APPENDIX 3 Rev1 Add1.pdf

PDF 118 KB Posted

Attached to
RFP #2026007 - Juvenile Fish Monitoring Services
Solicitation number
S-R33123-00018103
Issued by
Oregon

About this file

This is an Addendum No. 001 to a Request for Proposal (RFP) from Northern Wasco County People's Utility District (NWCPUD) for juvenile fish monitoring services at the North Fishway Hydroelectric Project in Klickitat County, Washington. The District seeks proposals for weekly monitoring of juvenile fish conditions following passage through the penstock intake screening structure, including species identification, injury and descaling documentation, length and condition data collection, fish anesthetization and return, data analysis, weekly summaries, annual reports, and attendance at Fish Passage Operation and Maintenance meetings. Services will be required during the April through July period each year, with one 24-hour sampling period per week. Proposals are due October 29, 2026 at 4:00 PM PST, with an optional preproposal conference scheduled for October 20, 2026 at 9:00 AM PST. The contract term runs three years from January 1, 2027 through December 31, 2029, with an option for one additional one-year renewal period by mutual written agreement. Award recommendation is anticipated on November 19, 2026, with contract execution on December 2, 2026.

Contractors must submit annual pricing rates with a not-to-exceed total for the three-year period, with all labor rates inclusive of wages, salaries, payroll taxes, insurance, employee benefits, small tools under $1,000, consumables, overhead, and profit. Direct expenses and materials are billed at cost with receipts required and no markup allowed. Initial rates remain firm for twelve months, after which adjustments may be requested subject to a cap of the lesser of the Consumer Price Index for All Urban Consumers annual increase or three percent. Contractors must acquire a Scientific Collection Permit from the Washington Department of Fish and Wildlife (estimated $117 annually) and meet all federal permitting requirements, with all associated costs included in the proposal. The District has no obligation to guarantee minimum work or compensation and reserves the right to adjust, suspend, or terminate services based on project needs, funding availability, or regulatory requirements. Evaluation criteria include proposal content (0-10 points), firm qualifications and experience (0-20 points), assigned staff experience and resumes (0-20 points), availability and commitment of resources (0-20 points), pricing competitiveness (0-20 points), exceptions to agreement/insurance/indemnification (0-10 points), and potential interviews (0-50 points) for a maximum of 150 points.

View the file

Other files

File Type Posted
RFP No 2026007 Juvenile Fish Monitoring Services.pdf PDF
2025 Annual Report.pdf PDF
July 2025 Report.pdf PDF
Personal Service Contract Sample.pdf PDF
RFP 2026007 Addendum No 001.pdf PDF
April 2025 Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Biological Services – Juvenile Fish Monitoring RFP No. 2026007 Northern WASCO PUD Addendum No. 001

REVISED APPENDIX 3 – ADDENDUM 001

PROPOSAL FORM – PRICING AND FEES

1. All pricing provided under this Appendix 3 shall constitute full compensation for all labor, supervision, materials, equipment, tools, mobilization, transportation, permits, overhead, profit, insurance, taxes, incidentals, and all other costs necessary to complete the Work in accordance with this Agreement unless specifically identified otherwise.

2. These rates are to be used for all invoices provided to the District, and work that is authorized to proceed on a T&M basis.

3. Contractor shall provide receipts for materials for them to be considered reimbursable:

a. Direct Expenses itemized and billed at cost.

b. All materials itemized and billed at cost.

4. The billing rates for labor shown below are inclusive of all wages and salaries, payroll taxes and insurance, employee benefits, small tools (initial value less than $1,000) and consumables, overhead, and profit.

Table 1: Labor Rates

Classification Standard Billable

Hourly Rate

Yearly Hours Yearly Cost

Table 2: Fees and Expenses at Cost. No Mark-up allowed and subject to verification.

Description QTY Units Unit Rate Total

File details come from the government source that posted it. Updated .