Attachment 1 - Performance Work Statement (PWS) Building 4607.pdf

PDF 309 KB Posted

Attached to
Exhaust Troubleshooting
Solicitation number
RFI1026
Issued by

About this file

This is a Performance Work Statement (PWS) for Building 4607 Exhaust System Troubleshooting at Cannon Air Force Base, New Mexico, dated 16 December 2025.

The contractor shall provide comprehensive troubleshooting services for the building's exhaust system, including testing and troubleshooting the communications control bus to all controllers and terminal equipment, verifying sequence of operations, and creating a deficiency list identifying non-working controllers and equipment. The contractor will compile a final report on items requiring repair or replacement for submission to 27 SOCES. Services include minor communication bus wiring repairs such as re-terminating controllers and devices, but exclude major repairs involving high bay/ceiling work (over 10 feet) or long wire runs (over 25 feet). The contractor must test network and field controller I/O control and monitoring points across paint booth air handlers, exhaust fans, breathing air system, chilled water system, heating water system, machine shop air handlers and terminal units, and office air handlers with variable air volume systems. Coordination with a remote software engineer is required to verify points and equipment in graphic utility interface systems and confirm sequence of operations. The government will provide electricity and potable water for work accomplishment.

Performance requirements include contractor-provided personnel, equipment, tools, materials, and transportation, with work hours scheduled 0700–1600, Monday through Friday, excluding U.S. Federal holidays. Contractor personnel must maintain neat appearance, speak and understand English, and obtain base access passes through 27th Special Operations Security Forces Squadron. Contractor vehicles must display company names, be professionally maintained, and comply with base traffic regulations. All contractor employees are prohibited from possessing weapons, firearms, or ammunition on CAFB. The contractor must conform to OSHA safety requirements and report any property damage or personnel injuries to the Contracting Officer or Contracting Officer's Representative within one hour of occurrence.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

BUILDING 4607 EXHAUST SYSTEM

TROUBLESHOOTING

Cannon Air Force Base, New Mexico

Date: 16 Dec 2025

Contract: Pending Attachment 1 Date: 23 Oct 2025

1. DESCRIPTION OF SERVICES. The contractor shall provide all labor, personnel, equipment, tools, materials, transportation, supervision, qualifications and other items and services necessary to troubleshoot building 4607 exhaust system. The Contractor will troubleshoot communications control bus, verify sequence of operations, create deficiency list on non-working controllers and equipment. Once completed contractor will compile a report on the items needed to be repaired or replaced to 27 SOCES for review. The contractor shall perform the requirements of this PWS in compliance with all federal, state, and local laws, regulations and industry standards.

1.2 Requirements. Test and troubleshoot communications BUS to all controllers and terminal equipment. Communication BUS wiring minor repairs such as re-terminating controllers and devices is included. Major repairs such as high bay/ceiling (over 10’ in height) wire replacement & device terminations or long runs (over 25’) are not included. Test network and field controllers I/O control and monitoring points and equipment responses. Work with remote software engineer to verify points and equipment in graphic utility interface systems included – paint booth air handler unit's, exhaust fan's, breathing air system, chilled water system, heating water system, machine shop air handler and terminal units, and office air handler and variable air volume's. All pumps, valves and actuators. Remote software engineer to operate and monitor automation system to verify sequence of operation with on-site technician.

1.3. Utilities: The government will allow the use of electricity and potable water (subject to availability in the area) for accomplishment of service IAW this PWS.

2. GENERAL INFORMATION.

2.1. Personnel: Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Employees must be clearly able to read, write, speak and understand English.

2.2. CAFB Access: The contractor shall ensure the pass and identification items required for contract performance are obtained for employees. The Pass and Identification Section of 27th Special Operations Security Forces Squadron (27 SOSFS) will provide base entry authorizations/passes to each authorized contractor employee. In addition, contractor personnel wishing to operate a privately-owned vehicle on CAFB must comply with all applicable state and base requirements. Entry authorizations must be renewed as required by the 27 SOSFS Pass and Identification Section. All contractor base pass requests must be sent to the point of contact on the contract from 27th Special Operations Contracting Squadron (27 SOCONS) within three business days of the time needed for the pass.

2.3. Retrieving Identification Media: The contractor shall retrieve all identification media, including vehicle passes, from employees who depart for any reason before the contract expires (e.g., terminated for cause, retirement, etc.).

Contract: Pending Attachment 1 Date: 23 Oct 2025

2.4. Vehicles: The contractor shall provide and maintain all vehicles necessary to perform the requirements of this contract. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicles. Vehicles shall be clean and always have a neat, professional appearance. All vehicles shall be in operable condition. Vehicle repairs, other than emergency repairs, shall not be accomplished on CAFB. Equipment failure shall not alleviate the contractor from performing any requirement contained in this contract.

2.4.1. Only qualified operators shall be permitted to operate the vehicles or equipment for work required under this contract. Vehicle/equipment operators shall possess a valid driver’s license.

2.4.2. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicles or privately-owned vehicle while on CAFB.

2.4.3. Traffic Laws. Contractor employees shall comply with all base traffic regulations. The contractor is not permitted to use cell phones on CAFB while operating a moving vehicle, unless the device is hands-free.

2.5. Work Hours: The work hours and work days for the period of performance are 0700 - 1600, Monday through Friday, with the exception of U.S. Federal holidays (listed below).

Additionally, if the contractor needs to work outside of the normal work hours, a request must be submitted to the Contracting Officer (CO) for approval.

New Year’s Day Labor Day Juneteenth Martin Luther King Day Columbus Day Washington’s Birthday Veterans Day Memorial Day Thanksgiving Day Independence Day Christmas Day

2.6. Security Forces and Fire Protection Services: On CAFB; Contact the appropriate agency in case of emergency by dialing 911. If dialing 911 from a cell phone, the call may be automatically routed to an off-base agency, such as the city of Clovis, NM. Be clear about whom you are communicating with and what your situation requires.

2.7. Safety Requirements: In performing work under this contract, the contractor shall conform to the safety requirements as required by OSHA. The contractor shall provide protection to Government property to prevent damage during the period of time the property is occupied by or in possession of the contractor. The contractor shall record and report promptly (within one hour) to the CO or COR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

PERFORMANCE WORK STATEMENT (PWS)
FOR

File details come from the government source that posted it. Updated .