RFP 2022-28 Construction Support servies for Sunnyside Paving projects.pdf
PDF 16 MB Posted
- Attached to
- RFP#2022-28 CONSTRUCTION ENGINEERING SUPPORT AND INSPECTION SERVICES FOR Sunnyside road paving
- Solicitation number
- S-C01010-00002466
- Issued by
- Clackamas County, Oregon
About this file
This document is a Request for Proposals (RFP) issued by Clackamas County, Oregon and the City of Oregon City for Construction Engineering Support and Inspection Services for Sunnyside Road paving projects. The requested services include construction oversight, inspection, materials testing, and related support for the paving of Sunnyside Road within the respective jurisdictions. The RFP outlines the scope of work, project overview, and response requirements. Proposals are due on December 16, 2022, and the anticipated contract term is 24 months with optional 12-month renewals.
The RFP provides details on pricing structure, which shall be on a time and materials basis. No specific set-aside or disadvantaged business requirements are noted. The projects are funded through a mix of state and local sources, but the total available budget is not disclosed. The RFP also includes requirements for insurance, bonding, and other standard contract terms and conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP Attachment-1_SP-968-17.pdf | ||
| 2022-28 Notice of Intent to Award- signed.pdf | ||
| RFP 2022-28 Submittal Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS #2022-28
QUALIFICATION BASED SELECTION
FOR
CONSTRUCTION ENGINEERING SERVICES FOR SUNNYSIDE PAVING PROJECTS
BOARD OF COUNTY COMMISSIONERS
TOOTIE SMITH, Chair
SONYA FISCHER, Commissioner PAUL SAVAS, Commissioner
MARK SHULL, Commissioner MARTHA SCHRADER, Commissioner
Gary Schmidt
County Administrator
Tralee Whitley
Contract Analyst
PROPOSAL CLOSING DATE, TIME AND LOCATION
DATE: April 5, 2022
TIME: 3:00 PM, Pacific Time
PLACE: Procurement@clackamas.us mailto:Procurement@clackamas.us
RFP#2022-27 Page ii Construction Engineering Support and Inspection Services for 2022 Local Paving Projects
SCHEDULE
Request for Proposals Issued…….................................................. March 15, 2022
Protest of Specifications Deadline..................................................March 22, 2022, 5:00 PM, Pacific Time
Deadline to Submit Clarifying Questions....................................... March 29, 2022, 5:00 PM, Pacific Time
Request for Proposals Closing Date and Time……....................... April 5, 2022, 3:00 PM, Pacific Time
Deadline to Submit Protest of Award............................................. Seven (7) days from the Intent to Award
Anticipated Contract Start Date……..............................................Spring 2022
TABLE OF CONTENTS
Section 1 – Notice of Request for Proposals
Section 2 – Instructions to Proposers
Section 3 – Scope of Work
Section 4 – Evaluation and Selection Criteria
Section 5 – Proposal Content (Including Proposal Certification)
SECTION 1
NOTICE OF REQUEST FOR PROPOSALS
Notice is hereby given that Clackamas County through its Board of County Commissioners will receive sealed Proposals per specifications until 3:00 PM, April 5, 2022 (“Closing”), to provide Construction Engineering Support and Inspection Services for 2022 Local Paving Projects. No Proposals will be received or considered after that time.
The resulting contract from this RFP require the consultant to begin work in Spring 2022.
RFP Documents can be downloaded from the state of Oregon procurement website (“OregonBuys”) at the following address https://oregonbuys.gov/bso/view/login/login.xhtml, Document No. S-C01010-00002466.
Prospective Proposers will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Proposers are responsible for obtaining any Addenda, clarifying questions, and Notices of Award from OregonBuys. Sealed Proposals are to be emailed to Clackamas County Procurement Services at procurement@clackamas.us.
Contact Information Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us
The Board of County Commissioners reserves the right to reject any and all Proposals not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any and all Proposals upon the finding that it is in the public interest to do so and to waive any and all informalities in the public interest. In the award of the contract, the Board of County Commissioners will consider the element of time, will accept the Proposal or Proposals which in their estimation will best serve the interests of Clackamas County and will reserve the right to award the contract to the contractor whose Proposal shall be best for the public good.
Clackamas County encourages proposals from Minority, Women, Veteran and Emerging Small Businesses.
https://oregonbuys.gov/bso/view/login/login.xhtml mailto:procurement@clackamas.us mailto:TWhitley@clackamas.us
RFP#2022-27 Page 2
SECTION 2
INSTRUCTIONS TO PROPOSERS
Clackamas County (“County”) reserves the right to reject any and all Proposals received as a result of this RFP. County Local Contract Review Board Rules (“LCRB”) govern the procurement process for the County.
2.1 Modification or Withdrawal of Proposal: Any Proposal may be modified or withdrawn at any time prior to the Closing deadline, provided that a written request is received by the County Procurement Division Director, prior to the Closing. The withdrawal of a Proposal will not prejudice the right of a Proposer to submit a new Proposal.
2.2 Requests for Clarification and Requests for Change: Proposers may submit questions regarding the specifications of the RFP. Questions must be received in writing on or before 5:00 p.m. (Pacific Time), on the date indicated in the Schedule, at the Procurement Division address as listed in Section 1 of this RFP.
Requests for changes must include the reason for the change and any proposed changes to the requirements.
The purpose of this requirement is to permit County to correct, prior to the opening of Proposals, RFP terms or technical requirements that may be unlawful, improvident or which unjustifiably restrict competition.
County will consider all requested changes and, if appropriate, amend the RFP. No oral or written instructions or information concerning this RFP from County managers, employees or agents to prospective Proposers shall bind County unless included in an Addendum to the RFP.
2.3 Protests of the RFP/Specifications: Protests must be in accordance with LCRB C-047-0730.
Protests of Specifications must be received in writing on or before 5:00 p.m. (Pacific Time), on the date indicated in the Schedule, or within three (3) business days of issuance of any addendum, at the Procurement Division address listed in Section 1 of this RFP. Protests may not be faxed. Protests of the RFP specifications must include the reason for the protest and any proposed changes to the requirements.
2.4 Addenda: If any part of this RFP is changed, an addendum will be provided to Proposers that have provided an address to the Procurement Division for this procurement. It shall be Proposers responsibility to regularly check OregonBuys for any notices, published addenda, or response to clarifying questions.
2.5 Submission of Proposals: Proposals must be submitted in accordance with Section 5. All Proposals shall be legibly written in ink or typed and comply in all regards with the requirements of this RFP. Proposals that include orders or qualifications may be rejected as irregular. All Proposals must include a signature that affirms the Proposer’s intent to be bound by the Proposal (may be on cover letter, on the Proposal, or the Proposal Certification Form) shall be signed. If a Proposal is submitted by a firm or partnership, the name and address of the firm or partnership shall be shown, together with the names and addresses of the members. If the Proposal is submitted by a corporation, it shall be signed in the name of such corporation by an official who is authorized to bind the contractor. The Proposals will be considered by the County to be submitted in confidence and are not subject to public disclosure until the notice of intent to award has been issued.
No late Proposals will be accepted. Proposals submitted after the Closing will be considered late and will be returned unopened. Proposals may not be submitted by telephone or fax.
2.6 Post-Selection Review and Protest of Award: County will name the apparent successful Proposer in a Notice of Intent to Award published on OregonBuys. Identification of the apparent successful Proposer is procedural only and creates no right of the named Proposer to award of the contract. Competing Proposers shall be given seven (7) calendar days from the date on the Notice of Intent to Award to review the file at the Procurement Division office and file a written protest of award, pursuant to LCRB C-047-0740. Any award protest must be in writing and must be delivered by email, hand-delivery or mail to the address for the Procurement Division as listed in Section 1 of this RFP.
Only actual Proposers may protest if they believe they have been adversely affected because the Proposer would be eligible to be awarded the contract in the event the protest is successful. The basis of the written protest must
RFP#2022-27 Page 3 be in accordance with ORS 279B.410 and shall specify the grounds upon which the protest is based. In order to be an adversely affected Proposer with a right to submit a written protest, a Proposer must be next in line for award, i.e. the protester must claim that all higher rated Proposers are ineligible for award because they are non-responsive or non-responsible.
County will consider any protests received and:
a. reject all protests and proceed with final evaluation of, and any allowed contract language negotiation with, the apparent successful Proposer and, pending the satisfactory outcome of this final evaluation and negotiation, enter into a contract with the named Proposer; OR
b. sustain a meritorious protest(s) and reject the apparent successful Proposer as nonresponsive, if such Proposer is unable to demonstrate that its Proposal complied with all material requirements of the solicitation and Oregon public procurement law; thereafter, County may name a new apparent successful Proposer; OR
c. reject all Proposals and cancel the procurement.
2.7 Acceptance of Contractual Requirements: Failure of the selected Proposer to execute a contract and deliver required insurance certificates within ten (10) calendar days after notification of an award may result in cancellation of the award. This time period may be extended at the option of County.
2.8 Public Records: Proposals are deemed confidential until the “Notice of Intent to Award” letter is issued.
This RFP and one copy of each original Proposal received in response to it, together with copies of all documents pertaining to the award of a contract, will be kept and made a part of a file or record which will be open to public inspection. If a Proposal contains any information that is considered a TRADE SECRET under ORS 192.345(2), SUCH INFORMATION MUST BE LISTED ON A SEPARATE SHEET CAPABLE OF SEPARATION
FROM THE REMAINING PROPOSAL AND MUST BE CLEARLY MARKED WITH THE
FOLLOWING LEGEND:
“This information constitutes a trade secret under ORS 192.345(2), and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS Chapter 192.”
The Oregon Public Records Law exempts from disclosure only bona fide trade secrets, and the exemption from disclosure applies only “unless the public interest requires disclosure in the particular instance” (ORS 192.345).
Therefore, non-disclosure of documents, or any portion of a document submitted as part of a Proposal, may depend upon official or judicial determinations made pursuant to the Public Records Law.
2.9 Investigation of References: County reserves the right to investigate all references in addition to those supplied references and investigate past performance of any Proposer with respect to its successful performance of similar services, its compliance with specifications and contractual obligations, its completion or delivery of a project on schedule, its lawful payment of subcontractors and workers, and any other factor relevant to this RFP. County may postpone the award or the execution of the contract after the announcement of the apparent successful Proposer in order to complete its investigation.
2.10 RFP Proposal Preparation Costs and Other Costs: Proposer costs of developing the Proposal, cost of attendance at an interview (if requested by County), or any other costs are entirely the responsibility of the Proposer, and will not be reimbursed in any manner by County.
2.11 Clarification and Clarity: County reserves the right to seek clarification of each Proposal, or to make an award without further discussion of Proposals received. Therefore, it is important that each Proposal be submitted initially in the most complete, clear, and favorable manner possible.
2.12 Right to Reject Proposals: County reserves the right to reject any or all Proposals or to withdraw any item from the award, if such rejection or withdrawal would be in the public interest, as determined by County.
RFP#2022-27 Page 4
2.13 Cancellation: County reserves the right to cancel or postpone this RFP at any time or to award no contract.
2.14 Proposal Terms: All Proposals, including any price quotations, will be valid and firm through a period of one hundred and eighty (180) calendar days following the Closing date. County may require an extension of this firm offer period. Proposers will be required to agree to the longer time frame in order to be further considered in the procurement process.
2.15 Oral Presentations: At County’s sole option, Proposers may be required to give an oral presentation of their Proposals to County, a process which would provide an opportunity for the Proposer to clarify or elaborate on the Proposal but will in no material way change Proposer’s original Proposal. If the evaluating committee requests presentations, the Procurement Division will schedule the time and location for said presentation. Any costs of participating in such presentations will be borne solely by Proposer and will not be reimbursed by County. Note: Oral presentations are at the discretion of the evaluating committee and may not be conducted;
therefore, written Proposals should be complete.
2.16 Usage: It is the intention of County to utilize the services of the successful Proposer(s) to provide services as outlined in the below Scope of Work.
2.17 Review for Responsiveness: Upon receipt of all Proposals, the Procurement Division or designee will determine the responsiveness of all Proposals before submitting them to the evaluation committee. If a Proposal is incomplete or non-responsive in significant part or in whole, it will be rejected and will not be submitted to the evaluation committee. County reserves the right to determine if an inadvertent error is solely clerical or is a minor informality which may be waived, and then to determine if an error is grounds for disqualifying a Proposal. The Proposer’s contact person identified on the Proposal will be notified, identifying the reason(s) the Proposal is non-responsive. One copy of the Proposal will be archived and all others discarded.
2.18 RFP Incorporated into Contract: This RFP will become part of the Contract between County and the selected contractor(s). The contractor(s) will be bound to perform according to the terms of this RFP, their Proposal(s), and the terms of the Sample Contract.
2.19 Communication Blackout Period: Except as called for in this RFP, Proposers may not communicate with members of the Evaluation Committee or other County employees or representatives about the RFP during the procurement process until the apparent successful Proposer is selected, and all protests, if any, have been resolved. Communication in violation of this restriction may result in rejection of a Proposer.
2.20 Prohibition on Commissions and Subcontractors: County will contract directly with persons/entities capable of performing the requirements of this RFP. Contractors must be represented directly.
Participation by brokers or commissioned agents will not be allowed during the Proposal process. Contractor shall not use subcontractors to perform the Work unless specifically pre-authorized in writing to do so by the County. Contractor represents that any employees assigned to perform the Work, and any authorized subcontractors performing the Work, are fully qualified to perform the tasks assigned to them, and shall perform the Work in a competent and professional manner. Contractor shall not be permitted to add on any fee or charge for subcontractor Work. Contractor shall provide, if requested, any documents relating to subcontractor’s qualifications to perform required Work.
2.21 Ownership of Proposals: All Proposals in response to this RFP are the sole property of County, and subject to the provisions of ORS 192.410-192.505 (Public Records Act).
2.22 Clerical Errors in Awards: County reserves the right to correct inaccurate awards resulting from its clerical errors.
RFP#2022-27 Page 5
2.23 Rejection of Qualified Proposals: Proposals may be rejected in whole or in part if they attempt to limit or modify any of the terms, conditions, or specifications of the RFP or the Sample Contract.
2.24 Collusion: By responding, the Proposer states that the Proposal is not made in connection with any competing Proposer submitting a separate response to the RFP, and is in all aspects fair and without collusion or fraud. Proposer also certifies that no officer, agent, elected official, or employee of County has a pecuniary interest in this Proposal.
2.25 Evaluation Committee: Proposals will be evaluated by a committee consisting of representatives from County and potentially external representatives. County reserves the right to modify the Evaluation Committee make-up in its sole discretion.
2.26 Commencement of Work: The contractor shall commence no work until all insurance requirements have been met, the Protest of Awards deadline has been passed, any protest have been decided, a contract has been fully executed, and a Notice to Proceed has been issued by County.
2.27 Nondiscrimination: The successful Proposer agrees that, in performing the work called for by this RFP and in securing and supplying materials, contractor will not discriminate against any person on the basis of race, color, religious creed, political ideas, sex, age, marital status, sexual orientation, gender identity, veteran status, physical or mental handicap, national origin or ancestry, or any other class protected by applicable law.
RFP#2022-27 Page 6
SECTION 3
SCOPE OF WORK
3.1. INTRODUCTION
The Clackamas County Department of Transportation and Development (“DTD”), hereafter referenced as “County”, is seeking the services of a qualified consultant to provide construction engineering support and inspection services for the 2022 Paving Projects as listed below.
Please direct all Technical/Specifications or Procurement Process Questions to the indicated representative referenced in the Notice of Request for Proposals and note the communication restriction outlined in Section 2.19.
3.2 BACKGROUND
Clackamas County Department of Transportation and Development’s Maintenance Division is responsible for repairing and maintaining 1,400 miles of county roads, 2,400 miles rock shoulders, 26,450 road signs, 9,300 catch basins, 8,200 cross-culverts, 21 miles of guardrail, 165 traffic signals, and 180 bridges.
Clackamas County Department of Transportation and Development’s Maintenance Division is seeking written statements of qualifications from engineering consulting firms with expertise in public works construction management, construction engineering support, and field inspection services for their pavement preservation projects.
The County is seeking construction engineering support and inspection services for Sunnyside Road between 122nd Avenue and 162nd Avenue. See table listed below.
The timing of this project will be dependent on when the contracts are awarded and the contractor’s schedule. The County is anticipating the majority of the work under this contract to occur in June, July, and August.
3.3. SCOPE OF WORK
3.3.1. Scope:
The County is soliciting professional services from consulting engineers ("Consultant") consisting of Construction Engineering Support and Inspection Services (“CESI”). The Consultant will support County
Road Name Funding Source From To Miles Asphalt Tonnage
Sunnyside Road Paving Project Sunnyside Road (122nd-132nd)
HB2017 + Road Fund 122nd Avenue 132nd Avenue
0.56 5,975
Sunnyside Road (132nd-162nd)
HB2017 + Road Fund 132nd Avenue 162nd Avenue
1.56 17,925
Total 2.12 23,900
RFP#2022-27 Page 7
Staff by providing CESI services necessary to ensure the construction that performed within the public right-of-way conforms to County standards, local, state, and federal laws by monitoring and verifying that the construction contractors’ work are in conformance with the approved project plans, special provisions, and specifications. The County will be responsible for construction contract administration and overall construction management of the projects.
The general scope of this contract is to support the County with construction management and construction contract administration of the six projects described in section 3.2. A detailed scope of work shall be included in the proposal addressing the following tasks:
Task 1: Project Management and Coordination As part of the Consultants project management of the project, the Consultant will:
A. Designate and coordinate the consultant team.
B. Provide direction to Consultant field staff and coordinate project issues with the County.
C. Review project schedule for staffing and resourcing.
D. Maintain project files related to Consultant deliverables.
E. Prepare detailed monthly progress reports and progress billings and submit to the County for approval and payment.
F. Monitor and manage project budget.
G. Lead Consultant project team.
H. Coordinate Consultant tasks and activities with the County. This may include bi-weekly 1-hour virtual meetings.
I. Consultant’s Project Manager to attend preconstruction conferences for each project.
J. Provide QA/QC of Consultant’s own work.
Consultant Deliverables: monthly progress billings reports.
Task 2: Construction Engineering Support and Inspection Services
The Consultant will provide daily construction field inspection and documentation services as follows:
A. Personnel wearing appropriate safety gear.
B. Tools and supplies to perform inspection duties and all other duties required under the contract.
C. Appropriate training and mentoring to require little assistance from County personnel.
D. Maintain effective work relations and attempt to resolve all issues as the lowest level practical.
E. Review the Contractor’s asphalt mix design submittal. Asphalt mix design review shall be performed by a professional engineer that licensed to practice engineering in the state of Oregon.
F. Provide ODOT certified inspectors. (At least one ODOT certified inspector per project).
G. Provide all inspection duties outlined in ODOT’s Inspector’s Manual.
H. Communicate important issues, such as actual or potential safety, political, cost, and schedule risks, to the County promptly.
I. Monitor the daily performance of the Contractor to ensure conformance to the plans, specifications, and contract change orders.
J. Inspect Contractor’s work and material deliveries to project site to ensure compliance with approved submittals.
K. Regulate Contractor’s activities to ensure construction activities are conducted within the
County’s rights of ways and easements as shown on the plans.
L. Follow the Engineer’s direction.
M. Record Contractor’s progress and/or delays with their work utilizing ODOT Daily General
Progress Report Form 734-3474, attach photographs.
RFP#2022-27 Page 8
N. Verify material sources compliance.
O. Facilitate proper and timely payments to the Contractor by collecting weigh memo, record material receipts, field measurements, and utilizing the County’s Quantity Verification Forms.
P. Assist with the preparation of monthly progress pay estimates by supporting County staff with timely submittals of completed and accurate Quantity Verification Forms.
Q. Inform quality assurance personnel of problems or potential problems with field-tested materials.
R. Work with County’s Construction Project Manager, Contractor, and others to trouble shoot problems with construction.
S. Help ensure quality control testing is being performed as required.
T. Meet with Clackamas County Department of Transportation and Development’s Construction
Project Manager to review construction progress and potential issues on a weekly basis.
U. Substantial Completion walk-thru and follow-up.
V. Prepare punch Lists.
W. Punch list verification walk-thru and follow-up.
X. QA/QC all documents submitted to the County
Consultant Deliverables: Construction Daily Progress Reports with photos, submit to the County within 48 hours after the construction contractors work occurred, Quantity Verification Forms, submit to the County within 48 hours after item was installed, and punch list, submit to the County within 7 days after the contractor is substantially complete.
The Scope further includes the following documents which are hereby attached and incorporated for reference.
• Sunnyside Road Paving Project, March 2022 (41 pages)
• Special Provisions for Sunnyside Road Paving Project, March 2022 (48 pages)
• 2022 Paving Packages: Sunnyside Road Paving Project 90% Design Construction Cost
Estimate (1 page)
3.3.2. Work Schedule:
Completion of the construction engineering support and inspection services for the 2022 Paving Packages will follow with one month of the completion of the latest project to be constructed. The timing of the work performed under this contract will be dependent on when the County receives applicable permits, award of the construction contracts, and contractors’ schedules. The County is anticipating the majority of the work to occur between June 20, 2022 and August 31, 2022.
3.3.3. Term of Contract:
The term of the contract shall be from the effective date through December 31, 2022.
3.3.4 Sample Contract: Submission of a Proposal in response to this RFP indicates Proposer’s willingness to enter into a contract containing substantially the same terms (including insurance requirements) of the sample contract identified below. No action or response to the sample contract is required under this RFP. Any objections to the sample contract terms should be raised in accordance with Paragraphs 2.2 or 2.3 of this RFP, pertaining to requests for clarification or change or protest of the RFP/specifications, and as otherwise provided for in this RFP. This RFP and all supplemental information in response to this RFP will be a binding part of the final contract.
The applicable Sample Personal Services Contract for this RFP can be found at https://www.clackamas.us/finance/terms.html.
https://www.clackamas.us/finance/terms.html
RFP#2022-27 Page 9
Personal Services Contract (unless checked, item does not apply)
The following paragraphs of the Professional Services Contract will be applicable:
Article I, Paragraph 5 – Travel and Other Expense is Authorized Article II, Paragraph 28 – Confidentiality Article II, Paragraph 29 – Criminal Background Check Requirements Article II, Paragraph 30 – Key Persons Article II, Paragraph 31 – Cooperative Contracting Article II, Paragraph 32 – Federal Contracting Requirements Exhibit A – On-Call Provision
The following insurance requirements will be applicable:
Commercial General Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for Bodily Injury and Property Damage.
Professional Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for damages caused by error, omission or negligent acts.
Automobile Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence for Bodily Injury and Property Damage.
RFP#2022-27 Page 10
SECTION 4
EVALUATION PROCEDURE
4.1 An evaluation committee will review all Proposals that are initially deemed responsive and they shall rank the Proposals in accordance with the below criteria. The evaluation committee may recommend an award based solely on the written responses or may request Proposal interviews/presentations.
Interviews/presentations, if deemed beneficial by the evaluation committee, will consist of the highest scoring Proposers. The invited Proposers will be notified of the time, place, and format of the interview/presentation. Based on the interview/presentation, the evaluation committee may revise their scoring.
Written Proposals must be complete and no additions, deletions, or substitutions will be permitted during the interview/presentation (if any). The evaluation committee will recommend award of a contract to the final County decision maker based on the highest scoring Proposal. The County decision maker reserves the right to accept the recommendation, award to a different Proposer, or reject all Proposals and cancel the RFP.
Proposers are not permitted to directly communicate with any member of the evaluation committee during the evaluation process. All communication will be facilitated through the Procurement representative.
4.2 Evaluation Criteria
Category Points available:
Proposer’s General Background and Qualifications 0-45 Project Understanding and Approach 0-25
Communication and Availability 0-25 Supportive Information 0-5 Available Points 100 points
4.3 Once a selection has been made, the County will enter into contract negotiations. During negotiation, the County may require any additional information it deems necessary to clarify the approach and understanding of the requested services. Any changes agreed upon during contract negotiations will become part of the final contract. The negotiations will identify a level of work and associated fee that best represents the efforts required. If the County is unable to come to terms with the highest scoring Proposer, discussions shall be terminated and negotiations will begin with the next highest scoring Proposer. If the resulting contract contemplates multiple phases and the County deems it is in its interest to not authorize any particular phase, it reserves the right to return to this solicitation and commence negotiations with the next highest ranked Proposer to complete the remaining phases.
RFP#2022-27 Page 11
SECTION 5
PROPOSAL CONTENTS
5.1. Vendors must observe submission instructions and be advised as follows:
5.1.1. Complete Proposals must be mailed to the below address or emailed to Procurement@clackamas.us.
The subject line of the email must identify the RFP title. Proposers are encouraged to contact Procurement to confirm receipt of the Proposal.
5.1.3. County reserves the right to solicit additional information or Proposal clarification from the vendors, or any one vendor, should the County deem such information necessary.
5.1.4. Proposal may not exceed a total of 21 pages (single sided), inclusive of all exhibits, attachments, or other information. be on 8 ½” X 11” paper with a minimum font size of 11 point (including tables).
Provide the following information in the order in which it appears below:
5.2 Cover Letter (not to exceed 1 page):
The cover letter should clearly identify the proposing entity and address; the contact name, phone number and email address for the procurement and contract negotiation process; and be signed by an authorized representative or official.
5.3. Proposer’s General Background and Qualifications (not to exceed 5 pages):
This criterion relates to the Proposer's firm and key individuals qualifications, capabilities, and experience.
Provide a description of the following:
• Provide a general overview of the firm including size of staff, location of staff in proximity to Clackamas County, background of company, specific qualifications and expertise, etc.
• Provide experience of the firm and staff with similar projects within the past five years. Include experience that best characterize work quality (references are required to be submitted. Minimum of 3 references).
• Provide experience of background and experience of key staff working together as a team.
• Include the name of individuals and their qualifications of who will be performing the work on the project. Identify any subcontractors that will be included on the team.
• Provide any additional supportive information that will illustrate the company’s qualifications.
5.4 Project Understanding and Approach (not to exceed 5 pages):
This criterion relates to the Proposer’s understanding of the project and the methodology and course of action used to meet the goals and objectives of the project. The issue is whether the Proposer has a clear and concise understanding of the project based on existing information. Elements to be considered include the following:
• Proposer’s understanding of the project as demonstrated in the RFP.
• Proposer’s awareness of key issues.
• How will the proposer manage their responsibilities on the project, such as team members, invoices, quality control, safety, equipment, supplies, etc.
• Proposer’s awareness of project requirements to produce the necessary project deliverables on schedule.
• Familiarity and experience working with ODOT Specifications
• How will the proposer ensure the accuracy of all documents and invoices submitted to the County.
mailto:Procurement@clackamas.us
RFP#2022-27 Page 12
How does the proposer intend to manage their team? What level of involvement will the proposer have
5.5. Communication and Availability (not to exceed 5 pages):
This criterion relates to accessibility and availability for project work, meetings, and other interaction with the County. Elements to be considered include the following:
• Ongoing projects for key staff and percent contracting availability for assignment to this project.
• Resources available to perform the work for the duration of the project.
• Ability to include Clackamas County’s concerns into project management.
• Accessibility for interaction with the County for meetings and other project tasks.
• Ability to establish and maintain functional, productive working relationships.
• How will key field issues be communicated to the County? How will the proposer determine what are key issues.
• How does the proposer intend to staff these projects? Describe your strategy.
5.6. Supportive Information (not to exceed 5 pages):
Supportive material that the County should take into consideration for the project or qualifications may include graphs, charts, photographs, resumes, references, etc., and is completely discretionary. Please note that the material included as supportive information will not be considered when scoring any sections of the Proposal other than “Supportive Information”.
5.7. Completed Proposal Certification (see the below form)
RFP#2022-27 Page 13
PROPOSAL CERTIFICATION
RFP #2022-28
Submitted by:
(Must be entity’s full legal name, and State of Formation)
Each Proposer must read, complete and submit a copy of this Proposal Certification with their Proposal. Failure to do so may result in rejection of the Proposal. By signature on this Proposal Certification, the undersigned certifies that they are authorized to act on behalf of the Proposer and that under penalty of perjury, the undersigned will comply with the following:
SECTION I. OREGON TAX LAWS: As required in ORS 279B.110(2)(e), the undersigned hereby certifies that, to the best of the undersigned’s knowledge, the Proposer is not in violation of any Oregon Tax Laws. For purposes of this certification, “Oregon Tax Laws” means the tax laws of the state or a political subdivision of the state, including ORS 305.620 and ORS chapters 316, 317 and 318. If a contract is executed, this information will be reported to the Internal Revenue Service. Information not matching IRS records could subject Proposer to 24% backup withholding.
SECTION II. NON-DISCRIMINATION: That the Proposer has not and will not discriminate in its employment practices with regard to race, creed, age, religious affiliation, sex, disability, sexual orientation, gender identity, national origin, or any other protected class. Nor has Proposer or will Proposer discriminate against a subcontractor in the awarding of a subcontract because the subcontractor is a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns or an emerging small business that is certified under ORS 200.055.
SECTION III. CONFLICT OF INTEREST: The undersigned hereby certifies that no elected official, officer, agent or employee of Clackamas County is personally interested, directly or indirectly, in any resulting contract from this RFP, or the compensation to be paid under such contract, and that no representation, statements (oral or in writing), of the County, its elected officials, officers, agents, or employees had induced Proposer to submit this Proposal. In addition, the undersigned hereby certifies that this proposal is made without connection with any person, firm, or corporation submitting a proposal for the same material, and is in all respects fair and without collusion or fraud.
SECTION IV. COMPLIANCE WITH SOLICITATION: The undersigned further agrees and certifies that they:
1. Have read, understand and agree to be bound by and comply with all requirements, instructions, specifications, terms and conditions of the RFP (including any attachments); and
2. Are an authorized representative of the Proposer, that the information provided is true and accurate, and that providing incorrect or incomplete information may be cause for rejection of the Proposal or contract termination; and
3. Will furnish the designated item(s) and/or service(s) in accordance with the RFP and Proposal; and
4. Will use recyclable products to the maximum extend economically feasible in the performance of the contract work set forth in this RFP.
Name:_______________________________________ Date:______________________________________
Signature:____________________________________ Title:______________________________________
Email:_______________________________________ Telephone:_________________________________
Oregon Business Registry Number:________________ OR CCB # (if applicable):________________________
Business Designation (check one):
Corporation Partnership Sole Proprietorship Non-Profit Limited Liability Company
Resident Quoter, as defined in ORS 279A.120 Non-Resident Quote. Resident State:__________________________
ATTENTION !
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY
NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR
952-001-0100. YOU MAY OBTAIN COPIES OF THE RULES FROM THE CENTER OR ANSWERS TO
QUESTIONS ABOUT THE RULES BY CALLING (503) 232-1987.
VICINITY MAP
NOT TO SCALE N
CLACKAMAS COUNTY
DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
PLANS FOR PROPOSED PROJECT
ASPHALT CONCRETE PAVING, GRINDING, AND PAVEMENT MARKINGS
E
I
I
SITE
Know what'sbelow.
Call before you dig.
CLACKAMAS
COUNTY
CLACKAMAS COUNTY OREGON
BEGINNING OF PROJECT
STA 1+00
R E
V
IS
IO
N
S C
LA
C
K A
M A
S C
O U
N
TY
C
S
O
U N
T Y
L A
C K
A M
A S
U N
N Y
S
ID
E R
O A
D P
A V
IN
G
P R
O
JE
C T
Murraysmith www.murraysmith.us
PRELIMINARY ONLY
DO NOT USE FOR CONSTRUCTION
DECEMBER 2021
90% SUBMITTAL
888 SW 5TH AVENUE, SUITE 1170
PORTLAND, OREGON 97204
P 503.225.9010
G P D
X P r o j e c t s
C l a c k a m a s
C o u n t y
D
T D
P a v i n g
P a c k a g e s C A D
S h e e t s C l a c k a m a s
C o u n t y
P r o j e c t
N o
S u n n y s i d e
R o a d
P a c k a g e O
R G d w g
G
A M
R A M
E L J E C H
I s
L M
S
T e c h
C O
V E
R S
H E
E T
G-01
HAPPY
VALLEY
SE SUNNYSIDE RD
S E
N
D
A V E
S E
N
D
A V E
S E
N
D
A V E
S E
N
D
A V E
HAPPY
VALLEY
S E
N
D
A V E
CLACKAMAS HWY
S
U
N
R
I
E
X
P
Y
END OF PROJECT
STA 115+79
C
L
A
C
K
A
M
A
S
R
I
V
E
R
SUNNYSIDE ROAD PAVING PROJECT
INDEX OF SHEETS
G-01 COVER SHEET
G-02 GENERAL NOTES AND LEGEND
EC-01 EROSION CONTROL DETAILS
C-01 TYPICAL SECTIONS
C-02 PAVING DETAILS
C-03 TO C-13 PAVING PLAN MAP AND NOTES
ST-01 TO ST-11 STRIPING LAYOUT
ST-12 STRIPING DETAILS
TS-01 TRAFFIC COUNT LOOP LEGEND
TS-02 TO TS-03 TRAFFIC COUNT LOOP PLAN
TS-04 TRAFFIC COUNT LOOP DETAILS
D-01 TO D-09 STANDARD DRAWINGS
S E
N
D
A V E
T. 2S, R. 2E SEC. 01, 02, 03 &
T. 2S, R. 3E SEC. 06
2022 PAVEMENT PRESERVATION
MARCH 2022
S E
H
V E
I
S
Y
R
S E
V E
AutoCAD SHX Text
NO.
AutoCAD SHX Text Sheet No.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
OREGON CITY, OR 97045
AutoCAD SHX Text
DEPT. OF TRANSPORTATION
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text 22342/22343
AutoCAD SHX Text
150 BEAVERCREEK ROAD
AutoCAD SHX Text
AND DEVELOPMENT
AutoCAD SHX Text
DAN JOHNSON
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
DEC 2021
AutoCAD SHX Text
AHG
AutoCAD SHX Text
MME
AutoCAD SHX Text
DKH
PAVING
SUMMER 2022
INFO?
503-557-6391
WAIT FOR
PILOT CAR
EXISTING VALVE
EXISTING FIRE HYDRANT
EXISTING CATCH BASIN/FIELD INLET
PROPOSED SURVEY MONUMENT
EXISTING WATER METER
EXISTING CLEAN-OUT
EXISTING MANHOLE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE
PAVEMENT
ADJ ADJACENT
AGG AGGREGATE
AL ALUMINUM
BTWN BETWEEN
C/L CENTERLINE
CONC CONCRETE
CONST CONSTRUCT
COOR'D COORDINATED
DWG DRAWING
DWY DRIVEWAY
EA EACH
EXIST EXISTING
FHWA FEDERAL HIGHWAY
ADMINISTRATION
MON MONUMENT
MUTCD MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES
ODOT OREGON
DEPARTMENT OF
TRANSPORTATION
PC POINT OF CURVE
PVMT PAVEMENT
R/W RIGHT-OF-WAY
S/W SIDEWALK
SHT SHEET
STA STATION
STD STANDARD
SY SQUARE YARD
THK THICK/THICKNESS
THRU THROUGH
TYP TYPICAL
W/ WITH
WES WATER
ENVIRONMENTAL
SERVICES
EXISTING SIDEWALK
EXISTING CONTOUR MINOR
EXISTING CONTOUR MAJOR
EXISTING CURB
EXISTING CENTERLINE
S/W
EXISTING RIGHT-OF-WAY (BASED ON GIS)
EXISTING CONCRETE
EXISTING PROPERTY LINE (BASED ON GIS)
D S
R E
V
IS
IO
N
S C
LA
C
K A
M A
S C
O U
N
O
U N
T Y
L A
C K
A M
A S
U N
N Y
S
ID
E R
O A
D P
A V
IN
G
P R
O
JE
C T
Murraysmith www.murraysmith.us
PRELIMINARY ONLY
DO NOT USE FOR CONSTRUCTION
DECEMBER 2021
90% SUBMITTAL
888 SW 5TH AVENUE, SUITE 1170
PORTLAND, OREGON 97204
P 503.225.9010
G P D
X P r o j e c t s
C l a c k a m a s
C o u n t y
D
P a v i n g
P a c k a g e s C A D
S h e e t s C l a c k a m a s
C o u n t y
P r o j e c t
N o
S u n n y s i d e
R o a d
P a c k a g e O
R G d w g
G
R A M
E L J E C H
I s
L M
S
T e c h
G E
N E
R A
L N
O
TE
S A
N D
L E
G E
N D
G-02
1. INSTALL TWO SETS (1 SIGNS PER SET) OF PROJECT SIGNS PRIOR TO COMMENCING
WITH WORK. MOUNT SIGN TO SINGLE WOOD SUPPORT. INSTALL NEAR THE
INTERSECTION OF SE 122ND AVENUE AND SE 162ND AVENUE. COORDINATE FINAL
LOCATION WITH INSPECTOR. SEE PROJECT SIGN DETAILS, THIS SHEET.
TOPOGRAPHIC LEGEND
GENERAL NOTES: ABBREVIATIONS
1. ALL PLAN INFORMATION IS BASED ON MOBILE LIDAR SCAN DATA AND
THIS APPROXIMATE.
VERTICAL DATUM: NAVD 88
GEODETIC DATUM: NORTH AMERICAN DATUM OF 1983 (2011) EPOC 2010
SYSTEM: OREGON COORDINATE REFERENCE SYSTEM (OCRS)
ZONE: PORTLAND
PROJECTION: LAMBERT CONFORMAL CONIC PROJECTION
LATITUDE OF GRID ORIGIN: 45°30'00" N
LONGITUDE OF GRID ORIGIN: 122°45'00" W
FALSE NORTHING: 50,000.00 m
FALSE EASTING: 100,000.00 m (32808.40 INTERNATIONAL FOOT)
VERTICAL DATUM AND BASIS OF BEARINGS:
1. ALL LINE-WORK SHOWN RELATING PROPERTY BOUNDARY TO SCAN DATA IS FOR
GRAPHICAL REPRESENTATION ONLY. ANY APPARENT DISCREPANCIES BETWEEN
SAID DATA WILL REQUIRE FIELD VERIFICATION THROUGH A PROPER RIGHT-OF-WAY
RESOLUTION.
RIGHT-OF-WAY REPRESENTATION:
1. CONTRACTOR SHALL FOLLOW AN APPROVED PHASING PLAN THAT MEETS THE
MINIMUM REQUIREMENTS AS SET FORTH IN THE CONTRACT DOCUMENTS. ANY
PROPOSED PHASING THAT CONFLICTS WITH REQUIREMENTS NOTED IN THE
CONTRACT DOCUMENTS, SHALL BE APPROVED IN WRITING BY THE COUNTY PRIOR
TO BEGINNING WORK.
TRAFFIC CONTROL/PHASING NOTES:
·RD302
·RD335
·RD336
·RD338
·RD356
·RD360
·RD610
·RD706
·RD1010
· TM500-503
· TM515
· TM517
· TM530
· TM531
· TM539
· TM560
· TM561
· TM800
· TM810
· TM820
· TM821
· TM822
· TM840
· TM841
· TM842
· TM843
· TM844
· TM851
· TM852
· TM853
ODOT STANDARD DRAWINGS:
PROPOSED HYDRANT REFLECTOR
PAVING SIGN
30"
SIGN NOTES:
1. SIGNS TO BE ORANGE BACKGROUND WITH BLACK LETTERING
AND BORDERS.
2. TEXT FONT TO BE FHWA C.
3. COUNTY LOGO TO COMPLY WITH SPECIFICATIONS IN THE
COUNTY BRAND GUIDE:
HTTP://WEB1.CLACKAMAS.US/PGA/LOGO.HTML#GUIDE.
12250EXISTING PROPERTY ADDRESS
T
EXISTING BENCHMARK
EXISTING SURVEY MONUMENT
PILOT CAR SIGN
NOTES:
1. ALL WORK ZONES LONGER
THAN 500 FEET IN LENGTH
SHALL REQUIRE THE USE OF
A PILOT CAR.
2. SIGN TO BE PLACED AT EACH
DRIVEWAY APPROACH WHEN
PILOT CAR IS USED.
3. SIGN SHALL CONFORM TO
ODOT DRAWING CR4-20 OR
CR4-20A.
SCALE: NTS
PROJECT SIGN DETAIL
· 4-19
WES STANDARD DRAWINGS:
·M150
COUNTY STANDARD DRAWINGS:
EXISTING UTILITY POLE
AutoCAD SHX Text
NO.
AutoCAD SHX Text Sheet No.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
OREGON CITY, OR 97045
AutoCAD SHX Text
DEPT. OF TRANSPORTATION
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text 22342/22343
AutoCAD SHX Text
150 BEAVERCREEK ROAD
AutoCAD SHX Text
AND DEVELOPMENT
AutoCAD SHX Text
DAN JOHNSON
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
DEC 2021
AutoCAD SHX Text
AHG
AutoCAD SHX Text
MME
V
IS
IO
N
S C
LA
C
K A
M A
S C
O U
N
O
U N
T Y
L A
C K
A M
A S
U N
N Y
S
ID
E R
O A
D P
A V
IN
G
P R
O
JE
C T
Murraysmith www.murraysmith.us
PRELIMINARY ONLY
DO NOT USE FOR CONSTRUCTION
DECEMBER 2021
90% SUBMITTAL
888 SW 5TH AVENUE, SUITE 1170
PORTLAND, OREGON 97204
P 503.225.9010
G P D
X P r o j e c t s
C l a c k a m a s
C o u n t y
D
P a v i n g
P a c k a g e s C A D
S h e e t s C l a c k a m a s
C o u n t y
P r o j e c t
N o
S u n n y s i d e
R o a d
P a c k a g e O
R E C d w g
E C
P
R A M
E L J E C H
I s
L M
S
T e c h
E R
O S
IO
N
C O
N
TR
O L
D E
TA
IL
S
EC-01
1. WHEN RAINFALL AND RUNOFF OCCURS DAILY INSPECTIONS OF THE EROSION AND SEDIMENT CONTROLS AND
DISCHARGE OUTFALLS MUST BE PROVIDED BY SOME ONE KNOWLEDGEABLE AND EXPERIENCED IN THE PRINCIPLES, PRACTICES, INSTALLATION, AND MAINTENANCE OF EROSION AND SEDIMENT CONTROLS WHO WORKS FOR THE
PERMITTEE.
2. CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND CREATION OF BARE GROUND FROM OCTOBER 1
THROUGH MAY 31 EACH YEAR.
3. DURING WET WEATHER PERIOD, TEMPORARY STABILIZATION OF THE SITE MUST OCCUR AT THE END OF EACH WORK
DAY.
4. SEDIMENT CONTROLS MUST BE INSTALLED AND MAINTAINED ON ALL DOWN GRADIENT SIDES OF THE CONSTRUCTION
SITE AT ALL TIMES DURING CONSTRUCTION. THEY MUST REMAIN IN PLACE UNTIL PERMANENT VEGETATION OR OTHER
PERMANENT COVERING OF EXPOSED SOIL IS ESTABLISHED.
5. ALL ACTIVE INLETS MUST HAVE SEDIMENT CONTROLS INSTALLED AND MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.UNLESS OTHERWISE APPROVED, A SURFACE MOUNTED AND ATTACHABLE, U-SHAPED FILTER BAG IS
REQUIRED FOR ALL CURB INLET CATCH BASINS.
6. SIGNIFICANT AMOUNTS OF SEDIMENT WHICH LEAVES THE SITE MUST BE CLEANED UP WITHIN 24 HOURS AND PLACED
BACK ON THE SITE AND STABILIZED OR PROPERLY DISPOSED. THE CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND
AND PREVENTED FROM CAUSING A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM
CLEAN UP OF SEDIMENT SHALL BE PREFORMED ACCORDING TO THE OREGON DEPARTMENT OF STATE LANDS REQUIRED
TIME FRAME.
7. SEDIMENT MUST NOT BE INTENTIONALLY WASHED INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES.
8. SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN IT HAS REACHED A HEIGHT OF
1/3RD THE BARRIER HEIGHT, AND PRIOR TO THE CONTROL MEASURES REMOVAL.
9. CLEANING OF ALL STRUCTURES WITH SUMPS MUST OCCUR WHEN THE SEDIMENT RETENTION CAPACITY HAS BEEN
REDUCED BY 50% AND AT COMPLETION OF PROJECT.
10. ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST INCLUDE PROPER STORAGE, APPLICATION, AND DISPOSAL.
11. THE PERMITTEE MUST PROPERLY MANAGE HAZARDOUS WASTES, USED OILS, CONTAMINATED SOILS, CONCRETE WASTE, SANITARY WASTE, LIQUID WASTE, OR OTHER TOXIC SUBSTANCES DISCOVERED OR GENERATED DURING
CONSTRUCTION.
12. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S
RECOMMENDATIONS. NUTRIENT RELEASES FROM FERTILIZERS TO SURFACE WATERS MUST BE MINIMIZED. TIME
RELEASE FERTILIZERS SHOULD BE USED AND CARE SHOULD BE MADE IN APPLICATION OF FERTILIZERS WITHIN ANY
WATER WAY RIPARIAN ZONE.
13. OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL
EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH CURRENT CLEAN WATER SERVICES STANDARDS
AND STATE, AND FEDERAL REGULATIONS.
14. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING LIMITS, VEGETATED BUFFERS, AND
ANY SENSITIVE AREAS SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD. UNLESS OTHERWISE
APPROVED, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS. THE OWNER/PERMITTEE MUST MAINTAIN
THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGETATED CORRIDORS TO BE DELINEATED WITH
ORANGE CONSTRUCTION FENCE OR APPROVED EQUAL.
15. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BMPS THAT MUST BE INSTALLED ARE GRAVEL CONSTRUCTION
ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION. THESE BMPS MUST BE MAINTAINED FOR THE
DURATION OF THE PROJECT.
16. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAN SEPTEMBER 1ST; THE TYPE
AND PERCENTAGES OF SEED IN THE MIX ARE AS IDENTIFIED ON THE PLANS OR AS SPECIFIED BY THE DESIGN
ENGINEER.
17. WATER-TIGHT TRUCKS MUST BE USED TO TRANSPORT SATURATED SOILS FROM THE CONSTRUCTION SITE. AN
APPROVED EQUIVALENT IS TO DRAIN THE SOIL ON SITE AT A DESIGNATED LOCATION USING APPROPRIATE BMPS; SOIL
MUST BE DRAINED SUFFICIENTLY FOR MINIMAL SPILLAGE.
18. ALL PUMPING OF SEDIMENT LADEN WATER MUST BE DISCHARGED OVER AN UNDISTURBED, PREFERABLY VEGETATED
AREA, AND THROUGH A SEDIMENT CONTROL BMP (I.E. FILTER BAG).
19. THE ESC PLAN MUST BE KEPT ONSITE. ALL MEASURES SHOWN ON THE PLAN MUST BE INSTALLED PROPERLY TO ENSURE
THAT SEDIMENT LADEN WATER DOES NOT ENTER A SURFACE WATER SYSTEM, ROADWAY, OR OTHER PROPERTIES.
20. THE ESC MEASURES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.
DURING THE CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE
WITH ALL REGULATIONS.
21. WRITTEN ESC LOGS ARE SUGGESTED TO BE MAINTAINED ONSITE AND AVAILABLE TO DISTRICT INSPECTORS UPON
REQUEST.
22. IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY INCLUDE THE APPLICATION OF
FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR OTHER APPROVED MEASURES.
23. ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD.
STANDARD EROSION AND SEDIMENT CONTROL PLAN DRAWING NOTES:
AutoCAD SHX Text
NO.
AutoCAD SHX Text Sheet No.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAFTED BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
OREGON CITY, OR 97045
AutoCAD SHX Text
DEPT. OF TRANSPORTATION
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text 22342/22343
AutoCAD SHX Text
150 BEAVERCREEK ROAD
AutoCAD SHX Text
AND DEVELOPMENT
AutoCAD SHX Text
DAN JOHNSON
AutoCAD SHX Text
DIRECTOR
AutoCAD SHX Text
DEC 2021
AutoCAD SHX Text
AHG
AutoCAD SHX Text
MME
V
IS
IO
N
S C
LA
C
K A
M A
S C
O U
N
O
U N
T Y
L A
C K
A M
A S
U N
N Y
S
ID
E R
O A
D P
A V
IN
G
P R
O
JE
C T
Murraysmith www.murraysmith.us
PRELIMINARY ONLY
DO NOT USE FOR CONSTRUCTION
DECEMBER 2021
90% SUBMITTAL
888 SW 5TH AVENUE, SUITE 1170
PORTLAND, OREGON 97204
P 503.225.9010
G P D
X P r o j e c t s
C l a c k a m a s
C o u n t y
D
P a v i n g
P a c k a g e s C A D
S h e e t s C l a c k a m a s
C o u n t y
P r o j e c t
N o
S u n n y s i d e
R o a d
P a c k a g e O
R C d w g
C
R A M
E L…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .