This is a Request for Offer (RFO) document issued by the Town of Payson, Arizona for facility development at Payson Municipal Airport in Fiscal Year 2027. The Town seeks a development partner to deliver innovative, durable, and cost-effective solutions that maximize available space and promote long-term operational sustainability. Offerors must present a complete development concept appropriate to the proposed use and site, addressing facility type, size, layout, and intended operations. When hangar development is proposed, the concept must include aircraft storage capabilities for varying aircraft sizes and taxiway connections for aircraft access. Additional requirements include vehicle circulation planning, site access and parking, restrooms and support facilities appropriate to the proposed use, and security and safety features such as fencing and lighting. The RFO expects offerors to incorporate energy-efficient materials, waste-management practices, water conservation, and other practical sustainability measures into their proposals.
The document establishes requirements for development concepts that balance operational functionality with environmental responsibility and cost-effectiveness. Specific response dates, due dates, site visit schedules, and bidder conferences are referenced within the RFO document. The development partner selected will be responsible for delivering solutions that address the airport's capacity and operational needs while adhering to sustainability standards and safety requirements appropriate to airport facility operations in Arizona.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF PAYSON
PAYSON MUNICIPAL AIRPORT
REQUEST FOR OFFERS
RFO-2026-006-TOP
AIRPORT FACILITY DEVELOPMENT FY27
September 2026
REQUEST FOR OFFERS
AIRPORT DEVELOPMENT FY27
SOLICITATION INFORMATION AND SELECTION SCHEDULE
Solicitation Number:
Solicitation Title:
Release Date:
Question Submission Deadline:
Question Response Deadline:
Proposal Due Date and Time
Bid Opening
Target Town Council Award Date:
Anticipated Agreement Start Date:
Project Contact:
RFP 2026-007-TOP
AIRPORT DEVELOPMENT FY27
Friday September 18, 2026
Monday November 2, 2026 by 3:00 PM
Thursday November 5, 2026
Tuesday, November 30, 2026 by 11:00 AM
Wednesday December 2, 2026 at 9:30 AM
January 13, 2026
February 1, 2027
Kyle Christiansen, Director of Capital Improvements Email: kchristiansen@paysonaz.gov Phone: 928-472-5047
*The Town of Payson reserves the right to amend the solicitation schedule as necessary.
A-1
1 Purpose The Town of Payson, as sponsor of Payson Municipal Airport, invites offers from qualified developers, contractors, businesses, and service providers for the design, development, construction, and operation of facilities on airport property. The Town's primary interest is the development of new aircraft hangars to accommodate the airport's growing fleet of based aircraft and support aviation activity.
The Town will also consider proposals for other primarily aviation-related uses, including aircraft maintenance and aviation training facilities. Property that does not have direct access to a runway or taxiway may be considered for compatible non-aeronautical development, including manufacturing or restaurant operations.
2 Airport and Development Area Payson Municipal Airport is located at 806 West Airport Road in Payson, Arizona. Proposed development must be located within buildable areas identified on the current Payson Municipal Airport Airport Layout Plan, attached as Exhibit A, and must be compatible with the location, access, and dimensional limitations shown on that plan.
The type and intensity of each proposed use must be appropriate for the selected site. Proposals requiring aircraft access must identify the necessary taxiway connection. Proposals for sites without direct runway or taxiway access must explain how the use supports or remains compatible with airport operations.
3 Project Scope Offerors should present a complete development concept appropriate to the proposed use and site. As applicable, the concept should address:
• The proposed facility type, size, layout, and intended operations.
• Aircraft storage for aircraft of varying sizes when hangar development is proposed.
• Taxiway connections when aircraft access is required.
• Vehicle circulation, site access, and parking.
• Restrooms and other support facilities appropriate to the proposed use.
• Security and safety features, including fencing and lighting where appropriate.
• Energy-efficient materials, waste-management practices, water conservation, and other practical sustainability measures.
4 Offer Submission Requirements Each offer must be sufficiently complete for the Town to understand the proposed development, the offeror's qualifications, and the anticipated financial and operational arrangement.
4.1 Company Profile
• Company background, ownership, experience, and relevant capabilities.
• Experience with airport, aviation-related, or comparable development projects.
• Examples of completed projects of similar scale or complexity.
• Relevant licenses, certifications, and insurance coverage.
4.2 Development Proposal
• A narrative describing the proposed use, operations, and public or airport benefit.
• A site and design concept, including drawings or renderings sufficient to explain the proposed facility.
• A construction and implementation schedule identifying major milestones.
• The principal materials, systems, and equipment anticipated for the development.
• An estimated cost breakdown for design, construction, and additional services.
• For hangar proposals, the anticipated number and size of aircraft spaces and the proposed taxiway connection.
• For other proposals, an explanation of the development's aviation purpose or compatibility with airport operations.
4.3 Financial Proposal
• Total anticipated development cost, with costs separated by phase or category.
• Proposed payment terms, financing approach, and schedule.
• Any proposed lease, revenue, or other financial arrangement with the Town.
• Cost-saving measures and value-added services included in the offer.
4.4 Sustainability Plan
• Environmentally responsible practices proposed for design, construction, and operation, including energy efficiency, waste reduction, and water conservation where applicable.
4.5 Safety and Security Plan
• Construction safety protocols and risk-management practices.
• Measures to protect airport operations during construction.
• Security features proposed for the completed development.
4.6 References
• At least two client references for comparable projects, including current contact information and a brief description of the work performed.
5 Evaluation Criteria The Town will evaluate offers based on the overall value and feasibility of the proposed development.
Evaluation factors include:
• Experience, qualifications, and reputation of the offeror.
• Compatibility of the proposed use with the Airport Layout Plan and airport operations.
• Responsiveness to the project scope and submission requirements.
• Financial feasibility, proposed cost, and payment or revenue structure.
• Reasonableness of the implementation schedule and project milestones.
• Commitment to safety, security, and sustainability.
• Benefits to the airport, the Town, airport users, and the community.
• Value-added services, innovation, and long-term viability of the proposed use.
6 Schedule
Milestone Date
Deadline for Offers November 30, 2026
7 Submission Instructions
• Offers must be received no later than November 30, 2025, and submitted to no later than 11:00 am on Monday November 30, 2026, to the Town of Payson via the Town’s e-Procurement Portal.
Hard copy (mailed or hand delivered), Fax, or e-mail submittals will not be accepted or considered.
8 Questions and Additional Information
1. Questions or requests for clarification regarding this RFO shall be submitted in writing via “Q&A” through the Town’s e-Procurement Portal, before 9:00 am on October 31, 2026.
2. All questions must be received before the deadline set forth above. Inquiries received afterwards will not receive responses.
3. No telephone calls with questions will be taken.
9 Town Rights and Conditions The Town may request clarification or additional information from an offeror as necessary to evaluate an offer. Submission of an offer does not obligate the Town to select an offeror, approve a development, enter into an agreement, or reimburse any cost incurred in preparing or submitting an offer. Any proposed development remains subject to applicable Town, airport, regulatory, environmental, planning, design-review, lease, and approval requirements.
1 11
Chandra Burks
Title Sheet
Ethan Blackburn
Matt Quick
Payson Airport
Payson, Arizona
D a te
/2
/2
T im e
:3
:0
A M
S o u rc e D o cu m e n t
P a th
C
U se rs \c d o n n
\C o ffm a n A ss o ci a te s
In c\
C o ffm a n s p
G
IS
\P
A N
\A
L P
S e t\
P A
N
A L
P
S e t\ E
S R
I\ M
X D s\
P A
N
T itl e
S h e e t.
m xd P
D F
C re a te d
SHEET OF
PLANNED BY:
DETAILED BY:
APPROVED BY:
REVISIONSNo. DATE BY APP'D
THE PREPARATION OF THESE DOCUMENTS WAS FINANCED IN PART THROUGH A PLANNING
GRANT FROM THE FEDERAL AVIATION ADMINISTRATION AS PROVIDED UNDER SECTION 505 OF THE AIRPORT AND AIRWAY IMPROVEMENT ACT OF 1982, AS AMENDED. THE CONTENTS DO NOT NECESSARILY REFLECT THE OFFICIAL VIEWS OR POLICY OF THE FAA. ACCEPTANCE OF THESE DOCUMENTS BY THE FAA DOES NOT IN ANY WAY CONSTITUTE A COMMITMENT OF THE PART OF THE UNITED STATES TO PARTICIPATE IN ANY DEVELOPMENT DEPICTED HEREIN NOR DOES IT INDICATE THAT THE PROPOSED DEVELOPMENT IS
ENVIRONMENTALLY ACCEPTABLE IN ACCORDANCE WITH THE APPROPRIATE PUBLIC LAWS
Drawing Index
1. Title Sheet
2. Airport Data Sheet
3. Airport Layout Plan Drawing
4. Airport Airspace Drawing
5. Approach Profile Drawing
6. Inner Portion of the Approach Surface Drawing - Runway 6
7. Inner Portion of the Approach Surface Drawing - Runway 24
8. Departure Surface Drawing
9. Terminal Area Drawing
10. Airport Land Use Drawing
11. Exhibit "A" Airport Property Inventory Map
AIRPORT LAYOUT PLAN
PAYSON AIRPORT
Prepared for Town of Payson for the
Payson, ArizonaLocation Vicinity
September 2024
EXHIBIT A
2 11
Airport Data Sheet
Ethan Blackburn
Matt Quick
Payson Airport
Payson, Arizona
D a te
/2
/2
T im e
:3
:2
A M
S o u rc e D o cu m e n t
P a th
C
U se rs \c d o n n
\C o ffm a n A ss o ci a te s
In c\
C o ffm a n s p
G
IS
\P
A N
\A
L P
S e t\
P A
N
A L
P
S e t\ E
S R
I\ M
X D s\
P A
N
D a ta
S h e e t.
m xd P
D F
C re a te d
SHEET OF
PLANNED BY:
DETAILED BY:
APPROVED BY:
REVISIONSNo. DATE BY APP'D
THE PREPARATION OF THESE DOCUMENTS WAS FINANCED IN PART THROUGH A PLANNING
GRANT FROM THE FEDERAL AVIATION ADMINISTRATION AS PROVIDED UNDER SECTION 505 OF THE AIRPORT AND AIRWAY IMPROVEMENT ACT OF 1982, AS AMENDED. THE CONTENTS DO NOT NECESSARILY REFLECT THE OFFICIAL VIEWS OR POLICY OF THE FAA. ACCEPTANCE OF THESE DOCUMENTS BY THE FAA DOES NOT IN ANY WAY CONSTITUTE A COMMITMENT OF THE PART OF THE UNITED STATES TO PARTICIPATE IN ANY DEVELOPMENT DEPICTED HEREIN NOR DOES IT INDICATE THAT THE PROPOSED DEVELOPMENT IS
ENVIRONMENTALLY ACCEPTABLE IN ACCORDANCE WITH THE APPROPRIATE PUBLIC LAWS
6 24 7 25
Takeoff Run Available (TORA) 5,504 5,504 Same Same
Takeoff Distance Available (TODA) 5,504 5,504 Same Same
Accelerate-Stop Distance Available (ASDA) 5,504 5,504 Same Same
Landing Distance Available (LDA) 5,504 5,504 Same Same
RUNWAY DECLARED DISTANCE
EXISTING ULTIMATE
APPROVAL DATE AIRSPACE CASE NUMBER STANDARD MODIFIED DESCRIPTION
MODIFICATIONS TO STANDARDS APPROVAL TABLE
None Required
Navaid Owner Airport Beacon Town of Payson
REILs Town of Payson
PAPI-2 Town of Payson
Airport Navaid Ownership
County: Gila Owner: Town of Payson
EXISTING ULTIMATE
B-I(Small) Same
5,160.41 ft Same
Latitude 34° 15' 24.611" N Same
Longitude 111° 20' 21.321" W Same
Lighted Wind Cone, Segmented Circle, AWOS
Same
Citation M2 Same
47.25 Same
100 Same
13.00 Same
Design Critical Aircraft
Wingspan of Design Aircraft (Feet)
Airport Elevation (NAVD 88)
AIRPORT DATA
City: Payson, Arizona
Airport Name & ID: Payson Airport, PAN
Airport Reference Code (ARC)
Mean Maximum Temperature of Hottest Month
Airport Beacon, RNAV
(GPS), REILs, PAPI-2
Airport Beacon, RNAV or LPV (GPS), REILs, PAPI-4
Airport Navigational Aids
Airport Reference Point (ARP) Coordinates
92.5° (July)
Miscellaneous Facilities
State System Plan Role
9° 38' E
April 2023
NOAA
Approach Speed of Design Aircraft (Knots)
Undercarriage Width of Design Aircraft (Feet)
Magnetic Declination (Degrees)
Declination Date
Declination Source
NPIAS Code Local GA
Community GA
Existing/Ultimate Taxiway/Taxilane
Designation
Taxiway Design Group
Existing/ Ultimate
Width
Taxiway/Taxilane Safety Area Dimension
Taxiway Object Free
Area
Taxilane Object Free
Area
Existing/Ultimate Taxiway/Taxilane
Lighting
Taxiway & Taxilane Separation1
Taxiway Edge Safety Margin
(TESM)
A TDG 1A 35' 49' 89' 79' MITL 44.5' 7.5'
A1 TDG 1A 80'/35' 49' 89' 79' MITL 44.5' 7.5'
A2 TDG 1A 80'/35' 49' 89' 79' MITL 44.5' 7.5'
A3 TDG 1A 30'/35' 49' 89' 79' MITL 44.5' 7.5'
A4 TDG 1A 80'/35' 49' 89' 79' MITL 44.5' 7.5'
B TDG 1A 35' 49' 89' 79' MITL 44.5' 7.5'
Objects located ins ide the TSA & TOFA/Distance from object to taxiway/taxi lane centerl ine. See Table 4-1 in AC 150/5300-13B
Taxiway Data Table
Existing Condition Corrective Action
1. RSA Obstructions & Gradient out of tolerance -
Vegetation and airport perimeter fence obstruct RSA near Runway 24. RSA does not meet gradient standard;
first 190' of RSA from runway end is within allowable grade, but remaining 50' exceeds tolerance.
Measurements are approximate.
Remove obstructions, relocate fence & re-grade RSA
2. ROFA Obstructions Present: Vegetation and airport perimeter fence obstruct ROFA near Runway 24.
Remove/relocate obstructions
3. Direct Access from Charlie Ramp via Taxiway A3 Taxiway geometry changes
Non-Standard Conditions
6 24 7 25
10.5 knots
13 knots
16 knots
20 knots
Lati tude 34° 15' 18.039" N 34° 15' 31.224" N Same Same
Longitude 111° 20' 53.112" W 111° 19' 49.511" W Same Same
5,142.17' ms l 5,160.41' ms l Same Same
Lati tude N/A N/A Same Same
Longitude N/A N/A Same Same
N/A N/A Same Same
N/A N/A Same Same
120' x 240' 120' x 240' Same Same
120' x 240' 120' x 240' Same Same
1,000' x 250' x 450' 1,000' x 250' x 450' Same Same
20:1 20:1 Same 34:1
Visua l Visua l Same NPC
Visua l Visua l Same 1-Mi le
NVG NVG Same Same
No No Yes Yes
250' x 240' 250' x 240' Same Same
250' x 200' 250' x 200' Same Same
Surface 4 Surface 4 Same Same
5,145.45' ms l 5,160.41' ms l Same Same
*Tables 3-2, 3-3, & 3-4 in AC 150/5300-13B
Same
Same
NAVD88
Horizonta l Datum
Departure Surface (Yes or N/A)
Runway Object Free Area Dimens ions (width x length beyond end)
Runway Obstacle Free Zone Dimens ion (width x length beyond end)
Runway Visua l and Instrument Navaids
Vertica l Datum
Touchdown Zone Elevation (TDZE)
NAD83
13B Approach Surfaces*
REILs , PAPI-2, RNAV (GPS) REILs , PAPI-4, RNAV or LPV (GPS)
Approach Vis ibi l i ty Minimums
Runway End Elevation
Type of Aeronautica l Survey Required for Approach
14 CFR Part 77 Approach Slope
14 CFR Part 77 Approach Type
MIRL
Nonprecis ion
Runway Displaced Threshold Coordinates
Runway Displaced Threshold Dis tance
Runway Displaced Threshold Elevation
Runway Safety Area Dimens ions (width x length beyond end) - Actual
Runway Safety Area Dimens ions (width x length beyond end) - Des ign Std.
Runway Lighting Type
Runway Protection Zone Dimens ions
Runway Marking Type
Runway End Coordinates
97.75%
5,504' x 75'
RUNWAY 6/24
EXISTING ULTIMATE
Approach Reference Code (APRC)
Departure Reference Code (DPRC)
Runway Dimens ions (L x W)
Runway Percent Wind Coverage
Same
Same
Same
Same
Runway Effective Gradient
B-I(S)-5000
Same
N/A
None
0.33%
RUNWAY DATA TABLE
Runway Identi fication
B-I(S)-4000
B-I(S)
Asphalt
40 (S); 50(D); 100(2D)
Runway Des ign Code (RDC)
Runway Surface Materia l
Runway Pavement Strength By Wheel Loading (in thousands of lbs .)
Runway Pavement Strength by PCN
Runway Surface Treatment
Same
Same
99.98%
99.10%
99.85%
Same
Same
Same
Same
Same
Same
3 11
Airport Layout Plan Drawing
Ethan Blackburn
Matt Quick
Payson Airport
Payson, Arizona
D a te
/2
2/
T im e:
:2
:0
A
M S ou rc e D o cu m en t P at h:
C
:\U se rs \c do nn
\C o ffm an
A ss o ci a te s In c\ C o ffm an s p_
G
IS
\P A
N
1\ A
L P
S et \P
A N
_A
LP
_S e t\E S
R I\M
X D s\
3_ P
A N
_A
LD
.m xd
P D
F C re a te d
SHEET OF
PLANNED BY:
DETAILED BY:
APPROVED BY:
REVISIONSNo. DATE BY APP'D
THE PREPARATION OF THESE DOCUMENTS WAS FINANCED IN PART THROUGH A PLANNING
GRANT FROM THE FEDERAL AVIATION ADMINISTRATION AS PROVIDED UNDER SECTION 505 OF THE AIRPORT AND AIRWAY IMPROVEMENT ACT OF 1982, AS AMENDED. THE CONTENTS DO NOT NECESSARILY REFLECT THE OFFICIAL VIEWS OR POLICY OF THE FAA. ACCEPTANCE OF THESE DOCUMENTS BY THE FAA DOES NOT IN ANY WAY CONSTITUTE A COMMITMENT OF THE PART OF THE UNITED STATES TO PARTICIPATE IN ANY DEVELOPMENT DEPICTED HEREIN NOR DOES IT INDICATE THAT THE PROPOSED DEVELOPMENT IS
ENVIRONMENTALLY ACCEPTABLE IN ACCORDANCE WITH THE APPROPRIATE PUBLIC LAWS
D
D
D
D
D
D
D kj
#I
RB'53
L
RB'53
L
RB'53
L
RB'53
L
RB'53
L
RB'53
L
RB'53
L
RB'53
L
RB'53
L
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
!A
!A
51405150
108109110
123 122 121 120 119
115 114
36 34 33
15 14
500'
362'
250'
200'
157'
97'
125'
120'
87'
80'
79'
74'
64'
47'
45'
25'
45'
79'
200'
47'
87'
0 300 600
1" = 300'
Ultimate Runway 7-25 (5,504' X 75')
Existing Runway 6-24 (5,504' X 75') 76.64° True
A4
A
A3
A2
A
A1
B
Exisitng Runway 6 End (Ult 7) Latitude: 34° 15' 18.039" N Longitude: 111° 20' 53.112" W Elevation: 5,142.17' msl
Existing Runway 6 End (Ult 7) Touchdown Zone Elevation (TDZE) 5,145.45' msl
Runway Low Point 5,132.20' msl
Airport Reference Point (ARP) Latitude: 34° 15' 24.611" N Longitude: 111° 20' 21.321" W
Runway High Point 5,160.54' msl
Existing Runway 24 End (Ult 25) Latitude: 34° 15' 31.224" N Longitude: 111° 19' 49.511" W Elevation: 5,160.41' msl Touchdown Zone Point (TDZE)
W Airport Rd
W Red Baron Rd
W Bravo Taxiway
C hennault P kw y
E arh a rt P kw y
Airport Access Rd
N M cL a ne R d
Security Fence Height: 8'
Legend
P L Airport Property Boundary
!A Runway End Point
!? Airport Reference Point (ARP)
Ground Contour
RB'53 L 35' Building Restriction Line (BRL)
Dense Vegetation Area qp Vegetation Point kj Airport Beacon
RPZ Runway Protection Zone (RPZ)
R SA Runway Safety Area (RSA)
OFA Runway Object Free Area (ROFA)
O F Z Runway Obstacle Free Zone (ROFZ)
Taxiway Object Free Area (TOFA)
Taxiway Safety Area (TSA)
Existing AWOS Critical Area
Ultimate AWOS Critical Area
D Fence
Existing Gate
D Ultimate Fence
Ultimate Gate
Existing/Ultimate Marking Line
" Existing PAPI-2
" Ultimate PAPI-4
! Existing Wind Sock
! Ultimate Wind Sock
" Self-Serve Fuel Pump
Existing Segmented Circle
Ultimate Segmented Circle
#I Existing AWOS-3
A Ultimate AWOS-3
REILs
13 B ( 4 )13B Surface 4
AS Existing Part 77 Approach Surface
AS Ultimate Part 77 Approach Surface
Ultimate Easement
Existing On-Airport Structure
Off-Airport Structure
Existing Paved Road/Parking
Existing Unpaved Road/Parking
Existing Taxiway
Existing Apron
Existing Runway
Ultimate Structure
Ultimate Airfield Pavement
Ultimate Paved Road/Parking
Pavement to be Removed
×True M ag ne tic
Magnetic Declination:
9° 38' E ± 0° 21' changing by 0° 6' W per year Source: ngdc.noaa.gov
Runway Protection Zone (RPZ) 250' x 1,000' x 450'
Runway Protection Zone (RPZ) 250' x 1,000' x 450'
5,109.23'msl
5,119.31'msl
5,129.05'msl
5,008.05'msl
5,017.01'msl
5,028.39'msl
73,914 sq. ft.
157,437 sq. ft.
41,374 sq. ft.
118,194 sq. ft.
154,975 sq. ft.
136,014 sq. ft.
Through-the-Fence Access Point
General Notes
1. Mapping data from Martinez Geospatial. Survey Date: 11/14/2022
2. Required dimensions for landside facilities shown on Terminal Area Drawing (Sheet 9).
13B Approach #4 20:1 Slope
Part 77 Approach 20:1 Slope
13B Approach #4 20:1 Slope
Ult Part 77 Approach (34:1 Slope)
39,507 sq. ft.
55,313 sq. ft.
Ex Part 77 Approach (20:1 Slope)
ID Feature Top Elevation
(ft. msl.)
ID Feature
Top Elevation
(ft. msl.)
1 Against The Wind 5,175.10 22 Utilities 5,161.84
2 Crosswinds Restaurant 5,170.10 23 AWOS 5,161.84
3 Payson Aviation 5,154.70 24 Utilities 5,164.40
4 Airport Operations 5,151.40 25 Utilities 5,164.40
5 T-Hangar 5,153.00 26 Utilities 5,164.40
6 Box Hangar 5,159.30 27 Utilities 5,155.90
7 Airport Campground 5,155.90 28 Shed 5,131.30
8 Auto Parking 5,164.40 29 PAPI-2 5,143.28
9 T-Hangar 5,165.90 30 Shed 5,150.50
10 Fuel Farm 5,144.00 31 Windcone 5,137.45
11 Town Yard 5,191.60 32 Utilities 5,150.50
12 REILs 5,139.60 33 Shed 5,145.30
13 Windcone 5,154.95 34 Shed 5,142.70
14 PAPI-2 5,153.03 35 Utilities 5,142.30
15 Segmented Circle/ Windcone 5,137.25 36 Shed 5,142.30
16 Utilities 5,175.10 37 Service Building 5,138.40
17 Utilities 5,175.10 38 Utilities 5,134.10
18 Utilities 5,154.70 39 REILS 5,139.60
19 Utilities 5,154.70 40 Storage 5,134.10
20 Airport Beacon 5,150.75 41 Utilities 5,134.10
21 Shed 5,151.60 42 Utilities 5,134.10
Existing Structures
*Top elevations are estimated
ID Feature Top
Elevation ID Feature
Top Elevation
(ft. msl.)*
100 5-Unit T-Hangar 5187.1 114 50' x 50' Executive Box Hangar 5164.4
101 5-Unit T-Hangar 5187.1 115 50' x 50' Executive Box Hangar 5164.4
102 5-Unit T-Hangar 5187.1 116 50' x 50' Executive Box Hangar 5164.4
103 75' x 75' Executive Box Hangar 5187.1 117 50' x 50' Executive Box Hangar 5165.9
104 75' x 75' Executive Box Hangar 5187.1 118 50' x 50' Executive Box Hangar 5165.9
105 75' x 75' Executive Box Hangar 5187.1 119 50' x 50' Executive Box Hangar 5165.9
106 Terminal Building 5175.1 120 50' x 50' Executive Box Hangar 5165.9
107 SRE Faciltiy 5175.1 121 50' x 50' Executive Box Hangar 5165.9
108 50' x 50' Executive Box Hangar 5164.4 122 50' x 50' Executive Box Hangar 5165.9
109 50' x 50' Executive Box Hangar 5164.4 123 50' x 50' Executive Box Hangar 5165.9
110 50' x 50' Executive Box Hangar 5164.4 124 5-Unit T-Hangar 5150.5
111 50' x 50' Executive Box Hangar 5164.4 125 PAPI-4 5143.28
112 50' x 50' Executive Box Hangar 5164.4 126 Segmented Circle/ Windcone 5137.25
113 50' x 50' Executive Box Hangar 5164.4 127 PAPI-4 5153.03
Ultimate Structures
| Airport_Development_RFO_FY27.pdf |
| 1 Purpose |
| 2 Airport and Development Area |
| 3 Project Scope |
| 4 Offer Submission Requirements |
| 4.1 Company Profile |
| 4.2 Development Proposal |
| 4.3 Financial Proposal |
| 4.4 Sustainability Plan |
| 4.5 Safety and Security Plan |
| 4.6 References |
| 5 Evaluation Criteria |
| 6 Schedule |
| 7 Submission Instructions |
| 8 Questions and Additional Information |
| 9 Town Rights and Conditions |
| RFO_ALP_FY27.pdf |
| RFO_ALP.pdf |
| Binder1.pdf |
| 2024 Payson_Master_Plan_Final.pdf |
ALP Exhibit B.pdf
| ALP Ex 2.pdf |
| ALP Ex 1.pdf |