This is a Questions & Answers document for RFP-1153 issued by the Florida Department of Transportation (FDOT) District One for traffic signal maintenance and modification services. The contract encompasses maintenance of 19 traffic signal intersections with potential signal modifications throughout the district, contingent on available funding. Key equipment and services include vehicle detection systems (video-based), traffic controller assemblies with various preemption options, ITS CCTV cameras, uninterruptible power supplies, pedestrian detectors, and cellular modems. The scope requires the contractor to maintain adequate spare parts on-hand sufficient for servicing 19 traffic signals, including signal heads, hardware, MMUs, and spare cabinets. The contract is a three-year agreement beginning in Fiscal Year 2026 with a current FY 26 budget allocation of $1,200,000.
The department does not plan to purchase remaining spare parts at contract conclusion. Contractors may store department-furnished equipment at their facilities as needed for scheduled installations. Preventive maintenance work will be reimbursed based on contractor estimates provided to the project manager prior to work commencement. Technical proposals must include a cover letter, surety letter, Drug Free Workplace Program Certificate, Vendor Certification Regarding Scrutinized Companies List, E-Verify Form, and Bid Opportunity List for Commodities & Contractual Services. Any APL-certified products are acceptable for the specified pay items, providing bidders with flexibility in equipment selection while maintaining quality standards.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers
DOT-RFP-26-1153-LE
District One Traffic Signal Maintenance and Modification
Does the department have a desired solution or a technical specification for the following pay items? Or is any APL certified product acceptable.
0660- 4- 11 VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET EQUIPMENT
0660- 4- 12 VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE GROUND EQUIPMENT
0670- 5-110 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA
0670- 5-111 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA, 1 PREEMPTION
0670- 5-112 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA, 2 PREEMPTION
0671- 2- 11 TRAFFIC CONTROLLER WITHOUT CABINET, F&I IN EXISTING CABINET
0682- 1-133 ITS CCTV CAMERA, F&I, DOME ENCLOSURE - NON-PRESSURIZED, IP, HIGH DEFINITION
0685- 1- 11 UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL, LINE INTERACTIVE
0685- 1- 13 UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL, LINE INTERACTIVE WITH CABINET
0665-1-12 PEDESTRIAN DETECTOR, FURNISH & INSTALL, ACCESSIBLE
684-8-1 Cellular Modem, F&I
A. Any APL product is acceptable
1. Does FDOT have a planned scope and / or planned budget for this contract for 2026?
A. This is a 3 year contract beginning in FY 26, regular maintenance of the listed signals and signal modifications are planned for 2026. Current FY 26 budget is $1,200,000
2. Exhibit “A” Scope of Services, Section 2.4, page A-5 states: “The Contractor shall provide adequate…spare traffic signal components…” and Section 3.2, Item 2 states “Contractor shall maintain a sufficient stock of signal equipment…” Please provide details of what spare parts the Contractor is required to have on-hand to be considered “adequate.”
A. Spare parts should consist of signal heads and hardware to hang them, MMUs, and spare cabinets. Spare stock should be sufficient for maintenance of 19 traffic signals.
3. Does the Department have any existing spare parts that will be given to the Contractor?
A. The department carries an inventory of spare parts that will be distributed to the contractor if the need arises.
4. Will the Department purchase any remaining spare parts at the end of the maintenance contract?
A. The department does not plan to purchase remaining spare parts at the end of the contract.
5. Exhibit “A” Scope of Services, Section 2.4, page A-5 states “…facilities shall be secured to prevent theft of
Department owned equipment and materials.” What Department owned equipment is the contractor expected to store at their facility?
A. The contractor is expected to store parts that have been furnished by the department for install on a new task if the contractor chooses to pick up the furnished equipment before the scheduled work begins.
6. Attachment II includes a Preventive Maintenance Report for “School Pedestrian w/ wo Radar – Flasher.” What pay item will be used to reimburse the contractor for this work?
A. If work is directed for this checklist, the contractor will provide an estimate to the project manager before proceeding.
7. Will the Department provide a list of locations for the “School Pedestrian w/ wo Radar – Flasher”?
A. In the directly maintained areas there are no locations for this item, this is a placeholder in case the need arises.
8. Attachment III includes the Signal Location List with a total of 19 intersections, but the following bit item quantities do not seem consistent with only 19 locations. Can you please clarify why the quantities don’t match?
a. 0639-4-7: Emergency Generator – Harness for Cabinet Retrofit; Quantity = 25
b. 0685-1-13 UPS, F&I, Line Interactive; Quantity = 10 and 0685-1-13 UPS, F&I Line Interactive with Cabinet;
Quantity = 40
c. 0684-1-1: Managed Field Ethernet Switch, F&I; Quantity = 50
d. 684-8-1: Cellular Modem, F&I; Quantity = 35
e. Intersection Preventative Maintenance; Quantity = 35
A. The main goal of this scope is to provide regular maintenance on the 19 locations listed, with the addition of signal modifications throughout the district, funding permitting.
9. Can a cover letter be included with the Technical Proposal?
A. Yes, a cover letter can be included.
10. Would FDOT please confirm that in addition to the letter from our Surety, the following forms are to be submitted with our technical proposal?
a. Drug Free Workplace Program Certificate;
b. Vendor Certification Regarding Scrutinized Companies List;
c. E-Verify Form; and
d. Bid Opportunity List for Commodities & Contractual Services.
A. Yes, please include these forms.
File details come from the government source that posted it. Updated .