RFP 2025010 Osborne Reef RWTAS.pdf
PDF 3 MB Posted
- Solicitation number
- RFP-12019
- Issued by
- Broward County, Florida
About this file
This Request for Proposals (RFP) 2025010 is issued by the Florida Department of Environmental Protection (DEP) for Osborne Reef Restoration Waste Tire Abatement Services. The DEP is seeking qualified vendors to remove submerged waste tires from the Osborne Tire Reef, located off the coast of Broward County, with the primary goal of protecting Florida's coral reef ecosystem. The project involves extracting tires from both sand and reef habitats at various water depths. An optional pre-response conference will be held on 4/7/25 via Microsoft Teams, with formal responses due by 5/12/25 at 3:00 PM. The Department anticipates awarding the contract on or about 6/16/25, with an initial contract term of seven years and the potential for up to seven additional renewal years.
The contract will be structured on a fixed unit rate basis, with vendors required to provide detailed pricing for tire retrieval from different habitats and water depths. Respondents must submit comprehensive proposals demonstrating their capabilities for site mobilization and tire abatement operations. The DEP reserves the right to award to one or multiple respondents or make no award. While no specific set-asides are mentioned, the solicitation includes various administrative requirements such as a Forced Labor Attestation Form and detailed documentation requirements for tire retrieval. The project represents a significant environmental restoration effort aimed at removing approximately 100,000 tires from the marine ecosystem, with the potential for long-term positive impact on the local marine environment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2025010 Osborne Reef RWTAS.pdf | ||
| Addendum No. 1 - RFP 2025010.pdf | ||
| Attachment 1 Draft Contract for VIP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals (RFP)
For
Osborne Reef Restoration Waste Tire Abatement Services
RFP 2025010
Procurement Officer:
Sabina Flanagan Purchasing Analyst, Department of Environmental Protection Bureau of Procurement & Contracting Services - Procurement Section
3800 Commonwealth Blvd., MS #93 Tallahassee, FL 32399-3000
Email: Sabina.Flanagan@FloridaDEP.gov
Osborne Reef Restoration Waste Tire Abatement Services
Rev. 07/30/24
Table of Contents 1 Introduction
1.1 Solicitation Objective
1.2 Background and Program Information
1.3 Anticipated Contract Term & Renewals
1.4 Definitions
1.5 Draft Contract
1.6 Procurement Officer
1.7 Special Accommodations
1.8 Timeline of Events
1.9 List of Attachments and Forms
2 RFP Process
2.1 Vendor Responsibilities
2.2 Who May Respond
2.3 Overview of the RFP
2.4 Conformance to Requirements
2.5 Limitation on Vendor Contact with Agency During Solicitation Period
2.6 Addenda/Amendments to the RFP
2.7 Contract Formation
2.8 Disclosure of Response Contents
2.9 Withdrawal of Responses
2.10 Administrative Cure Process
2.11 Clarification Process
2.12 Information from Other Sources
2.13 Firm Response
2.14 Right to Reject
2.15 Cancellation, Non-Award, and Withdrawal
2.16 Misrepresentations
2.17 Licensure & Registration
2.18 Replacement and Alternate Responses
2.19 Exclusivity
2.20 Diversity
2.21 Bid Protests
3 Response Instructions
3.1 MyFloridaMarketPlace (MFMP) Vendor Registration
3.2 Pre-Response Conferences and/or Site Visits
3.3 Submission of Responses
3.4 Response Content Requirements
3.5 Economy of Presentation
3.6 Confidential Response Materials and Redacted Submissions
4 Scope of Work
4.1 Scope of Work
4.2 Contractor Responsibilities
4.3 Department’s Responsibilities
4.4 Enforcement
5 Evaluation Criteria
5.1 Evaluation of Volume I, Past Performance
5.2 Evaluation of Volume II, Technical Response
5.3 Evaluation of Volume III, Price Sheet
5.4 Available Points
5.5 Compilation of Evaluation Scores
6 Award
6.1 Basis of Award
6.2 Florida-Based Business Preference
6.3 Award Preferences for Equal Scores (Ties)
6.4 Recommendation of Award
6.5 Posting of Decision
6.6 Execution of Contract
6.7 Failure to Perform the Contract
1 Introduction The Florida Department of Environmental Protection (the Department or DEP) hereby issues this Request for Proposals (RFP) to contract for Osborne Reef Restoration Waste Tire Abatement Services.
The Solicitation will be administered through the Vendor Information Portal (VIP). Respondents interested in submitting a Response must comply with all of the terms and conditions described in this
RFP.
1.1 Solicitation Objective
The Department intends to enter into a contract using the Attachment 1, Draft Contract, for Osborne Reef Restoration Waste Tire Abatement Services, hereby incorporated by reference. The Department intends to make a single award, however the Department reserves the right to award to one Respondent or multiple Respondents, or to make no award, as determined to be in the best interest of the State.
1.2 Background and Program Information
The Department of Environmental Protection, Division of Waste Management, is requesting removal of submerged waste tires from the tire field know as Osborne Tire Reef, as shown on the aerial maps, Exhibit J & K – Osborne Tire Reef Tires Plan View, of the attached Draft Contract. The Department’s Osborne Reef Restoration Project is part of ongoing abatement efforts to remove waste tires to help protect Florida’s vital coral reefs. See additional information at:
https://floridadep.gov/waste/permitting-compliance-assistance/content/osborne-reef-waste-tire-removal-project.
1.3 Anticipated Contract Term & Renewals
The initial term of the Contract will be seven (7) year(s) with up to seven (7) renewal year(s). At the discretion of the Department, the Contract may be renewed subject to the terms and conditions specified in the Contract.
1.4 Definitions
The “General Contract Conditions” Form PUR 1000 (PUR 1000) and “General Instructions to Respondents” Form PUR 1001 (PUR 1001), found in Rule 60A-1.002, Florida Administrative Code (F.A.C.), are hereby incorporated by reference and can be accessed at:
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state _purchasing_pur_forms. The following definitions apply to this RFP:
Business Days - Monday through Friday, inclusive, except for State government holidays.
Confidential Information - Any documents, data, or records that are confidential and not subject to disclosure pursuant to Chapter 119, Florida Statute (F.S.), the Florida Constitution, or any other authority.
Contract - The agreement that results from this competitive procurement, if any, between the Department and the Contractor.
Contractor(s) - The Respondent(s) that will be awarded a Contract pursuant to this Solicitation.
Respondent – an entity that submits a Response to this RFP.
State - The State of Florida.
https://floridadep.gov/waste/permitting-compliance-assistance/content/osborne-reef-waste-tire-removal-project https://floridadep.gov/waste/permitting-compliance-assistance/content/osborne-reef-waste-tire-removal-project https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms
1.5 Draft Contract
Awarded Respondent(s) must provide the contractual services sought by this RFP in accordance with the terms, conditions, and Scope of Work detailed in the Draft Contract. All Respondents should carefully review the Draft Contract prior to submission of a Response. Any questions related to the Draft Contract should be submitted as a formal question in accordance with the instructions contained in this RFP.
1.6 Procurement Officer
The Procurement Officer is the Department’s sole point of contact for information regarding this RFP from the date of release until an Agency Decision is posted on the VIP. Violation of this provision may be grounds for rejecting a Response.
Refer ALL inquiries in writing to the Procurement Officer by email. Responses to timely questions posed to the Procurement Officer will be posted on the VIP, at https://vendor.myfloridamarketplace.com/ in accordance with Section 2.3.1.2 below.
The Department will not talk to any Respondents or their agents regarding a pending solicitation.
Questions will NOT be answered via telephone.
1.7 Special Accommodations
Any person requiring a special accommodation due to a disability should contact the Department’s Procurement Officer. Requests for accommodation for meetings must be made at least five (5) Business Days prior to the meeting.
1.8 Timeline of Events
The following schedule will be strictly adhered to in all actions relative to this Solicitation. The Department reserves the right to modify this schedule and will notify participants in the Solicitation by posting an addendum to this Solicitation on VIP. It is the responsibility of the Respondent to check VIP on a regular basis for such updates.
Event Date Time* Location/Method
RFP Advertised 3/20/25 N/A Vendor Information Portal
Optional Pre-Response Conference 4/7/25 1:00 PM
Microsoft Teams Meeting Video option:
Join the meeting now Meeting ID: 260 744 455 207
Microsoft Teams Meeting Audio option:
Teleconference by calling +1 850-629-7330 Phone conference ID: 821 701 639#
The number will be active 5 minutes before the meeting.
Questions Due 4/21/25 5:00 PM Email to Procurement Officer
Answers Posted (Anticipated)
On or about:
4/28/25 Vendor Information Portal https://vendor.myfloridamarketplace.com/ https://teams.microsoft.com/l/meetup-join/19%3ameeting_MGQwNDRmNjItOWYwNC00NzAwLTk3NGItMmNiOGZkYTQ4N2E3%40thread.v2/0?context=%7b%22Tid%22%3a%22679d4c83-aea2-4635-b4f1-9f5012551b6a%22%2c%22Oid%22%3a%226b822339-b01f-4c3c-ab27-21538e4ffc16%22%7d
Responses Due 5/12/25 3:00 PM
Department of Environmental Protection DEP Procurement Section, Room 215 3800 Commonwealth Blvd, MS93 Tallahassee, Florida 32399-3000
Public Opening 5/13/2025 10:00 AM
Teleconference by calling +1 850-629-7330
Phone Conference ID: 622 502 622# The number will be active 5 minutes before the meeting.
References Contacted Between: Telephone and/or Email 5/20/25 5/30/25
Award Date (Anticipated) On or about:
6/16/25 Vendor Information Portal
*All times are Eastern Time Zone.
1.9 List of Attachments and Forms
The Attachments, Exhibits, and Forms below are incorporated by reference. Copies of these documents are available in the VIP advertisement that accompanies the RFP posting. If a Form requires electronic completion or filling in, such as a Microsoft Excel spreadsheet, an electronic copy can be obtained by contacting the Procurement Officer. Forced Labor Attestation Form
Attachment Title 1 Draft Contract 2 Past Performance Evaluation Form 3 Sample Task Assignment & Task Assignment Change Order Forms
Form Title A Business Response Form B Foreign State Preference Opinion Form C Client Reference Form D Price Sheet E Award Preference Form
F -RESERVED-
G Forced Labor Attestation Form
2 RFP Process
2.1 Vendor Responsibilities
Vendors should carefully read the entire RFP, all attachments, and any addenda before submitting a Response. Vendors interested in submitting a Response must comply with all instructions, terms, and conditions of this RFP to be considered for Award.
Vendors are responsible for understanding all terms and conditions of this RFP, its attachments, addenda, and proposed resulting Contract. If a Vendor does not understand these requirements, Vendor should submit formal questions to the Department in accordance with Section 2.3.1.2.
2.2 Who May Respond
Vendors who possess the financial capability, experience, and personnel resources described in this RFP are invited to submit Responses. Vendors on the Convicted, Suspended, Discriminatory Vendor List(s), the Antitrust Violator Vendor List(s), and/or the Scrutinized List(s) of Prohibited Companies may not submit a Response.
2.3 Overview of the RFP
The RFP is a method of competitively soliciting a commodity or contractual service under Chapter 287, F.S. The RFP process involves three phases: Solicitation, Minimum Mandatory Requirement Review and Evaluation.
2.3.1 Solicitation Phase
2.3.1.1 Pre-Response Conference and Site Visit (If Applicable) The Department may hold an optional or mandatory pre-response conference or site visit as part of the process as indicated in Section 3.2.
Anyone attending a pre-response conference or site visit is required to register their attendance in a means provided by the Department at the time and location of the meeting. Respondents who fail to attend or who are not represented at a mandatory conference or site visit will be determined Non- Responsive.
Note: Any answers to questions given at any conferences or site visits are not binding and do not alter the RFP. Only questions submitted in accordance with the instructions below and answered on the VIP are considered binding.
2.3.1.2 Question and Answer Period
Respondents may submit questions regarding the terms, conditions, and requirements of the RFP to the Procurement Officer via email by the deadline listed in the Timeline, Section 1.8 of the RFP. No question will be answered/considered after the deadline.
Questions will not constitute a formal protest of the specifications or of the Solicitation. Answers to questions will be posted on the VIP.
All emails shall have the Solicitation number in the subject line. The Department recommends that questions be submitted in the following format:
RFP Section RFP Page # Question
2.3.1.3 Submission of Responses
Once the Department posts the answers to the questions, Respondents may begin submitting Responses as indicated in Section 3.4; however, Respondents are encouraged to submit their Responses no earlier than five (5) days prior to the submission deadline. Responses must be submitted by the deadline listed in the Timeline above.
2.3.1.4 Public Opening
The Department will open the Responses in a public meeting at the date, time, and location noted in the Timeline, Section 1.8. The Procurement Officer will review the entire Response to ensure that all required volumes were timely submitted, however prices will not be read aloud at the public opening.
2.3.2 Minimum Mandatory Requirement Review Phase
2.3.2.1 Administrative Review
All responses will be reviewed by the Procurement Officer to ensure that Responses contain all mandatory Forms and are complete. Complete Responses will be sent to the Evaluation Team for their qualitative review.
2.3.2.2 Responsibility Review
The Department will review the Responsibility section of the Respondent’s Business Response Form, Form A, for affirmative responses and attached documentation, if any. Answers in the affirmative are not, in themselves, grounds for declaring a vendor as Non-Responsible; the Department may seek additional clarification and decide whether the circumstances of the case warrant declaring a Respondent Non-Responsible. Respondents deemed Non-Responsible are not eligible for Contract Award.
2.3.3 Evaluation Phase
2.3.3.1 Technical Response Evaluation
The Department will evaluate Responses from responsive and responsible Respondents that meet the Minimum Mandatory requirements listed in Form A, Business Response Form, and provide the documentation required in this Solicitation. All Respondents and Responses that meet the minimum mandatory requirements reviewed by the Procurement Officer will be evaluated according to the Evaluation Criteria in Section 5. Each evaluation team member will work independently using the Evaluation Criteria contained Section 5, to review and score Respondent’s Technical Response. Upon completion of the Technical Response evaluation, the evaluators will submit their scores to the Procurement Officer for tabulation.
A Respondent’s Response is the only material which will be considered by the evaluators. No oral or written representations, prior conversations, meetings, projects, or outside information, other than what is specifically requested to be in a Response, will be considered by the evaluators.
2.3.3.2 Past Performance
The Respondent’s references will be contacted by the Department by telephone during normal working hours (8:00 AM - 5:00 PM) as indicated in the Timeline. The Department will make up to two (2) attempts to call before making one attempt to contact the references by email. If the contact person cannot be reached following the three (3) attempts, or if the Respondent fails to provide a reference, the Respondent will receive a score of zero (0) for that reference.
2.3.3.3 Price Sheet Evaluation
The Procurement Officer will review the Price Sheet and apply the scoring criteria as contained in the Evaluation Criteria in Section 5.
2.3.3.4 Compilation of Scores
After the evaluation phase, the Procurement Officer will compile the final evaluation scores and use them to develop the recommendation of award.
2.4 Conformance to Requirements
In order to be considered for Award, Responses submitted to the Department must conform in all material aspects to the requirements set forth in this RFP, including the requirement set forth in Form D, Price Sheet. Responses failing to conform in all material aspects to the requirements included in this RFP, including the requirement set forth in Form D, Price Sheet are Non-Responsive and are not eligible for Award, at the sole discretion of the Department.
This is a request for proposals. The proposal must not include any proposal to negotiate, or any proposed terms and conditions that supersede, conflict with, take exception to, supplement, or materially change, the terms and conditions set forth in this RFP or the documents that will comprise the Contract. Any questions regarding the terms, conditions, or requirements of this RFP or the Contract can be raised during the Question and Answer Period described in Section 2.3.1.2 of this RFP.
Respondents that fail to comply with the requirements of this paragraph may, at the sole discretion of the Department, be deemed to be Non-Responsive.
2.5 Limitation on Vendor Contact with Agency During Solicitation Period Respondents to this Solicitation or persons acting on their behalf may not contact, between the release of the Solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this Solicitation, except in writing to the Procurement Officer or as provided in the Solicitation documents. Violation of this provision may be grounds for rejecting a Response.
2.6 Addenda/Amendments to the RFP
The Department reserves the right to modify this RFP by issuing addenda and/or amendments. All changes to the RFP will be made through addenda or amendments posted on the VIP. It is the responsibility of the Respondent to check for any changes on the VIP. Issuance of written Addenda and/or amendments is the only method by which a solicitation may be modified.
2.7 Contract Formation
The Department will issue a notice of award, if any, to successful Respondent(s). No contract shall be formed between the Department and the awarded Respondent until both parties sign the Contract. The Department will not be liable for any costs incurred by a Respondent in preparing or producing its Response or for any work performed before the Contract is effective.
The Contract will consist of the Draft Contract as attached, which will incorporate the Scope of Work/Technical Specifications, below in Section 4, relevant portions of the Response submitted by the awarded Respondent (if any), and the Price Sheet submitted by the awarded Respondent. If there is any discrepancy between the Scope of Work/Technical Specifications and the incorporated relevant portions of the Response, the terms most favorable to the Department shall prevail.
The Department objects to and shall not consider any additional terms or conditions submitted by a Respondent, including any appearing in documents attached as part of a Response, except those identified in the Contract. The Respondent shall bring any perceived inconsistencies among any of the provisions of the RFP and its attachments to the attention of the Department prior to the submission of its Response. At any time during the Solicitation, the Department may specifically identify and incorporate by reference any additional documents which are to be incorporated into the Contract. The Contract that results from this Solicitation will be posted on the Florida Accountability Contract Tracking System (FACTS) website in accordance with section 215.985, F.S., “Transparency Florida Act.”
2.8 Disclosure of Response Contents
All documentation produced as part of the RFP will become the exclusive property of the Department and will not be returned to the Respondent unless it is withdrawn prior to the Response opening in accordance with Section 2.9. Once the Procurement Officer opens the Response, the Response may be disclosed pursuant to a public records request, subject to any confidentiality claims and the timeframes identified in section 119.071(1)(b), F.S.
2.9 Withdrawal of Responses
The Respondent may withdraw or modify a Response at any time prior to the due date by submitting a request to the Procurement Officer.
2.10 Administrative Cure Process
In the interest of maximizing competition, the Response qualification and cure process seeks to minimize, if not eliminate, Respondent disqualifications resulting from nonmaterial, curable deficiencies in the Response that are identified in the Minimum Mandatory Review Phase. Therefore, the Department may, in its sole discretion, notify Respondents whose qualifying information or documentation does not meet the requirements of the RFP and allow for the correction of errors and omissions prior to making a final determination of responsiveness. Timely cures made pursuant to this section will be accepted by the Department.
2.11 Clarification Process
The Department may request clarification from the Respondent for the purpose of resolving ambiguities or questioning information presented in the Response. Clarifications may be requested throughout the Solicitation process. The Respondent’s answers to requested clarifications must be in writing and must address only the information requested. Respondent’s answers to requested clarifications must be submitted to the Department within the time specified by the Department in the requested clarification.
2.12 Information from Other Sources
The Department reserves the right to seek information from outside sources regarding the Respondent, the Respondent’s offerings, capabilities, references, and the Respondent’s performance, if the Department determines that such information is pertinent to the RFP. The Department may consider such information throughout the Solicitation process including, but not limited to, determining whether the award is ultimately in the best interest of the State. This may include, but is not limited to, the Department engaging consultants, subject matter experts, and others to ensure that the Department has a complete understanding of the information provided pursuant to the Solicitation.
2.13 Firm Response
The Department may make an award within one hundred and eighty (180) days after the date of the opening, during which period responses shall remain firm and shall not be withdrawn. If award is not made within one hundred and eighty (180) days, the Response shall remain firm until either the Department awards the Contract, or the Department receives from the Respondent written notice that the Response is withdrawn. Any response that expresses a shorter duration may, in the Department's sole discretion, be accepted or rejected.
2.14 Right to Reject
The Department may reject any Response not submitted in the manner specified by the Solicitation documents. Respondents whose past performance, current status, or Response does not reflect the capability, integrity, or reliability to fully, and in good faith, perform the requirements of Contract may be rejected as Non-Responsible and are not eligible for Award.
2.15 Cancellation, Non-Award, and Withdrawal
When the Department determines that is it in the best interest of the State, it reserves the right to:
• Cancel this Solicitation.
• Make no Award and reject all responses.
• Withdraw the Solicitation at any time, including after an award is made.
• Withdraw or amend its Notice of Award at any time prior to execution of a contract, including, but not limited to situations in which the Contractor(s) fails to execute the contract.
• Re-procure services.
2.16 Misrepresentations
All information submitted, and all representations made, by the Respondent in a response may be relied upon by the Department in determining Responsibility of a Respondent for Award. Any misstatement or omission, whether intentional or not, may be treated by the Department as a fraudulent concealment of the true facts relating to the Response. Such misrepresentation will be a basis for the Department to disqualify the Respondent as Non-Responsible, and bar the Respondent from participation in any re-solicitation pertaining to this subject matter (regardless of whether the re-solicitation resulted from Respondent’s misrepresentation) and may be punishable under law, including, but not limited to, Chapter 817, F.S.
2.17 Licensure & Registration
Prior to the execution of a Contract, the selected Respondent must be properly licensed to do business within the State, and all entities must be appropriately registered with the Florida Department of State, if required by federal or state law.
2.18 Replacement and Alternate Responses
The Department will only consider one (1) Response per Respondent, unless otherwise indicated in Section 3. Respondents may submit revised Responses at any time prior to the Response Due Date as specified in the Timeline of Events. Revised Responses must include a statement, signed and dated by an Authorized Signatory, withdrawing all prior Responses from the Respondent. Alternate commodities and/or contractual services may be proposed only if permitted in accordance with the instructions contained in this Solicitation. The Department is under no obligation to consider alternate commodities and/or contractual services to those requested in this Solicitation if not specifically requested as part of a Response and may reject a Response making such offers as Non-Responsive.
2.19 Exclusivity
This Solicitation will not result in an exclusive license to provide the commodities and/or contractual services described in this Solicitation or the resulting Contract. The Department may, in compliance with applicable laws, contract with other vendors to provide the same or similar commodities and/or contractual services if the Department determines that doing so will serve the State’s best interests.
2.20 Diversity
The State is dedicated to fostering the continued development and economic growth of minority-owned, veteran-owned, and woman-owned businesses. Participation of a diverse group of Respondents doing business with the Department is central to the State’s effort.
The Office of Supplier Development (OSD) has been established within the Florida Department of Management Services (DMS) to certify qualifying minority-owned, veteran-owned, and woman-owned business enterprises (CBEs). CBEs are encouraged to participate in the State’s procurement process as both prime Respondents and subcontractors. Non-CBE Respondents are encouraged to partner with CBEs for Contract performance.
2.21 Bid Protests
Failure to file a protest within the time prescribed in section 120.57(3), F. S., or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, F.S.
Documents received after normal working hours (Monday-Friday, 8:00 a.m. - 5:00 p.m., Eastern Time) will be filed the following business day.
All filings must be made with the Agency Clerk ONLY and are only considered "filed" when stamped, physically or digitally, by the Agency Clerk. It is the responsibility of the filing party to meet all filing deadlines.
The Agency Clerk's address is:
Agency Clerk, Office of General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Douglas Building, MS#35 Tallahassee, Florida 32399-3000 Email: Agency_clerk@floridadep.gov mailto:Agency_clerk@floridadep.gov
3 Response Instructions This section contains the General Instructions and Special Instructions to Respondents. The “General Instructions to Respondents” Form PUR 1001 is incorporated by reference and can be accessed at https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state _purchasing_pur_forms.
The terms of the PUR1001 are controlling for this RFP, except for the following sections, which are inapplicable:
Section 3. Electronic Submission of Responses Responses shall be submitted in accordance with Section 3.4 of this Solicitation.
Section 5. Questions Questions shall be submitted in accordance with Section 2.3.1.2 of this Solicitation.
Section 14. Firm Response.
This paragraph is superseded by Section 2.13 of this Solicitation.
Section 15. Clarifications/Revisions.
This paragraph is superseded by Section 2.11 of this Solicitation.
Section 16. Minor Irregularities/Right to Reject.
This paragraph is superseded by sections 2.10, 2.14 and 6.1 of this Solicitation.
Section 17. Contract Formation.
This paragraph is superseded by Section 2.7 of this Solicitation.
Section 20. Protests.
This paragraph is superseded by Section 2.21 of this Solicitation.
3.1 MyFloridaMarketPlace (MFMP) Vendor Registration
Prior to execution of the Contract by the Department, the Contractor must be registered with MFMP.
Information about the registration process is available on, and registration may be completed at https://vendor.myfloridamarketplace.com/.
Prospective vendors who do not have internet access may request assistance from MFMP Customer Service within DMS.
The following United Nations Standard Products and Services Code(s) (UNSPSC) are provided to assist potential Respondents in their registration efforts:
Code Title 70101901 Mariculture 70101902 Ostreiculture 70101903 Shellfish culture https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://vendor.myfloridamarketplace.com/
70101904 Shrimp farming 70101905 Fish farming 70161702 Marine ecosystem management services 72141200 Marine construction services 77101603 Marine conservation strategy planning 81102101 Coastal engineering 81171501 Marine biology consultation service
3.2 Pre-Response Conferences and/or Site Visits
The Department will hold an optional Pre-Response Conference for Respondents to ask questions informally. The optional Pre-Response Conference shall be held via Microsoft Teams as indicated in Section 1.8 Timeline of Events. There will not be an option to join in person.
3.3 Submission of Responses
Respondents shall deliver Responses to the Department’s office designated in the Timeline of Events before the date and time specified. Any Response that is received after the exact time specified in the Timeline of Events is late. Late Responses, as well as Responses submitted through email or by facsimile, are Non-Responsive and will not be evaluated. All Response materials must be packaged so that each box shipped to the Department does not exceed 25 pounds.
Response packages must be marked to show the Respondent's name and address, the Solicitation number, and the date and time Responses are due. If multiple packages are shipped, package sequences (i.e. 1 of 3, 2 of 4, etc.) must also be indicated on the outside of the package.
Responses must be submitted by U.S. Mail, United Parcel Service (UPS), Federal Express (FedEx), private courier, or hand delivery. Electronic mail (e-mail) submission or facsimile transmission of responses are NOT authorized and will NOT be accepted.
3.4 Response Content Requirements
Respondent’s Responses must be submitted in hard and electronic copies divided into volumes containing the information specified below:
Volume Name Copies Volume I Business Response One (1) Original Volume II Technical Response One (1) Original Volume III Price Sheet One (1) Original CD/DVD/USB Electronic Copy of Response One (1) copy of each Volume CD/DVD/USB Redacted Electronic Copy of Response (if applicable) One (1) Redacted copy of each Volume
3.4.1 Volume I, Business Response
Respondents must prepare a Business Response volume in the order outlined below.
Volume I Business Response Page Limit Tab A Executive Summary Two (2) Tab B Required Forms None
3.4.1.1 Tab A: Executive Summary
Respondents must prepare and include an Executive Summary that summarizes the key points from the Respondent’s Business and Technical volumes. The Executive Summary must begin with company/division’s street address; and size of business, CBEs status, and a summary of the key points from the Respondent’s Response. If the Respondent is a current or former Contractor to the Department, the Respondent will notify the Department of the contract number and the Department’s contract manager in its Executive Summary.
3.4.1.2 Tab B: Required Forms
Respondents must complete and submit Form A, Business Response Form and, if Respondent’s principal place of business is outside of the State of Florida, Form B, Foreign State Preference Opinion Form.
Respondents must complete Form C, Client Reference Form, for three (3) Clients to whom Respondent has provided commodities and/or contractual services of similar scope and size as those identified in the RFP. The three (3) completed Client Reference Forms shall be attached in this Tab. Respondents shall not list the Department as a reference. Current or former Contracts with the Department indicated in the Executive Summary will not count as one of the three references.
Respondent gives Department permission to contact client references and obtain their opinion of the Respondent’s past performance using the questions listed on Attachment 2. The Respondent acknowledges that Department will record the client’s opinion on Attachment 2, and that the completed form will become a public record.
Respondent must complete Form G, Forced Labor Attestation Form.
3.4.2 Volume II, Technical Response
The Respondent must prepare and submit a Technical Response volume detailing their qualifications, capabilities, and a description of the commodities and/or contractual services that they will provide to the Department. The Technical Response must contain complete responses to all items. If a portion of any section is omitted, the Response may be deemed Non-Responsive at the sole discretion of the Department.
Volume II Technical Response Tab A Introduction Tab B Background and Organizational Structure Tab C Qualifications and Experience Tab D Detailed Project Approach
3.4.2.1 Tab A: Introduction
Respondents must provide a general description of how the Respondent will accomplish the overall goal of this Solicitation.
3.4.2.2 Tab B: Background and Organizational Structure
Respondents should provide information on the historical background of the Respondent and on the Respondent’s organizational structure. This should include years in operation and years involved in work related to this Solicitation.
3.4.2.3 Tab C: Qualifications and Experience
Respondents should present the qualifications of the Respondent and Respondent’s team. The following topics must be addressed:
a) Each Team member’s experience and examples of qualifications to perform assigned tasks should be outlined. The resume or curriculum vitae for the proposed project manager and principal point of contact must be provided;
b) Respondent should provide any past experience in marine salvage or like activities from sensitive habitats. The resumes, as requested above, must demonstrate personnel with experience in marine salvage, their project experience, and roles in projects; and
c) Respondent’s knowledge of and experience with submerged tire abatement and marine debris removal from sensitive habitat.
3.4.2.4 Tab D: Detailed Project Approach
a) Tire Abatement Plan – The Respondent shall also submit a proposed tire abatement plan. The tire abatement plan shall describe the method of barge anchoring and method of tire recovery.
It shall describe the methodology for handling tires retrieved from the ocean from initial contact to placement on support vessel, transportation to Port, and loading into the Department-provided containers at Port. Tire abatement methods should incorporate the environmental considerations discussed in the Scope of Work for Tire Removal to eliminate impacts to reef habitat and reef organisms from tire removal and extraction.
b) Work Area Coordination – The Respondent shall describe the methods and any required coordination to be used to avoid contact or other project related impacts to hard bottom areas associated with Osborne Tire Reef. For the tire retrieval method proposed, such description shall include the proposed work areas, or a process and criteria to pre-select those areas prior to commencement of work.
c) Permitting – The Respondent shall list and describe all required permits for proposed method of abatement of the waste tires from the point the tires are removed from the ocean floor to the point that the waste tires are put into a container for transport. The Respondent shall describe any critical permit requirements that must be addressed by the proposed removal option and provide an estimated timeframe for obtaining necessary permits. The Respondent shall demonstrate the ability to get permits for this type of work by either having permits for similar types of work or having examples of permitted work done in sensitive marine environments.
d) Turbidity – The Respondent shall describe all methods to reduce any turbidity plume and potential sedimentation onto hard bottom, or to monitor and adaptively limit work area locations as needed for specific proposed tire retrieval methods.
e) Abatement Rate – The Respondent shall provide a description of the anticipated abatement rate, include the total time (in days) it will take to remove, transport and load 100,000 of the waste tires into provided container that will be located at Port. This time will encompass the period from initial mobilization to the loaded 100,000th tire.
3.4.3 Volume III, Price Sheet
The Respondent must complete and submit the Form D, Price Sheet, without alteration, using the instructions provided. The Price Sheet is to be organized as directed on the Form and must contain complete responses to all items. If a portion of any section is omitted, the Price Sheet may be deemed
Non-Responsive at the sole discretion of the Department. The Respondent must not submit their own forms, including quote forms or other documents, in lieu of Form D.
3.5 Economy of Presentation
Responses must be prepared simply and economically, providing a straightforward, concise delineation of the Respondent’s capabilities to satisfy the requirements of this Solicitation without the use of marketing materials, white papers, fancy or flashy graphics, case studies, or other promotional materials. The emphasis of each Response should be on completeness and clarity of content.
3.6 Confidential Response Materials and Redacted Submissions
In addition to the public records requirements of the PUR 1001, section 19, if the Respondent considers any portion of its Response to be Confidential Information or exempt under Chapter 119, F.S., or other authority (Public Records Law), then the Respondent must simultaneously provide the Department with an unredacted version of the materials and a separate redacted copy of the materials the Respondent claims as Confidential Information or exempt and in an index, as described in Section 3.6.1.
The Respondent shall mark the unredacted version of the document as “Unredacted version – contains Confidential Information” and place such information in an encrypted electronic form or a sealed separate envelope.
3.6.1 Redacted Submissions
If submitting a redacted version of its Response, the Respondent shall mark the cover of the redacted copy with the Respondent’s name, Department’s solicitation name, and number, and the words “Redacted Copy.” The Redacted Copy should only redact those portions of material that the Respondent claims are Confidential Information or exempt from Public Records Law. An entire Response should not be redacted. An entire page or paragraph which contains Confidential Information or exempt material should not be redacted unless the entire page or paragraph is wholly Confidential Information or exempt from Public Records Law. In the Redacted Copy, the Respondent shall redact and maintain in confidence any materials the Department provides or seeks regarding security of a proposed technology system or information subject to sections 119.011(14), 119.071(1)(f), and 119.071(3), F.S.
In addition, the Respondent should submit a separate index listing the Confidential Information or exempt portions of its Response. The index should briefly describe in writing the grounds for claiming exemption from the Public Records Law, including the specific statutory citation for such exemption.
The Redacted Copy will be used to fulfill public records and other disclosure requests and will be posted on the FACTS website. In addition, the Department will follow the procedures described in Attachment 4, Public Records Requirements, of the Draft Contract.
By submitting a Response, the Respondent agrees to protect, defend, and indemnify the Department for any and all claims arising from or relating to the Respondent’s determination that the redacted portions of its Response are Confidential Information or otherwise not subject to disclosure. If the Respondent fails to submit a Redacted Copy of its Response, the Department is authorized to produce the entire unredacted Response submitted to the Department in response to a public records request.
4 Scope of Work
4.1 Scope of Work
The Department created a Restoration Plan1 for the Osborne Tire Reef (Chapter 2023-126, Laws of Florida), which includes a plan for the abatement of submerged waste tires causing direct harm to the reef and recommended methods and environmental considerations for their removal. The Contractor shall provide removal services of submerged waste tires comprising the Osborne Tire Reef that are located on sand and reef/hardbottom habitats, off the coast of Broward County, in support of this Restoration Plan. For the purposes of this Scope of Work, the Osborne Tire Reef refers to all tires on the seafloor within the bounds of two sonar-based tire surveys from 2019 and 2024. Exhibits J and K contained within the Contract depict the distribution of Osborne Tire Reef tires identified by sonar surveys in 2019 and 2024, respectively. These figures depict the tire’s spatial distribution and do not represent the actual number of tires found on the seafloor (Appendix C of the Restoration Plan2).
The Contractor shall provide all personnel, materials, labor, permits, and equipment necessary to remove submerged tires from the seafloor, including reef/hardbottom and sand habitat, in support of the Restoration Plan. The Contractor shall remove, transport, and load the tires onto the provided containers at the Port, as detailed in the individual Task Assignments. This Scope of Work provides the minimum services the Department is seeking. The specific Tasks, Deliverables, Performance Measures, Budget, and Deliverable due dates will be included in each issued Task Assignment, see Attachment 3 - Sample Task Assignment & Task Assignment Change Order Forms.
4.2 Contractor Responsibilities
a. Deliverables. The Contractor shall provide the following deliverables:
• Support Vessel(s), Tow Vessel(s), and CREW: If the Contractor shall require a support vessel, then the vessel must have current certificates of inspection capable of handling seas and such other wind, weather, and sea conditions that are typical for Southeast Florida for all work offshore. The support vessel shall be equipped with a real-time Differential Global Positioning System (DGPS) able to navigate to a specific site. The support vessel should be capable of anchoring or spudding for work at 100 ft. depth or more. However, anchoring or spudding on hard bottom is prohibited. The support vessel and the crew shall be licensed and approved by the U.S. Coast Guard for the Scope of Work required.
• Scope of Work for Tire Removal: The Contractor shall be responsible for developing plans to remove all tires from reef/hardbottom and sand habitat based on their experience and the recommendations and requirements in Sections 4.1.1 and 4.1.2 of the Osborne Tire Reef Restoration Plan (Restoration Plan), discussed below.
1 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-tire-reef-restoration-plan-fiscal-year-2023 2 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-reef-waste-tire-removal-project-0 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-tire-reef-restoration-plan-fiscal-year-2023 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-tire-reef-restoration-plan-fiscal-year-2023 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-reef-waste-tire-removal-project-0 https://floridadep.gov/waste/permitting-compliance-assistance/documents/osborne-reef-waste-tire-removal-project-0
i. Considerations for tire removal from coral reef habitat (Section 4.1.1 of the Restoration Plan):
• In 2019, DEP contracted a study to map the density and distribution of Osborne Tire
Reef tires in sand and coral reef habitats (2019 Tire Survey). Results of the survey indicated that tires were primarily concentrated in offshore waters between Sunrise Boulevard and Hugh Taylor Birch State Park, Fort Lauderdale, approximately 3 to 4 miles north of Port Everglades Inlet (Exhibit J). However, the scope and scale of the 2019 Tire Survey was limited. To fully delineate the tires, the spatial scale of the tire mapping effort was expanded in a 2024 Tire Survey. As opposed to the roughly 770 acres of Middle Reef, sand, and Outer Reef habitat found to contain tires in the 2019 Tire Survey, the 2024 Tire Survey documented tires distributed across all four reef complexes and sand habitats within a greatly expanded area totaling over 6,000 acres (Exhibit K). The vast majority of tires were found to be located within sand channels between and within reef complexes, although substantial accumulations of tires were noted along the margins of reef complexes and, occasionally, on reef habitat. Both of the sonar-based surveys were able to distinguish the location of tires in sand habitat very well but less likely to identify tires on reef. Thus, the number of tires and their location on elevated reef habitat is not well understood. Additional survey efforts may be needed to verify the location of tires on reef habitat for their eventual removal.
• Tires shall be removed systematically using the grid-cell layer provided in Exhibit K.
Recommended reef complex and directional prioritizations for tire removal are based on the current distribution of tires in the broader area and on environmental and logistical considerations relating to the risks posed by future tire movement, the timing of restoration activities associated with the Restoration Plan, and the efficiency of contracted tire removal. Tire densities are greatest in the Outer Reef and decline in the inshore direction, and tires tend to be denser in the southern portions of the Outer and Middle Reefs and in the northern portions of the Inner Reef/Nearshore Ridge (Exhibit K).
These patterns, coupled with the logistical ease of working within the same depth contour, suggest that reef complexes should be fully cleared of tires starting at the Outer Reef and moving sequentially inshore as each complex is cleared (i.e., from the Outer Reef to the Middle Reef and then to the Inner Reef/Nearshore Ridge).
Additionally, it is recommended that tire removal start in the south and work north when removing tires from the Outer and Middle Reefs and start in the north and work south when removing tires from the Inner Reef/Nearshore Ridge. The described process and timing for tire removal may vary based on availability and development of appropriate specialized equipment needed to recover tires at greater depths.
• A grid of cells superimposed on a map of the current distribution of tires from the 2024
Tire Survey provides a systematic and manageable way to remove tires from the great expanse of reef habitat within the distribution of dispersed tires. It is therefore recommended that contractor(s) clear cells of tires sequentially, in the manner described previously (i.e., by reef complex and direction within reef complex). To allow restoration activities to progress in an efficient manner and to prevent the repopulation of reef habitat with tires from nearby sand features, tire removal contractor(s) shall coordinate with DEP to ensure that sand habitat within cells immediately adjacent to cells containing reef habitat are cleared of tires at similar times.
ii. Environmental considerations for tire removal from coral reef habitat (Section 4.1.2 of the
Restoration Plan):
• Along with stony corals, the coral reef community within the distribution of dispersed tires is characterized by an abundance of delicate soft corals and large barrel sponges, organisms which can easily be damaged by divers and equipment. Further, a 2024 Recon Survey (see Appendix C of the Restoration Plan3) discovered that tires, when present in the reef habitat, could be buried or entrapped, suggesting that indelicate removal could result in sedimentation and, in some cases, structural damage to the reef. The following considerations and recommendations are intended to help the tire removal effort be as efficient as possible while avoiding injury to the reef habitat and biota.
• Working in sensitive coral reef habitat in varying depths, currents, and visibility will be challenging, and divers must maintain neutral buoyancy or work in sand patches to avoid impacts. Sand patches, troughs, and flats can serve as staging areas for equipment and removed tires, where large enough to accommodate these items. Different reef areas will have their own unique conditions and communities, and contractors should familiarize themselves with each site before commencing work. Cached tires should be bound so that they remain in stable formations and should be removed from the water before any high-energy wave events (i.e., storms). Offloading tires brought to the surface by divers may be easier, especially at deeper depths, if the vessel is moored to a stationary point that avoids hardbottom.
• The standard tire removal procedure should be to carefully lift tires from the reef and relocate them to sand habitat where the sediment trapped within can be removed.
From there, they can be cached in secure bundles and then raised to vessels on the surface using lift bags. While all tires will have some degree of sediment trapped inside them, some tires will be loose on the reef while others will be buried or entrapped.
Further, over half of the tires will likely have organisms growing on them (e.g., sponges, octocorals and/or stony corals). Each of these scenarios will require a different approach to tire removal. The standard approach can be used for loose tires free of biota. Buried tires will need to be excavated before being relocated, and care should be taken to avoid releasing sediment on the reef.