About this file

This Request for Proposal (RFP) is issued by the Michigan Department of Transportation (MDOT) for an as-needed statewide contract to purchase epoxy materials for Thin Epoxy Overlay and Healer Sealer operations for bridge crews. The solicitation seeks proposals from contractors capable of supplying two distinct epoxy products: one for thin epoxy polymer bridge deck overlay applications and another for penetrating healer sealer applications on bridge decks. The RFP was issued on March 1, 2022, with a proposal deadline of 3:00 p.m. Eastern on March 17, 2022. Bidders must submit questions by March 8, 2022, with anticipated answers posted by March 10, 2022. The anticipated contract begin date is April 15, 2022. The contract term is one year from the effective date, with the option for up to four additional one-year renewal periods at the State's sole discretion. Based on future growth projections, the State anticipates purchasing no more than 8,800 gallons per year of epoxy for thin overlay and 11,550 gallons per year for healer sealer, distributed across multiple regional delivery locations throughout Michigan.

Proposals will be evaluated on a pass/fail basis across five criteria: completion of the Confidential Treatment Form, completion of the Vendor Questions Worksheet, completion of Schedule A (Statement of Work), completion of Schedule B (Pricing), and agreement with Standard Contract Terms. The contract will be awarded to the lowest-priced bidder meeting all mandatory minimum requirements and specifications, which require that epoxy materials comply with MDOT Special Provisions 20SP-712B-02 and 20SP-710B-03; only approved brands and manufacturers listed in these specifications will be considered. Pricing must be firm for the initial 365-day period, with adjustments thereafter based on documented changes in actual contractor costs supported by evidence such as the Consumer Price Index or manufacturer letters. All deliveries must be made F.O.B. Destination within 45 calendar days of order receipt, with materials packaged in minimum 275-gallon Intermediate Bulk Containers (IBCs) on galvanized steel pallets with protective caging. The contractor must maintain Commercial General Liability Insurance with minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate, Automobile Liability Insurance of $1,000,000 per accident, and Workers' Compensation Insurance according to applicable law. Invoices must be submitted within 45 days of delivery and payment will be made via Electronic Funds Transfer approximately 45 days after invoice receipt. Liquidated damages of $5,000 plus $100 per day apply for late or improper completion, and $1,000 per individual per day for unauthorized removal of key personnel.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement proposal instructions Department of Transportation Epoxy for Thin Epoxy Overlay and Healer Sealer Request for Proposal No. 220000001423 Solicitation Manager Name: Laura Dotson Direct Phone:517-230-1612 Email: DotsonL2@michigan.gov

This is a Request for Proposal (RFP) for:

An as-needed Statewide Contract to purchase Epoxy material for Thin Epoxy Overlay and Healer Sealer operations to MDOT Bridge Crews.

RFP Timeline

Event
Time
Date
RFP issue date
N/A
Tuesday, March 1, 2022
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
Tuesday, March 8, 2022
Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
5:00 p.m. Eastern
Thursday, March 10, 2022
Proposal deadline*
3:00 p.m. Eastern
Thursday, March 17, 2022
Anticipated contract begin date
N/A
April 15, 2022

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder MUST complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder MUST complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder MUST complete and submit by proposal deadline
Schedule B – Pricing
Pricing for goods and services sought by the State through this RFP
Bidder MUST complete and submit by proposal deadline
Exhibit C – Special Provision for Thin Epoxy Polymer Bridge Deck Overlay – 20SP-712B-02
Procurement of the epoxy portion of the materials section is applicable to this contract
Informational
Exhibit D – Penetrating Healer Sealer on Bridge Decks – 20SP-710B-03
Procurement of the epoxy portion of the materials section is applicable to this contract
Informational
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.

4. QUESTIONS. Bidder questions about this RFP must be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

5. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.

6. MANDATORY MINIMUM REQUIREMENTS. To avoid disqualification, the bidder must provide documentation to support the following:

· The epoxy materials will comply with the MDOT Special Provision, Thin Epoxy Polymer Bridge Deck Overlay – 20SP-712B-02 and Penetrating Healer Sealer on Bridge Decks – 20SP-710B-03. Bids on alternate brands or manufacturer lines will not be considered.

Only proposals meeting the mandatory minimum requirements will be considered for evaluation.

7. EVALUATION PROCESS. The State will evaluate each proposal on a PASS/FAIL basis based on the following criteria:

Documents
Pass/Fail
1.
Confidential Treatment Form is complete and signed
Pass/Fail
2.
Vendor Questions are complete
Pass/Fail
3.
Schedule A is complete
Pass/Fail
4.
Schedule B is complete
Pass/Fail
5
Agreement with Standard Contract Terms
Pass/Fail

The Contract will be awarded to the bidder who meets the specifications as determined by the State and offers the lowest price to the State.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

10. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.

11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives a PASS for each criterion and has the lowest price.

The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS or in the manner it was originally published.

12. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.

If you wish to initiate a protest of the award, you must submit your written protest electronically to Carol Rademacher at RademacherC@michigan.gov no later than 3:00 PM. EST, 3 business days after posting the Award Recommendation and Evaluation Synopsis on SIGMA VSS. The State reserves the right to adjust this timing and will publish any change.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

13. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

15. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.

Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

i. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

ii. Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation.

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

confidential treatment form INSTRUCTIONS. Complete either Section 1 or Section 2 of this CT Form and sign where indicated. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information.

Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form Instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information.

Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal.

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.

220000001423 RFP Number

Epoxy for Thin Epoxy Overlay and Healer Sealer

RFP Title

Signature

Date

Printed Name, Title, Company

Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.

The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material.

Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy”.

(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

220000001423 RFP Number

Epoxy for Thin Epoxy Overlay and Healer Sealer

RFP Title

Signature

Date

Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number.

Website address.

Number of years in business and number of employees.

Legal business name and address of parent company, if any.

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent).

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
Enter YES or NO.

If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.

Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name.

Contact name.

Contact role at time of project.

Contact phone.

Contact email.

City.

State.

Zip.

1. Project name and description of the scope of the project.

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 2

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 3

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan.

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)

Minimum wage paid to employees employed at locations within the State of Michigan.

Average wage paid to employees employed at locations within the State of Michigan.

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.

8. Labor and Environmental Laws Compliance

Bidder must disclose any violations of state or federal labor and employment laws and regulations received within the past five years.

Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.

9. Supplier Diversity

Does your company have a supplier diversity program or training?
Enter YES or NO.

10. Other

Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws.
Enter YES or NO.
Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

Contractor must enter company name here.

SCHEDULE A – STATEMENT OF WORK CONTRACT ACTIVITIES

Request for Proposal (RFP) No. 220000001423 Epoxy for Thin Epoxy Overlay and Healer Sealer

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

BACKGROUND

The Michigan Department of Transportation (MDOT) is seeking competitive bids on a material for use by MDOT direct forces that are suitable for applying the Thin Epoxy Overlay or Healer Sealer operations.

SCOPE

The contract requires that the contractor will procure material from the MDOT Special Provision, Thin Epoxy Polymer Bridge Deck Overlay – 20SP-712B-02 and Penetrating Healer Sealer on Bridge Decks – 20SP-710B-03.

The materials requested within this contract will be handled and delivered within the current guidelines of the Federal Occupational Safety and Health Administration (OSHA) and Michigan’s Occupational Safety and Health Administration (MIOSHA)

REQUIREMENTS

1. General Requirements

1.1. Product Specifications

The Contractor will provide a pre-approved product as indicated in the MANDATORY MINIMUM REQUIREMENTS Section of the contract.

1.1 Product Specifications

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

1.2. Warranties

Describe any warranties included in the bid and provide the length of the warranty. Explain the process for reporting warranty issues and how the Contractor how any repairs or replacements are made, including timing. If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State. Provide the name, address, contact name, phone number and email address of the party responsible for the warranty.

The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.

1.2. Warranties

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder response: Explain warranties

1.3. Recall Requirements and Procedures

The Contractor will notify the State immediately upon any potential manufacturer’s recall of the provided material.

The Contractor will work with the State to replace any products that could be defective.

1.3. Recall Requirements and Procedures

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder response: Explain Recall Requirements and Procedures

1.4. Quality Assurance Program

The contractor must explain their Quality Assurance Plan. The QCP may include but is not limited to the following:

· Your company’s definitions of QA, QC, and QCP

· Organizational chart of QA/QC managers or appointed representatives and their areas of responsibility

1.4. Quality Assurance Program

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder response: Explain Quality Assurance Program

1.5. Incentives

Explain any special incentives or services including, but not limited to, return policies, trade-in programs, quantity discounts, etc.

Bidder response: Explain any incentives offered

1.6. Transition

A. Contract Execution: The contractor will only accept orders from the Program Manager or employees authorized by the Program Manager. The contractor will contact the Program Manager in the event of an abnormal order.

B. Post-Contract Transition: Invoices must be sent within 45 days after expiration of contract. Any invoices received after 45 days will result in a non-payment of invoice.

1.6. Transition

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

2. Service Levels

2.1. Time Frames

All Contract Activities must be delivered within 45 calendar days from receipt of order. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.

2.2. Delivery

Delivery will be expected within 45 calendar days upon date of order. The receipt of order date is pursuant to Section 2, Notices, of the Standard Contract Terms. The Contractor must quote prices “F.O.B. Destination, within Government Premises” with transportation charged prepaid on all orders that meet the minimum order requirement specified in Section 5.3, Minimum Order.

Freight Charges – If the State orders below the minimum order requirement specified in Section 5.3, Minimum Order, or if a Contractor quotes F.O.B. Shipping Point on one-time purchases, the Contractor must specify the carrier being used.

The contractor shall notify the appropriate MDOT contact person at the designated locations during normal business hours, at least twenty- four (24) hours in advance of the arrival time of each shipment.

MDOT will accept deliveries between 8:00 a.m. and 2:00 p.m. Monday through Thursday, excluding State Holidays. All other times will have to be approved by the MDOT Supervisor at the designated locations.

Delivery locations will be coordinated by the Program Manager. The Contractor will contact the Program Manager 48 hours in advance to schedule delivery.

Delivery locations will not have loading docks.

The State forklifts cannot access van trailers.

The Contractor will provide material in trucks with side and rear access for removal with forklift. All loaded trucks will be tarped prior to delivery to the State.

The Contractor will specify delivery to be made by flatbed trailer or box trailer with side or rear access.

Delivery will be made at these facilities for this material as specified:

Grand Region:

Grand Rapids Special Crews 1240 Front Street, N. W.

Grand Rapids, MI 49504 (616)-451-4557

Reed City Garage

19424 US-10.

Reed City, MI 49677 (231)-832-5322

Marion Garage 2897 Sixteen Mile Rd.

Marion, MI 49665 (231)-743-6831

Bay Region:

Saginaw Special Crews 3502 East Washington Ave.

Saginaw, MI 48601 (989)-754-0784

Metro Region:

Auburn Hills Special Crews 2925 Lapeer Rd Auburn Hills, MI 48326 (248)-373-4900

Southwest Region:

Coloma Garage 3880 Red Arrow Hwy.

Benton Harbor, MI 49022 (269)-849-2811

Kalamazoo Special Crews 6345 American Ave.

Portage, MI 49002 (269)-327-4499

Niles Garage

33971 US-12.

Niles, MI 49120 (269)-683-2855

University Region:

Grand Ledge Garage 731 North Canal Road.

Lansing, MI 48917 (517)-627-3276

Jackson Special Crews 800 Chanter St.

Jackson, MI 49201 (517)-783-3852

Operations Field Services 6333 Old Lansing Rd.

Lansing, MI 48917 (517)-243-7821

North Region:

Kalkaska Garage 809 North Birch Street.

Kalkaska, MI 49646 (231)-258-5611

Cadillac Garage 725 Seneca Place Cadillac, MI 49601 (231)-499-8961

Atlanta Garage 13490 M-32.

P.O. Box 437 Atlanta, MI 49709 (989)-785-3514

Mio Garage 1161 M-72.

Mio, MI 48647 (989)-826-3663

Superior Region:

Houghton Garage 51750 Industrial Drive Calumet, MI 49913 (906)-483-3937

L’Anse Garage 301 Winter Street L’Anse, MI 49946 (906)-524-6124

St. Ignace Garage 500 Ferry Lane St. Ignace, MI 49781 (906)-643-8700

2.2. Time Frames and Delivery

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

2.3. Meetings

The State may request other meetings as it deems appropriate.

2.3. Meetings

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3. Staffing

3.1. Contractor Representative

The Contractor must appoint one (1) individual specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).

The Contractor must notify the Contract Administrator at least ten (10) calendar days before removing or assigning a new Contractor Representative.

3.1. Contractor Representative

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder Response: Provide Contractor Representative contact information

Contact name & title

Telephone #

Email

3.2. Key Personnel

The Contractor must appoint one (1) individual who will be directly responsible for the day-to-day operations of the Contract (“Key Personnel”). Key Personnel must be specifically assigned to the State account, be knowledgeable on the contractual requirements, and respond to State inquiries within 24 hours.

The Contractor may not remove or assign Key Personnel without the prior consent of the State. Prior consent is not required for reassignment for reasons beyond the Contractor’s control, including illness, disability, death, leave of absence, personal emergency circumstances, resignation, or termination for cause. The State may request a résumé and conduct an interview before approving a change. The State may require a 30-calendar day training period for replacement personnel.

3.2. Key Personnel

I have reviewed the above requirement and agree with no exception.

I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder Response: Provide Key Personnel contact information

Contact name & title

Telephone #

Email

3.3. Non-Key Personnel

The Contractor must notify the Contract Administrator at least 10-calendar days before removing or assigning non-key personnel.

3.4. Organizational Chart

Provide an overall organizational chart that details staff members, by name and title, and subcontractors.

3.4. Organizational Chart -Please present below or submit as an attachment to Proposal documents. Bidder Response:

3.5. Customer Service Number

The Contractor will provide technical support through e-mail, over the phone, or as needed to support, Region Bridge Unit support teams and Bridge Crews. The Contractor must specify its number for the State to contact the Contractor Representative who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.

3.5. Customer Service Number Bidder Response:

3.6. Disclosure of Subcontractors

If the Contractor intends to utilize subcontractors, the Contractor must disclose the following:

The legal business name, address, telephone number of the subcontractor(s):

A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities:

The relationship of the subcontractor to the Bidder:

Whether the Bidder has a previous working experience with the subcontractor.

If yes, provide the details of that previous relationship:

A complete description of the Contract Activities that will be performed or provided by the subcontractor:

Of the total bid, the price of the subcontractor’s work:

3.7. Security

The Contractor must explain any additional security measures in place to ensure the security of State facilities.

The Contractor’s staff may be required to make deliveries to or enter State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.

The Contractor must: (a) explain how it intends to ensure the security of State facilities, (b) whether it uses uniforms and ID badges, etc., (c) identify the company that will perform background checks, and (d) the scope of the background checks of employees and or the Contractor’s contracted shipping companies.

3.7. Security

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

4. Pricing

4.1. Price Term

Pricing is firm for a 365-day period (“Pricing Period”). The first pricing period begins on the Effective Date. Adjustments may be requested in writing by either party and will take effect no earlier than the next Pricing Period.

4.2. Price Changes

Adjustments will be based on changes in actual Contractor costs. Any request must be supported by written evidence documenting the change in costs. The State may consider sources, such as the Consumer Price Index; Producer Price Index; other pricing indices as needed; economic and industry data; manufacturer or supplier letters noting the increase in pricing; and any other data the State deems relevant.

Following the presentation of supporting documentation, both parties will have 30 days to review the information and prepare a written response. If the review reveals no need for modifications, pricing will remain unchanged unless mutually agreed to by the parties. If the review reveals that changes are needed, both parties will negotiate such changes, for no longer than 30 days, unless extended by mutual agreement.

The Contractor remains responsible for Contract Activities at the current price for all orders received before the mutual execution of a Change Notice indicating the start date of the new Pricing Period.

5. Ordering

5.1. Authorizing Document

The appropriate authorizing document for the Contract will be a Delivery Order from the Master Agreement.

5.2. Order Verification

The Contractor must have internal controls approved by MDOT to verify abnormal orders and to ensure that only authorized individuals place orders.

5.3. Minimum Order

The state’s requested minimum order of Epoxy for Thin Epoxy Overlay is:

· A minimum order of (2 units) – stored in a minimum 275 gallon IBC (Intermediate Bulk Container).

· The contractor must explain if it can accept a lower minimum order requirement. The contractor must explain any additional charges (i.e., handling fees) on orders less than the States requested minimum order of less than the contractor’s minimum order requirement.

· The contractor must explain what the maximum order allowed without additional cost or handling fees and is based on the shipping cost of the minimum order.

The state’s requested minimum order of Epoxy for Healer Sealer is:

· A minimum order of (1 unit) – stored in a minimum 275 gallon IBC (Intermediate Bulk Container).

· The contractor must explain if it can accept a lower minimum order requirement. The contractor must explain any additional charges (i.e., handling fees) on orders less than the States requested minimum order of less than the contractor’s minimum order requirement.

· The contractor must explain what the maximum order allowed without additional cost or handling fees and is based on the shipping cost of the minimum order.

Quantities specified in Exhibit B are estimates based on prior purchases, and the State is not obligated to purchase in these quantities.

5.3. Minimum Order

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

6. Delivery

6.1. Delivery Programs

The Contractor must explain in detail its delivery programs (e.g., standard delivery and quick-ship), including any limitations such as quantity.

The Contractor must explain the transportation method (e.g., UPS, FedEx, Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Contract Activities.

6.1. Delivery Programs Bidder Response:

6.2. Packaging and Palletizing

Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.

Material shall be packaged as follows:

· Packaged in a minimum 275 Gallon IBC (Intermediate Bulk Container)

· IBC totes will be secured to a galvanized steel pallet and be protected by a rigid tubular steel cage.

· IBC totes color will be translucent white.

· IBC totes will have a 6” top opening with threaded cap and TPE gasket, a 2” NPS fill opening and a drain that has a 2” NPS valve with dust cap.

· A drain that has a 3” Buttress valve will be permitted, provided the manufacture supplies fittings for each IBC to convert 3” buttress to 2” NPS.

6.2. Packaging and Palletizing

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

7. Acceptance

7.1. Acceptance, Inspection and Testing

The State will use the following criteria to determine acceptance of the Contract Activities:

Material delivered in manufacturer’s original, unopened, undamaged containers with identification labels intact.

The Contractor will provide confirmation that the epoxy material supplied comply with the MDOT Special Provision.

The material supplied and delivered under this contract will be rejected upon delivery, to include, but not limited to the following:

· Packaging and Palletizing requirements are not met reference, Section 6.2 Packaging and Palletizing.

· Irregularities in the material are found by visual inspection

· The material is expired or has a listed remaining shelf life less than the maximum manufacturers suggested expiration.

The State reserves the right to re-test any shipment at an independent laboratory.

7.1. Acceptance, Inspection and Testing

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

8. Invoice and Payment

8.1. Invoice Requirements

All invoices submitted to the State must include: (a) Vendor’s name; (b) Vendor ID number; (c) Date; (d) Quantity; (e) unit price; (f) total price; and (g) purchase order number. Overtime, holiday pay, and travel expenses will not be paid. Payments will follow approximately thirty (45) days after receipt of the invoice.

Invoices are to be emailed as an attachment to:

Jacob Creisher – Creisherj@michigan.gov and Aaron Porter – Portera@michigan.gov

Michigan Department of Transportation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .