This is a Request for Proposal (RFP) issued by Belknap County, New Hampshire, for the supply and installation of ductless mini-split HVAC systems. The project involves furnishing and installing Mitsubishi HVAC equipment in two locations: a Conference Room system consisting of two Mitsubishi Hyper Heat Condensing Units (Model MXZ-3C24NAHZ4-U1) with four 2' x 2' 4-Way Ceiling Cassette Units (Model SLZ-AF12NL) and an 18" fixed stand for condenser mounting, and a Server Room system with one Mitsubishi P-Series Condensing Unit for cooling only (Model PUY-AH30NL) and one wall-mounted indoor unit (Model PKA-AK30NL). Proposals must be submitted by 12:00 PM on Wednesday, April 15, 2026, to Jon Bossey, Facilities Director, at jbossey@belknapcounty.gov or in person at 34 County Drive, Laconia, NH 03246. A mandatory site visitation is required prior to bidding. The contractor shall provide a complete turnkey installation including all labor, materials, equipment, controls, electrical work, and roof penetrations necessary for full system operation.
The scope of work encompasses mechanical installation of refrigeration systems with proper pressure testing and evacuation, installation of indoor and outdoor units with manufacturer-recommended clearances and vibration isolation, complete electrical work including circuit breakers and disconnects, roof penetrations with proper flashing and weatherproofing, controls and system integration, full testing and commissioning, and a minimum one-year labor warranty in addition to manufacturer's standard equipment warranty. The contractor must coordinate with the County Facilities Department and perform work during normal business hours to minimize disruption. Specific vendors identified for coordination are Northeast Electrical Solutions (Greg Selesky, 603-387-3506) and Melanson Roofing (603-224-0444). No specific pricing information, set-asides, funding amounts, or contract term details are provided in the RFP document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
RFP2026-07CM
Ductless Mini-Split Installations Belknap County
Belknap County Commissioners’ Office Jon T. Bossey, Facilities Director
34 County Drive, Laconia, NH 03246
(603) 737-2391
BELKNAP COUNTY
REQUEST FOR BID
RFP 2026-07CM
Introduction:
Belknap County is seeking supply and installation of ductless mini-split AC systems. Proposals shall be submitted to the Board of Commissioners, 34 County Drive, Laconia, New Hampshire 03246 by 12:00pm, Wednesday, April 15, 2026.
Proposals may be submitted via email to:
Jon Bossey, Facilities Director, Belknap County jbossey@belknapcounty.gov
The County reserves the right to accept or reject any and all bids, in whole or in part, for any reason deemed to be in the best interest of the County. The County reserves the right to waive any informalities, irregularities, or technical defects in any bid when such waiver is determined to be in the best interest of the County and does not compromise the fairness of the competitive bidding process.
1. Project Overview
The intent of this project is to furnish and install new Mitsubishi HVAC systems to serve the Conference Room and Server Room. The Contractor shall provide a complete, fully operational system, including all labor, materials, equipment, controls, electrical work, and roof penetrations required for a turnkey installation.
2. Equipment to be Installed
Conference Room System
(2) Mitsubishi Hyper Heat Condensing Units Model: MXZ-3C24NAHZ4-U1
(4) Mitsubishi 2' x 2' 4-Way Ceiling Cassette Units with Grilles Model: SLZ-AF12NL
(1) 18” Fixed Stand for Condenser mounting
Server Room System
(1) Mitsubishi P-Series Condensing Unit (Cooling Only) Model: PUY-AH30NL
(1) Mitsubishi Wall-Mounted Indoor Unit Model: PKA-AK30NL
3. General Scope Requirements
The Contractor shall:
Verify all existing site conditions prior to bidding. SITE VISITATION MANDATORY.
Furnish all materials, accessories, and appurtenances required for a complete installation.
4. Mechanical Installation Requirements
4.1 Refrigeration Systems
Install all refrigerant piping per manufacturer specifications.
Pressure test, evacuate, and charge systems in accordance with industry standards.
Provide line hide, insulation, and UV protection for all exterior piping.
Ensure proper oil return and line sizing.
Insulate all piping.
4.2 Indoor Units
Install ceiling cassette units in Conference Room ceiling grid.
Coordinate exact locations with Owner prior to installation.
Provide condensate pumps (if required) and properly route all drain lines to approved discharge locations.
Install wall-mounted unit in Server Room with proper clearances and access.
4.3 Outdoor Units
Install condensers on furnished 18” stand or equivalent approved support system.
Secure units to meet wind and snow load requirements applicable to New Hampshire.
Maintain manufacturer-recommended clearances.
Provide vibration isolation.
5. Electrical Scope
The Contractor shall provide all electrical work required for a complete and operational system, including:
Circuit breakers sized per manufacturer requirements.
Electrical disconnects within line of sight of each condenser.
Low-voltage communication wiring between indoor and outdoor units.
Control wiring and interconnections.
Coordination with existing building electrical capacity.
Labeling of all new circuits and equipment.
6. Roof Penetrations and Weatherproofing
Provide all required roof penetrations for refrigerant piping, electrical conduit, and condensate lines.
All penetrations shall be:
o Properly flashed and sealed o Installed in accordance with roofing manufacturer standards
Contractor shall be responsible for maintaining roof integrity and preventing leaks.
Any damage to the roof system shall be repaired at Contractor’s expense.
7. Controls and System Integration
Provide complete Mitsubishi controls for system operation.
Install wall-mounted thermostats/controllers as required.
Ensure proper zoning and communication between all system components.
8. Testing and Commissioning
Perform full system startup in accordance with manufacturer requirements.
Test all modes of operation (heating/cooling where applicable).
Verify proper airflow, temperature control, and condensate drainage.
Provide system commissioning report to Owner.
9. Warranty Requirements
Provide manufacturer’s standard warranty on all equipment.
Provide minimum one (1) year labor warranty.
Ensure installation meets requirements to maintain extended manufacturer warranties.
10. Coordination and Scheduling
Coordinate all work with Belknap County Facilities Department.
Provide project schedule prior to start.
Perform work during normal business hours unless otherwise approved.
Ensure minimal disruption to occupied spaces.
Vendors to be used by bidding contractor:
Northeast Electrical Solutions Greg Selesky
(603) 387-3506 cell
Melanson Roofing 5 Ferry Road Bow, NH 03304 Phone: (603) 224-0444 office