortonville Shooting Range Bench Mods Bid Alternate
DNR Ortonville Shooting Range Bench Mods Specs