This Addendum 1 to RFP# 20261014 is issued by Pittsylvania County, Virginia, on behalf of the Town of Hurt and Pittsylvania County, and transmits a Preliminary Engineering Report (PER) prepared by Dewberry Engineers Inc. for the Southern Virginia Multimodal Park (SVMP) Membrane Filtration Plant project. The project involves the recommissioning and modernization of an existing water treatment plant adjacent to the SVMP to serve the park and the Town of Hurt's water customers. The proposed work includes replacing and refurbishing existing infrastructure, installing two 0.500 MGD membrane filtration skids with provisions for a future third skid, constructing a new pre-engineered metal building for the membrane filtration system, upgrading chemical feed and storage systems, rehabilitating the existing clearwell and sedimentation basins, installing new finished water pumps, creating backwash and sludge holding ponds with a drying pad, and upgrading electrical, controls, and SCADA systems. The project is being procured through a traditional design/bid/build competitive process as a single construction contract consistent with 2 C.F.R. 200.320(c). The project schedule indicates a 100% design submission ready for bid in late 2026, with bidding and notice to proceed anticipated in late 2026 to early 2027, and construction substantial completion estimated in late 2027 or early 2028.
The total construction cost is estimated at $8,158,000 with a 10% contingency of $820,000, bringing the total construction cost to $8,978,000. The overall project planning estimate, including engineering design, survey, permitting, construction administration, resident inspection, and administrative expenses, totals $10,381,000. The project is funded through a U.S. Economic Development Administration (EDA) grant awarded to the Town of Hurt and Pittsylvania County. Required permits include a VDH Construction Permit, Pittsylvania County Building Permit, Pittsylvania County Erosion and Sediment Control Permit, and a DEQ VPDES permit for discharge from the backwash and solids holding ponds. The RFP explicitly requires all firms submitting proposals to be licensed to practice in the Commonwealth of Virginia and to abide by all applicable State and Federal laws. Addendum 1 clarifies that no other terms, conditions, or specifications are changed by the inclusion of the PER.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 20261014 Hurt Water Treatment Plant EDA Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Connie Gibson, Procurement Manager
1 Center Street Virginia Phone (434) 432-
Website:
www.pittsylvaniacountyva.gov
October 22, 2026
RE: RFP# 20261014
The following shall serve as Addendum #1. Please acknowledge receipt of this addendum when submitting your proposal.
1.
Sincerely, Connie Gibson
Procurement Manager
This addendum is issued to formally provide all prospective vendors/firms with the Preliminary Engineering
Report associated with the project. The report is being included to offer additional technical context, clarify existing project parameters, and support accurate preparation of proposals. No other terms, conditions, or specifications are changed by this addendum. See attachment.
http://www.pittsylvaniacountyva.gov/
PROJECT NO. 50188957
PRELIMINARY ENGINEERING
REPORT
Southern Virginia Multimodal Park – Membrane Filtration Plant
DECEMBER 2025
SUBMITTED BY
Dewberry Engineers Inc.
551 Piney Forest Road
Danville, VA 24540
SUBMITTED TO
Pittsylvania County
1 Center Street
Chatham, VA 24531
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 1
Table of Contents C.1. Project Overview 2
C.2. Project Drawings 3
C.3. Construction Cost Estimate 7
C.4. Project Constraints 8
C.5. The Proposed Method of Construction Procurement 8
C.6. Number of Construction Contracts Anticipated 8
C.7. Project Permits 8
C.8. Project Schedule 9
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 2
C.1. Project Overview
A 2017 preliminary engineering report (PER) was completed by Peed & Bortz, LLC, evaluating the ability to provide additional water and wastewater treatment, distribution, and collection capacity to the Southern Virginia Multimodal Park (SVMP). It was discovered the cost to provide additional water capacity to the Town of Hurt’s system, which contains the SVMP site, would come at a high cost. Given the high cost of expansion and transmission for the Town of Altavista to meet increased water demands for the park, the Town of Hurt and Pittsylvania County plans to recommission the existing water treatment plant adjacent to the Southern Virginia Multimodal Park (SVMP) to serve the park, and the Town of Hurts water customers. This water treatment plant once owned by Burlington Industries, is herein referred to as the
SVMP WTP.
Given the age and condition of the SVMP WTP conventional gravity sand filters, valving and controls, it is proposed that only the raw water intake, sedimentation process, and clearwell can be refurbished and recommissioned at a reasonable cost. In lieu of gravity filtration, a new membrane filtration process is proposed to be installed in a new pre-engineered metal building adjacent to the current plant.
Based on the above-forecasted capacity needs of the SVMP WTP, two skids of membranes are proposed with an initial maximum rated capacity of 0.500 MGD. Since the Virginia Waterworks Regulations require at least two membrane skids to meet full redundancy and the typical smallest nominal sized membrane skids are designed to accommodate membrane modules to provide up to 0.500 MGD filtration capacity, at least two skids will be provided. Space will be provided in the filtration building to allow for the addition of a third future membrane skid which will result in a total future rated capacity of 1.0 MGD. Given the relatively small savings associated with the purchase of fewer membrane modules for a single skid and considering the large additional operating cost associated with staffing the WTP for additional shifts of operation, this installation of two 0.500 MGD skids are proposed. This system, with two skids in service would allow the plant to meet all water production needs within a single operating shift. With the future addition of a third skid, and assuming one skid out-of-service, the WTP could meet a water demand up to
1.0 MGD.
The components of the membrane filtration plant include:
• Replace one (1) raw water pump
• Repair the intake structure (including electrical and mechanical systems)
• Rehabilitate WTP concrete structures and handrail
• New chemical feed and storage systems
• Flocculator drive unit replacement
• Sedimentation basin mud valve replacements
• Convert sedimentation basin into break tank
• New membrane feed pumps
• New membrane filter building
• Microfiltration membrane skid system
• Rehabilitate the existing clearwell tank and install baffling
• Two (2) new finished water pumps
• New backwash and sludge holding pond and decant pump station
• New sludge drying pad
• New site piping and valves
• New distribution piping to connect to the Town of Hurt’s system
• Operations building rehabilitation (electrical, HVAC, and architectural components)
• Operations building roof replacement
• New emergency generator and transfer switch
• New electrical service and motor control center (MCC)
• New instrumentation, controls, and SCADA system
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 3
Raw water pumps will be replaced with smaller capacity pumps and controls sized for the plants ultimate design capacity of. Necessary chemical feed systems, electrical & controls, building HVAC and ancillary systems will be upgraded. Raw water pumped to the WTP will receive chemical coagulant addition and be routed through the existing flocculation and sedimentation basins. Settled water will then be routed through one of three existing sedimentation basins which will be converted to a break tank. Water in this break tank will be pumped via new horizontal centrifugal pumps through a new modular microfiltration membrane system that will be housed inside a new building. Filtered water will then flow into the existing WTP clearwell from which new smaller capacity pumps will transfer finished water into the Town of Hurt distribution system.
C.2. Project Drawings
See below figures 2.1, 2.2, and 2.3. These figures provide information regarding the beneficiary location, proposed site improvements, and a process flow diagram.
DEVELOPMENT AREA
Legend
SVMP WTP Project Area
Beneficiary Property
Boundary
NOTES:
• Aerial imagery from 2023
VGIN Aerial Imagery.
• SVMP Boundary shown graphically per
Pittsylvania County GIS
Staunton River
Plastics 19.62 Ac.
Conservation
Area ±6 Acres
Figure 2.1
Southern Virginia
0 400 800
MAIN STREET - BUS. 29 Multimodal Park
GRAPHIC SCALE
1"=800' Membrane
Filtration Plant
REFURBISH CLEARWELL
INCLUDING NEW BAFFLING
NEW MEMBRANE BUILDING
EXISTING RAW WATER
METER VAULT
EXISTING FLASH MIXER
GENERATOR
AND PAD
CHEMICAL FEED
STORAGE AND
FEED UPGRADE
CONVERT 1 SEDIMENTATION
BASIN TO BREAK TANK AND
INSTALL MEMBRANE FEED
PUMPS
RENOVATE
LABORATORY
NEW SCADA
SYSTEM
REPLACE
FLOCCULATOR
DRIVES AND
ADD VFDS
DRYING PAD
DECANT
PUMP STATION
TO DISCHARGE
2 NEW
BACKWASH
& SOLIDS
HOLDING
BASINS
REHABILITATE 3 OF 4 EXISTING
SEDIMENTATION BASINS
OFF VIEW IMPROVEMENTS
BACKWASH SYSTEM
T O
T O
W N
O F
H U
R T
IT
L E
D
A
/1
/2
V
IS
IO
N
D
F
IG
U R
E N
O
.2
S
E
I M
P R
O V
E M
E N e w b e rr y E n g in e e rs I n c
P in e y F o re s t
R o a d n v ill e V
A
-3
.7
.4
P
O J E
C
V
M P
M E
M B
R A
N E
F
IL
T R
A T
IO
N
P L A
O J N
O
A W
IN
G
N O
CHLORINE
ADDITION
RAW WATER
CHEMICAL ADDITION
(CAUSTIC AND ALUM)
RAPID MIX FLOCCULATION SEDIMENTATION
MAX W.S.
TO TOWN
OF HURT
DISTRIBUTION
SYSTEM
FINISHED WATER
MEMBRANE FEED
PUMPS
MIN W.S.
CLEARWELL FINISHED CHEMICAL
ADDITION (CHLORINE, CAUSTIC,
AND CORROSION INHIBITOR)
MEMBRANE
FILTRATION
BREAK TANK
(CONVERTED
SEDIMENTATION
BASIN)
L
/1
/2
V
IS
IO
D
F
IG
U R
E N
O
.3
O
C E
S S
F L O
W D
IA
G
R
M e w b e rr y E n g in e e rs I n c
P in e y F o re s t
R o d n v ill e V
A
-3
.7
.4
O J E
C
V
M P
M E
M B
R A
N E
F
IL
T R
A T
IO
N
P L A
O J N
O
A W
IN
G
N O
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 7
C.3. Construction Cost Estimate
Below is the construction cost estimate for the project with a combination of unit prices and lump sum items. Also included below in Table 3-2 is a project planning factor table that includes a total project cost estimate. Construction contingency at this phase is 10%. After bidding and awarding the construction contract to a general contractor, the contingency amount may be reduced to 5%.
All work proposed in the below cost estimate will be bid in a single construction contract, including demolition, site work, etc.
Table 3-1 - 0.5 MGD SVMP WTP Cost Estimate
Item Description Unit Quantity Unit Price Total
1 Refurbish Intake Mechancial, Structure & Electrical LS 1 $ 200,000 $ 200,000
2 Raw Water Pump Replacement LS 1 $ 75,000 $ 75,000
WTP Concrete & Misc Metal Hardware, Railing, Misc Restoration
LS
$ 100,000
$ 100,000
4 Chemical Feed Storage and Feed Upgrade LS 1 $ 275,000 $ 275,000
5 Flocculation Mixer Drive Unit Replacement and VFD EA 4 $ 65,000 $ 260,000
6 Sedimentation Basin - Mud Valves Replacement EA 3 $ 12,000 $ 36,000
7 Convert One Sed. Basin to Break-tank & Related Piping LS 1 $ 150,000 $ 150,000
8 Membrane Feed Pumps and VFDs EA 2 $ 75,000 $ 150,000
Membrane Building (Structure, Slab, Electrical, Lighting, and HVAC)
SF
2,500
$ 325
$ 812,500
10 Filter Platform, Pipe Supports, Stairs, Misc LS 1 $ 30,000 $ 30,000
11 Microfiltration Membrane System LS 1 $ 2,200,000 $ 2,200,000
12 Refurbish Clearwell including new baffling LS 1 $ 150,000 $ 150,000
13 Replace Finish Water Pumps EA 2 $ 70,000 $ 140,000
14 Site Piping and Valves LS 1 $ 500,000 $ 500,000
15 Piping Interconnection with Town of Hurt LF 1,650 $ 175 $ 288,750
16 Operations Building Misc Demolition LS 1 $ 40,000 $ 40,000
17 Replace Operations Building HVAC System LS 1 $ 90,000 $ 90,000
18 Partial Interior and Exterior Lighting Replacement LS 1 $ 35,000 $ 35,000
19 Partial Windows and Door upgrade/replacement LS 1 $ 30,000 $ 30,000
20 Laboratory Equipment, Furniture, Cabinet Restoration LS 1 $ 40,000 $ 40,000
21 Roof & Structural Repairs LS 1 $ 125,000 $ 125,000
22 Generator & pad LS 1 $ 275,000 $ 275,000
23 Electrical (Including upgrading incoming power and MCC) LS 1 $ 875,000 $ 875,000
24 Instrumentation and Controls LS 1 $ 125,000 $ 125,000
25 New SCADA System LS 1 $ 100,000 $ 100,000
26 New Backwash & Sludge Holding Lined Earthen Basins EA 2 $ 150,000 $ 300,000
27 Sludge Basin Decant Pump Station and forcemain LS 1 $ 175,000 $ 175,000
28 Sludge Drying Pad LS 1 $ 40,000 $ 40,000
29 General Site Improvements LS 1 $ 150,000 $ 150,000
Mobilization and General Conditions (5%) $ 388,000
Construction Subtotal $ 8,158,000
Contingency (10%) $ 820,000
Total Construction Cost $ 8,978,000
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 8
Table 5-2 - 0.5 MGD SVMP WTP
Project Planning Factors
Construction Cost $ 8,158,000
Construction Contingency (10%) $ 820,000
Engineering (Survey, Design, Permitting, and Construction Administration) $ 995,000
Geotechnical, Lead & Asbestos surveys $ 35,000
Resident Inspection $ 120,000
Part Time Engineering Inspection $ 55,000
DEQ Stormwater Permit Fee $ 8,000
Administrative and Legal Expenses $ 190,000
Total Project Cost* $ 10,381,000
C.4. Project Constraints
There are no major design or construction constraints for this project. Being that the water treatment plant is not currently in service, renovation of existing facilities and installation of new equipment and infrastructure will be simpler than in an active facility.
The survey and field investigation phase will be critical to determine location of current onsite utilities and condition of existing infrastructure. This will inform design decisions on location of new equipment and rehabilitation needs of existing systems.
C.5. The Proposed Method of Construction Procurement
This project will be a traditional design/bid/build with a competitive bid process consistent with 2 C.F.R. § 200.320(c). No portion of this project will be performed via an alternative construction procurement method such as design/build, construction management at risk, the applicant’s own forces, and/or a construction manager.
C.6. Number of Construction Contracts Anticipated
This project will be competitively bid through a single construction contract.
C.7. Project Permits
The following permits will be required to be obtained prior to the start of construction:
• VDH Construction Permit – Engineer to submit for permit on behalf of Owner
• Pittsylvania County Building Permit – Contractor to obtain permit
• Pittsylvania County E&S Permit – Contractor to obtain permit
• DEQ VPDES Permit (discharge from Backwash and Solids Holding Ponds) – Engineer to submit for permit on behalf of Owner and Contractor to obtain permit coverage
Based on the current project schedule, which is provided in section C.8. below, the permitting process will take place following the 90% design submission and prior to the 100% ready for bid plans being submitted that incorporate all agency comments. This is anticipated to take place in September and October 2026.
S V M P M E M B R A N E F I L T R A T I O N P L A N T P E R 9
Table 8.1 - Schedule
SVMP Membrane Filtration Plant - Project Schedule
90% Design Submittal and Review
Construction Permitting
100% Submittal - Ready for Bid
Advertise and Receive Bid
Notice to Proceed
Constructio
Con
35% Design Submittal and Review
Field Survey and Existing Conditions Evaluation
Design Contract Procurement
Environmental Review
Funding Acquisition
10 9 8 7 6 5 4 3 2 1 Description
C.8. Project Schedule
Table 8.1 shows the project schedule from the start of the funding acquisition phase to the completion of construction. Easements are not included in the below schedule as they are anticipated to not be required for this project.
Table 8.1 - Schedule (continued)
Description
SVMP Membrane Filtration Plant - Project Schedule
7 8 9 10 11 12 1 2 3 4 5
6 7
10 11 12
Funding Acquisition
Environmental Review
Design Contract Procurement
Field Survey and Existing Conditions Evaluation
35% Design Submittal and Review
90% Design Submittal and Review
Construction Permitting
100% Submittal - Ready for Bid
Advertise and Receive Bids
Notice to Proceed
Construction - Substantial Completion
Construction - Final Completion
| Addendum 1- PER |
| ENGIEERING REPORTSVMP Membrane WTP PER 12.23.2025 |
| PROJECT NO. 50188957 |
| DECEMBER 2025 |
| Dewberry Engineers Inc. 551 Piney Forest Road Danville, VA 24540 |
| Pittsylvania County 1 Center Street |
| Chatham, VA 24531 |
| C.1. Project Overview |
| C.2. Project Drawings |
| Legend |
| C.3. Construction Cost Estimate |
| C.4. Project Constraints |
| C.5. The Proposed Method of Construction Procurement |
| C.6. Number of Construction Contracts Anticipated |
| C.7. Project Permits |
| C.8. Project Schedule |
File details come from the government source that posted it. Updated .