This is a Statement of Work (SOW) for Visual Communications Services III (VCSIII), a contract with the National Geospatial-Intelligence Agency (NGA), Department of Defense. The contract supports NGA's Office of Corporate Communications and covers a base period of 12 months (June 21, 2027 – June 20, 2028) plus four optional 12-month periods through June 20, 2032. Performance will occur at two NGA facilities: NGA Washington in Springfield, VA, and NGA St. Louis in St. Louis, MO. The contractor must provide comprehensive visual communications services including video production, graphic design, photography, copy center operations, and website development. All contractor personnel are required to obtain and maintain Top Secret/Sensitive Compartmented Information (TS/SCI) security clearances and pass NGA counterintelligence-scope polygraph examinations every five years. Personnel must also complete continuous evaluation enrollment and cybersecurity maturity model certification (CMMC) compliance.
The contractor must maintain staffing from 6:30 a.m. to 5:30 p.m. with core coverage from 9:00 a.m. to 2:00 p.m. at both locations, with photography, graphic design, and video support extending to 4:30 p.m., and digital press operators working until 4:00 p.m. at NGA Washington and 3:00 p.m. at NGA St. Louis. Specific production timelines are mandated for video production (10–22 business days depending on type), graphic design (5–45 business days), and photography services. The contractor is responsible for all personnel, equipment, supplies, facilities, and materials except those designated as government-furnished equipment, with Other Direct Costs (ODC) for paper consumables, copy center supplies, travel, and digital press maintenance to be pre-approved by the Contracting Officer's Representative. All contractor personnel must adhere to business or business casual dress codes, obtain government badges, and comply with extensive security, information handling, insider threat program, and cyber incident reporting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| U_VCSIII_Follow_On_RFI_Questions.docx | DOCX document | |
| VCSIII_RFI_1.0.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
DRAFT VISUAL COMMUNICATION SERVICES III
National Geospatial-Intelligence Agency (NGA) Office of Corporate Communications (OCC) Visual Communications Services III (VCSIII)
DRAFT Statement of Work 19 November 2026
Background The National Geospatial-Intelligence Agency (NGA) is a Department of War (DoW) combat support agency and a member of the National Intelligence Community (IC). NGA develops imagery and map-based intelligence solutions for U.S. national defense, homeland security, and safety of navigation. NGA’s mission is to “provide timely, relevant, and accurate geospatial intelligence in support of national security.” This is not a Personal Services contract. This Statement of Work (SOW) supports the procurement of Visual Communications Services (VCS) for the National Geospatial-Intelligence Agency (NGA) in the Office of Corporate Communications (OCC). The services that are being performed by this contract are interrelated to OCC’s mission of driving and managing NGA’s visual identity and corporate messaging.
Description of Services/Introduction The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform visual communication services as defined in the SOW except for those items specified as government furnished equipment (GFE) and services. The Contractor shall perform to the standards in this contract.
Objectives OCC’s mission calls for the strengthening, enhancement and transformation of corporate communications across the NGA enterprise. The objective of VCSIII is to support this strategic goal by providing enhanced and transformational visual communication services that are timely, relevant and accurate on behalf of NGA and OCC.
DEFINITIONS
Metadata Tagging. Metadata is data that describes data. Entering metadata tags such as time, date, location, people in photos, etc. ensures photos and videos can be searched and retrieved.
OCC Work Order Tool. NGA OCC’s online application for submitting requests for graphic design, photography, videography, and copy center support.
Work Week. Monday through Friday, unless specified otherwise.
Scope of Work VCSIIIs services encompass the following: Video Production, Graphic Design, Photography, Copy Center, and Website Development.
Video Production Video production encompasses the complete, end-to-end process of creating video content from an initial concept to a finished, published video product to inform the public and support NGA’s communication goals. The complete process includes content from an initial idea through planning, filming, and final delivery along with video editing in the post-production phase of cutting, arranging, and refining raw footage into a cohesive story. Video Production includes, but is not limited to script writing, story development, logistics, lighting, shooting, editing, audio production, music selection, animation, graphic production, green screen, file conversion, digital asset management, content strategy, dubbing, and close captioning. To perform these tasks, the use of a ladder or stepstool may be required.
Graphic Design Graphic design is the art and practice of creating visual communication material that support organizational branding, public outreach, and stakeholder engagement. Graphic design utilizes various methods to create and combine words, symbols, and images to create a visual representation of ideas and messages. Graphic design includes, but is not limited to typography, color, imagery, layout, brand identity, data visualization, digital/print collateral, presentations, marketing/advertising, publication, packaging, environmental, and art/illustration design. Printing, engraving, and binding hard copy graphics are required as well as mounting and laminating large format graphics and posters.
Photography Photography is official government and military visual documentation used to shape public image, record operational history, and support strategic communication. It encompasses both the process (art, science and practice) of creating durable images by recording light electronically via a digital sensor with the result of a photograph as the final image produced. Photography includes but is not limited to capturing scenes internally and externally, processing photographs, editing photographs, tagging photographs with appropriate metadata, captioning photographs, posting photographs, archive management, and scrubbing digital files of errant metadata before release. To perform these tasks, the use of a ladder or stepstool may be required.
Website Development Website development is the process of creating or modifying NGA owned websites and/or online applications. This includes modifying / maintaining previously developed websites as well as developing new websites or online applications. Website development encompasses, but is not limited to establishing priorities and requirements, creating and modifying web-based languages such as HTML, CSS, XML, PHP, Java, JavaScript, SharePoint, MySQL, Oracle, etc. with the intention to provide complete end-to-end web support.
Copy Center Copy Center Support includes all copy, printing, and publishing services to support the post-production of the products required by the Government. Post-production operations will include, but are not limited to printing, cutting, folding and various binding options; mounting and laminating large format graphics and posters; filing, data entry, office organization, logistics on maintenance services for all copy center equipment, organization and cleanliness, and DoW safety requirements are met. Post-production operations will be performed on post-production machines including folders, perfect binders and cutters. Use of a Kluge Foil Stamper and replacement equivalent is required at NGA WASH.
2.5.1 Equipment/Supplies The contractor will be responsible for all computer, printer and copier maintenance and upgrades, detailed in Attachment 1. They are responsible for assuring that adequate paper and other office supplies are available and purchased via Other Direct Costs outlined in Section 4.1.
CONTRACTOR REQUIREMENTS
Period of Performance The period of performance shall be for one (1) Base Period of 12 months and four (4) 12-month option periods.
| Base: | 21 June 2027 – 20 June 2028 | |
| Option Year 1: | 21 June 2028 – 20 June 2029 | |
| Option Year 2: | 21 June 2029 – 20 June 2030 | |
| Option Year 3: | 21 June 2030 – 20 June 2031 | |
| Option Year 4: | 21 June 2031 – 20 June 2032 |
Place of Performance The work to be performed under this contract will be performed at both NGA facilities, NGA Washington (NGA WASH), in Springfield, VA; and NGA St. Louis (NGA STL), in St. Louis, MO.
Hours of Operation The Contractor is responsible for conducting business no earlier than 6:30 a.m. and no later than 5:30 p.m., daily local time and both locations must be fully staffed between the core hours of 9:00 a.m. – 2:00 p.m. local time. Contractor is responsible for coverage of photography, graphic design, and video support will be until 4:30 p.m. local time. The Digital Press Operators shall conduct business during the Copy Center Operational hours of 6:30 a.m. – 4:00 p.m. at NGA WASH, 6:30 a.m. – 3:00 p.m. at NGA STL Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. Coverage is a minimum of 1 (one) person for each LCAT described.
The Contractor must maintain an adequate workforce for the uninterrupted performance of all tasks defined within the SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential. Flex-time may be required for occasional work to be performed outside the core days and hours identified herein for special NGA events or projects. A flexible work schedule must be submitted in writing and reviewed by the Contracting Officer’s Representative (COR) or Contracting Officer (CO) for approval prior to implementing the approved flexible work. Work performed outside of the core days and hours specified shall be preapproved in writing by the COR or CO.
Identification of Contractor Employees All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be required to obtain and wear badges in the performance of these services.
Dress Code Policy The contractor will adhere to a Business or Business Casual Dress Code Policy. Specific dress code requirements will be determined by the Customer Project and provided by the COR based on the work components they are assigned to.
OTHER DIRECT COSTS (ODC)
Reimbursable Costs A separate Contract Line-Item Number (CLIN) is established to reimburse the contractor for allowable travel and ODC costs for the maintenance and service lease of the enterprise digital print press (Attachment 1 and Attachment 2), and other ODC costs related to the performance of the contract requirements. This category includes Travel [SOW Section. 4.2], reproduction, and shipping expenses associated with visits to contractor facilities. All ODCs, such as paper consumables, must be pre-approved by the COR before purchase. The Contractor will be reimbursed for all paper consumables, copy center supplies, and any supplies required to execute the scope of work within the contract.
Travel Travel may be required during the performance of this contract and shall be approved by the Government COR prior to travel. All travel shall be in accordance with FAR 31.205-46. Travel in the Washington D. C. and St. Louis Local Commuting Area will follow the DOD Instructions (DODI)4515.14. Travel authorizations are not issued for training, offsite meetings, or conferences within the local commuting area unless the traveler is required to stay overnight. Reimbursement of local travel under this contract is not authorized. Reimbursement for all toll lanes where non-toll lanes are available (regardless of traffic conditions) is not authorized. In addition, receipts are required to support reimbursement claims of $75 or greater and any ordinary commute cost must be deducted.
PHASE IN/PHASE OUT PERIOD
Post-award Kickoff Meeting The Government will conduct a post-award kickoff meeting at NGA WASH following contract award. The specific date and time will be mutually agreed upon. This meeting will be led by the contractor. For all meetings, the contractor shall be responsible for providing meeting materials, and administrative and facilitation support. Meetings will be conducted at either the NGA WASH location, or through an alternative method of communication (such as teleconferencing), as approved by the CO or COR.
Program Management Review The Government will conduct quarterly program management reviews at NGA WASH, to review the progress of the program, identify any risks, issues, or concerns, and provide feedback on the Contractor’s progress and performance. The Contractor shall provide written data and verbal presentations as to the financial status of the contract, schedule compliance, staffing levels, small business participation, any identified risks, issues, or concerns and plans for mitigation, if applicable.
Phase-In To minimize any reduction in productivity and to prevent possible negative impacts on additional services, the Contractor shall have all personnel on board within the 30-day phase-in period. During this timeframe Contractor shall become familiar with performance requirements in order to commence full performance of services after the 30-day phase-in period. Contractor employees shall obtain required IC badges, Common Access Cards (CAC), all other forms of government identification, all government required training, and will conduct inventory and transfer of GFP/GFE/GFM during the phase-in period, to include transfer of all source code, documentation, and SOPs developed and maintained by the outgoing contractor.
Phase-Out Prior to the completion of this contract, an observation period shall occur, at which time management personnel of the incoming Contractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of services. The outgoing Contractor is ultimately responsible for performing in accordance with (IAW) the contract during the phase-out period and shall not defer any requirements for the purpose of avoiding responsibility of or transferring such responsibility to the succeeding Contractor. The outgoing Contractor shall fully cooperate with the succeeding Contractor, and the Government, so as not to interfere with their work or duties.
Phase-Out Plan The Contractor shall develop a written phase-out plan to affect a smooth and orderly transfer of contract responsibility to a successor. The plan shall fully describe the Contractor’s approach to the following issues, at a minimum: Inventories and turn-over of government property; removal of Contractor property; reconciliation of all property accounts; turn-in of excess property; data and information transfer; clean-up of Contractor work areas; security debriefings in accordance with NGA policies and IC directives for incumbent personnel holding security clearances; and any other actions required to ensure continuity of government mission and operations. The Contractor shall provide the plan to the COR 30 days before the phase-out period commences.
SECURITY INFORMATION
Contractors must possess a TS/SCI clearance. Cleared personnel will be provided cubicle space onsite at NGA facilities.
5.1. (U) Classified Work Performance Security Requirements: Contractors shall comply with the requirements specified in the respective DD Form 254 - Contract Security Classification Specification (referred to as DD 254 hereafter) applicable to the contract, the National Industrial Security Program Operating Manual (NISPOM 32 CFR Part 117), and all other applicable security policies and regulations including operations security (OPSEC) requirements.
5.2. Security Classification Guidance and Mandated Electronic Processing: Performance under this contract requires access to classified information up to the level specified on the attached DD 254. In accordance with DoDI 5220.31, NGA will either generate, certify, and release, or upload the certified DD 254 in the NISP Contract Classification System (NCCS). The Contractor may access and download the DD254. The Contractor shall validate the DD 254 within NCCS has been attached to the contract by the Contracting Officer via a contract action such as an administrative modification.
5.3. Subcontractor Flow-Down Requirements Regardless of Tier
The Contractor shall include the security requirements of this contract in all subcontracts as necessary that meet the performance requirements of the contract and require access to classified information. Once the Contract DD 254 is processed and issued via NCCS, the Contractor—and all sequential Subcontractors—shall draft, route, and certify all subcontract DD 254s through NCCS. This requirement applies to all subcontracts requiring classified access, regardless of subcontract tier. The Contractor shall contact their Defense Counterintelligence and Security Agency representative regarding gaining access and how to use to NCCS.
5.4. (U) Cognizant Security Agency: Per DoDM 5220.32 Vol 1, the Defense Counterintelligence and Security Agency (DCSA) remains the Cognizant Security Agency (CSA) for individuals performing work with collateral (SECRET or TOP SECRET) security clearances. The Contractor shall report matters required by Security Executive Agent Directive (SEAD) 3 to the Contractor’s Facility Security Officer (FSO) for reporting to DCSA via Defense Information Security System (DISS) or successor system. DCSA will also dictate mandatory security training requirements as the CSA for the collateral cleared community.
5.5. (U) Clearance Requirements
5.5.1 (U) Contract performance requiring TS//SCI Cleared Contractors
(U) The Contractor shall ensure that all personnel requiring access to Top Secret Sensitive Compartmented Information (TS/SCI) hold and retain a Top-Secret clearance and are adjudicated for SCI access by NGA. The NGA shall verify security clearances/SCI eligibility of Contractor personnel in accordance with (IAW) SEAD 7: Reciprocity of Background Investigations and National Security Adjudications and/or any subsequent policies & guidance. If needed, NGA may sponsor SCI accesses at its sole discretion. Contractor personnel with TS//SCI are subject to a NGA Counterintelligence-Scope Polygraph examination. As a condition of fulfilling a NGA contract, contractor personnel who have not successfully completed polygraph testing within the last five years must immediately schedule a polygraph examination. Additionally, all contractor personnel who have not successfully completed testing within the last five years are immediately scheduled for a polygraph examination and are required to complete the process, in no more than three test sessions, within 90 days. If the process is not completed, access to information systems and NGA facilities will be removed by NGA. Contractor personnel may not work on another contract unless they are nominated and approved.
5.5.2. (U) Continuous Evaluation: NGA will enroll all Contractor personnel assigned to NGA holding TS/SCI access in the DNI Continuous Evaluation System (CES) for the duration of the contract, in compliance with SEAD 6 TS//SCI cleared contractor personnel shall self-report security issues as directed by the DD254, foreign contacts, and other applicable information IAW SEAD 3: “Reporting Requirements for Personnel with Access to Classified Information or Who Hold a Sensitive Position” and NGA Instruction 5205.3, “Security Reporting Requirements”. In addition, cleared Contractor personnel shall submit electronic fingerprints and be enrolled into NGA’s Report of Arrest and Prosecution Background (RAPBack) program, which supports CES.
5.6. Access GFP: NGA shall provide badges, Common Access Cards (CAC) and other items (e.g. parking hangtags) when applicable, for required Contractor personnel.
5.7. (U) Physical Security Requirements
5.7.1. (U) Prohibited Items: Contractor personnel shall not bring prohibited or unauthorized items into any NGA installation or other secure facility covered under this contract. These items include weapons, cell phones, cameras, two-way pagers, laptops, recording devices of any kind, flash drives, or any other removable media. The Contractor must request exceptions through the Contracting Officer. NGA Security may grant exceptions at its discretion. If granted an exception, Contractor personnel must bring documentation showing approval prior to entering with the item(s). Violations may subject the Contractor and its offending personnel to civil and/or criminal liability IAW applicable laws and regulations governing access to secure Government facilities.
5.8 (U) Information Security Requirements
5.8.1. Information Access: NGA shall have the sole authority to determine whether, and to what extent, protected information shall be provided to the Contractor under the terms of the contract. Access to classified information shall be consistent with the security requirements established in the DD Form 254. The Contractor shall not access, download, print, or further disseminate any classified information outside the execution of the defined contract requirements without the guidance and written permission from the COR.
5.8.2. (U) Information Security Compliance: When the Contractor receives protected information under the terms of this contract, the Contractor shall comply with all applicable NGA, DoD, and IC information security policies (including the Consolidated NGA (CoNGA) Security Classification Guide) for the proper marking, handling, processing, storing, and safeguarding of classified and unclassified material. The Contractor shall ensure that document markings are given the lowest possible security classification to maximize dissemination while still maintaining the information’s confidentiality and integrity.
5.8.3. (U) CUI Flowdown Controls: The prime contractor shall include DFARS clause 252.204.7012, including paragraph (m) in subcontracts, or similar contractual instruments, for operationally critical support or for which subcontract performance involves covered defense information, including subcontracts for commercial items, without alteration, except to identify the parties. The Contractor shall determine if the information required for Subcontractor performance retains its identity as covered defense information and, if determined to be covered defense information, shall require the Subcontractor to protect the covered defense information pursuant to this clause. Contractor personnel shall not release any unclassified information, regardless of medium (e.g., film, tape, document), pertaining to any part of this contract or any program related to this contract, unless the COR has given prior written approval or in performance of a project that has been scoped and negotiated by NGA.
5.8.4. (U) Disposition and Archival Retention of Government-Furnished Information: As directed by the NGA Contracting Officer (CO) or Contracting Officer’s Representative (COR), the Contractor shall destroy or return to NGA all Government-Furnished Information (GFI) upon contract termination or when no longer required for contract performance. The disposition of such GFI is solely at the discretion of the Government.
5.8.5. (U) Exception: In Accordance With (IAW) FAR Part 4.7, the Contractor may retain one archival copy of GFI strictly for audit and recordkeeping purposes. This Contractor’s archival copy must be strictly isolated from active operational networks and systems. The Contractor is allowed to maintain this isolated archive solely for the allowable retention period prescribed by FAR Part 4.7. During this allowable retention period, the isolated archive remains subject to all relevant data safeguarding practices and Controlled Unclassified Information (CUI) restrictions, after which the Contractor must permanently destroy this archival copy of GFI.
5.8.6. (U) Transmission of Classfied Information: In situations when electronic transmission is not practicable, Contractor personnel with the appropriate security clearance may hand-carry contract-related classified information when authorized by the COR in writing. These contractor personnel must obtain NGA courier authorization prior to hand-carrying of classified contract-related information. Only classified information related to the performance of this contract may be hand-carried. Contractor personnel shall be limited to hand-carrying classified information between approved Contractor facilities and US Government facilities unless the COR approves other circumstances in writing, when applicable, on a case-by-case basis.
5.9. Contractor Unclassified Information Systems
5.9.1. (U) Implementation: The Contractor shall, at a minimum, implement 10 U.S.C. Sections 391 and 393 along with National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations” requirements.
5.9.2. (U) CMMC: The Contractor shall achieve and maintain the Cybersecurity Maturity Model Certification (CMMC) level required by this contract in accordance with DFARS 252.204-7021 throughout the duration of the contract. Regardless of the specific CMMC status or level required, the Contractor must obtain and provide the CMMC Unique Identifier(s) (UID) for each covered contractor information system used to store, process, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) in performance of this contract to the Contracting Officer (CO) and Contracting Officer’s Representative (COR) prior to contract award and maintain current status in the Supplier Performance Risk System (SPRS).
5.9.3. (U) Post-Award System Modifications: In the event the Contractor intends to utilize a new covered contractor information system for contract performance post-award, the Contractor must provide the CMMC UID for the new system to the CO and COR, and receive written approval from the CO or COR prior to storing, processing, or transmitting any FCI or CUI on that system. Furthermore, the Contractor shall notify the CO and COR in writing before an approved system is decommissioned or that will no longer be used in the performance of this contract.
5.9.4. (U) Cloud Service: If the Contractor intends to use an external cloud service provider to store, process, or transmit any covered defense information in performance of this contract, the Contractor shall require and ensure that the cloud service provider meets security requirements equivalent to those established by the Government for the Federal Risk and Authorization Management Program (FedRAMP) Moderate baseline (https://www.fedramp.gov/resources/documents/).
5.9.5. Cyber Incident Reporting: In accordance with DFARS Clause 252.204-7012, in the event that the Contractor discovers a cyber incident that affects a covered Contractor information system or covered defense information residing therein, or that affects the Contractor’s ability to perform the requirements of the contract that are designated as operationally critical support and identified in the contract, the Contractor shall—
1. (U) Notify the DoD Cyber Crime Center (DC3) and the COR in writing within 72 hours of incident discovery.
2. (U) Conduct a review for evidence of compromise of covered defense information, including, but not limited to, identifying compromised computers, servers, specific data, and user accounts. This review shall also include analyzing covered Contractor information system(s) that were part of the cyber incident, as well as other information systems on the Contractor’s network(s), that may have been accessed as a result of the incident in order to identify compromised covered defense information, or that affect the Contractor’s ability to provide operationally critical support.
5.9.6. (U) Malicious software: In the event the Contractor discovers and isolates malicious software in connection with a reported cyber incident, the Contractor shall submit the malicious software to DC3 in accordance with instructions provided by the COR. The Contractor should NOT send the malicious software to the COR.
5.10. (U) Insider Threat Requirements
(U) Insider Threat Program Requirements: The Contractor shall establish, execute, and maintain an insider threat program in accordance with 32 CFR § 117.7(d) and applicable Cognizant Security Authority (CSA) guidelines. The program must be designed to gather, integrate, and report relevant and available information indicative of a potential or actual insider threat to classified information or cleared personnel.
(U) Reportable Security Events and Insider Threat Indicators: The Contractor shall report to their designated Insider Threat Program Senior Official (ITPSO) and Facility Security Officer (FSO), who shall subsequently notify the Cognizant Security Agency (CSA), the Contracting Officer (CO), the Contracting Officer’s Representative (COR), and the NGA Counter Insider Threat Office, as soon as practicable but no later than the timelines established in 32 CFR Part 117, any of the following events:
1. May have an effect on the status of the entity's or personnel’s eligibility for access to classified information;
2. Indicate an insider threat to classified information or to personnel with access to classified information;
3. Affect the proper safeguarding of classified information; or
4. Indicate classified information has been, or is suspected to be, lost or compromised.
SPECIAL QUALIFICATIONS
Video Production The Contractor is responsible for ensuring all employees assigned to provide Video Production support services have detailed knowledge of the full functionality of Adobe Creative Cloud, including Adobe Premiere, After Effects, Photoshop and Media Encoder along with Nikon camera video capabilities. This list of equipment and software shall be GFE and tracked by the Contractor [SOW Section. 9.5.1].
All Video Production support must adhere to the timelines in Table 1 below, which is our standard production timeline. Due to the nature of the business processes at NGA, timelines may require acceleration to meet ad hoc and high-priority efforts. The Contractor shall meet accelerated timeline efforts as directed by the Government.
Table 1 Video Production Requirements and Timeline
| Requirement |
| Timeline (# of Business Days) |
| Full Productions |
| 22 |
| Short Videos |
| 22 |
| Social Media Videps |
| 10 |
| Other Video Productions |
| 10-22 |
Graphic Design The Contractor is responsible for ensuring all employees assigned to provide Graphic Design support services have detailed knowledge of the full functionality of Adobe Creative Suite / Creative Cloud and the designing of products for both web and digital press printing. This list of equipment and software shall be GFE and tracked by the Contractor [SOW Section. 9.5.3].
All Graphic Design support shall adhere to the timelines in Table 2 below, which is our standard production timeline. Due to the nature of the business processes at NGA, timelines may require acceleration to meet ad hoc and high-priority efforts. The Contractor shall meet accelerated timeline efforts as directed by the Government.
Table 2 Graphic Design Requirements and Timeline
| Requirement |
| Timeline (# of Business Days) |
| Digital Signage / Web Graphics |
| 14 |
| Engravings |
| 5 |
| Handouts |
| 14 |
| Historical Displays and Exhibits |
| Varies depending on exhibit size |
| Infographics |
| 22 |
| Miscellaneous/Special Projects |
| 22 |
| Posters |
| 14 |
| PowerPoint Visualizations (Executive Leadership Only) |
| 14 |
| Publications (>20 pages) |
| 45 |
| Publications (<20 pages) |
| 21 |
Photography The Contractor is responsible for ensuring all employees assigned to provide Photography support services have detailed knowledge of the Nikon Digital camera systems and Adobe Creative Suite / Creative Cloud. Employees must be fully capable and qualified to perform metadata tagging, captioning, and metadata removal. This list of equipment and software shall be GFE and tracked by the Contractor [SOW Section. 9.5.2].
All Photography support must adhere to the timelines in Table 3 below, which is our standard production timeline. Due to the nature of the business processes at NGA, timelines may require acceleration to meet ad hoc and high-priority efforts. The Contractor shall meet accelerated timeline efforts as directed by the Government.
Table 3 Photography Requirements and Timeline (edit/print/final)
| Requirement |
| Timeline (# of Business Days) |
| Visits and Events |
| 3 |
| EXCOM Visits and Events |
| Same day |
| Miscellaneous/Social Media |
| 3-7 |
Copy Center Support The Contractor is responsible for ensuring all employees assigned to provide Copy Center and Scanning support services have detailed knowledge of the full functionality of Canon imagePRESS machines; post-production equipment and a Kluge Foil Stamper; bulk scanning; and overhead / large format scanning processes and equipment during the performance of this contract. This list of equipment and software shall be a mix of GFE and Contractor Acquired Property (CAP) [all CAP will be in SOW Attachment 1 and Attachment 2] and tracked by the Contractor [SOW Section. 9.5.4]. The Contractor shall create and maintain a searchable database with necessary information to track requests, product types, paper counts, ink usage, etc. and easily accessible by the Government.
All Copy Center support must adhere to the timelines in Table 4 below, which is our standard production timelines. Due to the nature of the business processes at NGA, timelines may require acceleration to meet ad hoc and high-priority efforts. The Contractor shall meet accelerated timeline efforts as directed by the Government.
Table 4 Copy Center Requirements and Timeline
| Requirement |
| Timeline (# of Business Days) |
| Business Cards |
| 10 |
| Document Reproduction & Binding |
| 10-14 |
| Name Tags |
| 10 |
| Handouts |
| 10-14 |
| Photo Prints |
| 10 |
As an essential job function, all Copy Center support must be able to lift and/or move objects weighing up to 25 pounds. Objects weighing over 25 pounds should be lifted using the government provided equipment to include, but not limited to, pallet jacks. The Material Handling Center (MHC) should be utilized when necessary.
Web Developer The Contractor is responsible for ensuring all employees assigned to provide Website Development support services have detailed knowledge of the Adobe Creative Suite / Creative Cloud, HTML, CSS, XML, PHP, Java, JavaScript, SharePoint, MySQL, and Oracle. Employees must be fully capable of building new websites and maintaining existing websites.
MONTHLY PROGRESS REPORTING
The Contractor shall furnish a monthly progress report to the CO and COR on or before the 10th of each month following the calendar month being reported. Each report shall be submitted Electronically in Microsoft Office Format (Excel and Word) that contain concise statements covering all the activities of each of this contract’s services and shall include the following information for the reporting period:
· A clear and complete account of all the work performed.
· Accounts will be arranged by discipline: videography, photography, graphic design, copy center, and website development.
· Timeliness of the work performed.
· Projected schedule of the work to be accomplished during the next reporting period.
· Description and projected schedule of projects that may span until contract completion.
· Description of the approach taken, progress in achieving contract objectives, and estimate of percentage of technical work completed.
· Description of:
· Any problems encountered or anticipated that will affect the completion of the contract within the time and fiscal constraints set forth in the contract, together with recommended solutions, or a statement that no problems were encountered or
· Any problems or concerns requiring Government guidance or assistance.
· Summary of all relevant financial information and funds expended on the contract, including projected over- or under-runs for the current period of performance.
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, & SERVICES
Facilities:
The Government will provide the necessary workspace at NGA WASH and NGA STL for the Contractor staff to provide support at these locations outlined in the SOW to include desk space, telephones, computers, and other items necessary to maintain an office environment.
Utilities:
The Government will provide all utilities at both the NGA WASH and NGA STL for the Contractor’s use in performance of tasks outlined in the SOW on-site.
Equipment:
For services provided on-site, the Government will provide access to all of the specific equipment through software referenced in Special Qualifications [SOW Section. 6] together with access to other equipment at NGA WASH and NGA STL necessary for the performance of tasks outlined in the SOW [SOW Attachment 1 and Attachment 2] through the OCC Asset Manager. Replacement equipment can be purchased by the government or through the contractor ODC CLIN at the discretion of the COR. The contractor is responsible for the security requirements for all replacement equipment.
Materials:
The Government will provide the necessary materials for the proper operation of GFE as set forth in Special Qualifications [SOW Section Section.6]. All GFE and CAP materials will be tracked and reported to the government either in a database or other easily accessible tracking tool.
List of Government Furnished Equipment by Labor Category. This is not an all-inclusive list:
Video Production
· iMac Pro
· Red EPIC-W Video Camera
· Panasonic Varicam Video Camera
· Panasonic EVA1 Video Camera
1. Rimage Everest Thermal CD Printer
1. Nikon Z9
1. All Nikon Camera Lenses
Photography
· Nikon D3 and D3X Digital Cameras
· Nikon D810 Digital Camera
· All Nikon Camera Lenses
Graphic Design
· Laser Engraver
Copy Center
· Kluge Foil Stamper
· Minipack -Torre Replay 55 Shrinkwrap Machine
· Seal 62 Pro Wide Format Laminator
· Interlake Stitcher
· Morgana DocuFold
· Challenge Paper Jogger
· Challenge Hole Drill MS-10A
· Tablematic Plus
· Heavy Duty Spiral Binder / Coil Inserter
· Heavy Duty Hole Punch
· GBC Magnapunch
· GBC Docuseal 1200 Laminator
· Martin Yale Business Card Cutter
· Padmaster 2000
· Formax Polor Industrial Cutter
DESCRIPTION OF WORK
This SOW details each functional area’s unique requirements. Support provided under this task includes, but is not limited to, those duties identified by the applicable labor categories for Motion Media Specialist, Graphic Designer, Photographer, Digital Press Operator, and Web Developer SOW Job Title. Reference Task Descriptions (Appendix B).
Labor Categories (LCAT) and Skill Levels The Government has estimated the labor categories, skill levels, and locations for all Contractor Full-Time Equivalents (CFTEs) required to accomplish the mission of this contract. Please reference each labor category and skill level, for specific information. The Government reserves the right to adjust, as necessary, to the CFTE labor category mix, level, and quantity throughout the term of performance in accordance with Appendix A.
Required Task Qualifications If additional qualifications, certifications, skills, experience, etc., apply to certain positions supporting this SOW, the Task Descriptions in the LCAT/ Family and SOW Job Title (Appendix B) for each task area will identify those requirements.
Key Personnel Certain experienced professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. Such personnel are defined as "Key Personnel" and are those persons whose resumes were submitted for evaluation of the proposal. Personnel identified by NGA as Key Personnel under this contract are listed below.
The contractor agrees that Key Personnel shall not be removed from the contract work or replaced without compliance with the following:
If one or more of the Key Personnel, for any reason, becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days, or is expected to devote substantially less effort to the work than indicated in the proposal, the contractor shall, subject to the concurrence of the CO or COR, promptly replace personnel with personnel of equal ability and qualifications.
All requests for approval of substitutions hereunder must be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitutions. The request must contain a resume for the proposed substitute and any other information requested by the CO. The CO shall promptly notify the contractor of approval or disapproval in writing. The following two positions are designated as Key Personnel:
· OCC-GD-01, Senior Level NGA Washington
· OCC-GD-02, Senior Level NGA St. Louis
DELIVERABLES
This table lists the Quality Control Plan (QCP) and Phase-Out Transition Plan deliverables for the Contract.
| CDRL |
| Title |
| 1st Submission |
| Updates |
| Delivered to |
| Format |
| 0001 |
| Monthly Financial, Staffing/Vacancy and Activity Report |
| Task Order Start +30 Days |
| Monthly |
| COR |
| See Base SOW, Section 8.0 |
| 0002 |
| Maintenance Lease of Digital Print Press (See Attachment 1) |
| 90 days after award of contract |
| Monthly |
| PM/CO/COR |
| Contractor Defined, Government Approved |
Section 4.0
| 0003 |
| Lease of Enterprise Digital Print Press (See Attachment 2) |
| 180 days after award of OY2 of contract |
| Monthly |
| PM/CO/COR |
| Contractor Defined, Government Approved |
Section 4.0
| 0004 |
| Phase in Transition Plan |
| 10 days after contract award |
| As Required |
| PM/CO/COR |
| Contractor Defined, Government Approved |
Section 5.3
| 0005 |
| Reports, Briefings, Evaluations, Technical Assignments, White Papers Etc. |
| As Required |
| As Required |
| COR |
| Contractor Defined, Government Approved |
| 0006 |
| Phase Out Transition Plan |
| 90 days before end of contract |
| As Required |
| PM/CO/COR |
| Contractor Defined, Government Approved |
Section 5.4
| 0007 |
| Trip Report |
| NLT 10 business days after completion of travel event |
| As Required |
| COR/TM |
| Contractor Defined, Government Approved |
Appendix A Visual Communication Services Anticipated Support Requirements The following tables list the position requirements for adequately supporting this contract, which cross-references with their respective Government-defined labor categories (Appendix B). The location column in each table indicates the primary work location for each position. The Government expects all contractors assigned to these positions to work primarily at the Government-provided sites (GPS) listed in Section. 3.2 of the SOW.
Experience and Skill Levels: Appendix B defines the specific ranges of experience (i.e. years) for various contractor skill levels listed in the following tables.
| Position Number |
| Position Designator |
| Labor Category |
| Skill Level |
| Location |
| Position Description # |
| 1 |
| OCC-GD-01* |
| Graphic Design |
| Senior |
| NGA-W |
| 1 |
| 2 |
| OCC-GD-02* |
| Graphic Design |
| Senior |
| NGA-STL |
| 1 |
| 3 |
| OCC-GD-03 |
| Graphic Design |
| Senior |
| NGA-W |
| 1 |
| 4 |
| OCC-GD-04 |
| Graphic Design |
| Mid |
| NGA-W |
| 2 |
| 5 |
| OCC-GD-06 |
| Graphic Design |
| Mid |
| NGA-W |
| 2 |
| 6 |
| OCC-GD-07 |
| Graphic Design |
| Junior |
| NGA-W |
| 2 |
| 7 |
| OCC-PHGD-01 |
| Photography/Graphic Design |
| Mid |
| NGA-STL |
| 3 |
| 8 |
| OCC-PHGD-02 |
| Photography/ Graphic Design |
| Mid |
| NGA-STL |
| 3 |
| 9 |
| OCC-PH-01 |
| Photography |
| Senior |
| NGA-W |
| 4 |
| 10 |
| OCC-PH-02 |
| Photography |
| Mid |
| NGA-W |
| 5 |
| 11 |
| OCC-DPO-01 |
| Digital Press Operation |
| Senior |
| NGA-W |
| 6 |
| 12 |
| OCC-DPO-02 |
| Digital Press Operation |
| Mid |
| NGA-W |
| 7 |
| 13 |
| OCC-DPO-03 |
| Digital Press Operation |
| Mid |
| NGA-W |
| 7 |
| 14 |
| OCC-DPO-04 |
| Digital Press Operation |
| Mid |
| NGA-STL |
| 7 |
| 15 |
| OCC-DPO-05 |
| Digital Press Operation |
| Mid |
| NGA-STL |
| 7 |
| 16 |
| OCC-MM-01 |
| Motion Media |
| Senior |
| NGA-W |
| 8 |
| 17 |
| OCC-MM -02 |
| Motion Media |
| Mid |
| NGA-W |
| 9 |
| 18 |
| OCC-WD-01 |
| Web Development |
| Mid |
| NGA-W |
| 10 |
| 19 |
| OCC-PGM-01 |
| Program Management |
| Mid |
| NGA-W |
| 11 |
* Indicates Key Position
Appendix B
Position Descriptions Per the Anticipated Support Requirements (Appendix A), support through the individual position descriptions are listed below. The government expects all individuals performing under this contract to be professional at all times, work effectively alone and in teams, and to communicate effectively orally and in writing.
Position Description 1: Graphic Design/Senior Level (Key Personnel)
Overall Assignment Description: Leads organization-wide projects that involve conceptualizing, structuring, and presenting information and graphic design. Creates the design and layout of collateral that includes digital signage / web graphics, engravings, print ads, handouts, infographics, posters, PowerPoint visualizations, and publications, created to communicate with existing and potential clients. Graphic design includes, but is not limited to typography, color, imagery, layout, brand identity, data visualization, digital/print collateral, presentations, marketing/advertising, publication, packaging, environmental, and art/illustration design. Printing, engraving, and binding hard copy graphics are required as well as mounting and laminating large format graphics and posters. This position will serve as points of contact to provide oversight and quality assurance of graphic design services within the contract. Oversees design projects from concept to completion. Works with the Program Manager to select and manage professional talent.
Duties: The Contractor shall:
· Provide design and layout support, text processing, page mark-up, graphic scanning, large and small format printing, sign marking, engraving, mounting & laminating, and any other creative design support.
· Services rendered are required to be entered into NGA OCC’s online application, the OCC Work Order Tool and easily accessible by the Government.
· Must have detailed knowledge of the entire Adobe Creative Suite / Creative Cloud graphic design software package on a Windows platform.
· Shall stay abreast of new and potentially evolving software packages which may be useful for NGA in the future.
· Serve as an editor for the team to ensure there are no grammatical, typographical or compositional errors on the graphic teams designs before it is sent to the GPOC and/or Art Director for approval.
· Will design products for printing on digital presses, which can differ from other design and layouts.
· Products produced by OCC include but are not limited to the following product types. The Contractor shall provide the following work products that are timely and meet the needs of the Government. Approximately 2000 graphic design products are created each year. An approximate percentage is listed next to each type as well.
· Digital Signage / Web Graphics. (20%)
· Engravings: Engraving includes engravings on brass, glass, plastic, and wood. (10%)
· Handouts: Fact sheets, flyers, newsletters, tri-folds, pamphlets, programs, etc. (10%)
· Historical Displays and Exhibits: Production timeline varies depending upon the exhibit size. (5%)
· Infographics. (10%)
· Miscellaneous: Cover Designs, logos, coins, etc. (5%)
· Posters: Posters can range in sizes from 11” x 17” inches up to 24” x 30”. (20%)
· PowerPoint Visualizations: Provided for executive leadership only. (10%)
· Publications: NGA on average completes approximately 4-6 publications over 20 pages annually. These can range from 21 pages to 200 pages. The remaining are typically under 20 pages. (10%)
· Must adhere to the timelines in Table 2 (SOW Section. 7.2.1).
Required Skills:
· 10 years relevant experience in the career field of graphic design and familiarity with a wide range of design software applications.
· Demonstrates expertise in all manners of graphic design, with particular emphasis on strategic and technical communications
· Shows experience in developing and implementing creative visual and strategic solutions from scientific presentations to websites to infographics.
Position Description 2: Graphic Design/ Mid and Junior Level
Overall Assignment Description: To meet the Government’s needs, the Contractor shall create and deliver the products (designs) which are generated. The services are the art of communication, stylizing, and problem-solving through the use of type, space and image. Graphic design utilizes various methods to create and combine words, symbols, and images to create a visual representation of ideas and messages. Graphic design includes, but is not limited to typography, color, imagery, layout, brand identity, data visualization, digital/print collateral, presentations, marketing/advertising, publication, packaging, environmental, and art/illustration design. Printing, engraving, and binding hard copy graphics are required as well as mounting and laminating large format graphics and posters.
Duties: The Contractor shall:
· Provide design and layout support, text processing, page mark-up, graphic scanning, large and small format printing, sign marking, engraving, mounting & laminating, and any other creative design support.
· Services rendered are required to be entered into NGA OCC’s online application, the OCC Work Order Tool [SOW Section. 1.4.3] and easily accessible by the Government.
· Must have knowledge of the entire Adobe Creative Suite / Creative Cloud graphic design software package on a Windows platform.
· Shall stay abreast of new and potentially evolving software packages which may be useful for NGA in the future.
· All products shall be reviewed by the Graphic Design Lead Key Positions to ensure there are no grammatical, typographical or compositional errors.
· Will design products for printing on digital presses, which can differ from other design and layouts.
· Products produced by OCC include but are not limited to the following product types. The Contractor shall provide the following work products that are timely and meet the needs of the Government. Approximately 2000 graphic design products are created each year. An approximate percentage is listed next to each type as well.
· Digital Signage / Web Graphics. (20%)
· Engravings: Engraving includes engravings on brass, glass, plastic, and wood. (10%)
· Handouts: Fact sheets, flyers, newsletters, tri-folds, pamphlets, programs, etc. (10%)
· Historical Displays and Exhibits: Production timeline varies depending upon the exhibit size. (5%)
· Infographics. (10%)
· Miscellaneous: Cover Designs, logos, coins, etc. (5%)
· Posters: Posters can range in sizes from 11” x 17” inches up to 24” x 30”. (20%)
· PowerPoint Visualizations: Provided for executive leadership only. (10%)
· Publications: NGA on average completes approximately 4-6 publications over 20 pages annually. These can range from 21 pages to 200 pages. The remaining are typically under 20 pages. (10%)
· Must adhere to the timelines in Table 2 (SOW Section. 7.2.1).
Required Skills:
· Mid-level will have 3-5 years’ relevant experience in the career field of graphic design and familiarity with a wide range of design software applications.
· Junior-level will have 1- 3 years relevant experience in the career field of graphic design
· Demonstrates experience in of graphic design and managing multiple projects simultaneously
Position 3: Photography and Graphic Design/Mid-Level
Overall Assignment Description: Provide photography and graphic design services. Uses imagination and creative ability to implement NGA objectives within the capabilities and limitations of cameras and equipment, may exercise limited control over the substance of events to be photographed by staging actions, suggesting behavior of the principals, and rehearsing activities before photographs are taken.