RFP 200000001208 Outsole Blockers.docx

DOCX document 301 KB Posted

Attached to
shoe outsole blocker MDOC-MSI
Solicitation number
RFP 472 200000001208 4
Issued by
Huron County, Lansing City, Michigan

About this file

This is a Request for Proposal (RFP) issued by the Michigan Department of Corrections (MDOC) for outsole blockers—raw materials used in shoe production by Michigan State Industries (MSI). The solicitation seeks a contractor to provide outsole blockers in sizes 7 through 17, black in color, pre-bluffed with oil-resistant properties, and meeting specific technical specifications including defined thickness, hardness, tensile strength, and other performance criteria. The RFP was issued on February 26, 2020, with a pre-proposal meeting scheduled for March 4, 2020 at 1:00 p.m. Eastern Time via conference call. The deadline for bidders to submit questions was March 10, 2020 at 3:00 p.m. Eastern, with answers posted March 11, 2020. Proposals were due March 25, 2020 at 3:00 p.m. Eastern, and the anticipated contract begin date was May 22, 2020. The contract term is three years with the option to renew for up to two additional one-year periods at the sole discretion of the State. Deliveries must be completed within 30 business days of order receipt at the MSI Shoe Factory in Ionia, Michigan, during hours of 7:30 a.m. to 1:30 p.m., Monday through Friday, excluding State holidays.

Pricing must be firm for the initial three-year base term, quoted F.O.B. destination with all transportation costs included in the unit price. The State estimated three-year usage of 180,000 pairs and does not guarantee minimum order quantities. Contractors must maintain Commercial General Liability insurance of $1,000,000 per occurrence and $2,000,000 general aggregate, along with automobile liability, workers' compensation, and employers' liability coverage. All deliverables require a minimum one-year manufacturer's warranty, and the contractor must implement quality control mechanisms and provide monthly delivery reports within 15 calendar days of month-end closure with a $100 daily penalty assessed thereafter. The contractor must assign a dedicated representative for State accounts, provide a toll-free customer service line, and disclose all subcontractors and manufacturers. Technical proposals receiving 80 or more evaluation points will have pricing considered, and contract award goes to the responsive and responsible bidder with the lowest price among qualified proposals. No specific incumbent information or funding sources are identified in this solicitation.

View the file

Other files

File Type Posted
Outsole Blockers SLA 200000001208.docx DOCX document
RFP 200000001208 Amendment 2.docx DOCX document
RFP 200000001208 Outsole Blockers Questions and Answers.docx DOCX document
RFP 200000001208 Amendment 1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN

Department of Corrections

Outsole Blockers Request for Proposal No. 2000000001208

Solicitation Manager Name: Cathy Carr Direct Phone: 517-241-2192 Email: CarrCmichigan.gov

This is a Request for Proposal (RFP) for:

Shoe Outsole Blockers

RFP Timeline

Event
Time
Date
RFP issue date
N/A
02/26/2020
Pre-proposal meeting
1:00 p.m. Eastern
03/04/2020
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
03/10/2020
Anticipated date State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
3:00 p.m. Eastern
03/11/2020
Proposal deadline*
3:00 p.m. Eastern
03/25/2020
Anticipated contract begin date
N/A
05/22/2020

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

PROPOSAL INSTRUCTIONS

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal.

Bidders must submit any proposed alternate specifications or products as a question by the deadline for bidder questions. Specifications must be emailed with the question. The State may or may not approve a proposed alternate, in its sole discretion. Approval or disapproval of proposed alternates will be posted in the Q&A document online.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A – Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B – Pricing
Pricing for goods and services sought by the State through this RFP
Bidder to complete and submit by proposal deadline
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in Section 7, Evaluation Process is submitted by proposal deadline
Attachment A. Service Level Agreements SLAs)
Service Level Agreements
Deemed accepted by bidder unless redlined.

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. OPTIONAL PRE-PROPOSAL MEETING.

An optional pre-proposal meeting will be held on March 4, 2020 at 1:00 pm Eastern Time by telephone.

Phone number: (248) 509-0316 - Conference ID: 970137202

The purpose of the pre-proposal meeting is to discuss the RFP and the work to be performed. Statements made by the Solicitation Manager or designee at a pre-proposal meeting are not considered modifications to the RFP. If, however, the Solicitation Manager determines modifications to the RFP are warranted after the meeting, modifications will be posted in writing on www.michigan.gov/SIGMAVSS as explained in Section 4, Modifications.

Attendance at the pre-proposal meeting is limited to 1 person per bidder. A bidder may be disqualified by being late. Subcontractor sign-in is permitted in lieu of the bidder as evidence of attendance. Accessibility requests for reasonable accommodations at the pre-proposal meeting should be made with the Solicitation Manager at least 5 business days before the date of the meeting. Accommodation requests received outside this time period cannot be guaranteed.

4. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS . This is the only method by which the RFP may be modified.

5. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

6. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder.

Hard Copy – The bidder should also submit its proposal in hard copy form (paper). The bidder should submit one copy of its technical proposal, attachments, and separately sealed price proposal by the proposal deadline. A hard copy proposal received after the proposal deadline identified on the Cover Page is considered a late proposal. The bidder must submit its hard copy proposal utilizing one of the following methods:

Delivery or Courier Michigan Department of Corrections – Finance Division 206 E. Michigan Avenue Lansing, MI 48933 U.S. Postal Service Michigan Department of Corrections – Finance Division PO Box 30003 Lansing, MI 48909

When submitting hard copies of a proposal, the bidder should:

· Allow adequate time to clear State-building security checkpoints.

· Label the RFP number and bidder name on the outside of each package. If a delivery or courier service is used that prohibits markings on its package, this information should be placed on the outside of an interior package.

· Not submit responses to more than one RFP in one package.

7. EVALUATION PROCESS. The State will evaluate each proposal based on the following factors:

Technical Evaluation Proposals receiving 80 or more technical evaluation points will have pricing evaluated and considered for award.

The State may utilize all bidder information, without regard to a proposal’s technical score, to determine fair market value for goods or services sought. The State is not obligated to accept the lowest price proposal. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: https://www.michigan.gov/dtmb/0,5552,7-358-82550_85746_48677-412612--,00.html.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

10. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal, if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in Section 7, Evaluation Process, if the State receives only one proposal.

11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives 80 or more technical evaluation points and has the lowest price. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS .

12. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis, which will provide instructions on how to request a debrief meeting

If you wish to initiate a protest of the award, you must submit your written protest to HawkerR@michigan.gov no later than 5:00 p.m. EDT, 5 calendar days after posting the Notice of Recommendation for Award, or by 5:00 p.m. the next business day if that date falls on a state holiday or weekend. The State reserves the right to adjust this timing and will publish any change on the SIGMA VSS system.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

13. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

15. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. All portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, some information may be exempt from disclosure. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

a. SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process.

i. Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

ii. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

CONFIDENTIAL TREATMENT FORM (CT FORM)

INSTRUCTIONS. Complete either Section 1 or Section 2 of this CT Form and sign where indicated. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information. Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. See Section Error! Reference source not found. of the Proposal Instructions for additional information.

Section 1. Confidential Treatment Is Not Requested

This section must be completed, signed, and submitted with the proposal if bidder does not request confidential treatment of any material contained in the proposal.

By signing below, the bidder affirms that confidential treatment of material contained in the proposal is not requested.

________________________________________________________________
RFP NumberRFP Title
_________________________________________________________
SignatureDate

[Printed Name] [Title] [Company]

Section 2. Confidential Treatment Is Requested

The section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary. The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies whether the material is a trade secret (TS), financial information (FI), or proprietary information (PI); (2) explains the specific legal grounds that support treatment of the material as TS, FI, or PI; and (3) provides the contact information for the person at bidder’s organization authorized to respond to inquiries by the State concerning the material. Bidders must not simply cite to an applicable act or case name; rather, bidders must provide a complete justification as to how the material falls within the scope of an applicable act or relevant case law.

CONFIDENTIAL TREATMENT FORM (CT FORM)

RFP page #, paragraph #, and section #
State whether the material is a trade secret (TS), financial information (FI), or proprietary information (PI)
Explain the specific grounds in State or other applicable law which supports treatment of the material as TS, FI, or PI. Do not simply cite to the applicable act. Provide a complete justification as to how the material falls within the scope of the applicable act or relevant case law.
Provide the bidder contact information

By signing below, the bidder affirms that confidential treatment of material contained in its proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

________________________________________________________________
RFP NumberRFP Title
_________________________________________________________
SignatureDate

[Printed Name] [Title] [Company]

VENDOR QUESTIONS WORKSHEET

Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number

Website address

Number of years in business and number of employees

Legal business name and address of parent company, if any

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.

If you entered “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
If you entered “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.
Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
If you entered “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least 3 relevant experiences from the last 5 years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name Contact name Contact role at time of project Contact phone Contact email

City State Zip

1. Project name and description of the scope of the project

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

Experience 2

Company name

Contact role at time of project

City

1. Project name and description of the scope of the project

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

Experience 3

Company name

Contact role at time of project

City

1. Project name and description of the scope of the project

Dollar value

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)

Minimum wage paid to employees employed at locations within the State of Michigan

Average wage paid to employees employed at locations within the State of Michigan

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance

8. Other

Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

Version 10 (1/2020) 2

Request For Proposal No. 200000001208 Outsole Blockers

SCHEDULE A

STATEMENT OF WORK

CONTRACT ACTIVITIES

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

BACKGROUND

The Michigan Department of Corrections (MDOC), Michigan State Industries (MSI), manufactures goods and provides services for sale to state agencies, tax supported entities and local governmental units. Outsole blockers are a raw material that is used in the production of shoes for the Michigan Department of Corrections. Current product is Soletech product CPM-142 ST RUVA.

SCOPE

This is a request for a Contractor to provide outsole blockers. The State reserves the right to add or delete items to best meet the needs of the ordering entity.

Bidders must submit any proposed alternate specifications or products as a question by the deadline for bidder questions. Specifications must be emailed with the question. The State may or may not approve a proposed alternate, in its sole discretion. Approval or disapproval of proposed alternates will be posted in the Q&A document online.

REQUIREMENTS

1. General Requirements

1.1. Product Specifications

The Contractor must provide outsole blockers for the MDOC/MSI for use in the production of shoes according to the following specifications. The Contractor will be required to provide the outsole blockers as ordered and within the time constraints required.

The Contractor is solely responsible to ensure that products delivered meet the specifications and requirements of this RFP.

· Outsole blockers must be in the following sizes: 7,8,9,10,11,12,13,14,15,16m, & 17.

Bidder must provide sizes available.

Bidder Response:

· Color must be black in color.

· Outsole blockers must be pre-bluffed (roughed) with “oil resistant” printed on the bottom.

· From toe to heal thickness must be ½” (+/- 1/8”) thick, heal must be 1” (+/- 1/8”) thick.

Bidder must provide thickness of heal.

Bidder Response:

· Must bond to neoprene primer.

· The product must have labels that state the country where the product was manufactured.

· Blockers must be consistent in color, size, shape, thickness, and hardness

· Must be free of flaws.

· Must be die cut clean with no rips or frays.

· Must not have air pockets greater than 3/32”.

Bidder must check only one box below and identify exception(s):

|_|
Bidder has reviewed the above section and agrees with no exception(s).
|_|
Bidder has reviewed the above section and has noted all exception(s) in column to the right.
List all exception(s).

The bidder must supply documentation, such as specification sheets, with the RFP that verifies the bidder’s proposed product meet the specifications below:

· Mold SMP-06

· NBS abrasion resistance of 90 – 100%

· Specific gravity: 31 +/- 2.03g/cm3.

· Oil resistance must be 19% minimum.

· Hardness: 66 (+/- 1) scale c

· Tensile strength: 35 (+/- 1) KG/CM

· Elongation: 230 maximum.

· Tear strength: 15 minimum KG/CM

· Ross Flex (-20C) 0 cut growth @ 7500 flexes minimum

Bidder must check only one box below and identify exception(s):

|_|
Bidder has reviewed the above section and agrees with no exception(s).
|_|
Bidder has reviewed the above section and has noted all exception(s) in column to the right.
List all exception(s).

Provide the locations where the product(s) are manufactured.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:
City: State or Providence: Country:

1.2. Warranties

All deliverables must have a minimum one (1) year warranty against any and all manufacturer’s defects.

The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.

If there are deficiencies in the deliverables, the State will notify the Contractor by email of the deficiencies. The Contractor will have 30 calendar days to correct and resubmit the deliverables at no cost to the State.

All shipping costs for defective, damaged and/or flawed products will be at no cost to the State. The Contractor is solely responsible to coordinate the refund/return/replacement of damaged and/or flawed products.

Bidder must provide detailed information as requested below.

Describe any warranties included in the bid.
Provide the length of the warranty.
Explain the process for reporting warranty issues.
If the warranty is provided through a third party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State. Provide the name, address, contact name, phone number and email address of the party responsible for the warranty.

1.3. Recall Requirements and Procedures

In the event of a recall, the Contractor must immediately notify MDOC Contract Administrator, Contract Monitor, and Program Manager by email. The Contractor must provide instructions detailing the process to return the products to the Contractor at the expense of the Contactor. The Contractor is solely responsible for notifying MDOC and coordinating the return of the products.

1.4. Incentives

Explain any special incentives or services including, but not limited to, quantity tier discounts, etc.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

1.5. Minimum Order

The State prefers that there is no minimum order quantity. If the Contractor requires a minimum order quantity, the Contractor must state the minimum order.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

There is no specific guarantee of the number of orders that will be placed or total quantity ordered during the contract period.

1.6. Incorrectly Filled Orders

The Contractor must explain its mechanism to refund/return/replace incorrectly filled orders, including over shipments. The bid response must describe in detail the Contractor’s policy and procedure. The response must include the reporting process for notifying the Contractor. All returns for incorrectly filled orders must be at no cost to the State.

The Contractor is solely responsible to coordinate the refund/return/replacement of incorrectly filled orders.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

1.7. Return Policy and Procedure

The Contractor must explain its return policy and procedure in the event that the State wants to return the items for reasons other than warranty, defects, or incorrectly filled orders. The Contractor should state who is responsible for the return shipping costs and if the Contractor charges a restocking fee.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

1.8 What is the Contractor’s mechanism to guarantee the quality of the deliverable?

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

2. Service Levels

2.1. Time Frames

A. The State prefers that deliveries be made within 30 business days from receipt of order. The State requires that deliveries be made within the contracted business days from receipt of order. Deliveries after the contracted business days are considered late. The receipt of order date is pursuant to Section 2, Service Levels, of the Standard Terms and Conditions.

B. The Contractor must state its delivery time after receipt of order.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

C. The Contractor must submit its Delivery Date, via email, within two business days of receipt of the order to the Program Manager and Contract Manager.

D. The Contractor is solely responsible to ensure that it or any suppliers/subcontractors meet the delivery requirement.

E. MDOC requires all deliveries be completed by the time period specified in the Contract.

|_|
The Bidder agrees to the requirement with no exceptions.

F. The Contractor must verify with its manufacturing plant and/or supplier/subcontractors that the above time frame can be met. The Contractor must list in its response any known circumstances, such as, specific holidays, plant shutdowns, etc., that may affect the requested delivery time frames.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

G. What is your manufacturer/supplier/subcontractor’s shut down schedule?

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

H. What is your manufacturer/supplier/subcontractor’s lead time?

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

I. The Contractor must describe its plan for guaranteeing that the deliverables will be met within the above time frame. This must include meeting the delivery time frame even during the specific holidays, plant shutdowns, etc., listed above.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

2.2. Delivery

A. Deliveries will be accepted 7:30 a.m. through 1:30 p.m., EST/EDT Monday through Friday, excluding State of Michigan holidays. The State of Michigan holidays are: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, General Election Day on even numbered years, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas eve, Christmas Day, and New Year’s eve.

B. Deliveries will be made at:

MSI Shoe Factory Ionia Regional Warehouse 717 Wall Street Ionia, Mi. 48846

The State reserves the right to add, delete, or change the delivery addresses.

C. The Contractor is responsible for delivering the product to the delivery location specified on the delivery order. Delivery to any other facility or warehouse will not be accepted unless approved by the MDOC Contract Administrator prior to delivery. Program Managers and factory staff do not have the authority to approve alternate delivery locations. The State reserves the right to require that delivery be made directly to the factory which is located inside a correctional facility.

D. The Contractor should be aware that there is a possibility of a delay at any of the correctional facilities which prohibits delivery carriers entering the facility at time of arrival. The State will not be responsible for any additional charges which may arise due to delivery delays caused by a mobilization or any other reason.

Bidder must check only one box below and identify exception(s):

|_|
Bidder has reviewed the above section and agrees with no exception(s).
|_|
Bidder has reviewed the above section and has noted all exception(s) in column to the right.
List all exception(s).

2.3. Reporting

A. The Contractor must ensure that an accurate Monthly Order and Delivery Report is delivered via email to the Program Manager and Contract Manager within 15 calendar days from the close of the previous month. $100.00 will be accessed on the 16th calendar day from the close of the previous month and every 7 calendar days thereafter until the reports are received by the MDOC.

B. The Contractor must provide various reports to the MDOC Contract Administrator, Contract Manager, Program Manager, or designees, upon request. Examples may include itemized reports of total items purchased by MDOC, open invoice reports, delivery compliance reports, quality reports, and proof of delivery documentation.

C. Upon request, the Contractor must provide an Order Report to the Contract Manager or designee listing the delivery order number, date of receipt of the delivery order, quantity ordered, shipment dates and quantities, and date of signed shippers by MDOC. The due dates will be agreed upon by the Contractor and MDOC.

D. The Contractor must proactively update the Contract Administrator, Contract Manager or designee and Program Manager of industry shifts and trends; as well as new products offered when such information becomes available.

E. The Contractor should annually evaluate if MSI can recognize cost savings of 5% or more and provide the information to the Contact Administer and Program Manager. The due date of the reports and format will be agreed upon by the Contractor and MDOC Contract Administrator. Suggestions may include, but are not limited to:

a. Whether any products of equivalent specifications are available at a lower cost.

b. Whether price decreases are justified based on increased volume, market changes, or other issues.

Bidder must check only one box below and identify exception(s):

|_|
Bidder has reviewed the above sections A-D and agrees with no exception(s).
|_|
Bidder has reviewed the above section and has noted all exception(s) in column to the right.
List all exception(s).

2.4. Meetings

A. The Contractor must inform the Contract Administrator and Contract Monitor of any meetings with MSI factory or Business Office Staff. Notification shall be provided to the Contract Administrator and Contract Monitor by email at least 10 business days prior the proposed meeting.

B. Mandatory Meetings The Contractor is required to participate in a kick-off meeting scheduled by the MDOC. The kick-off meeting is expected to be scheduled within 30 calendar days of the Effective Date of the Contract. The kick-off meeting may be conducted by phone.

C. Annual Meetings Upon request, the Contractor will attend annual meetings by telephone or in person to be held at a location and time of MDOC’s choosing. Topics shall include contract compliance, industry information, and other issues or concerns.

The State may request other meetings as it deems appropriate.

3. Staffing

3.1. Contractor Representative

A. The Contractor must appoint a representative specifically assigned to State of Michigan accounts who will respond to State inquiries regarding the Contract Activities, answer questions related to ordering and delivery, etc. (the “Contractor Representative”).

B. The Contractor must notify the Contract Administrator immediately upon removing or assigning a new Contractor Representative.

C. The Contractor Representative should be located within the continental United States.

D. The Contractor must provide the following information for the Customer Service Representative.

Customer Representative’s Name:
Title:
Telephone Number:
Fax Number:
Email Address:
City and state of physical location

3.2. Customer Service Toll-Free Number

The Contractor should specify its toll-free number for the State to make contact with the Contractor Representative. The Contractor Representative must be available for calls during the hours of 8 am to 5 pm EST/EDT.

Bidder must provide detailed information as requested in the above requirement(s).

Bidder Response:

3.3. Disclosure of Subcontractors

A. The Contractor must disclose if it intends to utilize subcontractors, including manufacturers/suppliers, in the performance of this Contract. Changes to the subcontractor must be approved by the State through the issuance of a Contract Change Notice. If the Contactor changes subcontractor/manufacturers, the State reserves the right to require new Certificates of Analysis for approval. The State reserves the right to require the Contract change sub-contractors at the State’s sole discretion.

Bidder must respond Yes or No.

Does the Contractor intend to utilize subcontractors including other manufacturers/suppliers?

B. If the Contractor intends to utilize subcontractors, including other manufacturers/suppliers, the Contractor must disclose the following:

The legal business name, address, telephone number of the subcontractor(s).
A description of subcontractor’s organization and the services it will provide and information concerning subcontractor’s ability to provide the Contract Activities.
The relationship of the subcontractor to the Contractor.
Whether the Contractor has a previous working experience with the subcontractor. If yes, provide the details of that previous relationship.
A complete description of the Contract Activities that will be performed or provided by the subcontractor.
Of the total bid, the price of the subcontractor’s work.

3.4. Security

The Contractor’s staff may be required to make deliveries to or enter MDOC facilities.

The Contractor will be subject to the following security procedures:

A. All Contractor and subcontractor staff working on the Contract must undergo a security and background check, to include at a minimum ICHAT http://apps.michigan.gov/ichat/home.aspx, to be performed by the Contractor at its expense.

B. The Contractor‘s and subcontractor’s staff who are entering an MDOC facility must be Law Enforcement Information Network (LEIN) cleared by the MDOC prior to facility entry. The Contractor must submit the LEIN information to the MDOC Program Manager at least two business days prior to the facility visit. If an employee of the Contractor or subcontractor has a felony or misdemeanor conviction (excluding minor driving offenses), that employee may not be permitted to enter any MDOC facility. The LEIN check is no cost to the Contractor.

C. The Contractor’s and subcontractor’s staff may be required to complete and submit an RI-8 Fingerprint Card for Finger Print Checks to the MDOC.

D. The Contractor must anticipate delays when visiting any facility due to issues within that facility.

E. All vehicles entering an MDOC facility must be inspected before entry of the secure perimeter.

F. The MDOC reserves the right to deny access to any facility to any Contractor(s)/ subcontractor(s) staff members who fails to comply with any applicable State, Federal or local law, ordinance or regulation or whose presence may compromise the security of the facility, its members or staff.

G. Weapons, alcoholic beverages, poison, and prescription drugs and controlled substances without written certification of needs from a license physician (does not include medical supplies for the facility), cellular devices, cameras, and audio or visual recording devices are prohibited from being brought into all MDOC correctional facilities. Tobacco products and smoking also are prohibited both inside a correctional facility and on facility grounds except as specifically authorized by MDOC policy. Wardens may prohibit other items from being brought into their respective correctional facilities. Smoking is prohibited.

H. The MDOC may require the Contractor’s and subcontractor’s personnel to wear State-MDOC issued identification badges.

Bidder must check only one box below and identify exception(s):

|_|
Bidder has reviewed the sections 1-9 and agrees with no exception(s).
|_|
Bidder has reviewed the above section and has noted all exception(s) in column to the right.
List all exception(s).

4. Pricing

4.1. Price Term

A. Pricing is firm for the initial base three-year term of the Contract. Adjustments may be requested, in writing, by either party during an option year and will be firm for 365 calendar…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .