RFP 2025-11 - Attachment D - Price Schedule MTA _APC_and_AVL.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
RFP 2025-11-Automatic Passenger Counter(APC) & Automatic Vehicle Loc. Sys. (AVL)
Solicitation number
2025-11
Issued by
Michigan

About this file

This document is a Price Schedule for RFP 2025-11 issued by the Mass Transportation Authority (MTA) in Michigan, detailing a comprehensive procurement for Automatic Passenger Counter (APC) and Automated Vehicle Location (AVL) systems. The RFP is structured across nine tabs covering software licenses, equipment, implementation, and optional components for two primary project phases. Phase 1 focuses on Automatic Passenger Counters and Passenger Information Display Systems, while Phase 2 covers optional Computer Aided Dispatch and Automated Vehicle Location systems. The proposal requires detailed pricing across base and optional years, with vendors expected to provide unit prices, quantities, installation costs, maintenance, technical support, and warranty information for fixed-route transit equipment.

The pricing schedule emphasizes that while certain items are labeled "optional," proposers must submit complete details and costs for all items. The document includes extensive pricing breakdowns for software licenses, equipment, integrations, implementation costs, and spare parts. Specific integration requirements include interfaces with exterior vehicle destination systems, fare collection systems, scheduling software, and cellular mobile data communications. The pricing structure allows for five base years with optional year extensions, and requires proposers to complete detailed cost calculations across multiple categories including software applications, equipment, installation, maintenance, and warranty. Proposers are instructed to sign and date each tab of the pricing schedule, ensuring comprehensive and accurate proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Mass Transportation Authority (MTA)

PRICING SCHEDULE
Instructions
1PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.

2 The Proposer is responsibile for ensuring all calculations are accurate on each sheet (Formulas, Sub-totals, Summary Totals, Totals by Section etc.)

3If required additional "ROWS" may be inserted in tables to include additional line items.
4The Proposer is required to "SIGN AND DATE" the Price Schedule and each tab on the PDF format to be submitted.
5On the RFP 2025-11 Document, SHEETS are listed. On this document the SHEETS are referred to as TABS.
Acknowledgement of Price Schedule and Tabs
The Proposer acknowledges review and completion of the following tab(s)/sheets(s) (Mark "X" to each tab).
Tab/DescriptionMark "X" for acknowledgement
Price Schedule
Tab1 - Phase 1 - Automatic Passenger Counters - Software Licenses & Applications / Software Maintenance & Technical Support/ Hosting Services
Tab 2 - Phase 1 - Automatic Passenger Counters Equipment
Tab 3 - Phase 1 - Passenger Information Display System Tranist Center and Bus Bay(s)
Tab 4 - Phase 1 - Automatic Passenger Counters and Implementation Cost
Tab 5 - Phase 1 - Automatic Passenger Counters Spare Equipment
Tab 6 - Phase 2 - Automated Vehicle Location - Software Licenses & Applications / Software Maintenance & Technical Support/ Hosting Services - Optional
Tab 7 - Phase 2 - Automated Vehicle Location Equipment - Optional
Tab 8 - Phase 2 - Automated Vehicle Location Intergration and Implementation Cost - Optional
Tab 9 - Phase 2 - Automated Vehicle Location Spare Equipment - Optional
Reference TAB(s)Phase 1 - Automatic Passenger Counters (Base & Option Years)
Base TotalOptional Years TotalGrand Total
TAB 1Software Licenses & Applications$ - 0ERROR:#REF!ERROR:#REF!
TAB 1Software Maintenance & Technical Support$ - 0ERROR:#REF!ERROR:#REF!
TAB 1Hosting Services$ - 0ERROR:#REF!ERROR:#REF!
TAB 2Automatic Passenger Counters and On-board Passenger Information Display System Equipment$ - 0$ - 0
TAB 2Automatic Passenger Counters and On-board Passenger Information Display System Equipment - Installation$ - 0$ - 0
TAB 2Automatic Passenger Counters and On-board Passenger Information Display System Equipment - Maintenance & Technical Support$ - 0ERROR:#REF!ERROR:#REF!
TAB 2Automatic Passenger Counters and On-board Passenger Information Display System Equipment- Warranty$ - 0ERROR:#REF!ERROR:#REF!
TAB 3Intergrations / Application Programming Interfaces$ - 0$ - 0
TAB 3Implementation$ - 0$ - 0
TAB 4Equipment Spare Parts$ - 0$ - 0
Grand Total$ - 0ERROR:#REF!ERROR:#REF!
Reference TAB(s)Automated Vehicle Location - Optional
Base TotalOptional Years TotalGrand Total
TAB 5Software Licenses & Applications$ - 0ERROR:#REF!ERROR:#REF!
TAB 5Software Maintenance & Technical Support$ - 0ERROR:#REF!ERROR:#REF!
TAB 5Hosting Services$ - 0ERROR:#REF!ERROR:#REF!
TAB 6Computer Aided Dispatch and Automated Vehicle Location EquipmentERROR:#REF!ERROR:#REF!
TAB 6Computer Aided Dispatch and Automated Vehicle Location Equipment - InstallationERROR:#REF!ERROR:#REF!
TAB 6Computer Aided Dispatch and Automated Vehicle Location Equipment - Maintenance & Technical SupportERROR:#REF!ERROR:#REF!ERROR:#REF!
TAB 6Computer Aided Dispatch and Automated Vehicle Location Equipment - WarrantyERROR:#REF!ERROR:#REF!ERROR:#REF!
TAB 7Intergrations / Application Programming Interfaces$ - 0$ - 0
TAB 7Implementation$ - 0$ - 0
TAB 8Equipment Spare Parts$ - 0$ - 0
Grand TotalERROR:#REF!ERROR:#REF!ERROR:#REF!
Base TotalOptional Years TotalGrand Total
Phase 1 - Automatic Passenger Counters and Passenger Information Display System(s)$ - 0ERROR:#REF!ERROR:#REF!
Phase 2 - Computer Aided Dispatch and Automated Vehicle Location - OptionalERROR:#REF!ERROR:#REF!ERROR:#REF!
TotalERROR:#REF!ERROR:#REF!ERROR:#REF!

Signature and Date

TAB 1

Mass Transportation Authority
Automatic Passenger Counters
Software Licenses & Applications / Software Maintenance & Technical Support/ Hosting Services
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.

Software Licenses & Applications

Product/DescriptionBase YearsBase Total Only
Provide description of Software Licenses/Applications to be Hosted12345
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Product/DescriptionBase YearsBase Total Only
12345
Software Maintenance & Technical Support$ - 0
Hosting Services$ - 0
Signature and Date

TAB 2

MTA
Automatic Passenger Counters Equipment
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.
MTA Fixed-Route Equipment - APC
Product/DescriptionUnit PriceQtyTotal
Automatic Passenger Counter$ - 0
Other Equipment and Systems (Please provide description and cost break-down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Sub-Total$ - 0
Additional Fixed Route Onboard Equipment
Product/DescriptionUnit PriceQtyTotal
Other Equipment and Systems (Please provide description and cost break-down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0

Onboard Equipment Total $ - 0

APC Onboard Equipment Installation
Product/DescriptionTotal
Installation - APC$ - 0
Other costs (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0
Product/DescriptionBase YearsBase Total Only
12345
Equipment Maintenance & Technical Support - APC$ - 0
Total Equipment Maintenance & Technical Support$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Equipment Warranty - APC$ - 0
Total Equipment Warranty$ - 0$ - 0$ - 0$ - 0$ - 0

Signature and Date

TAB 3

Mass Transportation Authority
Phase 1 - Automatic Passenger Counters
Integration and Implementation Cost
Integrations / Application Programming Interfaces
Product/DescriptionTotal
Inegration with current systems$ - 0
List Integrations and Application Programming Interfaces. (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0
Implementation
Product/DescriptionTotal
Project Management$ - 0
Design Reviews$ - 0
Full System Testing$ - 0
Training$ - 0
Documentation$ - 0
Other implementation costs (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
Total$ - 0
Signature and Date

TAB 4

Mass Transportation Authority
Phase 1 - Automatic Passenger Counters Spare Equipment
Equipment Spare Parts Required
Product/DescriptionUnit PriceQtyTotal
List all spare parts recommended$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total Spare Part Inventory$ - 0
Signature and Date

TAB 5

Mass Transportation Authority
Automated Vehicle Location
Software Licenses & Applications / Software Maintenance & Technical Support/ Hosting Services
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.

Software Licenses & Applications

Product/DescriptionBase YearsBase Total Only
Provide description of Software Licenses/Applications to be Hosted12345
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Product/DescriptionBase YearsBase Total Only
12345
Software Maintenance & Technical Support$ - 0
Hosting Services$ - 0
Signature and Date

TAB 6

Mass Transportation Authority
Automated Vehicle Location Equipment
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.
MTA Fixed-Route Equipment
Product/DescriptionUnit PriceQtyTotal
Automatic Vehicle Location$ - 0
$ - 0
Other Equipment and Systems (Please provide description and cost break-down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Sub-Total$ - 0
Additional Equipment
Product/DescriptionUnit PriceQtyTotal
Other Equipment and Systems (Please provide description and cost break-down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Sub-Total$ - 0

Total ERROR:#REF!

Equipment Installation
Product/DescriptionTotal
Installation - Fixed Route$ - 0
$ - 0
Other costs (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
Total$ - 0
Product/DescriptionBase YearsBase Total Only
12345
Equipment Maintenance & Technical Support$ - 0

Equipment Warranty $ - 0

Signature and Date

TAB 7

Mass Transportation Authority
Automated Vehicle Location - Optional
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.
Integration and Implementation Cost
Integrations / Application Programming Interfaces
Product/DescriptionTotal
Integration with Exterior Vehicle Destination$ - 0
Integration with Fare Collection System$ - 0
Integration with Optibus for Scheduling$ - 0
Integration with Cellular Mobile Data Communications System$ - 0
On-board Single Sign-On$ - 0
List other Integrations and Application Programming Interfaces. (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total$ - 0
Implementation
Product/DescriptionTotal
Project Management$ - 0
Design Reviews$ - 0
Full System Testing$ - 0
Training$ - 0
Documentation$ - 0
Travel and other expenses$ - 0
Other implementation costs (Please provide description and cost break down)$ - 0
$ - 0
$ - 0
Total$ - 0
Signature and Date

TAB 8

Mass Transportation Authority
Automated Vehicle Location Spare Equipment - Optional
PLEASE NOTE THAT THE TERM “OPTIONAL” APPLIES TO MTA’S SELECTION OF THESE ITEMS AS OPTIONAL; THE PROPOSER MUST SUBMIT DETAILS AND COSTS FOR ALL OPTIONAL ITEMS.
Equipment Spare Parts Required
Product/DescriptionUnit PriceQtyTotal
List all spare parts recommended$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total Spare Part Inventory$ - 0
Signature and Date

File details come from the government source that posted it. Updated .