RFP# 202603055 - Popham Peninsula Climate Resilience Planning _Final.docx
DOCX document 234 KB Posted
- Attached to
- Popham Peninsula Climate Resilience Planning
- Solicitation number
- RFP - 01A - 202603055
- Issued by
- Piscataquis County, Maine
About this file
RFP# 202603055 - Popham Peninsula Climate Resilience Planning
This Request for Proposals (RFP) is issued by the State of Maine, Department of Agriculture, Conservation and Forestry, Bureau of Parks and Lands, seeking professional coastal planning and stakeholder consultation services to develop a comprehensive resilience plan for the Popham Peninsula in Phippsburg, Maine. The project will address vulnerabilities posed by coastal erosion, sea level rise, storm surges, and climate-related impacts affecting Popham Beach State Park, Fort Popham State Historic Site, Route 209 (a critical evacuation route), beachfront properties, and the Morse River tidal estuary. The scope of services includes nine primary tasks: project initiation and stakeholder engagement, coastal vulnerability assessment, recreational and ecological inventory, public outreach (up to three workshops), resilience strategy identification and evaluation, development of model ordinance language, draft and final plan development, presentation and final reporting, and implementation support with monitoring frameworks. The anticipated project timeline spans 12 to 18 months. A mandatory Bidders' Conference is scheduled for June 4, 2026, from 9:00 a.m. to 11:00 a.m. at Popham Beach State Park, 711 Popham Rd, Phippsburg, Maine 04562. Written questions must be submitted by June 8, 2026, at 4:00 p.m., local time. Proposals are due June 30, 2026, at 4:00 p.m., local time, via the Vendor Self Service (VSS) system. The Department anticipates making one award. The initial contract period runs from August 1, 2026, through June 30, 2027, with an optional renewal period from July 1, 2027, through June 30, 2028, contingent on funding availability and satisfactory performance.
Proposals will be evaluated on a 100-point scale: Organization Qualifications and Experience (35 points), Proposed Services (40 points), and Cost Proposal (25 points). The lowest cost proposal will receive the maximum 25 cost points, with other proposals scored proportionately lower using a mathematical formula. The State will not request best and final offers, and all pricing must be submitted with the initial proposal. Bidders must provide detailed budget breakdowns covering all costs for the full contract period, including hourly rates for all personnel, along with financial statements for the past three years, certificates of insurance, organizational charts, and documentation of relevant licensure and certifications. This project is partially funded through a grant from the National Oceanographic and Atmospheric Administration (NOAA) under the "Resilient Maine: Local Adaptation and Resilience Actions at a Coastwide Scale" initiative. The project builds on prior assessments completed through the "Changing Shorelines: Adaptation Planning for Maine's Coastal State Parks" effort and a NOAA Project of Special Merit. All proposals will be publicly available following award notification in accordance with Maine's Freedom of Access Act. The awarded Bidder will be required to execute a State of Maine Service Contract and will be paid on a net 30 basis upon receipt of accurate invoices containing the contract number and supporting documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP# 202603055 Amendment 1_Popham 06.16.26.docx | DOCX document | |
| RFP# 202603055_Popham Q | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MAINE
Department of Agriculture, Conservation and Forestry Bureau of Parks and Lands
RFP# 202603055
Popham Peninsula Climate Resilience Planning
RFP Coordinator
| NAME: |
| Andy Cutko |
| TITLE: |
| Director, Bureau of Parks and Lands |
| EMAIL: |
| Andy.cutko@maine.gov |
| Bidders’ Conference |
| DATE: |
| June 4, 2026 |
| TIME: |
| 9:00 a.m. – 11 a.m., local time |
| LOCATION: |
| Popham Beach State Park, 711 Popham Rd, Phippsburg, ME 04562 |
Submitted Questions Due Date
June 8, 2026, no later than 4:00 p.m., local time
| Proposal Submission Deadline |
| DATE: |
| June 30, 2026, no later than 4:00 p.m., local time |
| TO: |
| Vendor Self Service System |
TABLE OF CONTENTS
Page
| PUBLIC NOTICE |
| 3 |
| RFP DEFINITIONS/ACRONYMS |
| 4 |
| PART I INTRODUCTION |
| 5 |
A. PURPOSE AND BACKGROUND
B. GENERAL PROVISIONS
C. CONTRACT TERM
D. NUMBER OF AWARDS
| PART II SCOPE OF SERVICES TO BE PROVIDED |
| 8 |
| PART III KEY RFP EVENTS |
| 13 |
A. VENDOR SELF SERVICE SYSTEM (VSS)
B. BIDDERS’ CONFERENCE
C.
D. QUESTIONS
E. AMENDMENTS
F. PROPOSAL SUBMISSION
| PART IV PROPOSAL SUBMISSION REQUIREMENTS |
| 15 |
| PART V PROPOSAL EVALUATION AND SELECTION |
| 18 |
A. EVALUATION PROCESS – GENERAL INFORMATION
B. SCORING WEIGHTS AND PROCESS
C. NEGOTIATIONS
D. SELECTION AND AWARD
E.
F. APPEAL OF CONTRACT AWARDS
| PART VI CONTRACT ADMINISTRATION AND CONDITIONS |
| 20 |
A. CONTRACT DOCUMENT
B. STANDARD STATE CONTRACT PROVISIONS
| PART VII RFP APPENDICES AND RELATED DOCUMENTS |
| 22 |
APPENDIX A – PROPOSAL COVER PAGE
APPENDIX B – RESPONSIBLE BIDDER CERTIFICATION
APPENDIX C – QUALIFICATIONS AND EXPERIENCE FORM
APPENDIX D – SUBCONTRACTORS FORM
APPENDIX E – PROPOSED SERVICES FORM
APPENDIX F – COST PROPOSAL FORM
APPENDIX G – NOAA PROJECT – BACKGROUND INFORMATION
PUBLIC NOTICE
State of Maine Department of Agriculture, Conservation and Forestry Bureau of Parks and Lands
RFP# 202603055
Popham Peninsula Climate Resilience Planning
The State of Maine is seeking proposals for professional services to provide coastal planning and stakeholder consultation to develop a comprehensive resilience plan for the Popham peninsula in Phippsburg, Maine.
A copy of the RFP and all related documents can be obtained through Vendor Self Service (VSS): https://mevss.hostams.com/PRDVSS1X1/AltSelfService
A Bidders’ Conference will be held on June 4, 2026, at 9:00 a.m.–11:00 a.m., local time at the following location: Popham Beach State Park, 711 Popham Rd, Phippsburg, ME 04562
Proposals must be submitted to the Office of State Procurement Services, via Vendor Self Service (VSS). Proposal submissions must be received no later than 4:00 p.m., local time, on June 30, 2026. Proposals will be opened the following business day.
RFP TERMS/ACRONYMS with DEFINITIONS
The following terms and acronyms, as referenced in the RFP, have the meanings indicated below:
| Term/Acronym |
| Definition |
| BPL |
| Bureau of Parks and Lands |
| Confidentiality |
| Preserving authorized restrictions on information access and disclosure, including means for protecting confidential or sensitive information. A loss of confidentiality is the unauthorized disclosure of information. |
| Department |
| Department of Agriculture, Conservation and Forestry |
| GIS |
| Geographic Information System |
| GOPIF |
| Governor’s Office of Policy Innovation and the Future |
| RFP |
| Request for Proposals |
| State |
| State of Maine |
| Vendor Self Service System (VSS) |
| The Vendor Self Service System (VSS) web portal provides vendors with a single-entry point to register, identify the commodities/services that their company provides, look for business opportunities, and respond to solicitations. |
State of Maine Department of Agriculture, Conservation and Forestry Bureau of Parks and Lands
RFP# 202603055
Popham Peninsula Climate Resilience Planning
PART I INTRODUCTION
A. Purpose and Background
The Department of Agriculture, Conservation and Forestry (DACF) seeks professional services to provide professional coastal planning and stakeholder consultation services to develop a comprehensive resilience plan for the Popham peninsula in Phippsburg, Maine, as defined in this Request for Proposals (RFP) document. This document provides instructions for submitting proposals, the procedure and criteria by which the awarded Bidder will be selected, and the contractual terms which will govern the relationship between the State of Maine (State) and the awarded Bidder.
Hiring professional and consultation services to provide planning and to develop a comprehensive resilience plan for the Popham peninsula will further the Department’s commitment to effective, science-based resource management, land use planning, and conservation. Previous research, attached as Appendix G: NOAA Project – Background Information for bidders’ reference, provides a baseline understanding of key natural resource features and dominant coastal processes
DACF has a wide range of duties, including promoting and advancing Maine's agricultural resources, protecting and enhancing forestland, managing more than 700,000 acres of state parks and public lands, and administering numerous science-based programs focused on resource management, sound land use planning, and conservation. It also strengthens the base of scientific research and information for effective decision-making.
The Popham peninsula in Phippsburg, Maine includes Popham Beach State Park and Fort Popham, two of the BPL’s most popular recreational and cultural attractions. The peninsula also includes beachfront summer homes, the Morse River tidal estuary, and Route 209, which crosses an expanse of salt marsh adjacent to Atkins Bay. Collectively, these natural and cultural resources are highly vulnerable to sea level rise and coastal storms. This project will engage a planning consultant to work with relevant stakeholders to develop a long-term coastal resilience plan for the Popham Peninsula.
B. General Provisions
1. From the time the RFP is issued until award notification is made, all contact with the State regarding the RFP must be made through the RFP Coordinator. No other person/ State employee is empowered to make binding statements regarding the RFP. Violation of this provision may lead to disqualification from the bidding process, at the State’s discretion.
2. Issuance of the RFP does not commit the Department to issue an award or to pay expenses incurred by a Bidder in the preparation of a response to the RFP. This includes attendance at personal interviews or other meetings and software or system demonstrations, where applicable.
3. All proposals must adhere to the instructions and format requirements outlined in the RFP and all written supplements and amendments (such as the Summary of Questions and Answers), issued by the Department. Proposals must follow the format and respond to all questions and instructions specified below in the “Proposal Submission Requirements” section of the RFP.
4. Bidders will take careful note that in evaluating a proposal submitted in response to the RFP, the Department will consider materials provided in the proposal, information obtained through interviews/presentations (if any), and internal Departmental information of previous contract history with the Bidder (if any). The Department also reserves the right to consider other reliable references and publicly available information in evaluating a Bidder’s experience and capabilities.
5. The proposal must be signed by a person authorized to legally bind the Bidder and must contain a statement that the proposal and the pricing contained therein will remain valid and binding for a period of 180 days from the date and time of the bid opening.
6. The RFP and the awarded Bidder’s proposal, including all appendices or attachments, will be the basis for the final contract, as determined by the Department.
7. Following announcement of an award decision, all submissions in response to this RFP will be public records, available for public inspection pursuant to the State of Maine Freedom of Access Act (FOAA) (1 M.R.S. § 401 et seq.). State contracts and information related to contracts, including bid submissions, are generally public records per FOAA.
8. In the event that a Bidder believes any information that it submits in response to this RFP is confidential, it must mark that information accordingly and include a citation to legal authority in support of the Bidder’s claim of confidentiality. In the event that the Department receives a FOAA request that includes submissions marked as confidential, the Department shall evaluate the information and any legal authority from the Bidder to determine whether the information is an exception to FOAA’s definition of public record. If the Department determines to release information that a Bidder has marked confidential, it shall provide advance notice to the Bidder to allow for them to seek legal relief.
9. The Department, at its sole discretion, reserves the right to recognize and waive minor informalities and irregularities found in proposals received in response to the RFP.
10. If awarded a contract resulting from this RFP, vendors shall be required to disclose, in writing and in accordance with applicable Maine law, any actual or potential conflicts of interest. Such disclosure must include any financial, professional, or personal relationships that could give rise to a conflict of interest or the appearance of a conflict of interest. Failure to disclose a known conflict or appearance of conflict may result in disqualification, contract termination, or other remedies as provided by law.
11. All applicable laws, whether or not herein contained, are included by this reference. It is the Bidder’s responsibility to determine the applicability and requirements of any such laws and to abide by them.
C. Contract Term
The Department is seeking cost-efficient proposals to provide services, as defined in this RFP, for the anticipated contract period defined in the table below. The dates below are estimated and may be adjusted, as necessary, in order to comply with all procedural requirements associated with the RFP and the contracting process. The actual contract start date will be established by a completed and approved contract.
Contract Renewal: Following the initial term of the contract, the Department may opt to renew the contract for one (1) renewal period, as shown in the table below, and subject to continued availability of funding and satisfactory performance.
The term of the anticipated contract, resulting from the RFP, is defined as follows:
| Period |
| Start Date |
| End Date |
| Initial Period of Performance |
| August 1, 2026 |
| June 30, 2027 |
| Renewal Period #1 |
| July 1, 2027 |
| June 30, 2028 |
D. Number of Awards
The Department anticipates making one (1) award as a result of this RFP process. Subcontracts will be allowed, subject to approval by BPL.
PART II SCOPE OF SERVICES TO BE PROVIDED
Project Objective: Develop a comprehensive Coastal Resilience Plan for the Popham peninsula, including Popham Beach State Park and Fort Popham State Historic Site, to address current and future challenges posed by coastal erosion, rising sea levels, storm surges, and other climate-related impacts. The plan will recommend sustainable strategies to protect natural ecosystems, infrastructure, and local communities, while enhancing the site’s resilience to climate change. Work will build on the assessments previously completed as part of Changing Shorelines: Adaptation Planning for Maine’s Coastal State Parks.
This project is a component (Task 2.4b, in part) of the State of Maine’s multi-agency grant from the National Oceanographic and Atmospheric Administration entitled, Resilient Maine: Local Adaptation and Resilience Actions at a Coastwide Scale – See Appendix G.
Scope of Work Overview:
This scope of work outlines the key tasks, deliverables, and timelines for completing the Coastal Resilience Plan for the Popham Peninsula. This plan will be based on scientific assessments, agency and stakeholder input, and best practices for coastal management.
1. Project Initiation & Kick-Off
· Objective: Establish project parameters, engage stakeholders, and gather initial data.
· Tasks:
· Conduct a project kick-off meeting with relevant state and federal agency staff and relevant local stakeholders (e.g., Town of Phippsburg, Small Point Association, Bates/Morse Mountain representatives, Popham Beach Boat Owners Association).
· Review project goals, agency roles, priorities, expected outcomes, and time frame.
· Provide a high-level review of existing reports, studies, and data related to Popham Beach.
· Deliverables:
· Project charter
· Initial stakeholder meeting notes
· Data inventory
2. Coastal Vulnerability Assessment
· Objective: Assess current and future vulnerabilities on the Popham Peninsula due to climate change, sea level rise, and storm surges.
· Tasks:
· Analyze historical and recent climate data, sea level rise projections, and weather patterns for the region.
· Assess the current and future potential status of coastal erosion, natural beach nourishment, geomorphic cycling of the Morse and Kennebec Rivers, and the effectiveness of ongoing shoreline erosion mitigation efforts (e.g., Christmas tree restoration efforts along Popham Beach State Park, private landowner efforts along Hunnewell Beach and Riverside Beach).
· Determine the vulnerability of built infrastructure, including the two state park bath houses, Popham Beach parking lot, the Fort Popham State Historic Site, and Route 209 (which serves as a critical evacuation route).
· Consider impacts on adjacent private properties.
· Review the Maine Geologic Survey’s shoreline change analysis using aerial imagery, historical data, and GIS tools.
· Deliverables:
· Updated Coastal Vulnerability Report
· Maps of Vulnerable Areas and Projected Dune/Beach Loss (GIS)
· Vulnerability Summary Table
3. Recreational & Ecological Inventory
· Objective: Identify and assess the key ecological and recreational assets of Popham Beach.
· Tasks:
· Document/update significant habitats, species, and ecosystems, such as sand dunes, salt marshes, tidal flats, and the rare pitch pine/dune system. (Note, much of this ecological information exists from a prior NOAA Project of Special Merit: https://digitalmaine.com/geo_docs/7/).
· Identify areas particularly critical to wildlife, such as bird nesting sites, tidal marshes, and fish passage.
· Evaluate the condition of these ecosystems, their resilience to environmental stressors, and their vulnerabilities to climate change.
· Document potential impacts to groundwater aquifers and drinking water supplies.
· Document potential impacts to recreation (beach access and use).
· Deliverables:
· Ecological Inventory Report
· Ecological Sensitivity and Mapping
· Recreational Sensitivity and Mapping
· Considerations for Protection Measures
4. Stakeholder Engagement & Public Outreach
· Objective: Engage the local community, stakeholders, and the public to ensure the plan reflects community values and needs.
· Tasks:
· Coordinate with Bureau of Parks and Lands staff to host up to three public workshops to gather input on coastal resilience needs, concerns, and management strategies. Include local government officials (e.g., select board, local legislators), businesses, conservation groups, adjacent landowners, and residents.
· Share information gleaned through project inventory and vulnerability assessments.
· Deliverables:
· Stakeholder Input Summary
· Public Outreach Materials (e.g., possible surveys associated with the workshops, presentation decks)
· Summary of Key Issues and Community Preferences
5. Identification of Resilience Strategies
· Objective: Develop and evaluate strategies to enhance coastal resilience, protect vulnerable areas, and improve public safety.
· Tasks:
· Review a wide range of resilience strategies (e.g., beach nourishment/nearshore sediment placement, dune restoration, seawalls, living shorelines, green infrastructure, managed retreat).
· Conduct cost-benefit analysis of various strategies, considering environmental impact, feasibility, and community preferences.
· Identify funding sources and opportunities for collaboration (e.g., grants, local partnerships).
· Deliverables:
· Resilience Strategy Options Report
· Evaluation Matrix for Strategies
· Funding & Partnership Recommendations
6. Development of Model Ordinance language
· Objective: Develop model ordinance language that reflects coastal resilience needs.
· Tasks:
· Review existing ordinances for Phippsburg and other coastal Maine communities.
· Review any ‘state of the art’ coastal resilience ordinances from around the country.
· Develop model ordinance language.
· Consult with the Town of Phippsburg, Maine Municipal Association, and others regarding the model ordinance and potential implementation.
· Deliverable:
· Model ordinance, scaled for Maine purposes, to ensure and promote coastal resilience
7. Plan Development & Draft Report
· Objective: Compile a comprehensive Coastal Resilience Plan.
· Tasks:
· Work with state agencies to develop a detailed action plan with short-term and long-term goals, a timeline, and resource allocation.
· Outline priority resilience measures, monitoring frameworks, and adaptive management strategies.
· Ensure the plan integrates best practices from similar coastal resilience projects.
· Deliverables:
· Draft Coastal Resilience Plan (including Executive Summary, Action Plan, Monitoring Framework)
· Develop actionable recommendations for immediate implementation as well as recommendations for long-term goals.
8. Final Report and Presentation
· Objective: Deliver and present the final Coastal Resilience Plan to stakeholders.
· Tasks:
· Review and refine the plan based on feedback from selected stakeholders.
· Present the final plan to the local community, government officials, and other stakeholders.
· Submit the final report to the relevant agencies or authorities.
· Building on experience in this project, provide guidance on a replicable process for inter-agency collaboration.
· Deliverables:
· Final Coastal Resilience Plan Document (PDF/Print)
· Final Presentation Materials
· Executive Summary for Public Distribution
9. Implementation Support & Monitoring
· Objective: Provide guidance on implementing recommended actions and establish a monitoring framework.
· Tasks:
· Provide technical assistance for the early implementation of selected resilience measures.
· Establish a monitoring program to track progress and adapt the plan as conditions change.
· Support the formation of a governance body or partnership to oversee the resilience efforts.
· Deliverables:
· Monitoring and evaluation framework
· Initial support materials for implementation
· Governance and oversight recommendations Timeline:
The estimated timeline for the completion of the Coastal Resilience Plan for the Popham Peninsula is 12–18 months, broken down into estimated phases as follows:
1. Project Initiation – 1 month
2. Coastal Vulnerability Assessment – 3 months
3. Recreational and Ecological Inventory – 3 months
4. Stakeholder Engagement & Public Outreach – ongoing
5. Resilience Strategy Development – 3 months
6. Development of Model Ordinances – 3 months
7. Plan Development & Draft Report – 4 months
8. Final Report and Presentation – 2 months
9. Implementation Support & Monitoring – Ongoing
PART III KEY RFP EVENTS
A. Vendor Self Service System (VSS)
The Office of State Procurement Services Vendor Self Service System website is found at the link below: https://www.maine.gov/dafs/bbm/procurementservices/vendors/vendor-self-service-system A copy of the RFP and all associated documents will be published in VSS.
Only documents published in VSS will be considered binding.
Any interested party may view open solicitations in VSS using the Public Access feature.
Vendors must have an active User ID and password in VSS to submit questions and respond to solicitations, including this RFP.
Vendor registration instructions and User Guide may be found at the link above, which include steps for searching for an existing account/User ID, or registering for a new account/User ID.
Vendors interested in responding to a solicitation are encouraged to obtain a User ID and password for VSS as soon as possible.
Vendors must have an active Vendor Code (VC or VS) to contract with the department.
B. Bidders’ Conference
The Department will sponsor a Bidders’ Conference concerning the RFP beginning at the date, time and location shown on the RFP cover page. The purpose of the Bidders’ Conference is to answer and/or field questions, clarify for potential Bidders any aspect of the RFP requirements that may be necessary and provide supplemental information to assist potential Bidders in submitting responses to the RFP. Although attendance at the Bidders’ Conference is not mandatory, it is strongly encouraged that interested Bidders attend.
C. Questions
1. General Instructions: It is the responsibility of all Bidders and other interested parties to examine the entire RFP and to seek clarification, in writing, if they do not understand any information or instructions.
a. Questions must be submitted in VSS as soon as possible but no later than the date and time published in VSS.
b. Questions should be clearly stated and reference the applicable section and/or page number of the RFP.
c. The Department assumes no liability for assuring accurate/complete/on time transmission and receipt.
2. Question & Answer Summary: Responses to all questions will be compiled in writing and published in VSS no later than seven (7) calendar days prior to the Proposal Submission Deadline. It is the responsibility of all interested parties to go to VSS to obtain a copy of the Question & Answer Summary. Only those answers issued in writing in VSS will be considered binding.
D. Amendments
All amendments released in regard to the RFP will be published in VSS. It is the responsibility of all interested parties to go to VSS to obtain amendments. Only those amendments published in VSS are considered binding.
E. Proposal Submission
1. Proposals Due
a. Proposal submissions must be received no later than the Proposal Submission Deadline (closing date) published in VSS.
b. Any proposal submissions or any additional or revised proposal files received after the Proposal Submission Deadline will be rejected without exception.
2. Delivery Instructions
a. Proposal submissions must be submitted to the Office of State Procurement Services via VSS.
b. Only proposal submissions received via VSS will be considered. The Department assumes no liability for assuring accurate/complete receipt.
c. Submissions containing links to file sharing sites or online file repositories will not be accepted as submissions. Only proposal submissions that have the actual requested files attached will be accepted.
d. Encrypted submissions received which require opening attachments and logging into a proprietary system will not be accepted. Bidders should work with their Information Technology team to ensure that the proposal submission will not be encrypted due to any security settings.
e. File size limits are 15MB per file. Bidders may separate their submissions into multiple files, as necessary, due to file size concerns.
3. Submission Format:
a. Bidders must submit multiple files, with each file named and containing the required information as defined below.
File 1 [Bidder’s Name] – Preliminary Information PDF format preferred, and must include:
· Appendix A (Proposal Cover Page)
· Appendix B (Responsible Bidder Certification)
File 2 [Bidder’s Name] – Organization Qualifications and Experience PDF format preferred, and must include:
· Appendix C (Organization Qualifications and Experience Form)
· Appendix D (Subcontractors Form)
· And all required information and attachments stated in PART IV, Section II.
File 3 [Bidder’s Name] – Proposed Services PDF format preferred, and must include:
· Appendix E (Proposed Services Form)
· And all required information and attachments stated in PART IV, Section III.
File 4 [Bidder’s Name] – Cost Proposal Excel format preferred, and must include:
· Appendix F (Cost Proposal Form)
PART IV PROPOSAL SUBMISSION REQUIREMENTS
This section contains instructions for Bidders to use in preparing their proposals. The Department seeks detailed yet succinct responses that demonstrate the Bidder’s qualifications, experience, and ability to perform the requirements specified throughout the RFP.
Bidders’ proposals must follow the outline used below, including the numbering, section, and sub-section headings. Failure to use the outline specified in PART IV, or failure to respond to all questions and instructions throughout the RFP, may result in the proposal being disqualified as non-responsive or receiving a reduced score. The Department, and its evaluation team, has sole discretion to determine whether a variance from the RFP specifications will result either in disqualification or reduction in scoring of a proposal. Rephrasing of the content provided in the RFP will, at best, be considered minimally responsive.
Bidders are not to provide additional attachments beyond those specified in the RFP for the purpose of extending their response. Additional materials not requested will not be considered part of the proposal and will not be evaluated. Bidders must include any forms provided in the submission package or reproduce those forms as closely as possible. All information must be presented in the same order and format as described in the RFP.
Proposal Format and Contents
Section I Preliminary Information (File #1)
1. Proposal Cover Page Bidders must complete Appendix A (Proposal Cover Page). It is critical that the cover page show the specific information requested, including Bidder address(es) and other details listed. The Proposal Cover Page must be dated and signed by a person authorized to enter into contracts on behalf of the Bidder.
2. Responsible Bidder Certification Bidders must complete Appendix B (Responsible Bidder Certification). The Responsible Bidder Certification must be dated and signed by a person authorized to enter into contracts on behalf of the Bidder.
Section II Organization Qualifications and Experience (File #2)
1. Overview of the Organization Bidders must complete Appendix C (Qualifications and Experience Form) describing their qualifications and skills to provide the requested services in the RFP. Bidders must include three (3) examples of projects which demonstrate their experience and expertise in performing these services, as well as highlighting the Bidder’s stated qualifications and skills.
2. Subcontractors Bidders must complete Appendix D (Subcontractors Form) to provide a list that specifies the name, address, phone number, contact person, and a brief description of organizational capacity and qualifications for any subcontractors to be used. If no subcontractors will be used, indicate as such on the form.
3. Organizational Chart Bidders must provide an organizational chart. The organizational chart must include the project being proposed. Each position must be identified by position title and corresponding to the personnel job descriptions.
4. Litigation Bidders must attach a list of all current litigation in which the Bidder is named and a list of all closed cases that have closed within the past five (5) years in which the Bidder paid the claimant either as part of a settlement or by decree. For each, list the entity bringing suit, the complaint, the accusation, amount, and outcome.
5. Financial Viability Bidders must provide the following information for each of the past three (3) tax years:
a. Balance Sheets
b. Income (Profit/Loss) Statements
6. Licensure/Certification Bidders may provide documentation of any applicable licensure/certification or specific credentials that are related to providing the proposed services of the RFP.
7. Certificate of Insurance Bidders must provide a certificate of insurance on a standard ACORD form (or the equivalent) evidencing the Bidder’s general liability, professional liability and any other relevant liability insurance policies that might be associated with the proposed services.
Section III Proposed Services (File #3)
1. Services to be Provided Bidders must complete Appendix E (Proposed Services Form) to discuss the Scope of Services referenced above in Part II of the RFP and what the Bidder will offer, including a description of the methods and resources the Bidder will use and how each task involved will be accomplished. Bidders must also describe how the expectations and/or desired outcomes as a result of these services will be achieved. If subcontractors are involved, Bidders must clearly identify the work each will perform.
2. Implementation - Work Plan Bidders must provide a realistic work plan for the implementation of the program through the first contract period. The work plan must be displayed in a timeline chart, and concisely describe each program development and implementation task, the month it will be carried out, and the person or position responsible for each task. If applicable, Bidders must identify all tasks to be delegated to subcontractors.
Section IV Cost Proposal (File #4)
1. Cost Proposal Form Bidders must complete Appendix F (Cost Proposal Form).
A detailed budget will be prepared based on the final scope of services, estimated effort, and required resources. The budget will include costs for data collection, community outreach, professional expertise, report preparation, and implementation support.
2. General Instructions
a. The cost proposal must include the costs necessary for the Bidder to fully comply with the contract terms, conditions, and RFP requirements.
b. No costs related to the preparation of the proposal for the RFP, or to the negotiation of the contract with the Department, may be included in the proposal. Only costs to be incurred after the contract effective date that are specifically related to the implementation or operation of contracted services may be included.
PART V PROPOSAL EVALUATION AND SELECTION
Evaluation of the submitted proposals will be accomplished as follows:
A. Evaluation Process – General Information
1. An evaluation team, composed of qualified reviewers, will judge the merits of the proposals received in accordance with the criteria defined in the RFP.
2. Officials responsible for making decisions on the award selection will ensure that the selection process accords equal opportunity and appropriate consideration to all who are capable of meeting the specifications. The goals of the evaluation process are to ensure fairness and objectivity in review of the proposals and to ensure that the contract is awarded to the Bidder whose proposal provides the best value to the State of Maine.
3. The Department reserves the right to communicate and/or schedule interviews/presentations with Bidders, if needed, to obtain clarification of information contained in the proposals received. The Department may revise the scores assigned in the initial evaluation to reflect those communications and/or interviews/presentations.
4. Changes to proposals, including updating or adding information, will not be permitted during any portion of the evaluation process. Therefore, Bidders must submit proposals that present their rates and other requested information as clearly and completely as possible.
B. Scoring Weights and Process
1. Scoring Weights: Proposal scores will be based on a 100-point scale and will measure the degree to which each proposal meets the following criteria. The proposal materials that will be evaluated under each section below are identified in Part IV of the RFP.
| Section I. |
| Preliminary Information |
| (No Points) |
| Section II. |
| Organization Qualifications and Experience |
| 35 |
| Section III. |
| Proposed Services |
| 40 |
| Section IV. |
| Cost Proposal |
| 25 |
| Total |
| 100 |
2. Scoring Process: For proposals that demonstrate meeting the eligibility requirements in Section I, if applicable, the evaluation team will use a consensus approach to evaluate and score Sections II & III above. Members of the evaluation team will not score those sections individually but, instead, will arrive at a consensus as to assignment of points for each of those sections. Section IV, the Cost Proposal, will be scored as described below.
3. Scoring the Cost Proposal: The total cost proposed for conducting all the functions specified in the RFP will be assigned a score according to a mathematical formula. The lowest bid will be awarded 25 points. Proposals with higher bid values will be awarded proportionately fewer points calculated in comparison with the lowest bid.
The scoring formula is:
(Lowest submitted cost proposal / Cost of proposal being scored) x 25 = pro-rated score
No Best and Final Offers: The State of Maine will not seek or accept a best and final offer (BAFO) from any Bidder in this procurement process. All Bidders are expected to provide their best value pricing with the submission of their proposal.
C. Negotiations
1. The Department reserves the right to negotiate with the awarded Bidder(s) to finalize a contract. Such negotiations may not significantly vary the content, nature, or requirements of the proposal or the Department’s Request for Proposal to an extent that may affect the price of goods or services requested.
2. The Department reserves the right to terminate contract negotiations with an awarded Bidder who submits a proposed contract significantly different from the proposal they submitted in response to the advertised RFP.
3. In the event that an acceptable contract cannot be negotiated with the highest ranked Bidder, the Department may withdraw its award and negotiate with the next-highest ranked Bidder, and so on, until an acceptable contract has been finalized. Alternatively, the Department may cancel the RFP, at its sole discretion.
D. Selection and Award
1. The final decision regarding the award of the contract will be made by representatives of the Department subject to approval by the State Procurement Review Committee.
2. Notification of conditional award selection or non-selection will be made in writing by the Department.
3. Issuance of the RFP in no way constitutes a commitment by the State of Maine to award a contract, to pay costs incurred in the preparation of a response to the RFP, or to pay costs incurred in procuring or contracting for services, supplies, physical space, personnel or any other costs incurred by the Bidder.
4. The Department reserves the right to reject any and all proposals or to make multiple awards.
E. Appeal of Contract Awards
Any person aggrieved by the award decision that results from the RFP may appeal the decision to the Director of the Bureau of General Services in the manner prescribed in 5 M.R.S.A. § 1825-E and 18-554 Code of Maine Rules Chapter 120. The appeal must be in writing and filed with the Director of the Bureau of General Services, 9 State House Station, Augusta, Maine, 04333-0009 within fifteen (15) calendar days of receipt of notification of conditional contract award.
PART VI CONTRACT ADMINISTRATION AND CONDITIONS
A. Contract Document
1. The awarded Bidder will be required to execute a State of Maine Service Contract with appropriate riders as determined by the issuing department.
All exceptions will be negotiated between the awarded Bidder(s) and the State. The State will not accept any proposed exceptions as part of this RFP process. The State is not obligated to accept, negotiate, or compromise of any proposed exceptions.
The complete set of standard State of Maine Service Contract documents, along with other forms and contract documents commonly used by the State, may be found on the Office of State Procurement Services’ website at the following link: Office of State Procurement Services Forms Page
2. Allocation of funds is final upon successful negotiation and execution of the contract, subject to the review and approval of the State Procurement Review Committee. Contracts are not considered fully executed and valid until approved by the State Procurement Review Committee and funds are encumbered. No contract will be approved based on an RFP which has an effective date less than fourteen (14) calendar days after award notification to Bidders. (Referenced in the regulations of the Department of Administrative and Financial Services, Chapter 110, § 3(B)(i).)
This provision means that a contract cannot be effective until at least fourteen (14) calendar days after award notification.
3. The State recognizes that the actual contract effective date depends upon completion of the RFP process, date of formal award notification, length of contract negotiation, and preparation and approval by the State Procurement Review Committee. Any appeals to the Department’s award decision(s) may further postpone the actual contract effective date, depending upon the outcome. The contract effective date listed in the RFP may need to be adjusted, if necessary, to comply with mandated requirements.
4. In providing services and performing under the contract, the awarded Bidder must act as an independent contractor and not as an agent of the State of Maine.
B. Standard State Contract Provisions
1. Contract Administration Following the award, a Contract Administrator from the Department will be appointed to assist with the development and administration of the contract and to act as administrator during the entire contract period. Department staff will be available after the award to consult with the awarded Bidder in the finalization of the contract.
2. Payments and Other Provisions The State anticipates paying the awarded Bidder on the basis of net 30 payment terms, upon the receipt of an accurate and acceptable invoice. An invoice will be considered accurate and acceptable if it contains a reference to the State of Maine contract number, contains correct pricing information relative to the contract, and provides any required supporting documents, as applicable, and any other specific and agreed-upon requirements listed within the contract that results from the RFP.
PART VII LIST OF RFP APPENDICES AND RELATED DOCUMENTS
Appendix A – Proposal Cover Page
Appendix B – Responsible Bidder Certification
Appendix C – Qualifications and Experience Form
Appendix D – Subcontractors Form
Appendix E – Proposed Services Form
Appendix F – Cost Proposal Form
Appendix G – NOAA Project – Background Information
APPENDIX A
Department of Agriculture, Conservation and Forestry Bureau of Parks and Lands
PROPOSAL COVER PAGE
RFP# 202603055
Bidder Name:
Chief Executive - Name/Title:
Tel:
E-mail:
Headquarters Street Address:
Headquarters City/State/Zip:
(Provide information requested below if different from above)
Lead Point of Contact for Proposal - Name/Title:
Tel:
E-mail:
Headquarters Street Address:
Headquarters City/State/Zip:
· This proposal and the pricing structure contained herein will remain firm for a period of 180 days from the date and time of the bid opening.
· No personnel currently employed by the Department participated, either directly or indirectly, in any activities relating to the preparation of the Bidder’s proposal.
· No attempt has been made, or will be made, by the Bidder to induce any other person or firm to submit or not to submit a proposal.
· The above-named organization is the legal entity entering into the resulting contract with the Department if they are awarded the contract.
· The undersigned is authorized to enter contractual obligations on behalf of the above-named organization.
To the best of my knowledge, all information provided in the enclosed proposal, both programmatic and financial, is complete and accurate at the time of submission.
Name (Print):
Title:
Authorized Signature:
Date:
APPENDIX B
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands
RESPONSIBLE BIDDER CERTIFICATION
RFP# 202603055
Bidder Name:
By signing this document, I certify to the best of my knowledge and belief that the aforementioned organization, its principals and any subcontractors named in this proposal:
a. Are not presently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from bidding or working on contracts issued by any governmental agency.
b. Have not within three years of submitting the proposal for this contract been convicted of or had a civil judgment rendered against them for:
i. Fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a federal, state, or local government transaction or contract.
ii. Violating Federal or State antitrust statutes or committing embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property.
c. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) with commission of any of the offenses enumerated in paragraph (b) of this certification.
d. Have not within a three (3) year period preceding this proposal had one or more federal, state, or local government transactions terminated for cause or default.
e. Have not entered into a prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same materials, supplies, equipment, or services and this proposal is in all respects fair and without collusion or fraud. The above-mentioned entities understand and agree that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards.
f. Is not a foreign adversary business entity (https://www.maine.gov/oit/prohibited-technologies).
g. Is not on the list of prohibited companies (https://www.maine.gov/oit/prohibited-technologies) or does not obtain or purchase any information or communications technology or services included on the list of prohibited information and communications technology and services https://www.maine.gov/oit/prohibited-technologies (Title 5 §2030-B).
Name (Print):
Title:
Authorized Signature:
Date:
APPENDIX C
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands QUALIFICATIONS and EXPERIENCE FORM
RFP# 202603055
Bidder Name:
Present a brief statement of qualifications. Describe the history of the Bidder’s organization, especially regarding skills pertinent to the specific work required by the RFP and any special or unique characteristics of the organization which would make it especially qualified to perform the required work activities. The Bidder may expand this form and use additional pages to provide this information.
Provide a description of projects the Bidder performed which occurred within the past five (5) years and reflect experience and expertise needed in performing the functions described in Part II – Scope of Services to be Provided of the RFP. The Bidder may expand this form and use additional pages to provide this information.
Project One
Client Name:
Client Contact Person:
Telephone:
E-Mail:
Project Start/End Dates:
Brief Description of Project
Project Two
Client Name:
Client Contact Person:
Telephone:
E-Mail:
Project Start/End Dates:
Brief Description of Project
Project Three
Client Name:
Client Contact Person:
Telephone:
E-Mail:
Project Start/End Dates:
Brief Description of Project
APPENDIX D
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands
SUBCONTRACTORS FORM
RFP# 202603055
Bidder Name:
Subcontractors If subcontractors are to be used, Bidders must use the tables below to describe the name, address, phone number, contact person, and a brief description of the subcontractors’ organizational capacity and qualifications.
Subcontractor 1
Subcontractor Name:
Contact Person:
Telephone:
E-Mail:
Brief Description of Anticipated Role and Qualifications
Subcontractor 2
Subcontractor Name:
Contact Person:
Telephone:
E-Mail:
Brief Description of Anticipated Role and Qualifications
Subcontractor 3
Subcontractor Name:
Contact Person:
Telephone:
E-Mail:
Brief Description of Anticipated Role and Qualifications
APPENDIX E
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands
PROPOSED SERVICES FORM
RFP# 202603055
Bidder Name:
Services to be Provided Bidders must discuss the Scope of Services referenced in Part II of the RFP and what the Bidder will offer, including a description of the methods and resources the Bidder will use and how each task involved will be accomplished. Bidders must also describe how the expectations and/or desired outcomes as a result of these services will be achieved. If subcontractors are involved, Bidders must clearly identify the work each will perform.
APPENDIX F
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands
COST PROPOSAL FORM
RFP# 202603055
Bidder Name:
| Proposed Cost: |
| $ |
Special Instructions
Bidders must submit a cost proposal that covers the Initial Period of Performance and all Renewal Periods as defined in Part I of the RFP.
Bidders must submit a cost proposal that includes the costs necessary for the Bidder to fully comply with the contract terms, conditions, and RFP requirements. The proposed cost must include a detailed budget breakdown that includes everything required in this RFP for the full contract period. Hourly rates of all employees involved in the project must be specified.
APPENDIX G
Department of Agriculture, Conservation, and Forestry Bureau of Parks and Lands
NOAA PROJECT – BACKGROUND INFORMATION
RFP# 202603055
Popham Peninsula Climate Resilience Planning
Resilient Maine: Local Adaptation and Resilience Actions at a Coastwide Scale
SUMMARY
Maine’s vision is to become a national leader in climate resilience among rural states by the end of this decade. This will be accomplished by supporting the goals outlined in Maine Won’t Wait, the state’s award-winning climate action plan. This funding is focused on nature-based solutions, strengthening the resilience of Maine’s working waterfronts, and building enduring capacity to prepare for, and respond to, climate change impacts.
Specific activities include supporting rural and tribal communities in the development and implementation of climate adaptation strategies; expanding the availability and use of technical assistance tools and training focused on flood risk, saltwater intrusion, bluff stability, and living shorelines; updating the state’s regulatory framework to support climate resilience; conducting demonstration projects that incentivize regional collaboration and nature-based solutions; and strengthening the climate resilience of vulnerable public infrastructure and working waterfronts.
OVERALL GOALS
Tackling climate change, advancing clean energy, and improving climate resilience is a top priority for Governor Mills. Recent severe storms and flooding recently clearly demonstrated the urgent need to provide planning and implementation assistance to Maine communities. In December 2023 and January 2024, for instance, storms caused $90 million in damage to public infrastructure. Four lives were lost. With nearly 500 municipalities and tribal governments, many lack the capacity or expertise needed to adequately prepare. The approach outlined in this project plan will bolster community-led projects that reduce risk, build enduring capacity, and support helpful regulatory change.
Building Enduring Community Resiliency Lack of capacity, expertise, and funding are consistently cited by municipalities as reasons why they are unable to adequately address climate risks. To address this need, this project builds on existing activities that assist rural and tribal communities. Actions include increasing participation in the Community Resilience Partnership, which provides communities with climate technical assistance and funding, in 225 communities to date, and offering grants that help communities, particularly smaller communities, assess climate risk and implement projects. This portion of the project also provides engineering expertise for designing public green infrastructure projects, offers support for improvements made to at-risk infrastructure, and funds 20 to 30 subgrants for projects designed to make communities safer from extreme weather, sea level rise, inland and coastal flooding, severe heat, and other climate impacts.
Investing in Nature-Based Solutions To increase the ability of Maine communities to adapt to a changing climate, the state is expanding the availability of technical tools and technical assistance. The effort includes incentivizing resilient designs with an emphasis on nature-based solutions, and positive changes to the state’s land-use and permitting regulations. The development of “shore corps stewards” will provide trained individuals to help communities implement nature-based adaptation solutions.
Several nature-based demonstration projects will be conducted, including living shoreline projects, as well as regionally-significant coastal resilience projects on the Popham Peninsula in Southern Maine and in the West Branch of the Pleasant River in Downeast Maine.
Strengthening Working Waterfronts With 3,500 miles of tidal coastline, Maine is the fourth longest coast in the continental U.S. Most of the state’s population lives in the coastal zone, and the coast represents an important economic engine for the state. Project funding will support a full-time position that works with coastal municipalities and tribes to determine commercial fishing access needs; prepare Maine for working waterfront investments; and help municipalities and tribes acquire funds allocated to improve waterfront infrastructure for the public and commercial fisheries and aquaculture needs.
Additional activities include providing assistance to coastal communities and working waterfronts that need help addressing climate threats related to maintenance, protection, funding and financing, and engineering support. To increase the economic resiliency of working waterfronts, the project will support a needs assessment focused on how aggregated facilities or transportation could better serve small businesses. Another research focus area is how targeted investments to fund energy efficiency conversions or construction may improve resilience to climate-related shocks.
APPLICABLE COMPONENT OF OVERALL PRJOECT
2.4b: Implement a replicable process for inter-agency collaboration where multiple state-owned assets are at risk.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .