Amendment to answer vendor questions.docx
DOCX document 18 KB Posted
- Solicitation number
- Not on record
About this file
This document is an amendment to answer vendor questions related to a Request for Information (RFI) for Prototype: Reversible Signature Management Overwhite Garments. The key details are:
The RFI is seeking information on the capabilities and willingness of prospective offerors to generate novel reversible multi-spectral camouflage fabrics that provide visible through longwave infrared (IR) wavelength camouflage properties. The government is seeking proposals for reversible camouflage-printed fabrics with IR mitigating properties that can be made into trousers, jackets, ponchos, and pack covers. Specific essential design requirements include providing thermal signature management technology, maintaining or improving upon the performance of current fielded Snow Overwhites, and maintaining acceptable visual and near infrared (NIR) signatures. Elective requirements include incorporating SWIR reflectance, functional finishes, fire resistance, lightweight, water repellency, and durability. Interested parties are requested to submit BOTAA preproposals by May 22, 2024. Questions for clarification can be emailed by May 21, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment to answer vendor questions.docx | DOCX document | |
| Amendment 0001 to answer vendor questions.docx | DOCX document | |
| RFI Key Performance Parameter (KPP) Key System Attribute (KSA) .docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI for Prototype: Reversible Signature Management Overwhite Garments Amendment to answer Vendor Questions:
Question #1 How do we request the classified KPP/KSA document? The attachment on SAM has several redacted metrics.
To receive classified KPP/KSA you’ll need to be on contract with the government, this will occur after submission to the BOTAA.
Question #2: The solicitation requests a BOTAA preproposal against DEVCOMBOTAA22-01. Does this imply that an RFI will be released in 60-90 days?
The RFI is the preproposal to the BOTAA. We are looking for a short paper and approximately 10 yards of fabrics to test next winter. If the materials show promise you can submit a white paper to the BOTAA.
Question #3: The Contractor would be producing 10 yards of fabric for government evaluation as part of the preproposal? Or would this activity be funded by CCDC SC?
Yes, if you have materials that fit the RFI the government would like samples. At minimum 6 x 6” but optimally 10 yards. CCDC SC can purchase these materials if they are available.
NEW QUESTIONS/ANSWERS 22 MAY 2024
Question #4: Are there any costing/ budget guidelines? I'm wondering if there are any general guidelines on typical budgets for projects and their timelines. Also how detailed does the costing information need to be? Is there a template you're able to provide for how this information is generally represented in short-papers?
Each budget and timeline is unique to each effort. For this effort since it focuses on overwhites we would like to have about 10 yards of fabrics ready by end of the calendar year. This allows us time to look at the fabrics out in an operational relevant environment which would be someplace cold with snow and would align with the winter (Jan-March) 2025 timeframe. As for a budget it can be as large or as small as you like what path you chose is up to you however for this effort anything under $1M is appropriate. Costs can be rough estimates of labor, supplies, travel and R&D.
Question #5: Regarding timelines, the RFI has mentioned technologies that are at TRL levels 3-4, but there is a request for a 10yard sample for field testing this winter. My understanding is that to produce samples of that size, we have to consider both the TRL and the MRL level of technologies. Depending on these, development can take more than 6-8 months. With decisions being given in the 60-90 days range, what does this mean for sample delivery?
Samples supplied to this RFI should be at least a TRL 3-4 however you do not have to deliver 10 yards. A 6” by 6” swatch is good enough for now. By winter time we would like to have yardage of fabrics even if its less than 10. We hope to test March 2025 so it gives as much time as possible however I cannot guarantee when the test will be just some point during the winter so it is best to plan for January.
NEW QUESTIONS/ANSWERS 29 MAY 2024
Is there a timeline for this project?
There is a timeline. We are looking to start evaluating swatches of materials now to gear up for a winter collect (JAN-MARCH) in 2025. By the end of the calendar year we would need at least 10 yards of fabric to conduct this operational relevant field assessment. If there is a potential for more work the timeline would be around a year.
1. Is there an expected time when the project can be started?
An official project would not be initiated until after the winter evaluation.
1. When shall any samples be provided (T0 + ?months)?
You can provide samples now. The earlier we can assess the materials them or time you will have for the next step which would be a full proposal to the BOTAA if the government is interested.
1. When are actual deliveries expected to be started?
I am not sure exactly what deliverable you are speaking of but we are looking for samples now (swatches will work but 10 yards is ideal). At least 10 yards by end of calendar year.
1. Any other contractual steps to be executed/provided (T0 + ?months)?
There is no other action at this time on your part besides sending in any samples or fabrics you think would fit this effort. If the government is interested the government willr each out for the next steps which is the full proposal to the BOTAA.