This is a Request for Proposal issued by the Orlando Utilities Commission for Electric Vehicle Charging Network Service Providers. OUC seeks one or more qualified suppliers to provide comprehensive EV charging network services for over 300 existing EV charging stations throughout Central Florida, with plans to expand to eight Re-Charge Mobility Hubs by 2030. The solicitation requires proposers to integrate OUC-owned charging stations into a network platform, configure user and administrative access, and provide implementation, training, ongoing support, and reporting capabilities. The pre-response conference is scheduled for December 15, 2026, with a non-mandatory attendance format. Questions and comments are due by December 18, 2026, and proposals must be submitted electronically through VendorLink by January 5, 2027, at 2:00 PM Eastern Time. The contract term is three years with an option to renew for up to two additional one-year terms at OUC's discretion. No bid bond or payment and performance bond is required.

Pricing must remain firm throughout the initial three-year contract period, with any renewal-term increases limited to the Consumer Price Index. The price schedule requires detailed breakdown of network subscription costs for one and three-year terms, user transaction fees, onboarding costs, site validation costs, and applicable discounts for bulk subscriptions, differentiated by charging equipment type (AC Level 2 and DCFC/Level 3). Minimum bidder qualifications are pass/fail requirements encompassing three years of EV charging network experience, OCPP compliance and version 1.6 or newer support, real-time monitoring and control capabilities, RFID authentication and roaming interoperability, comparable deployment experience, 24-hour customer support, PCI DSS compliance for payment processing, SOC 2 or equivalent cybersecurity certification, Florida public records data retention support, hardware-agnostic platform services, secure data access mechanisms, and 97 percent system uptime capability. Additional evaluation criteria include supplier experience and business viability, network platform capability, technical architecture and integration, operational reliability and maintenance, data management and analytics, customer support and user experience, security and compliance, and public records management. Proposers must complete comprehensive qualification forms, provide three project references with similar scope and complexity from the past five years, demonstrate financial stability through Dun & Bradstreet information and three years of financial reports, submit executed compliance forms including public entity crimes statements and dispute disclosures, and provide evidence of required insurance coverage including $2 million commercial general liability, $1 million commercial auto liability, and $5 million professional liability with two-year tail.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 2026 PR 9056

For

Electric Vehicle Charging Network Service Providers

Issue Date:

Pre-response Conference:

Pre-response Conference Date:

Questions/Comments Due Date:

Addendum Due Date (Tentative):

Proposal Due Date:

Bid Bond:

Payment & Performance Bond:

Wednesday, November 25, 2026 Not

Mandatory Attendance

Tuesday, December 15, 2026

Friday, December 18, 2026

Tuesday, December 22, 2026

Tuesday, January 5, 2027, by 2:00 PM ET

Not Required

Not Required

Direct all inquiries to Buyer of Record:

Dom P. Sotero, CPPO, CPPB

407-434-2909 dsotero@ouc.com mailto:dsotero@ouc.com

Orlando Utilities Commission RFP 2026 PR 9056 – Electric Vehicle Charging Network Service

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

Orlando Utilities Commission Orlando, Florida

RFP 2026 PR 9056 for Electric Vehicle Charging Network Service Providers

Table of Contents 1 Introduction

1.1 Scope of Work Summary

1.2 Pre-Response Conference

1.3 Term of Contract

1.4 Minimum Bidder Qualifications

1.5 Price and Costs

1.6 Terms and Conditions

1.7 Contract Sample

1.8 Proposal Evaluation Criteria

2 Bidder Requirements and Qualifications

2.1 Detailed Scope, Requirements, & Drawings

2.2 Bidder Information & Required Bidder Qualifications

2.2.1 Bidder Information

2.2.2 Required Bidder Qualifications

3 Instructions to Bidders

3.1 Legal and Public Record Statement

3.2 Confidentiality Notice to Bidders

3.2.1 Exemptions

3.3 Acknowledgement

3.3.1 Statement of No Bid

3.4 General Information

3.4.1 Common Terms

3.4.2 Submittal

3.4.2.1 Alternate Proposals

3.4.3 Signatures

3.4.4 Withdrawal

3.5 Electronic Submittal of the Proposal

3.6 Compliance Forms

SCM-RFP-T-01 – Request for Proposal Template v5.0 – 5/22/25

3.6.1 Public Entity Crimes

3.6.2 Dispute Disclosure

3.7 RESERVED

3.8 Proposal Preparation Costs

3.9 Exceptions

3.10 Clarifications

3.11 Local Conditions

3.12 Opening

3.13 Solicitation Selection Schedule

3.14 Proposal Acceptance and Rejection

3.15 Proposal Evaluation Criteria

3.16 Cancelation

3.17 Freight (If Applicable)

3.18 Bid Bond (If Applicable)

3.19 Payment and Performance Bond (If Applicable)

3.20 Contract Execution

3.21 Award

3.22 Taxes, Permits, and Licenses

3.23 Error and Omissions

3.24 Proposal Submittal Format

3.24.1 OUC Policies and Procedures for Bidders

3.25 Signatures

4 Proposal Submittal Format & Checklist

5 Attachments

SCM-RFP-T-01 – Request for Proposal Template v5.0– 5/22/25

Orlando Utilities Commission Orlando, Florida

RFP 2026 PR 9056 for Electric Vehicle Charging Network Service Providers

Direct all inquiries to the Buyer of Record: Dom P. Sotero, CPPO, CPPB

407-434-2909 dsotero@ouc.com

Proposal Opening Location: Orlando Utilities Commission Reliable Plaza 100 West Anderson Street Orlando, Florida 32801

1. Instructions are located in the Instruction to Bidders section of this document; or may be provided during a Pre-Conference Meeting.

2. Electronic proposal submittals, described in the Electronic Submittal of the Proposal section of this document, will be accepted. Email or other means will not be accepted.

3. VendorLink help can be accessed by calling 407-222-1885, or by emailing support@evendorlink.com.

Re qu es t f or P ro po sa l (

RF

P) mailto:dsotero@ouc.com mailto:support@evendorlink.com

1 INTRODUCTION

The Orlando Utilities Commission (OUC) is an electric and water municipal utility serving Orlando, Florida and portions of surrounding Orange County. OUC also has an Inter-local agreement with the City of St.

Cloud, Florida for the management of its electric utility. Currently, OUC serves more than 380,000 customers. To obtain general information about OUC, access www.ouc.com.

1.1 SCOPE OF WORK SUMMARY

The Orlando Utilities Commission (“OUC”) invites proposals from Electric Vehicle Charging Network Service Providers. The purpose of this Request for Proposal (RFP) is to establish a contract with qualified Proposers to provide Electric Vehicle Charging Network Services. The primary objective is to obtain the best value for OUC, including the potential for more advantageous pricing. This RFP may result in the award of contracts to multiple suppliers.

This document provides interested Proposers with sufficient information to prepare proposals that satisfy the minimum requirements. The information provided does not intend to limit proposal content or omit any relevant or essential information. Proposers are encouraged to expand upon the specifications and propose services and value-added solutions consistent with OUC requirements.

OUC continues to expand electric vehicle (EV) infrastructure throughout Central Florida as part of its commitment to sustainability, innovation, and reliable energy services. Current initiatives include installation of EV charging stations across the region, support for electrification of public transportation, and transition of OUC’s fleet to electric vehicles.

OUC currently owns or maintains more than 300 EV charging stations throughout Central Florida. These stations include advanced Direct Current Fast Chargers (DCFC), which provide convenient, reliable, and rapid charging for a wide range of EVs. OUC plans to further expand this infrastructure through development of eight Re-Charge Mobility Hubs across the region by 2030, strengthening the regional EV charging network.

This Request for Proposal seeks to engage one or more additional EV charging network service providers to diversify OUC’s supplier pool, improve operational flexibility, and enhance the performance, reliability, and interoperability of OUC’s EV charging network system. The selected supplier(s) shall integrate OUC-owned EV charging stations into the proposed network platform, configure user access and administrative access as directed by OUC or its customers, and provide implementation, training, ongoing support and reporting capabilities.

Refer to Section 2.1, Detailed Scope, Requirements, & Drawings for more information.

1.2 PRE-RESPONSE CONFERENCE

To comply with security requirements, email names of attendees and company affiliations to the Buyer of Record at least 48 hours in advance of the meeting. Please bring government issued photo identification the day of the Pre-Response Conference.

If applicable, refer to Attachment C: Invitation to Pre-Response Conference

1.3 TERM OF CONTRACT

OUC intends to enter into a three (3) year contract with the option to renew up to two (2) one-year terms http://www.ouc.com/ at the option of OUC for the services described in this solicitation. No cost increases shall be permitted during the initial three-year term. If the contract is renewed, any price increase during the two-year renewal period shall be limited to no more than CPI for the entire renewal term.

1.4 MINIMUM BIDDER QUALIFICATIONS

The Proposer shall complete and submit Attachment E, Qualification Form, demonstrating compliance with each of the following minimum qualifications. Failure to meet any minimum qualification or to provide sufficient supporting information may result in the Proposal being determined nonresponsive.

1. Has your firm been providing EV charging network services or similar services for at least three (3) years?

2. Does your proposed solution provide EV charging network services compliant with the Open Charge Point Protocol (OCPP)?

3. Does your proposed solution support OCPP Version 1.6 or newer?

4. Does your proposed solution provide a network platform capable of real-time monitoring and operational control of EV charging stations?

5. Does your proposed solution support Radio Frequency Identification (RFID) authentication and roaming interoperability using recognized industry protocols?

6. Has your firm successfully deployed and currently operates EV charging network solutions of comparable size and complexity?

7. Does your firm provide twenty-four (24)-hour customer support services for EV charging network users?

8. If payment processing is provided, does your proposed solution comply with the Payment Card

Industry Data Security Standard (PCI DSS)?

9. Does your firm maintain System and Organization Controls (SOC) 2 or an equivalent cybersecurity certification?

10. Does your proposed solution support the retention and return of OUC data in accordance with

Florida public records requirements?

11. Does your proposed solution provide hardware-agnostic network services that support multiple EV charging hardware manufacturers?

12. Does your proposed solution provide secure data access mechanisms that allow OUC to retrieve operational and billing data?

13. Can your firm demonstrate that the proposed solution is capable of maintaining at least ninety-seven percent (97%) system uptime and providing ongoing operational support?

1.5 PRICE AND COSTS

Prices documented in the submitted Proposal must remain firm throughout the contract period (including additional extensions, if applicable). Refer to Attachment B: Price Schedule.

1.6 TERMS AND CONDITIONS

The Terms and Conditions of this Agreement shall be governed by the General Conditions for Goods and Services.

https://www.ouc.com/wp-content/uploads/2024/12/Procurement_general_terms_cond_goods_services.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_general_terms_cond_goods_services.pdf

1.7 CONTRACT SAMPLE

Click here to view an OUC contract sample.

1.8 PROPOSAL EVALUATION CRITERIA

Refer to the Instructions to Bidders section of this document.

http://www.ouc.com/docs/procurement/proc_contract_agreement.pdf?sfvrsn=2

2 BIDDER REQUIREMENTS AND QUALIFICATIONS

2.1 REQUIREMENTS

The requirements contained in Section 2, Bidder Requirements and Qualifications, are addressed through Attachment E: Qualification Form. Proposers shall complete Attachment E in its entirety and provide the supporting information and proposal page references requested. The requirements contained in this Section are addressed through Attachment E: Qualification Form. Proposers shall complete Attachment E in its entirety and provide all requested supporting information and proposal page references.

For each narrative response, identify the applicable proposal page number(s) where the supporting information can be found.

A. Supplier Experience and Business Viability

Provide the information requested in Attachment E addressing the following:

1. Demonstrated experience providing electric vehicle (EV) charging network services at commercial, municipal, or utility scale.

2. Financial stability and ability to support long-term EV infrastructure operations.

3. Participation in industry programs, partnerships, or certifications relevant to EV charging infrastructure.

4. Experience integrating multiple Original Equipment Manufacturer (OEM) charging manufacturers.

B. Network Platform Capability

Provide a narrative describing the proposed solution:

1. Capability of the proposed platform to monitor and control EV charging stations in real time.

2. Capability to manage charging sessions, pricing structures, and user access.

3. Capability to support roaming, authentication, and interoperability across EV charging networks.

4. Ability to migrate existing chargers with minimal operational disruption.

C. Technical Architecture and Integration

Provide a narrative describing the proposed solutions:

1. Ability to integrate with multiple EV charging hardware manufacturers.

2. Capability to integrate with external systems through application programming interfaces.

3. Flexibility and scalability of the proposed platform architecture.

D. Operational Reliability and Maintenance

Provide a narrative describing the proposed solution:

1. Demonstrated system uptime and reliability.

2. Availability of diagnostic tools, maintenance procedures, and system monitoring capabilities.

3. Approach to preventive maintenance and system updates.

4. Ability to export all configuration and operational data without proprietary restrictions.

5. Response procedures and service levels for system outages, incident resolution, and restoration of service.

E. Data Management and Analytics

Provide a narrative describing the proposed solution:

1. Capability to collect and provide operational data related to charging sessions and energy usage.

2. Reporting capabilities and ability to export data for operational and financial analysis.

3. Ability to provide automated access to data through system interfaces or databases.

4. Data retention, accessibility, and retrieval capabilities, including support for OUC public records requirements.

F. Customer Support and User Experience

Provide a narrative describing the proposed solution:

1. Availability of customer support services and response capabilities.

2. Ease of use of the proposed mobile applications and web portals.

3. Features that improve driver experience and system usability.

4. Charger monitoring, maintenance notifications, and remote management capabilities.

5. User access management and remote equipment administration.

6. OEM onboarding, interoperability, and coordination with multiple charging hardware manufacturers.

7. Implementation, training, and ongoing support for OUC personnel.

G. Security and Compliance

Provide a narrative describing the proposed solution:

1. Cybersecurity practices and certifications.

2. Compliance with applicable EV charging infrastructure standards.

3. Protection of user and operational data.

4. Identity and access management capabilities, including multi-factor authentication and role-based access control.

H. Records

Provide a narrative describing:

The Proposer shall describe the method used to transfer OUC data upon expiration or termination of the contract (e.g., Supplier transfers the data or OUC personnel download the data). If additional fees apply, the Proposer shall identify the fee and include it in the Price Schedule.

2.2 BIDDER INFORMATION & REQUIRED BIDDER QUALIFICATIONS

2.2.1 Bidder Information

On company letterhead Bidder to provide a response cover page with the following information:

1. Firm Name

2. Name of Parent Company if applicable

3. Complete Business Address

4. State of Incorporation

5. Number of years in business

6. Name(s) and contact information of key personnel

7. Dun & Bradstreet number

8. Licenses obtained to conduct business with OUC

2.2.2 Required Bidder Qualifications

Refer to Attachment E: Qualification Form and Section 1.4 Minimum Bidder Qualifications for more information.

1. List the number of projects (with similar scope and size) that the bidding organization has completed and are in progress.

2. Provide at least three (3) references with contact information related to completed projects with the similar scope and size project.

a. If deemed pertinent, OUC will request to do site visits to customers provided as references by selected Bidder or Bidder’s affiliates.

3. Provide a complete list of all the subcontractors that may be part of the project, with the following information:

a. Company name

b. Contact information

c. Number of years in business

d. Proof of the necessary licenses for the job (if applicable)

e. List of projects that they had participated with similar scope and size to this RFP

4. Should bidder be awarded the work in this RFP, please provide information on any Economic Development Opportunities that Bidder may bring, such as the creation of new jobs or purchasing or leasing new building space, which could benefit the local Orlando Area or the State of Florida.

3 INSTRUCTIONS TO BIDDERS

3.1 LEGAL AND PUBLIC RECORD STATEMENT

As required by Florida’s Public Records Law, information provided to OUC in the course of business will be made available for public inspection and copying unless a specific statutory exemption applies.

3.2 CONFIDENTIALITY NOTICE TO BIDDERS

By submitting a proposal to OUC, each Bidder acknowledges and understands that OUC is a public agency subject to Chapter 119 Florida Statutes (“Public Records Law”). Any Proposal document the Bidder submits will become a public record when OUC provides notice of an intended decision or 30 days after opening the bids, proposals, or final replies, whichever is earlier. Trade Secrets, certain background financial information, and other items may constitute exemptions to disclosure under the Public Records law.

3.2.1 Exemptions

If during the Proposal or Negotiation Phase a Bidder wishes to claim an exemption on any portion of its Proposal to OUC, the Bidder must identify the specific statutory exemption and do the following:

1. Submit a redacted version. Redact (black out) only those portions of the Proposal put forward for exemption.

2. Submit an un-redacted version of the same documents marked, “Confidential –Trade Secret/ Proprietary Information”. Both versions are to be submitted at the same time.

3.3 ACKNOWLEDGEMENT

1. From the issue date of this solicitation packet until a selection decision is made, no unauthorized contact related to this solicitation will be allowed between a Bidder, their employees or subcontractors and any OUC commissioner, officer, director, or staff, with the exception of the Buyer of Record. Any unauthorized contact will disqualify the Bidder from further consideration

2. The selected Bidder agrees to obtain, prior to award, Worker's Compensation, General Liability, Automotive, and other insurance requirements in accordance with the requirements in the terms and conditions specified in section 1.7.

3. All policies shall be subject to approval by OUC and issued by companies authorized by the State of Florida’s Department of Insurance to conduct business in the State of Florida.

4. The selected Bidder agrees that it and its subcontractors have a Drug-Free Workplace Program that complies with Florida Statute §§ 287.087 and 440.101 et. seq., the Omnibus Employee Testing Act of 1991, 49 Code of Federal Regulation § 391 and 40 (operation of commercial motor vehicles).

a. In addition, all subcontractors must implement a controlled substance and alcohol testing policy for safety sensitive positions as defined by the Commission’s Alcohol and Controlled Substance Testing Policy for Safety Sensitive Positions.

5. The selected Bidder’s employees and its subcontractors’ employees are further prohibited from being under the influence or impairment of alcohol on OUC property or work sites or at any time or place while conducting business with or on behalf of OUC.

6. The selected Bidder shall submit only one proposal/bid in response to this solicitation packet and shall have no financial interest in other entities submitting proposals/bid responses for the same solicitation packet.

7. Neither the selected Bidder, nor its affiliates, nor anyone associated with them shall have any potential conflict of interest due to any other clients, contracts, business relationships or property interests for this solicitation packet’s scope of work.

8. The selected Bidder shall disclose to OUC the name(s) of any OUC employee, contractor, or OUC Board Member who has a direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction. A direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction exists if the OUC employee, contractor, or Board Member:

a. Presently, or in the preceding twelve (12) months, has an ownership interest in the selected Bidder’s organization (other than as owner of less than 1% of the stock of a publicly traded corporation).

b. Works for, is a partner, officer, director, trustee, or consultant to the selected Bidder.

c. Has received grant, travel, honoraria, or other similar support from the selected Bidder

d. Has a right to receive royalties from the selected Bidder.

9. No member of the selected Bidder’s ownership, management, or staff shall have a vested interest in any aspect of OUC, nor any business or other relationship with any of OUC’s employees, officers, directors, or Board Members that creates a conflict of interest or the appearance of a conflict of interest.

10. No member of the selected Bidder’s ownership or management is presently applying for an employee position or actively seeking an appointment within OUC.

11. The selected Bidder, or authorized signatory, shall provide written notice to OUC in the event that a conflict of interest is identified at any time.

3.3.1 Statement of No Bid

The OUC Procurement Department is committed to continuously improving its processes to receive maximum participation from the industry/market. OUC is requesting that organizations, who do not wish to bid on this RFP, send the Buyer of Record an email briefly explaining their “no bid” decision. This response will help to improve the solicitation process and any future communications.

3.4 GENERAL INFORMATION

Bidders shall prepare Proposals in accordance with the requirements of these Instructions to Bidders. Not preparing a Proposal, in accordance with such instructions, implies that the Bidder does not intend to comply with all of the proposed contract conditions. Such proposals will be considered irregular and may be rejected.

OUC will receive Proposals through the VendorLink system for goods, equipment, materials, and related services set forth in the included specifications and documents.

http://www.myvendorlink.com/

3.4.1 Common Terms

OUC and Bidders (the parties) agree that the following phrases each shall have the meaning provided here and may be used interchangeably:

1. “Bidder(s)”, “Supplier(s)”, and “Proposer(s)” shall mean the organization, party, person, firm, company, corporation, partnership, joint venture, or other type of entity responding to this solicitation.

2. “Solicitation” shall mean, “Request for Proposal(s)”, “RFP”, “Request for Quote”, “RFQ”, “Invitation to Bid”, “ITB”, “Solicitation Package” or “Solicitation Packet”, to which the Bidder is responding.

3. “Bid(s)”, “Proposal(s)”, or “Quote(s)” shall mean the documents formally submitted to OUC by each of the Bidders responding to this solicitation packet.

3.4.2 Submittal

Bidders shall submit Proposals in accordance with the instructions and schedule included in the solicitation containing these specifications and documents. Refer to Section 4: Proposal Submittal Format & Checklist and submit Proposal with all applicable content.

3.4.2.1 Alternate Proposals

If the Bidder submits an alternate proposal, they shall identify clearly the proposal as an “Alternate Proposal”. OUC may consider alternate proposals a blanket exception to the solicitation and reject the Proposal.

3.4.3 Signatures

An authorized representative of each Bidder shall:

1. Sign or e-sign the Proposal, give their full name and title, and provide the Bidder’s business name and address.

2. Enter the organization’s exact legal name on the Proposal.

3. Sign or e-sign compliance forms, if applicable.

3.4.4 Withdrawal

Bidders may withdraw, alter, and resubmit their Proposals through VendorLink at any time prior to the Proposal due date and time. Proposals may not be withdrawn, altered, or resubmitted after the Proposal due date and time. OUC may request clarifications and additional information after proposal submission.

3.5 ELECTRONIC SUBMITTAL OF THE PROPOSAL

To ensure correct Proposal formatting, Bidders shall:

1. Submit Proposals electronically through VendorLink.

2. Upload files only in MS Word (.doc or .docx), Excel (.xls or .xlsx), and PowerPoint (.ppt or .pptx); Adobe Portable Document Format (.pdf); Compressed File (ZIP) formats.

3. Enable printing on files submitted.

4. Clearly identify the RFP Number, Name, Submission Date, and Bidder Name on the Response Cover Page on Bidder’s letterhead.

5. Separate and identify each part of the submission (i.e. document type, form type, content type) with a divider/separation page.

6. Contact VendorLink technical support at support@evendorlink.com, if technical difficulties arise during proposal submission.

7. Follow all instructions outlined in this RFP and provide all requested information.

OUC may ask the selected Bidder to supply one hard copy set with original, written signatures and original compliance forms, prior to the contract execution. Do not submit following both methods unless otherwise instructed.

3.6 COMPLIANCE FORMS

3.6.1 Public Entity Crimes

Each Bidder shall submit copies of an executed and notarized Sworn Statement under Section

287.133 (3)(a) and 287.135, Florida Statutes, on Public Entity Crimes and Scrutinized Companies.

3.6.2 Dispute Disclosure

Each Bidder shall submit copies of an executed Dispute Disclosure form.

3.7 RESERVED

3.8 PROPOSAL PREPARATION COSTS

OUC shall provide, without charge, one set of specifications and documents to prospective Bidders for preparation of proposals. Addenda documents will be issued only to prospective Bidders registered in VendorLink.

This solicitation does not commit OUC to pay any costs incurred in the preparation and submission of the Proposal or to pay any other costs incurred prior to award.

3.9 EXCEPTIONS

OUC is seeking proposals that meet all technical and commercial requirements as outlined in this solicitation. If a Bidder takes exception to any solicitation requirement or condition, the exception must be specifically stated on the Exception Form provided within the solicitation document. OUC shall consider only those exceptions written on the form at the time the Proposal is submitted. The Bidder acknowledges that any exception taken to the solicitation criteria (including submitting an alternate proposal) may result in OUC determining the Proposal to be nonresponsive.

3.10 CLARIFICATIONS

If a prospective Bidder has doubt as to the true meaning of any part of the solicitation, they may submit a written request for clarification through email to the Buyer of Record; verbal requests will not be accepted. The Bidder must reference the Solicitation Package page number and section heading on any clarification requests

Failure of the Bidder to request information or make inquiries will not relieve them of any responsibility to perform under the terms of any contract awarded for the work in accordance with subsequent clarifications.

OUC shall issue an addendum to all Bidders, via VendorLink, once an inquiry is clarified and/or answered. Verbal responses will not be provided and are not binding on OUC.

mailto:support@evendorlink.com http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.myvendorlink.com/ http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2

3.11 LOCAL CONDITIONS

Each Bidder shall have thorough knowledge of conditions, factors, and scope of work, which would affect the execution and completion of the requested work. If required, site visits will be held on the day of the Pre-Response Conference unless otherwise arranged.

Bidders shall investigate properly and consider all such factors in the preparation of every Proposal submitted. OUC shall not permit claims for financial adjustment based on the lack of prior information or its effect on the cost of the work.

3.12 OPENING

OUC shall open Proposals on the RFP Due Date at 2:30 p.m. EST at 100 West Anderson Street, Orlando, Florida. If required, at a public opening, OUC shall read only the Bidder name and if they have provided all the required information. OUC shall not share any other information at this time, with the exception of solicitations for construction or repairs on public works projects in which the price is submitted. Proposals not meeting the requirements may be rejected.

All questions concerning this solicitation must reference the document page number, and section heading. OUC shall answer questions and post them to VendorLink as an addendum to the solicitation.

3.13 SOLICITATION SELECTION SCHEDULE

OUC shall adhere to the stated schedule during the solicitation process, unless a change notice is issued to the Bidders via a written addendum. OUC reserves the right to postpone the date and time announced for the opening of proposals at any time.

OUC expects Proposals to address all of the information requested in the solicitation and subsequent clarifications, and to reflect the capabilities of the Bidder.

Bidders shall submit any supplemental information, and list any variations on the Exceptions form, in accordance with Section 4, Proposal Submittal Format & Checklist.

3.14 PROPOSAL ACCEPTANCE AND REJECTION

OUC reserves the right to accept the Proposal which, in its judgment, is the most responsive and responsible Proposal and to reject any and all proposals; as well as waive irregularities and formalities in any proposal that is submitted.

Without limiting the generality of the foregoing, OUC may reject any proposals which are incomplete or irregular; Proposals which omit any one or more items for which the solicitation requires, any Proposals which omit unit prices if unit prices are required, any Proposals from Bidders who have previously failed to satisfactorily complete contractual obligations.

1. The following shall cause an automatic rejection of the proposal:

a. Proposals delivered/submitted after the 2:00 p.m. due date

b. Failure to submit a Bid Bond (if required)

c. Failure to attend a mandatory Pre-Response Conference and/or any mandatory presentation (if required)

d. Failure to submit a signed Payment and Performance Bond Compliance Form when (a) a Payment and Performance Bonds is required or (b) alternate payment and performance security permissible under Section 255.05, Florida Statutes is required http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2

2. The following items may cause a rejection of the proposal:

a. Failure to submit copies of any of the signed & notarized (where required) forms:

i. Statement on Public Entity Crimes form

ii. Dispute Disclosure

3.15 PROPOSAL EVALUATION CRITERIA

OUC shall evaluate the Proposals based on the information provided by each of the Bidders. OUC’s review may include, but may not be limited to the following categories:

1. Qualifications and Experience, including past performance for OUC

2. Responsiveness to Requirements

3. Safety and Quality Programs

4. Financial Soundness of Organization

5. Price

OUC reserves the right to negotiate with Bidders who submitted responsive and responsible Proposals in the best interest of the OUC Commission. This negotiation process may occur prior to OUC Commission approval. Each Bidder acknowledges that OUC shall evaluate all Proposals and may initiate clarification discussions or seek additional information from all or some of the Bidders to fully understand any unclear elements of their proposals. Following clarification, OUC may initiate negotiations with the Bidder, considered to be the most responsive and responsible. If no agreement is reached with the highest ranked Bidder, OUC may reject all Proposals or continue negotiations with each subsequently ranked Bidder until an acceptable deal is reached. A final contract award may be contingent upon OUC Commission and legal approval.

OUC reserves the right to consider historic information and facts, whether gained from the Bidder’s Proposal, question and answer conferences, references, and/or other sources during the evaluation process. OUC may conduct such investigations to assist with the evaluation of any Proposal. The investigation also serves to establish the Bidders’, subcontractors’, and other related entities’ responsibility, qualifications, and financial ability to fulfill the Proposal requirements to the Commission’s satisfaction, within the prescribed time.

The Bidder solely is responsible for submitting information related to the evaluation categories.

OUC is under no obligation to solicit such information. Failure of the Bidder to submit information may cause an adverse impact on the Proposal’s evaluation.

3.16 CANCELATION

Prior to the final execution of a Contract or full Notice to Proceed, OUC reserves the right to rescind said award without prior notice to Bidders. In addition, OUC may reject all Proposals, reissue the solicitation packet, or re-award the contract.

3.17 FREIGHT (IF APPLICABLE)

The selected Bidder shall coordinate with OUC’s freight contractor for shipping unless OUC determines that the selected Bidder can obtain freight/shipping rates or methods that are more advantageous to OUC. The selected Bidder shall submit an alternate shipping proposal based on delivery to OUC’s Free On Board (FOB) carrier at the designated OUC facility or location. The alternate proposal must include the:

http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2

1. Carrier name

2. Insurance coverage

3. Firm price freight quote

The Bidder must include any alternate proposal in the bid response to this solicitation. OUC may accept or reject the proposed alternate shipping arrangement.

OUC’s freight/shipping supplier and contact information is:

Nexterus

1-888-867-5952 (Monday – Friday, 8:00 a.m. – 7:00 p.m. EST) dcs@nexterus.com

3.18 BID BOND (IF APPLICABLE)

Bidder may be required to submit a certified check or cashier’s check drawn on an acceptable bank, or an acceptable Bidder’s bond executed by the Bidder and a surety company authorized to do business in the State of Florida. The value of the bid bond shall be five percent (5%) of the proposal price schedule. When submitting a Proposal through VendorLink, the Bidder shall provide a copy of the check and express mail the original check to the delivery location provided on the first page of the Solicitation Packet Form.

The bid bond guarantee shall be made payable without condition to OUC. The amount of the check or bond may be retained by and forfeited to OUC as liquidated damages if the Proposal results in a contract award and the Bidder fails to honor the accepted terms.

OUC shall return the selected Bidder’s bid bond when Bidder executes the contract and files a satisfactory payment and/or performance bond, if required. OUC may retain the bid bond of the second highest ranked Bidder for a period not to exceed thirty (30) days, pending the execution of the contract by the selected Bidder. OUC shall return the bid bond of each unsuccessful Bidder upon request, after the contract is awarded or when the Proposal is rejected.

3.19 PAYMENT AND PERFORMANCE BOND (IF APPLICABLE)

The selected Bidder may be required to furnish a Payment and Performance Bond to OUC per Florida Statutes; Section 255.05 equal to 100 percent of the contract price. The cost of such bonds shall be stated as a separate line item in the Proposal.

A surety company, authorized to do business in the State of Florida and acceptable to OUC, shall sign the bond. The Performance Bond and Payment Bond shall be dated with the actual execution date. With these bonds, the responsible party shall file certified copies of the power of attorney of such attorney-in-fact signing the bond on behalf of the surety, and such certificates shall be certified to show that such power of attorney was in effect to and including the date of the actual execution of the bonds. Any bonds submitted by a surety or its agent shall be conclusively presumed to have been authorized by and binding upon the surety company irrespective of the date shown on the power of attorney.

If bonds are required, they shall remain in full force and effect until satisfactory completion of any specified performance guarantee tests, or satisfactory completion of all other contractual requirements, whichever shall occur last. Upon recording of the performance and payment bond (if applicable) Bidder shall provide OUC three (3) copies.

mailto:dcs@nexterus.com http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2

OUC shall furnish a copy of the selected Bidder’s bond to any lienor demanding that bond under the provisions of Florida Statute 713.23.

3.20 CONTRACT EXECUTION

The selected Bidder shall execute the necessary contractual forms and return the executed forms within ten (10) business days of receipt of forms for execution.

3.21 AWARD

OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items or any combination of such items; or to make no contract award.

OUC shall be the sole judge of its own best interests, the proposals, and the resulting contract. An award may be made to the most responsive and responsible organization whose proposal is determined to be the most advantageous to OUC. The Commission’s decision shall be final and OUC’s rights include the ability to:

1. Reject any or all proposals or parts thereof

2. Issue subsequent solicitations

3. Cancel the entire solicitation

4. Remedy technical errors on the solicitation

5. Negotiate with any, all or none of the Bidders

6. Award a contract to one or more Bidders or none at all

7. Accept other than the lowest price

8. Waive informalities and irregularities in proposals

3.22 TAXES, PERMITS, AND LICENSES

The Bidder's attention is directed to the General Terms and Conditions and the Florida Statutes regarding taxes, permits, and licenses. It shall be the Bidder's responsibility to determine the applicable taxes, permits, and licenses. If the Bidder has doubt as to whether or not a tax, permit, or license is applicable, they shall state in their proposal whether this item has been included in their proposal price and the amount of the applicable tax, permit, or license in question.

3.23 ERROR AND OMISSIONS

Bidders or their authorized representatives are expected to be fully informed as to the conditions, requirements and specifications before submitting proposals; failure to do so will be at the Bidder’s own risk. Neither law nor regulations make allowance for errors either of omission or commission on the part of Bidders. In case of error of extension of prices in the proposal, the unit price shall govern.

3.24 PROPOSAL SUBMITTAL FORMAT

Bidders shall complete all required forms and include them in the proposal submittal package with any other required information. Refer to Section 4, Proposal Submittal Format & Checklist for more information.

3.24.1 OUC Policies and Procedures for Bidders

The Bidder shall read and comply with OUC’s policies and procedures before submitting this Proposal:

1. Contractor Security Policy

2. Bid Protest Guidance

3. Generic Contractor Orientation

4. Drug and Alcohol-Free Workplace and Testing Policy

5. OUC Travel and Expense Guidelines

6. All policies – OUC Procurement Services Department website

These policies and any supplemental policies provided at contractor orientation are hereby fully incorporated into this contract by reference and to the extent applicable to the supplier in the performance of their work. Supplier and its subcontractors, suppliers, agents, and employees shall fully comply with all such policies as amended from time to time.

3.25 SIGNATURES

By submitting this proposal with the authorized electronic signature, the Bidder hereby declares that, in all respects for and in good faith, without collusion or fraud:

1. Only the individuals or organizations interested in this proposal/bid response as principal or principals are named in this Proposal.

2. No other individuals or organizations than mentioned in this Proposal have any interest in this Proposal/Bid Response or in the subsequent contract.

3. This Proposal/Bid Response is made without connection with any other person, company, or parties likewise submitting a Proposal/Bid Response.

Bidders shall prepare Proposals in accordance with the Instructions to Bidder’s document. Failure to submit the necessary forms may cause a rejection of the proposal. The Bidder hereby agrees to provide the services and/or items specified in the solicitation packet at the prices quoted pursuant to the requirements of this document.

https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_sec_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_bid_protest.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_procure_contractor_orientation_stanton.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_proc_alc_cont_subs_testing_pol.pdf https://www.ouc.com/wp-content/uploads/2024/12/Procurement_supplier_business_expense_guidelines.pdf https://www.ouc.com/doing-business-with-ouc/

Orlando Utilities Commission RFP 26 9056 DPS – Electric Vehicle Charging Network Service Providers

SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19

4 PROPOSAL SUBMITTAL FORMAT & CHECKLIST

A checkmark (✓) on the items below indicates these are applicable items and the terms and conditions stated in earlier sections are applicable. Bidders shall complete all the forms checked (✓) below and include them in the proposal submittal package in order with any other information.

Provide a written signature on all original forms and, when required, a notary stamp. Scan & upload these forms with the Proposal.

Technical Response File (checked if applicable)

Tab 1 – Cover Page

Proposal Cover Page on Bidders Letterhead

Bidder Information as listed in Section 2.2.1

Tab 2 – Bidder Background and Qualifications

References and Qualifications listed in Section 2.2

Tab 3 – Response to Requirements

Response to all Requirements as listed in Section 2 and any applicable Attachments

Tab 4 – Compliance Forms

Submit at time of proposal

Exceptions

Sworn Statement on Public Entity Crimes and Scrutinized Companies Under Florida Statutes, Section 287.133 (3) (a) and 287.135

Dispute Disclosure

Anti-Human Trafficking Affidavit (Section 787.06, Florida Statutes)

☐ Bid Bond as described in Section 3.18 (If Applicable)

Addenda (If Applicable)

Provided at time of award

Copy of Company’s Business License

Copy of Insurance Certificate

W-9 Form

☐ Payment & Performance Bond as described in Section 3.18 (If Applicable) http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2 https://www.ouc.com/wp-content/uploads/2025/11/2025_11-Exceptions-for-Solicitation.pdf https://www.ouc.com/wp-content/uploads/2025/08/2025_08-ProcurementDispute-Disclosure-Form.pdf https://www.ouc.com/wp-content/uploads/2025/11/Addendum.pdf https://www.ouc.com/wp-content/uploads/2025/11/w9.pdf

Orlando Utilities Commission RFP 2026 PR 9056 DPS – Electric Vehicle Charging Network

SCM-RFP-T-01 – Request for Proposal Template v5.0 - 5/22/25

5 ATTACHMENTS

Attachment A: Scope of Work & Technical Requirements

Attachment B: Price Schedule

Attachment C: Invitation to Pre-Response Conference

Attachment D: OUC – IT Security Form

Attachment E: Qualification Form

Attachment F: Anti-Human Trafficking Affidavit (Section 787.06, Florida Statutes)

SCOPE OF WORK & TECHNICAL REQUIREMENTS

The Supplier shall provide electric vehicle (EV) network charging services for OUC that are compliant with Open Charge Point Protocol (OCPP) standards. The Supplier shall provide turnkey, scalable, and interoperable EV charging network solutions capable of supporting OUC’s existing charging infrastructure and future expansion across its service territory. The services shall emphasize system reliability, interoperability with multiple charging platforms, and long-term operational sustainability.

A. EV Charging Network Platform

1. The Supplier shall provide an EV charging network platform capable of managing and operating EV charging stations owned or operated by OUC.

2. The platform shall support OCPP standards to ensure communication with a wide range of EV charging hardware and software platforms.

3. The Supplier shall provide a scalable network solution capable of supporting deployment and operation of EV charging infrastructure throughout OUC’s service territory.

4. The Supplier shall provide hardware-agnostic network services that allow integration with multiple EV charging station manufacturers and models.

B. System Monitoring and Operational Control

1. The Supplier shall provide a platform capable of real-time monitoring of EV charging stations, including operational status, energy usage, and equipment faults.

2. The platform shall support real-time control of EV charging stations and respond to dynamic control signals within one minute or less.

3. The Supplier shall provide automated fault detection and alert capabilities to identify and report charger faults or system interruptions.

4. The Supplier shall provide remote system control capabilities including the ability to start or stop charging sessions, enable or disable chargers, and perform remote equipment resets.

C. Work Order and Maintenance Management

1. The Supplier shall provide integrated work order management capabilities that allow tracking of service requests, scheduling of maintenance activities, and resolution of equipment issues.

2. The platform shall support maintenance tracking and provide tools to assist with operational troubleshooting.

3. The Supplier shall provide maintenance protocols including scheduled software updates and preventive maintenance routines.

4. The Supplier shall maintain system reliability through redundant cloud-hosted infrastructure

D. User Interface and Access Management

1. The Supplier shall provide mobile and web portals for both EV drivers and system administrators.

2. The platform shall support the following capabilities.

a. Charging session tracking

b. Payment processing

c. Charger availability monitoring

d. Notifications to OUC regarding charger faults or outages

e. Notifications to customers regarding charging status

f. Remote equipment reset capability

g. Multiple user access levels

h. Restriction of equipment access to authorized users

i. Configuration of charging rates including time-of-use pricing, idle fees, and fleet pricing

j. Geographic location tools to allow drivers to locate EV charging stations

k. Data sharing with third-party EV charging applications such as PlugShare and Google Maps

l. Remote start or stop of charging sessions and the ability to disable chargers

E. Roaming and Authentication

1. The Supplier shall support Radio Frequency Identification (RFID) authentication through RFID cards or dongles.

2. The Supplier shall support roaming capability across EV charging networks through protocols such as Open Charge Point Interface (OCPI) and platforms such as Subject.

F. Managed Charging and Grid Integration

1. The Supplier shall provide managed charging capabilities including load balancing and charging management.

2. The platform shall support integration with dynamic pricing structures and demand response programs.

3. The platform shall support capabilities associated with vehicle-to-grid (V2G) or vehicle-to-everything (V2X) integration where applicable.

G. System Integration and Technical Architecture

1. The Supplier shall provide application programming interfaces (APIs) that allow integration with external systems.

2. The Supplier shall support REST APIs and OCPI protocols to enable system interoperability and roaming capabilities.

3. The platform shall support modular and scalable system architecture capable of expanding to support additional charging stations and system functions.

4. The platform shall support integration with external systems including Distributed Energy Resource Management Systems (DERMS) and Open Automated Demand Response (OpenADR) where applicable.

H. Operations, Maintenance and Reliability

1. The Supplier shall maintain EV charging network uptime of 97 percent or greater.

2. The Supplier shall provide automated diagnostics and fault detection to identify system issues.

3. The Supplier shall implement maintenance protocols including preventive maintenance procedures and scheduled software updates.

4. The Supplier shall maintain secure and redundant cloud-hosted infrastructure supporting system reliability.

I. Customer Support

1. The Supplier shall provide customer support services for EV drivers and system administrators.

2. The Supplier shall provide support services available twenty-four (24) hours per day.

3. Support services shall be available through multiple communication channels including phone, email, chat, and ticketing systems.

4. The Supplier shall provide training to OUC personnel regarding operation of the EV charging network platform and reporting capabilities.

J. Data Management and Reporting

1. The Supplier shall provide detailed operational data including charging session data, energy usage data, and transaction information.

2. The Supplier shall provide exportable reports in commonly used formats including Comma- Separated Value (CSV), Microsoft Excel, and Adobe Portable Document Format (PDF).

3. The Supplier shall provide OUC the ability to access system data through application programming interfaces or database integration methods.

4. The platform shall support billing and revenue reporting related to EV charging operations.

K. Security and Compliance

1. The Supplier shall implement security measures including encrypted communications, role-based access control, and secure cloud-hosted infrastructure

2. The Supplier shall maintain cybersecurity practices consistent with recognized industry standards including System and Organization Controls (SOC) 2 and Payment Card Industry Data Security Standard (PCI DSS) where applicable.

3. The Supplier shall comply with applicable EV charging infrastructure standards and regulatory requirements including OCPP.

4. The proposed solution shall meet NIST CSF 2.0 requirements and NIST SP 800-53.

5. Strong access controls shall be supported by the solution such as requirements for multi-factor authentication, role-based access control, and integration with OUC's IdP.

6. For PII, data must be encrypted or tokenized when possible (e.g., AES-256 for data at rest, TLS 1.2+ for data in transit).

7. All security incidents that involve either shared data or systems shall be notified to OUC in a period of no longer than 72 hours.

L. Public Records

OUC must comply with all applicable Florida state records management laws, rules, and retention requirements, including but not limited to Chapter 119, Florida Statutes, and the State of Florida General Records Schedules.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .