RFP 149-26 Emergency Generator Maintenance Scope of Work_amended~1.pdf

PDF 571 KB Posted

Attached to
RFP 149-26 Emergency Generator Maintenance
Solicitation number
BD-27-1206-40000-40000-134987
Issued by
Suffolk County, Massachusetts

About this file

This Scope of Work document outlines emergency generator maintenance and repair services for the Massachusetts Bay Transportation Authority (MBTA), a public transit agency serving Greater Boston. The MBTA is soliciting sealed bids (RFP 149-26) from qualified contractors to provide inspection, testing, preventive maintenance, service, and repair work on 110 total units comprising 84 permanent emergency generators, 17 portable emergency generators, and 9 light towers located at 70 MBTA sites throughout the region. Equipment specifications and locations are detailed in Exhibit A, with portable generators and light towers primarily stored at 440 Riverside Avenue in Medford. The contract term is one year from the commencement date, with four optional one-year extension periods at the MBTA's sole discretion. Award will be made to the lowest responsible and eligible bidder under Massachusetts General Law.

Bidders must meet mandatory qualifications including current Massachusetts Master Electrician and gas fitter licenses, five years of generator maintenance experience, OSHA certifications, appropriate staff training, 24/7 service availability with defined response times, and owned or rented load bank equipment. The contractor must provide monthly routine inspections and maintenance, monthly load transfer testing on permanent generators between 1:00 AM and 5:00 AM, annual load bank testing, annual ATS testing, and immediate response to emergency calls. Pricing is submitted on Form C with monthly unit prices varying by equipment category. The contract includes a Baseline Condition Assessment due within 60 days of commencement, with identified deficiencies potentially becoming Additional Work billable at hourly rates plus materials. Major Repairs and Additional Work are paid separately at Form C rates. The contractor must maintain detailed records, comply with applicable codes and standards (NFPA 110, Massachusetts Electrical Code, OSHA requirements, and EPA regulations), provide comprehensive safety and security programs for MBTA approval, and submit extensive monthly and quarterly reports documenting all work performed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 149-26 Emergency Generator Maintenance Scope of Work

1. INTRODUCTION

The Massachusetts Bay Transportation Authority (MBTA) invites sealed bids from qualified contractors for the following services for its emergency generators, automatic transfer switches (ATS) and associated equipment. The Contract will be awarded to the lowest responsible and eligible Bidder under M.G.L. c.

30, § 39M, on the basis stated in Form C – Bidder Price Response:

• Inspection

• Testing

• Preventive Maintenance

• Service

• Repair

The Contract covers eighty-four (84) permanent emergency generators, seventeen (17) portable emergency generators and nine (9) light towers, one hundred ten (110) Units in total, at seventy (70) MBTA sites throughout Greater Boston, together with each Unit’s ATS(s), controls, fuel, cooling, exhaust, starting and ventilation systems. Portable generators and light towers are stored at 440 Riverside Avenue, Medford, except where Exhibit A shows a Unit stationed at another site. Each Unit is listed in Exhibit A –

Equipment Inventory (the Equipment List tab of Form C), which governs the quantity, type, rating and location of the equipment. The MBTA may add or remove Units in accordance with Section 2.10.

1.1 Bidder Qualifications. The following are mandatory and must be evidenced on Form B – Technical

Response. A Bidder that fails any item will be found not responsible:

1.1.1 The Bidder (or its named electrical subcontractor) holds a current Massachusetts Master Electrician license (M.G.L. c. 141) and employs a Massachusetts-licensed journeyman or master electrician.

1.1.2 All field personnel hold OSHA 10-hour construction certification; supervisors hold OSHA 30-hour certification; electrical personnel are trained as qualified persons under NFPA 70E.

1.1.3 The Bidder (or its named subcontractor) holds a current Massachusetts gas fitter license

(M.G.L. c. 142) for work on natural-gas Units.

1.1.4 At least five (5) consecutive years performing maintenance and repair of stationary emergency generators and ATSs.

1.1.5 At least three (3) references for generator maintenance contracts performed within the last five

(5) years.

1.1.6 Field technicians have manufacturer or equivalent training on the engine and control makes listed in Exhibit A (any manufacturer’s program or an equivalent recognized program is acceptable).

1.1.7 A staffed 24-hour, 7-day dispatch telephone number, and a service location, staffing and vehicles able to meet the response times in Section 2.1.5. No geographic location is required;

the Bidder must describe how it will meet those times.

1.1.8 Owned or rented resistive load banks with capacity for every Unit in Exhibit A, including the

1,500-kW portable generator.

1.1.9 A written safety program, and identified sources of replacement parts for the engine and control makes in Exhibit A.

1.2 Definitions

1.2.1

1.2.2

1.2.3

1.2.4

1.2.5

1.2.6

1.2.7

“Unit”: each generator, portable generator or light tower listed in Exhibit A, including its ATS(s) and associated equipment.

“MBTA Contract Manager”: the MBTA employee designated in writing to administer this

Contract. “Program Manager”: the Contractor’s dedicated manager under Section 2.2.

“MCC”: MBTA Maintenance Control Center (617-222-5278). “OCC”: MBTA Operations

Control Center. “Power Dispatcher”: MBTA Power Dispatcher (617-222-5546). “Trapeze”: the

MBTA maintenance management system.

“Normal Hours”: Monday–Friday, 7:00 a.m.–3:30 p.m., excluding MBTA holidays. All other times are “Outside Normal Hours”.

“Emergency”: a Unit fails to start, run, carry load or transfer; a Unit is running during a utility outage with an active alarm; a fuel, oil or coolant leak; a condition creating a risk to life safety or train service; or any call the MCC declares an Emergency. All other requests are “Non-

Emergency”.

“Monthly Unit Price”: the Bidder’s monthly price for a Unit in its Form C price category.

“Monthly Service Fee”: the sum of all Monthly Unit Prices invoiced for a month.

“Covered Repair”, “Major Repair” and “Additional Work” have the meanings in Sections 2.1.6 and 2.1.8.

1.3 Codes and Standards

1.3.1 Work shall comply with the following, in the edition in effect on the bid opening date: NFPA 110;

Massachusetts Electrical Code (527 CMR 12.00); NFPA 70B; NFPA 70E; NFPA 30 and 37;

OEM maintenance manuals; OSHA 29 CFR 1910 and 1926; 40 CFR Part 60 Subpart IIII and Part

63 Subpart ZZZZ; 310 CMR 7.00 and 30.000. Where this Scope of Work states a higher frequency, longer duration or stricter requirement than a code or OEM manual, this Scope of Work governs; otherwise, the most stringent applicable requirement governs.

2. SCOPE OF WORK

2.1 Scope of Work

2.1.1 General

2.1.1.1 The Contractor shall furnish all labor, supervision, licensed trades, tools, test instruments, load banks and cables, vehicles, parts, consumables, lubricants, permits and waste disposal needed to perform the work. All such costs are included in the Monthly Unit

Price unless this Scope of Work expressly identifies them as a Major

Repair or Additional Work.

2.1.1.2 Performance objective: every Unit shall be able at all times to start, transfer and carry its rated load within the time required by its NFPA 110

Type and the OEM specification.

2.1.1.3 The Contractor shall perform all work in accordance with the OEM specifications and the codes and standards in Section 1.3. Electrical work, including all ATS work, shall be performed only by

Massachusetts-licensed electricians. Work on natural-gas piping, regulators and gas boosters shall be performed only by a

Massachusetts-licensed gas fitter. The Contractor shall obtain and pay for any permits and inspections required for its work.

2.1.1.4 Medium-voltage areas. Some Units are in 13.8 kV unit substations. The

Contractor shall not operate, open or enter energized medium-voltage switchgear; all medium-voltage switching will be performed by the

MBTA. Only the Contractor’s licensed electricians may enter substation rooms; other Contractor personnel may enter only when accompanied by one of them. All work affecting switchgear or transfer switches shall be coordinated in advance with the Power Dispatcher.

and shall be considered “off limits” to all personnel under normal operating conditions. Only the Contractor’s assigned and dedicated licensed electricians (and technicians or other trades only when in the presence of the former) engaged in the performance of the contract services shall be allowed and authorized for access to the high voltage unit substations. The Contractor must coordinate any and all contract service work impacting unit substation switch gear and/or associated transfer switches with the MBTA’s Power Dispatcher at 617-222-

5546.

2.1.1.5 The MBTA’s emergency generators vary by manufacturer, model, age, size and performance characteristics and are subject to varied use in operating times and durations, as well as severe transit and environmental conditions that most properties and equipment do not experience. The Emergency generators, support systems and associated equipment included in this contract require a significantly higher degree of preventative maintenance, service, repair, inspection and testing than typical industrial installations. In spite of these conditions, the full contract requirements and obligations must be performed by the Contractor at all times; equipment safety standards, reliability and availability must be maintained by the Contractor at all times.

2.1.1.6 The Contractor is responsible for the emergency generator equipment regardless of any preexisting conditions. It is the responsibility of the

Contractor to inspect the condition of all the included emergency generator systems and equipment, associated systems, field conditions and all other aspects by which contract services, requirements and obligations. The Contractor may arrange an inspection for any of the emergency generators, ATS’s or any equipment that is required for the operation of the emergency generator, including all-natural gas gensets and related systems ( gas boosters etc ).

Baseline Condition Assessment. Within sixty (60) days after the

Commencement Date, the new Contractor shall inspect every Unit and submit a Baseline Condition Report listing each existing deficiency, with photographs and a cost estimate to correct it. The MBTA may order correction of listed deficiencies as Additional Work. Any deficiency not listed in the accepted report becomes the Contractor’s responsibility under Section 2.1.6.

2.1.2 Inspection

2.1.2.1 The Contractor must perform monthly routine safety inspections of the emergency generators, support systems and associated equipment, work areas, and work procedures of all employees assigned and dedicated to the MBTA. Inspection duties will be performed concurrently with all Preventative Maintenance duties.

2.1.3 Testing

2.1.3.1 Permanent Generators:

(a) Monthly load transfer testing must be performed on each generator between the hours of 1:00AM and 5:00AM, during non-revenue service, unless a time change is approved by the MBTA. The Contractor must perform these tests with the latest NFPA requirements.

(b) The Contractor must develop and execute a detailed yearly load bank (currently expected to test 2 hour) test schedule for each permanent generator and adhere to the minimum NFPA 110 load banking requirements. The MBTA reserves the right to go beyond NPFA 110 minimum requirements. Any problems discovered that causes a load bank test to fail would call for another load bank test until the problem is resolved.

(c) The Contractor must develop and execute a detailed yearly ATS testing schedule (requires a Massachusetts licensed electrician) for each ATS that is connected to the emergency generator.

(d) Record every deficiency found during testing in the test report and the

Trapeze work order and report it to the MBTA Contract Manager.

2.1.3.2 Portable Generators and Light Towers:

(a) Monthly: start and run each portable generator and light tower for at least thirty (30) minutes; check fluids, battery, charger and block heater; test light-tower lamps, mast and controls. Confirm each portable is staged in its designated area with charger and block heater connected, or with the battery disconnect switch open where no outlet is available.

(b) Annually: perform the OEM annual service on each portable generator and light tower, and the annual load-bank test in Section

2.1.3.1(b) on each portable generator. Where Exhibit A shows a portable without a battery disconnect switch, install one within sixty

(60) days after the Commencement Date; this is included in the

Monthly Unit Price.

2.1.4 Preventive Maintenance

(a) Perform the following monthly maintenance on each permanent Unit, once each calendar month, in addition to all maintenance required by the OEM manual and NFPA 110. Any PM reports that are required by the MBTA Contract Manager must be submitted within 30 days into the Trapeze system and/or shared Teams folder.

(b) Clean track dust and debris from the generator, enclosure and

ATS.

(c) Check fuel levels. Inspect for leaks. Record and report fuel deficiencies to the MBTA MCC 617-222-5278 and the Contract Manager.

(d) Check oil level and oil condition. Check for evidence of dilution or contamination. Add/replace oil as required and change oil filters yearly. A yearly oil sample will need to be submitted and resulting report needs to be submitted as part of the annual maintenance. Oil sample reports must be submitted to MBTA Contract Manager within 30 days and depending upon report, the oil may not need to be changed for that testing year.

(e) Check that the ammeter, voltmeter and frequency meter read zero at rest. Record run hours.

(f) Inspect condition of water jacket heater. Check radiator coolant level.

Add fluid as required.

(g) Check generator heater.

(h) Check all belts and hoses. Tighten and/or replace as required.

(i) Check level of day tank (diesel). Check operation of day tank pump.

(j) Check battery fluid level. Add water as required. Check battery cables and connections, make clean and tight. All start batteries shall be replaced every 4 years.

(k) Check battery charger ammeter.

(l) Check battery volts while cranking. Observe cranking time.

(m) Check automatic louver and damper operation.

(n) Prior to starting, check oil pressure. After starting, observe engine temperature after 15 minutes and verify all gauges working properly.

(o) Check for coolant, fuel and oil leaks, including the radiator and water-pump weep hole.

(p) Record all readings in Trapeze in accordance with Section 2.7.1.

(q) After shut down return switches to automatic.

(r) Verify ATS operation and power transferred to normal source.

(s) Check circuit breakers for “on” position.

(t) Cleaning: Maintain all areas clean and free of debris. Any material, equipment or components not related to or necessary for the performance of the contract service must be immediately reported to the MBTA Maintenance Control Center [(617)-222-5278] and the

Contract Manager. Floor gratings, drains and related piping must be kept free of debris and clear at all times.

(u) Repair: correct every deficiency found during maintenance, inspection or testing in accordance with Section 2.1.6.

2.1.4.2 Perform monthly electrical maintenance as described below.

Electrical maintenance must be performed by a Massachusetts licensed electrician:

(a) Control Panel:

• Check all indicator lamps for proper operation.

• Check all button and selector switch functions. Perform any required repairs.

• Check voltage levels and record.

• Check all fuses, confirm that they are properly installed and operable.

• Check wiring for defects and/or loose connections.

• Repair or replace any components or systems that are not functioning correctly.

• Perform monthly maintenance a minimum of once every four weeks.

(b) Automatic Transfer Switches:

• Check automatic transfer switches and observe for normal operation. Repair or replace components as required.

• Perform visual inspection of all the components.

• Perform monthly testing and exercising of all the Automatic Transfer Switch functions to ensure proper operation.

• Clean and maintain all exposed contacts to minimize electrical resistance.

(c) Miscellaneous Equipment (report deficiencies outside the

Contractor’s scope to the MCC and the MBTA Contract Manager within 24 hours):

• Check the room lighting.

• Check the fire extinguisher (expiration date, charge, etc.)

• Doors: Observe condition and security of access points.

• Check room HVAC system.

• Check exit signs.

• Check for any signs of vermin.

• Report any potential hazard to the equipment (presence of water, oil, gas or debris).

(d) Perform the following annual maintenance on each permanent Unit (portable generators and light towers per the OEM manual):

• Damper Actuator Fluid Renewal

• Thoroughly drain each actuator of hydraulic fluid.

• Thoroughly remove all dirt, sludge and foreign materials from all screen, valves, seals, etc.

• Refill each actuator with new hydraulic fluid in accordance with the Original Equipment Manufacturer’s specifications.

• Dispose of all waste oil, fluids and material in a lawful manner.

• Change engine oil and oil filter; replace fuel filters, air filters and crankcase breather.

• Test coolant and adjust or replace it per the OEM interval; inspect radiator, fan, hoses and clamps.

• Inspect exhaust system, supports, flexible connector, muffler and rain cap.

• Inspect fuel system: lines, check valves, transfer pump, tank vents, leak detection and alarms.

• Test all safety shutdowns and alarms by simulation (overcrank, overspeed, low oil pressure, high coolant temperature, low coolant level, low fuel) and confirm remote alarms reach the MCC.

• Load-test or conductance-test starting batteries. Replace starting batteries every four (4) years from the installation date in Exhibit A, or sooner on test failure; replacement is included in the Monthly Unit Price.

• Perform an infrared scan of generator output connections under load, a torque check when de-energized, and an insulation resistance test of the generator windings.

• Natural-gas Units: inspect the gas train, regulators and gas booster per the OEM manual and leak-test (licensed gas fitter).

• Take laboratory samples of engine oil (before the oil change), coolant (freeze point, pH, additive level) and diesel fuel from each storage and day tank (ASTM D975). Submit results within fourteen (14) days of receipt.

• Record every run (date, hours and reason: emergency, test or maintenance) to support MBTA recordkeeping under 40 CFR Part 60 Subpart IIII, Part 63 Subpart ZZZZ and 310 CMR 7.00.

2.1.4.3 Develop and maintain a detailed schedule for the monthly and annual preventative maintenance of each generator included in this contract.

This includes developing preventative maintenance check charts for each generator.

2.1.4.4 Treat corrosion and touch-up paint generator enclosures and exposed surfaces annually and whenever damage is found.

2.1.4.5 Clean up oil drips and minor leaks from the Units and dispose of the waste. The Contractor bears all costs of any spill or release caused by its work. Response to a reportable release not caused by the Contractor is Additional Work.

2.1.5 Service

2.1.5.1 The Contractor shall receive and respond to service requests twenty-four (24) hours a day, seven (7) days a week, 365 days a year, through one telephone number and one e-mail address.

2.1.5.2 The Contractor shall acknowledge and arrive within the times below.

Times are measured from the time stamp of the MBTA request.

“Acknowledge” means a call back from a qualified Contractor representative; “arrive” means the technician’s barcode scan-in at the site.

Normal Hours – Acknowledge Outside Normal Hours –

Acknowledge

Emergency Within Five (5) minutes Within Five (5) minutes

Non-Emergency Within Thirty (30) Minutes Within One (1) Hour

Normal Hours – Arrive Outside Normal Hours –

Arrive Emergency Within Forty-five (45) minutes Within One (1) hour

Non-Emergency Within [Two (2) hours] Within [Two (2) hours]

2.1.5.3

2.1.5.4

2.1.5.5

2.1.5.6

If a Unit cannot be returned to service within four (4) hours after arrival, the Contractor shall give the MBTA Contract Manager and the MCC a written diagnosis, repair plan and estimated return-to-service time.

Labor and travel for service calls, and the resulting Covered Repairs, are included in the Monthly Unit Price. Labor is paid separately only for Major Repair or Additional Work.

The Contractor must immediately respond to and investigate any and all accidents, incidents and emergencies that may be in any way associated with the emergency generators.

The Contractor must provide support services, up to 400 hours on a yearly basis, for Massachusetts Department of Public Safety elevator testing under emergency generator power as directed by the MBTA.

2.1.5.7 The generator room areas shall be then maintained in a clean, safe condition, by the Contractor throughout the contract term. The

Contractor must include this service as part of the contract base scope and the contract base price and no extra payment shall be made by the

Authority, at any time throughout the duration of the contract for this service.

2.1.6 Repair

2.1.6.1 The contractor must routinely repair all emergency generators and include routine repairs in the monthly service fee. The following is a list is not all-inclusive but serves as an outline the repair work that must be included in the monthly service fee:

2.1.6.2

2.1.6.3

(a) Systems, automatic transfer switches, transformers, pumps, motors, heaters, meters, controls, and equipment.

(b) Machinery and component parts, control components, equipment and wiring including relay, electronic tubes and components, contacts, solid state components, semi-conductors, resistors, condensers, transformers, fuses, leads, mechanical or electrical timing devices, computer devices and boards.

(c) Engine components, lubrication systems, exhaust system components, fans, belts, blades, bearings, governors, drive couplings, compression cylinders and block heaters.

(d) All fuel system components, filters, valves, controls, air cleaners, breathers, hoses, pumps, gauges and day tank function.

(e) All cooling system components, plug, radiators, pumps, controls, louvers and drain systems.

(f) Any and all ancillary equipment, components and systems related to the proper emergency generator operation.

(g) All supervisory wiring related to the emergency generator system operation.

(h) All charging systems, wiring, starting batteries, starters and alternators.

(i) All dampers and actuators.

All consumables (filters, oil, coolant, belts, hoses, lamps, fuses and starting batteries) are Covered Repairs regardless of cost. A single repair event shall not be divided to remain under the threshold.

Major Repairs (paid separately at Form C rates) are:

(a) a repair whose parts cost exceeds the Covered Repair threshold;

(b) regardless of cost: engine overhaul or replacement; alternator rewind or replacement; or replacement of a complete controller, ATS, radiator, fuel tank or enclosure; or

(c) damage from causes other than normal wear or the Contractor’s acts or omissions, such as vandalism, collision, flood, fire, lightning, utility surge, theft or misuse by others.

2.1.6.4

2.1.6.5

For each Major Repair, the Contractor shall submit within five (5) business days a written quotation showing scope, and labor hours by trade at the Form C hourly rates, and parts at the Contractor’s invoice cost plus the Form C markup. No

Major Repair shall start without an MBTA written work order, except that in an

Emergency the MBTA Contract Manager may authorize the work verbally, with written confirmation within one (1) business day. Diagnosis and quotation are included in the Monthly Unit Price.

The Contractor must:

(a) Develop and maintain service and repair logs for each emergency generator. The service logs must be designed for the specific type of emergency generator equipment.

(b) Not make changes, alterations, or modifications to the existing emergency generators, support systems or associated equipment operational design, performance characteristics, safety circuits, circuit wiring, sequencing, etc. without prior written approval of the MBTA.

(c) Furnish OEM parts or equal. A part is equal if it meets the OEM specification for form, fit, function and rating and does not void any active warranty. Before installing any non-OEM major component, submit data for MBTA approval.

(d) Maintain a stock of commonly used parts (filters, belts, hoses, batteries, fuses, relays) sufficient to complete routine Covered Repairs on the first visit.

2.1.6.6 All parts must be:

(a) New and unused, meet the manufacturer’s specifications, and be UL-listed where a listing applies.

(b) Compatible and integrative with the existing equipment and must not degrade the performance of said equipment in any way.

2.1.6.7 Any and all drawings, diagrams, prints, manuals, special diagnostic tools, access/control keys, computer equipment and other related items furnished to the Contractor by the MBTA or any such similar aforementioned records, documents or items procured or prepared by the Contractor for work under this contract will be considered the property of the MBTA. All of the aforementioned items must be accessible to the MBTA at all times throughout the duration of the contract and must be returned to the MBTA at the expiration of the contract term, contract termination or upon demand by the MBTA, and shall be kept current throughout the Contract. The MBTA will not incur any additional costs for this provision.

2.1.7 Special Events

2.1.7.1 The Contractor must be prepared to provide full support services for any special events (Boston Marathon, New Years, St. Patrick’s Day, July 4th etc.) without any exception at all times (24-hour, 7-day, 365 days per year) as directed by MBTA Contract Manager. The support services must not interfere with regularly scheduled emergency generator work tasks. The Contractor must ensure full personnel staffing to provide support services.

Failure to provide full staffing support may result in contract termination.

2.1.7.2 The Contractor’s operating and management facility must provide system and service status updates to the OCC and MCC (and any other MBTA office as directed) when required by the MBTA.

2.1.7.3 The Contractor must develop and maintain a suitable and detailed record or transcript of all communications and corresponding information with the MBTA. The Contractor must submit a copy of the records or transcripts for each corresponding special day or event to the MBTA within seventy-two (72) hours after the conclusion of the Contractor’s required support service coverage.

2.1.7.4 Fourteen (14) days prior to a special day or event, the Contractor must develop and submit a detailed action plan summarizing the

Contractor’s intended full support services. The action plan must contain:

(a) The special day or event date(s) and corresponding hours of coverage

(b) A list of all Contractor employees who will perform the support services

(c) The specific hours of coverage for each employee

(d) The specific assignment(s) and/or locations of each employee

(e) The inclusion and accommodation of any and all MBTA required assignments and/or special instructions and any other information necessary for the Contractor to successfully perform the support services.

2.1.8 Additional Work

2.1.8.1 The MBTA may require or direct the Contractor to provide services that are above and beyond the base scope of contract services. Such

“Additional Work” may involve:

2.1.8.2

(a) Upgrades, enhancements or modifications to comply with: changes to applicable codes, laws, or regulations as may be directed by the

MBTA, insurance companies, Federal, State, municipal or other governmental jurisdiction agencies.

(b) Services and/or work occasioned by a natural disaster, civil disorder, riot, war or other similar severe and unusual occurrence.

(c) Major Repairs; correction of Baseline Condition Report deficiencies; standby during utility outages or severe weather; elevator test events above the included quantity; and fuel polishing.

Additional Work is priced only at the Form C hourly rates plus parts and materials at invoice cost plus the Form C markup; the MBTA may instead agree to a fixed price not exceeding that calculation.

Within ten (10) business days after an MBTA request, the Contractor shall submit a written proposal that includes:

(a) Acknowledging and understanding the additional work requirement

(b) Describing the full impact, if any, of the additional work to the Contractor’s performance of the base scope of contract services.

(c) Explanation as to whether or not the additional work is feasible and advisable

(d) Estimating in detail the full cost associated with the additional work

(e) The Contractor’s proposed action plan

2.2 Contract Manager Requirements

2.2.1 The Contractor must attend with appropriate staff any meetings requested by the MBTA. The MBTA will determine the quantity and type of appropriate staff at the time of request. The MBTA will not incur any additional costs at any time throughout the duration of the contract for this service.

2.2.2 The Contractor must assign a manager that is dedicated to this contract. The contract manager must be:

2.2.2.1 Experienced, qualified, competent, and capable of communicating in

English.

2.2.2.2 Available full-time to support the contract services at any and all times when Contractor employees (including but not limited to supervisors, technicians, electricians, and administrative personnel) are working on

MBTA property including all days, hours, shifts, vacations, special days and events, special coverage, severe weather, etc.

2.2.2.3 Available to communicate with and appropriately respond to the

MBTA on a seven (7) days per week, twenty-four (24) hours per day basis.

2.2.2.4 Delegated sufficient authority so as to be able to exercise day-to-day decision making on all matters relating to the Contractor’s requirements and obligations under this contract.

2.2.2.5 Have the principal responsibility for directing and coordinating the

Contractor’s work and the performance of his requirements and obligations under this contract.

2.3 Safety Requirements

2.3.1 The Contractor must assume responsibility for Subcontractor(s) performing work and services on MBTA property and assets.

2.3.2 Post a durable “Temporarily Out of Service” sign at the entrance to each Unit under work or out of service, before work starts and for its duration. The

MBTA may specify the sign design at no additional cost. Signs must:

2.3.2.1 Be of sufficient size, design, detail and durability for the intended use and environment

2.3.2.2 Be located in full, clear and advanced view of entry to work areas

2.3.2.3 Include information relative to the nature of work being or to be performed (ie preventative maintenance, service, repair, etc) and the duration of work (ie anticipated start and completion dates)

2.3.3 Be securely stored in approved locations when not in use.

2.3.4 Provide each Contractor employee with portable two-way radios with a minimum of six (6) separate and distinct frequencies for communication with

MBTA representatives (ie OCC, Power Dispatcher, Transit Line Officials) and Contractor employees.

2.3.5 Provide each Contractor employee with all necessary tools, personal protective equipment, clothing, training, information and documents.

2.3.6 Contractor and Subcontractor(s) personnel performing work on MBTA

Property must:

2.3.6.1 Report to MBTA Supervision upon arrival and departure of MBTA property (a barcode scan may be required upon arriving on a work order and another barcode scan may be required upon job completion.

The Contractor must enter MBTA property only when fully authorized (ie via contractor-coordinated OCC and/or MCC authorization) to perform required MBTA work.

2.3.6.2 RWP (Roadway Worker Protection) contractor training is required to work on MBTA property. The training is a prerequisite for issuance of an MBTA “Contractor Badge” and takes 2-3 days, depending upon training schedule. Contractor must plan on having all employees working on MBTA property fully trained on RWP or any supplemental training that the

MBTA requires.

2.3.6.3 Display an MBTA-issued “Contractor Badge” at all times while performing work or services on MBTA Property.

2.3.6.4 Receive appropriate OSHA, US EPA, and MBTA safety training.

2.3.6.5 Wear a safety vest that clearly displays the Contractor company name on the front and back at all times while on MBTA Property. Safety

Vests must comply with ANSI/ISEA 107-2015 Class 2R. The MBTA reserves the right to approve or deny the attire used by the Contractor’s employees at no additional cost to the MBTA.

2.3.6.6 Abstain from carrying firearms while performing contract services on

MBTA property.

2.3.6.7 Protect MBTA buildings, materials, equipment, furniture, etc. and all persons from damage and injury in every way possible. The Contractor is solely responsible for any damage or injury due to a failure to provide this protection.

2.3.6.8 Comply with all applicable laws, codes and regulations concerning any release of a contaminant on or along MBTA property resulting from the performance of any contract service work or emanating from any equipment under this contract.

2.3.6.9 Submit MSDS sheets for any hazardous chemicals used by the

Contractor and/or Subcontractor(s)’ employees while performing the requirements and obligations of this contract in accordance with all applicable local, State and Federal laws and regulations.

2.3.6.10 Be responsible for any and all penalties and fines imposed regarding the violation of local, municipal, state or federal codes, laws or regulations insomuch as the violation occurs as the result of the

Contractor’s negligence for contract compliance.

2.3.7 If the full and complete contract service work requirements, obligations or performance standards are not met at any time, the Contractor must provide and sustain additional workforce personnel who must be assigned and dedicated to this contract at no additional cost to the MBTA. The MBTA reserves the right to approve the appropriate quantity and type of additional workforce personnel to be provided by the Contractor, such that the full and complete contract service work requirements and performance standards continue to be met.

2.3.8 The failure of any Contractor employee to strictly comply with the rules of any safety/security program or any other applicable safety requirements, policies or procedures will be the basis for the termination of such employee, upon the request of the Authority, from providing any of the contract services to the MBTA.

2.3.9 In accordance with Authority policies and procedures, all Contractor employees engaged in the provision of any of the contract services must attend required MBTA safety training sessions at the Contractor’s sole cost and expense. The Authority will determine the type, level and quantity

(including periodic re-training and re-certification intervals) of the safety training sessions. The Contractor’s employees must comply with all safety training session requirements, including but not limited to the use of MBTA-approved and required personal protective equipment, at the Contractor’s sole cost and expense.

2.3.10 The MBTA, at its sole discretion, may require the Contractor to remove any

Contractor or Subcontractor(s) personnel from MBTA property, with or without cause.

2.4 Safety Program

2.4.1 The Contractor must develop, and submit to the Authority for approval, within thirty (30) days after the Commencement Date, a Safety Program which will identify, minimize, control and eliminate safety hazards and their attendant risks to all Authority employees, contractors, representatives, vendors, passengers and the general public arising in connection with performance of the contract services. The Safety Program must be specifically developed to reflect the requirements and obligations of the contract, Authority policies, procedures, special orders and must include, but not be limited to, work habit policies and procedures, personal protective equipment and tool requirements and usage, lines of authority, levels of responsibility and accountability, methods of inspection and documentation and any other procedure necessary to ensure the safe performance of work.

2.4.2 The Contractor will be solely responsible:

2.4.2.1 To promote and rigorously enforce the Safety Program. In carrying out the requirements and obligations of the contract in accordance with Safety Program, the Contractor shall at all times conduct his work and operations in a safe manner and shall promptly take all precautions which are reasonable and necessary to safeguard against risks. The Contractor shall perform routine safety inspections of the emergency generators, support systems and associated equipment, work areas, work habits and all employees assigned and dedicated to this contract.

2.4.2.2 For the discovery, determination and correction of any unsafe condition(s) arising in connection with the performance of the contract services.

2.4.2.3 To give immediate notice to the Authority of any condition that may present a safety hazard to either the emergency generator, support systems or associated equipment included in this contract, to passengers and the general public or to Authority employees, contractors, representatives and vendors.

2.5 Security Program

2.5.1 To promote Security, the Contractor shall develop and submit to the Authority for approval, within thirty (30) days after the Commencement Date, a Security

Program which will identify, minimize, control and eliminate security hazards and their attendant risks to all Authority equipment, facilities, Authority employees, contractors, representatives, vendors, passengers and the general public arising in connection with and during the performance of the contract services. The Security Program must be specifically developed to reflect the requirements and obligations of the contract, Authority policies, procedures, special orders and shall include, but not be limited to, work habit policies and procedures related to chemical incidents, biological incidents, unknown substances, suspicious packages, evacuation, contractor personnel and contingency measures to allow continuous function of equipment.

2.5.2 The Contractor will be solely responsible:

2.5.2.1 To promote and rigorously enforce the Security Program. In carrying out the requirements and obligations of the contract in accordance with the Security Program, the Contractor shall at all times conduct his work and operations in a safe manner and shall promptly take all precautions which are reasonable and necessary to safeguard against risks. The Contractor shall perform routine security inspections of the emergency generators, support systems and associated equipment, work areas, work habits and all employees assigned and dedicated to this contract.

2.5.2.2 For the discovery, determination and correction of any security risk(s) arising in connection with the performance of the contract services.

2.5.2.3 The Contractor shall be responsible to give immediate notice to the

Authority of any condition that may present a security hazard to either the emergency generators, support systems or associated equipment included in this contract, to buildings, to passengers and the general public or to Authority employees, contractors, representatives and vendors.

2.6 Hazardous Waste Program

2.6.1 The Contractor shall develop and submit to the Authority for approval, within thirty (30) days after the Commencement Date, a policy and procedures manual and guideline for handling and managing hazardous wastes and materials. This document shall be specifically developed to reflect the requirements and obligations of the contract, Authority policies, procedures, special orders and shall include, but not be limited to, the identification of hazardous materials and their exposures, spill prevention and control, medical waste handling, oil and any other waste or hazardous material drainage or containment devices. The document shall additionally be developed in compliance with all applicable local, State and Federal environmental laws and regulations.

2.6.2 The Contractor shall enforce the approved manual and correct any hazardous condition arising from its work. It shall remove and lawfully dispose of all waste oil, filters, coolant, batteries and absorbents generated by the work in accordance with 310 CMR 30.000 and submit copies of manifests or receipts with the Monthly Report.

2.7 Coordination & Reporting

2.7.1

2.7.2

The Contractor must take a proactive approach to coordinating and communicating with MBTA personnel at every emergency generator site; the

Contractor is responsible for learning and adhering to the reporting requirements, policies, protocol and procedures. The Contractor may be required to scan / barcode into a site before work is started and submit electronically the details of the work order assigned. The Contractor will be required to submit data forms if any data submission policies change for internal tracking at the MBTA. On completion, the

Contractor may also be required to scan out of the site via a barcode.

Any work orders assigned must be completed and submitted electronically into the MBTA Trapeze system which may also require the use of a tablet. Any additional data that needs to be submitted into

Trapeze / shared Teams folder, must be submitted within 30 days.

With the assistance of the MBTA Contract Manager, the Contractor is responsible for coordinating any and all work with the Maintenance Control

Center (MCC), the Operations Control Center (OCC) and the facility personnel on site. The Contractor will be required to provide these entities with detailed information about their organization, staff, and procedures.

2.7.3 The Contractor must coordinate all service work impacting unit substation switch gear and/or associated transfer switches with the MBTA’s Power

Dispatcher at 617-222-5546.

2.7.4 The Contractor must cooperate with other contractors, agencies, companies or

MBTA representatives performing adjacent, adjoining or overlapping work.

2.7.5 The Contractor must give immediate notice to the MBTA of any condition that may present a security or safety hazard. The Contractor will be responsible for notifying all affected utility companies prior to performing any contract service work.

2.7.6 The Contractor must coordinate any other internal and external departments in order to safely work and perform their duties.

(Including any radio / RF / cell tower shutdowns that may be required). An example of this would be 45 High St and ATT cell towers / RF / equipment is required to be shut down prior to working on the roof. All email exchanges in preparation for any shutdown must give 2 day advance notice to Contract Manager in order to notify appropriate groups.

2.7.7 The Contractor must submit the following schedules:

2.7.7.1 Yearly load transfer test schedule.

2.7.7.2 Monthly preventative maintenance schedule.

2.7.7.3 Monthly workforce assignment schedule for all routinely planned and scheduled preventative maintenance, service, repair, inspection and testing work:

The schedule must be sorted by employee name, work shift, and work activities; in addition, the schedule must include the emergency generator number and location and the work type (i.e. service, inspection), class (i.e. monthly mechanical/electrical), and nature (i.e.

symptom or reason). The schedule must be submitted a week in advance.

2.7.8 The Contractor must report:

2.7.8.1 Any emergency generator to be removed from service to the

Contracting Manager, OCC, appropriate station and/or transit line official. The Contractor must obtain MBTA approval prior to removing any generator from service.

2.7.8.2 Any and all contract service work to the Maintenance Control Center

(MCC). The Contractor must provide notification to the MCC within

¼ hour upon the completion of work and the equipment’s subsequent return to service.

2.7.8.3 Any fuel deficiency, to the MCC and the MBTA Contract

Manager within fifteen (15) minutes.

2.7.8.4 Any Emergency, unscheduled outage or spill, to the MCC, OCC, MBTA Contract Manager and the appropriate station or transit line official, within fifteen (15) minutes.

2.7.9 The Contractor shall submit the following reports (see Section 2.12):

2.7.9.1 Copies of weekly payroll records on a monthly basis, with invoices.

2.7.9.2 Monthly Support Material Usage Report that lists generator units and the corresponding parts, components, equipment and materials used or installed, the date of usage or installation and description of the reason for usage or installation.

2.7.9.3 Monthly Work Summary Report summarizing the previous month’s preventative maintenance, service, repair, inspection, testing and all other work activities performed. The report must include:

a. The start and finish dates and times of work performed

b. The total labor hours expended per work task

c. The type and class of work performed (i.e. monthly, or annual preventative maintenance, major or minor repair, service request, inspection, test, etc.)

d. A brief description of the work performed (i.e. nature, extent, symptoms, parts or lubricants used, component settings or adjustments made, etc.)

2.7.9.4 Annual Work Summary Report summarizing the previous year’s preventative maintenance, service, repair, inspection, testing and all other work activities performed. The report must include the content and formatting of the Monthly Work Summary Report.

2.7.9.5 Monthly Service Request Response Report summarizing the previous month’s responses to service requests and the corresponding work performed. The report must be chronologically sorted by emergency generator unit number and location. The report must include:

a. The date and time of service request to the equipment

b. The MBTA assigned incident or work order number

c. Repair action code and work item code (as applicable)

d. The name(s) and type(s) of the Contractor employee(s) responding to the request for service

e. The date and time(s) of the Contractor employee(s) job site arrival

f. The reason for any delays (as applicable) in service request/job site response arrival

g. The cause or condition that necessitated the service request

h. The start and finish dates and times of corresponding work performed

i. The total labor hours expended per work task

j. A brief description of the work performed

k. The date and time the emergency generator was returned to service (if different from work completion date and time, provide the reason why)

2.7.9.6 Annual Service Request Response Report summarizing the previous year’s responses to service requests and the corresponding work performed. The report shall contain all elements of the Monthly

Service Request Response Report.

2.7.9.7 The Contractor must develop and submit programs of all routinely planned and scheduled preventative maintenance, service, repair, inspection and testing work. Each program must be on a generator-by-generator basis and separated by all work tasks (preventative maintenance, inspection, testing, service, repair) for each month for a complete six (6) month “look-ahead” schedule. Each program must be sorted chronologically by emergency generator unit numbers and locations. The program must include:

a. One generator per program with corresponding generator location information

b. The type of work (i.e. preventative maintenance, service, repair, inspection, testing)

c. The class of work (i.e. monthly mechanical, monthly electrical or annual)

d. The anticipated start and finish dates of work by specific task, type and/or class, and any other pertinent information.

e. All programs must be submitted every six months.

2.7.9.8 The Contractor must review operating and maintenance, service and repair costs on a unit basis as directed by the MBTA.

2.7.9.9 The Contractor must maintain and provide the MBTA with all records, reports and documents as necessary and required to support the contract services and obligations.

2.7.9.10 The Contractor must return to the MBTA upon demand, termination or expiration of the contract term all keys, prints, diagrams, drawings, manuals, tools, equipment, etc. provided to and used by the Contractor in performing the contract services and obligations.

2.7.9.11 The Contractor must maintain and submit as required full and accurate records and documentation of all contract services and other activities carried out under this contract.

2.7.9.12 The Contractor must update and maintain all records, documents and related items in an “as modified” or updated condition throughout the duration of the contract.

2.8 MBTA Inspection & Investigation:

2.8.1 The MBTA reserves the right to execute the following at its sole discretion, including but not limited to:

2.8.1.1 Inspect and examine the emergency generators, support systems and associated equipment without giving notice to the Contractor.

2.8.1.2 Inspect and examine the services and work performed and the materials provided and used by the Contractor at any time without giving notice to the Contractor.

2.8.1.3 Obtain any information related to the services, work or obligations of the Contractor as required under this contract from any of the

Contractor’s employees.

2.8.1.4 Not be responsible or liable for the violation of local, municipal, state or federal codes, laws and regulations applicable to the contract services.

2.8.1.5 Have the final and binding determination for all issues which may arise as to the quality and acceptability of the contract services performed or the materials provided therefor and as to the rate of performance of said contract services; all questions which may arise as to the interpretation of any or all plans, diagrams and/or specifications; and all questions as to the acceptable fulfillment of the requirements and obligations of the contract on part of the

Contractor.

2.8.1.6 Suspend the contract services wholly or in part due to the failure of the Contractor to carry out the requirements and obligations of the contract.

2.8.1.7 Provide notifications to the Contractor at his operating and management facility of any condition discovered by the MBTA for which direct response service is required.

2.8.1.8 Perform a prior, simultaneous or subsequent corresponding accident or emergency investigation.

2.8.1.9 Require or direct increase, reductions, alterations or modification in any portion or part of the base scope of contract services.

2.8.1.10 At the conclusion of any inspection by MBTA officers, the MBTA will provide written notice to the Contractor of any deficiencies found as related to the base scope of contract services. The

Contractor will be responsible, at his sole cost and expense, to properly correct or remedy the deficiencies within thirty (30) days after receipt of said notice. The Contractor must provide any and all necessary personnel for the aforementioned inspection support and required remedial or corrective work at no additional cost to the

MBTA.

2.8.1.11 All work which does not conform to the contract requirements will be considered unacceptable; any and all rejected or defective work, whether the result of poor workmanship, used of defective materials, inferior or unsatisfactory end product, damage through carelessness or any other cause must be removed and replaced by work which must conform to the contract requirements or must be remedied otherwise in an acceptable manner at the discretion and approval of the MBTA, by and at the expense of the Contractor.

2.9 Warranty

2.9.1 In addition to the manufacturer’s warranty, the Contractor warrants all parts, materials and workmanship it furnishes for one (1) year from installation.

Manufacturer warranties shall be passed through to the MBTA.

2.9.2 Under the direction of the Authority, the Contractor must, without any additional charge, replace and install any materials or equipment furnished and installed under this contract which have failed or have been found to be defective…