Addendum No. 001 Summary: RFP 2026007 - Juvenile Fish Monitoring Services

This addendum to RFP 2026007, issued by Northern Wasco County People's Utility District (NWCPUD) on October 26, 2026, provides clarifications and revisions to the original request for proposals for juvenile fish monitoring services at the North Fishway Hydroelectric Project. The addendum addresses critical contractual and operational questions submitted by potential bidders, including revisions to pricing appendices, prevailing wage applicability, expense reimbursement policies, staffing requirements, site access procedures, equipment responsibilities, permit acquisition, sampling schedules, reporting timelines, and debris management protocols. Key clarifications include confirmation that the prevailing wage requirement does not apply to fish monitoring and reporting work; direct expenses and materials shall be reimbursed at actual cost with no markup; project-specific fish sampling supplies may be invoiced separately as reimbursable expenses; and proposers must use the same annual rates for all three years when calculating the three-year not-to-exceed contract amount without including projected rate increases. The sampling period requires one person minimum on-site per week (Tuesday-Wednesday or Wednesday-Thursday), with continuous coverage not required but contractor availability within 30 minutes for debris removal; outside normal business hours (4:00 PM–6:00 AM), the contractor bears full responsibility for debris removal. Sample historical reports, data, and methodology documentation have been provided to clarify data collection procedures and reporting expectations.

Contractors are responsible for obtaining and maintaining the Scientific Collection Permit from the Washington Department of Fish and Wildlife, including annual collection report submission and permit fee payment, with reimbursement available through invoicing. All travel-related expenses, including mileage, lodging, meals, airfare, and vehicle costs, must be included in the proposed annual pricing and are not separately reimbursable. The contractor must provide all necessary tools, equipment, personal protective equipment, and chemical supplies (including MS-222 fish anesthetic), though NWCPUD provides rakes, brushes, garbage handling, and a fish measurement device, with some supplies potentially available on-site for discussion with the Chief Hydro Operator. USACE badging is required using a Real ID or passport, and overnight camping at the project site is prohibited. Weekly reports must be submitted within one week of sampling completion, and Fish Passage Operations and Maintenance meeting attendance is required only as requested by NWCPUD, typically only if sampling departures or anomalous results occur. Additional sampling events or unscheduled site visits beyond the static April–July sampling season will be compensated separately at the submitted labor rates with prior written authorization.

View the file

Other files

File Type Posted
APPENDIX 3 Rev1 Add1.pdf PDF
RFP No 2026007 Juvenile Fish Monitoring Services.pdf PDF
2025 Annual Report.pdf PDF
July 2025 Report.pdf PDF
Personal Service Contract Sample.pdf PDF
April 2025 Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 2026007 Addendum No.001

Addendum Number 001

RFP No. 2026007 – Juvenile Fish

Monitoring Services

Date: 10/26/26

Addendum Overview:

This addendum is issued to provide clarifications, revisions, and additions to the original RFP documents. Please review the following carefully and incorporate the changes into your RFP submission.

RFP No. 2026007

REVISIONS

1. Appendix 3 Proposal Form – Pricing and Fees (Page 14 or 16)

• Remove currently published “Appendix 3 – Pricing and Fees” remove in its entirety, and replace with “Exhibit 3 Rev1 Add1” Proposal Form – Pricing and Fees.

Response to RFIs/Questions

Question Number

Question

Response

1 Section 10(h) of the sample agreement states that prevailing wages apply to all services, and Appendix 3 of the RFP requests prevailing-wage billing rates. Does this requirement apply to the fish monitoring and reporting work? If so, which activities are subject to prevailing wages, and which wage classifications and schedules should we use? If not, can we enter N/A in the prevailing wage column of Appendix 3?

While the District includes prevailing wage provisions in its agreements, the fish monitoring, reporting, and related professional services requested under this RFP do not require prevailing wage classifications for purposes of completing Appendix 3. Proposers may enter "N/A" in the prevailing wage column.

2 Appendix 3 of the RFP states that direct expenses and materials are reimbursed at cost, but Exhibit B of the sample agreement allows a 10% markup. Which provision should we follow when preparing our pricing?

For purposes of this RFP, direct expenses and materials shall be reimbursed at actual cost with no markup.

Proposers should prepare their pricing in accordance with Appendix 3. To the extent there is any inconsistency between Appendix 3 and the sample agreement, Appendix 3 governs for proposal submission purposes under this solicitation.

3 Appendix 3 of the RFP states that consumables and small tools are included in labor rates. Does this include project-specific fish sampling supplies, such as nitrile gloves, fish anesthetics, fish handling supplies, and replacement nets, or can we bill these separately as reimbursable materials?

Project-specific fish sampling supplies and materials directly required for performance of the Services may be invoiced as reimbursable direct expenses. Routine general-use supplies and small tools that are part of the Contractor's normal operating overhead shall be included in the labor rates.

I think it would be helpful to provide a list of supplies… that will be covered by NWCPUD vs….

4 Section 6 of the RFP states that the three-year not-to-exceed contract amount is calculated by multiplying the proposed annual amount by three. It also allows annual rate adjustments of up to 3% or CPI-U, whichever is less, with NWCPUD approval. For the proposal, should we calculate the three-year total using the same annual rates for all three years, or should we include projected rate increases for 2028 and 2029?

Proposers shall use the same annual rates for all three years when calculating the three-year not-to-exceed contract amount. Do not include projected annual rate increases for 2028 or 2029 in the proposed pricing. Any future rate adjustments will be considered in accordance with the contract provisions and will require NWCPUD approval.

5 Staffing Requirements: The RFP specifies a consistent 24-hour sampling period each week.

What is the minimum staffing requirement, must personnel work in pairs for safety, and is continuous onsite coverage required for the full 24 hours? Are staggered shifts or remote monitoring between active sampling activities permitted?

One person is the minimum when on site; a pair is not required. Continuous onsite coverage is not required, although the contractor must be available to attend to debris buildup within approximately 30 mins. Contractor shall contact NWCPUD TDF staff during normal business hours (0600‐1600) and instruct staff to remove excessive debris during the sampling period to avoid harm to the smolt. Outside of normal business hours (1600‐0600) the Contractor shall be responsible for debris removal. The cameras can be used to check the debris buildup, which is heavier during the higher flows at the beginning of the sampling period, so more frequent checks are required.

6 Site Access and Safety: Are any USACE access approvals, security clearances, safety training, or site-specific certifications required before beginning work?

The contractor will only need to get badged by USACE for the sampling period. The contractor will need a Real ID or passport for the badging and access processes.

7 Overnight Accommodations: Is there a designated area at the District or USACE facility where the Contractor may park a travel trailer or access overnight accommodations and restroom facilities during sampling events?

No, we cannot provide overnight accommodation. It is not permissible to camp on the project site.

No restrooms available?

8 Historical Reports, Data, and Methodology:

Could the District provide a recent weekly sampling report and annual report, along with historical data on typical fish counts, species composition, and mortality rates? These materials would help clarify the established sampling methodology, data collection procedures, analysis, and reporting expectations.

Yes, see attached sample reports

9 Equipment and Supplies: Beyond access to the Wisenet-WaveSync camera system, which sampling equipment, fish-handling supplies, chemicals (including MS-222), and personal protective equipment will the District provide, and which must the Contractor supply?

The contractor is responsible for ascertaining and acquiring the tools, equipment, ppe, MS-222, etc.

necessary to complete the job. There may be some supplies on site, and the contractor can discuss these items with NWCPUD's Chief Hydro Operator. Remaining supply expenses can be invoiced to NWCPUD. The

NWCPUD provides rakes and brushes and garbage handling for the debris that the contractor needs to manage. NWCPUD also provides a fish measurement device. Should we say that extra supplies must remain on site? Does the NWCPUD Chief Hydro Operator control or monitor the supplies?

10 Scientific Collection Permit: Please clarify whether the District will maintain the Scientific Collection Permit and authorize the Contractor's qualified personnel under it, or whether the Contractor is expected to obtain and maintain the permit on the District's behalf. Additionally, who is responsible for submitting the annual collection report required for permit renewal and paying the associated permit fee?

The contractor is expected to obtain and maintain the collection permit.

The contractor is responsible for submitting the annual collection report and applying for the permit and paying the fee but can invoice for reimbursement.

11 Sampling Schedule and Interruptions: Does the District have a preferred sampling weekday, and how should sampling be handled if high flows, adverse weather, equipment issues, or access

Tues – Weds or Wed-Thurs each week are acceptable.

High flows do not affect the sampling facility or process.

If there is a situational scheduling issue, the 24-hour period can be moved with advanced coordination.

restrictions prevent completion of a 24-hour event? Would makeup sampling be required?

Access issues can be resolved via USACE and/or calling NWCPUD's Chief Hydro Operator.

12 Reporting and Agency Coordination: What is the expected turnaround time for weekly reports, and how frequently is the Contractor expected to attend Fish Passage Operations and Maintenance (FPOM) meetings or participate in additional agency coordination?

The reports should be issued within a week of the sampling.

The FPOM meeting or other agency coordination will be as requested by the NWCPUD and may not occur every year. Typically, this would only be needed if there are departures in normal sampling or anomalous results.

13 Travel and Reimbursable Expenses: The RFP requires transportation costs to be included in pricing while allowing direct expenses to be itemized and billed at cost. Please clarify whether mileage, lodging, and other travel-related expenses may be billed separately as reimbursable direct expenses or must be included in the proposed annual price.

Travel-related expenses, including mileage, lodging, meals, airfare, and vehicle costs, shall be included in the Proposer's annual pricing and are not separately reimbursable. Reimbursable direct expenses are limited to project-specific costs that receive prior written approval from the District, are necessary for performance of the work, supported by documentation, and billed at actual cost without markup.

14 Additional Services: If additional sampling events, extended monitoring periods, or unscheduled site visits are requested, would these be compensated separately under the proposed labor rates with prior written authorization?

The sampling season is static between April and July so there should not be additional sampling events.

Additional time will be compensated at the labor rates the applicant submits with prior authorization.

15 What is the ideal response time for clearing debris that becomes entrained in the fishway?

The collection tank should be checked every ~3 hours for debris buildup; the Wisenet-WaveSync camera system can be used to do this remotely. If there is significant buildup the debris needs to be removed from the collection tank within approximately 30 mins. Contractor shall contact NWCPUD TDF staff during normal business hours (0600‐1600) and instruct staff to remove excessive debris during the sampling period to avoid harm to the smolt. Outside of normal business hours (1600‐0600) the Contractor shall be responsible for debris removal.

16 When processing fish, is a census of all captured fish taken or is a sampling framework (e.g., systematic sampling) possible during the periods with the most fish?

The contractor needs to directly count, measure, and evaluate all salmonids and lamprey.

Non-salmonids only need to be counted.

17 What the take levels (i.e., how many fish they are handling) were for the previous 2-3 years?

NWCPUD is providing sample reports. Please refer to these reports for numbers.

18 Are there any previous reports that we could review?

Yes – see attached sample reports.

19 There is mention of printed datasheets in the RFP, if we were to develop a custom App and use digital measuring boards (Already owned by CFS) would that be a possibility?

The use of a custom application and digital measuring boards is not a requirement of this RFP and should not be included in the proposed scope or pricing. However, the District may be interested in exploring alternative data collection methods in the future.