RFI - VPS - LWR - 30SEP2025.pdf
PDF 307 KB Posted
- Solicitation number
- VPS_LWR_30SEP2025
About this file
This document is a Request for Information (RFI) for a Laser Warning Receiver (LWR) issued by the U.S. Army on 30 September 2025. The Vehicle Protection System (VPS) Laser Warning Receiver is an Acquisition Category (ACAT) II program currently in production as a survivability sensor for ground combat vehicles. The Army is conducting market research to inform a potential production contract for award in FY26, with a potential requirement of up to 4,000 kits.
The RFI seeks detailed technical capabilities from potential vendors, including field of view coverage, threat classification, data storage, multiple threat detection, and Modular Active Framework (MAF) compliance. Respondents must provide information about their company's security clearance, production capabilities, technical understanding, and ability to meet specific technical requirements. The RFI requires unclassified responses by 1700 EST on 30 October 2025, with submissions to be made via email. Participation is voluntary, and the government is not obligated to take further action based on the responses.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information for Laser Warning Receiver
(LWR)
30 September 2025
Distribution Statement A: Approved for public release; distribution is unlimited.
DESCRIPTION OF INTENT:
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY. No award will be made as a result of this request.
DESCRIPTION:
The Vehicle Protection System (VPS) Laser Warning Receiver (LWR) is an Acquisition Category (ACAT) II program currently in production as a survivability sensor for ground combat vehicles.
The Army is assessing market research to inform a potential production contract for award in FY26. The
Government will utilize a Performance Specification to solicit for prospective vendors. A potential requirement could exceed procurement up to 4,000 kits.
DISCLAIMER:
Reference herein to any specific commercial company, product, process, or service by trade name, trademark, manufacturer, or otherwise, does not constitute or imply its endorsement, recommendation, or favoring by the USG or the Department of the Army (DA). The opinions of the authors expressed herein do not necessarily state or reflect those of the USG or the DA and shall not be used for advertising or product endorsement purposes.
GENERAL INFORMATION:
There is no risk to respondents for participating in this RFI. Participation in this effort is strictly voluntary, resulting in no cost or obligation incurred by the USG. The USG is not bound to this information if any solicitation is issued. However, this is an important opportunity for industry to provide input on this program. This RFI, and all information herein, is for informational planning purposes only and does not constitute a proposal request of any kind. All respondents therefore understand that there is no commitment by the USG.
INSTRUCTIONS FOR RESPONDING TO THIS REQUEST:
The USG will not publish any notifications regarding the results of this RFI, or any information identifying the respondents of this RFI.
Responses are expected to remain solely UNCLASSIFIED for this RFI. Controlled Unclassified Information
(CUI) is not authorized. All respondents shall submit via e-mail to the UNCLASSIFIED e-mail addresses listed at the bottom of this posting. Microsoft Office applications or Adobe Acrobat is preferred.
Respondents wishing to submit proprietary information may request a link to submit the proprietary data through the DoD SAFE (Secure Access File Exchange). Contact Mr. Chester Ho, chester.c.ho.civ@army.mil for a link to transmit files through DoD SAFE.
Responses are due no later than 1700 EST on 30 October 2025.
Responses received after the stated due date are not considered by the USG as part of this RFI.
INSTRUCTIONS FOR COMPLETING THIS RFI:
1. Please respond to every question.
2. Number each response with the appropriate question number.
3. Questions do not have to be repeated in the response.
4. A “No Response” indication can be provided for those questions with a “no” answer.
5. If a response will satisfy another question, state: “See response to question XX.”
6. Include relevant sales media and product manuals. If providing an ACROBAT formatted manual, annotate the manual to indicate which material is applicable to the questions. If preferred, include
Internet Web links to locations where animations/videos may be viewed.
7. If providing sales media and/or manuals containing a restricted distribution statement, issue a release statement indicating that the restricted material may be distributed to Army personnel involved with this
RFI.
8. Spell out any acronyms in their first instance.
9. Clearly mark any proprietary information. If applicable, the front page of the response package should state, “Proprietary Information Contained.”
ADMINISTIVE INFORMATION:
1. Manufacturer
a. Company Name:
b. Mailing Address:
c. CAGE:
d. DUNs Number:
e. Company Web Site:
Business Type (Check or identify in your response all that apply):
8(a) Minority Owned
Disabled Veteran Small Business
Hub Zone Small-Disadvantaged
Large Business Women Owned
2. Personnel Responding to this Questionnaire:
a. Name:
b. Title:
c. Responsibility/Position:
d. Telephone/Fax Numbers:
e. E-mail address:
QUESTIONAIRE: Please provide answers to all the following questions with a “not applicable” being acceptable.
1. Security:
a. Does your company currently have a Facility Security Clearance (FCL) for an Army
Contract.
i. Provide current contract number
ii. Provide current facility clearance level
iii. Identify the names and titles of all Key Management Personnel (KMP)
b. If your company does not have a current FCL, would your company be able to produce proof of an FCL or one in process if one is not already obtained by 1 Oct 2026?
i. Proof provided could include:
1. At least a SECRET final facility clearance level
2. At least an interim SECRET facility clearance
3. An existing facility clearance sponsorship letter and documentation that reasonably demonstrates that the facility clearance is in the final stages of obtaining one.
c. Does your company currently meet National TEMPEST standards and which standard?
i. Does your company have a TEMPEST Control Plan in place?
ii. Who is the Accrediting Official (AO) and Certified TEMPEST Technical Authority
(CTTA)?
2. Small Business Questions (if applicable):
a. What are your company’s core competencies?
b. Provide relevant examples of past project or contracts that demonstrate your ability to meet the Army’s LWR requirements.
c. What is the size of your company, how many employees, annual revenue?
d. Will your company have to hire to support this contract? If yes, where will you go to get personal? How quickly can you obtain personnel? If this will be a big growth step for your company, how will you handle the sudden growth and its impact to managing your company? Do you have a growth plan?
e. Do you have any current or past performance issues with the government (e.g., cure notices, negative past performance evaluations)?
f. Are you registered in the System for Award Management (SAM)?
3. Production Capability:
a. Is your company able to perform First Article Testing (FAT)/ First Article Inspection (FAI) on the kit produced for this contract?
i. Is your company able to deliver the initial set of kits within 12 months of contract award? If not, provide a more accurate delivery timeline.
ii. Is your company able to complete quality acceptance in 6 months? If not provide a more accurate quality acceptance timeline.
iii. Is your company able to provide 12 months production lead time after quality acceptance? If not provide a more accurate production lead time.
4. Technical Capabilities:
a. Provide an UNCLASSIFIED ONLY discussion demonstrating your company’s understating of how to provide the U.S. Army a capability for the below characteristics. Companies should provide analysis or test data when possible.
i. Currently integrated on-platform systems can make LWR sensor locations challenging to meet an installed field of view (FOV). Can the sensors of the Laser
Warning Receiver be located on different planes to provide FOV coverage over
360° in azimuth and at least -20° to + 60° in elevation? The use of multiple sensor heads to achieve FOV requirements is permissible.
ii. Threat Classification: Does the system detect and declare laser threats by classification: Laser Range Finder (LRF), Laser Target Designator (LTD), or Laser
Beam Rider (LBR) when presented with those types of systems?
iii. Data Storage: Does the system contain non-volatile memory to store threat data on a rolling basis from at least the 100 most recent threat events? Can the system store the following data (if available) for each event: threat type, threat pulse repetition interval (PRI), Angle of Arrival (AoA) relative to the platform, threat bearing, vehicle longitude and latitude, vehicle attitude, and GPS time? Is the data able to be extracted via a host platform interface. Can data be retained in memory until erased on command?
iv. Does the system have the ability to detect and declare multiple threats simultaneously?
v. Modular Active Framework (MAF) Compliance:
1. Does your company have experience with MAF Compliance requirements?
a. If not, is there an industry standard that is similar to MAF compliant systems that your company has followed?
b. Describe the industry standard that is similar to MAF compliance, if applicable.
2. Describe what your company has done in relation to MAF compliance, what was the process, certification received?
3. With complete MAF and Technical Capabilities, does your system meet the Size Weight and Power (SWaP) requirements of 11.34 kilograms (25 pounds), 0.03m3 volume, and consume less than 100 watts of power?
a. See Appendix A for the complete chart of MAF Compliance requirements as it pertains to Laser Warning Receiver. For this
RFI, the “subsystem” is the LWR. Mark Yes, No, or Unknown in the System Ability column of the chart.
Please send any Questions, Comments, or Concerns to the e-mail addresses listed at the bottom of this posting.
POINT OF CONTACT INFORMATION:
Mr. Chester Ho, chester.c.ho.civ@army.mil
APPENDIX A
LASER WARNING RECEIVER (LWR) MODULAR ACTIVE FRAMEWORK (MAF) REQUIREMENTS
Requirement Title Requirement Description System Ability
(Yes/No/Unknown)
Allow Only Approved Remote Access
Methods
The Subsystem shall allow only the following approved remote access method, if remote access is required:
Secure Shell (SSH).
Enforce Disabling of Functions, Ports, Protocols, and Services
(PP&S)
The Subsystem shall enforce disabling of functions, ports, protocols, and services within the information system deemed to be unnecessary and/or nonsecure, as defined in the MAPS Active Controller (MAC) Controlled Element
PP&S.
Allow Incoming Communications from
Authorized Sources
The Subsystem shall only allow incoming communications from authorized sources routed to authorized destinations, as defined in the MAC Controlled Element PP&S.
Transition to Fault Mode - Intermittent
Heartbeat Failure
The Subsystem shall, upon not receiving a "Heartbeat" for five (5) of the last ten (10) cycles, transition to Fault Mode.
Output "Registration Request"
The Subsystem shall, upon recognizing a communication channel has been established (T) and receipt of the "MCE Authentication Success" (O) input, output "Registration
Validate and Apply Configuration Data
The Subsystem shall, upon receipt of the "Configuration Data" input, validate and apply the configuration data.
Output "Configuration Result"
The Subsystem shall, upon validating and applying the configuration data, output "Configuration Result"
Output "Threat Report"
- Threat Present
The Subsystem shall, upon detecting a threat, output "Threat Report"
Output "Threat Report"
- Threat No Longer
Present
The Subsystem shall, upon determining that a threat is no longer present, output "Threat Report" indicating the threat is no longer present.
Lock Physical
Maintenance Port(s)
The Subsystem physical maintenance port(s) shall be locked (i.e. inputs disallowed) upon the conclusion of maintenance activities.
Perform Integrated Built in Test (IBIT)
The Subsystem shall, upon receipt of the "IBIT Command" input, perform IBIT
Output "IBIT Report" The Subsystem shall, upon performing IBIT, output "IBIT
Report"
Perform Startup BIT The Subsystem shall, upon powering up, perform startup
BIT.
(Yes/No/Unknown)
Use Gigabit Ethernet
(IEEE 802.3) for Non-deterministic Messages
The Subsystem shall, upon the establishment of a communication channel (T) / secure communication channel (O), use Gigabit Ethernet (IEEE 802.3) for all non-deterministic messages
Use Deterministic
Ethernet (IEEE 802.1
AVB/TSN) for
Deterministic Messages
The Subsystem shall, upon the establishment of a communication channel (T) / secure communication channel (O), use deterministic Ethernet (IEEE 802.1
AVB/TSN) for all deterministic messages.
Output "Heartbeat"
The Subsystem shall, upon outputting the first "Secure
Heartbeat", begin to output "Heartbeat" at the rate cited in the configuration file. (T)
Output "Fault Report" -
Initialization
The Subsystem shall, upon performing startup BIT (T) and outputting the first "Secure Heartbeat", output "Fault
Report" for any faults set/cleared during initialization (one
Fault Report per fault) (T).
Output "Subsystem
Status Report"
The Subsystem shall, upon outputting the first
"Heartbeat", assess subsystem status and begin to output
"Subsystem Status Report" at the rate specified in the configuration file.
Output "Mode Status" -
Standby
The Subsystem shall, upon outputting the first "Subsystem
Status Report, transition to Standby Mode and output
"Mode Status" if no critical faults are detected.
Updateable Software
The Subsystem software, including firmware on reconfigurable logic flashes but excluding safety-critical devices designed to be programmed once, shall be updatable.
Permit Modes, Sub-
Modes, Transitions
The Subsystem shall permit only MAF directed the modes, sub-modes, and transitions.
Output
"Communication
Channel Request"
The Subsystem shall, upon powering up, output
"Communication Channel Request".
Wait for Configuration
Data
The Subsystem shall, upon outputting "Registration
Request", wait for configuration data.
Output "Registration
The Subsystem shall, upon failing to receive the
"Configuration Data" input within the registration time limit, output "Registration Request".
(Yes/No/Unknown)
Provide a One Pulse per
Second Signal
The Subsystem shall provide a single-ended one pulse per second signal at a standard TTL gate signal level (3.3V or
5V) to a pin on the logic-bearing element with the gPTP clock.
The signal will be used to monitor the Maximum Time
Interval Error (MTIE) of the gPTP 1 second rollover bit in laboratory settings.
AOP-52
The Subsystem shall comply with sections 4.1, 4.2, 4.3, and
4.5 through 4.11 of AOP-52 (Edition 1).
MIL-STD-882E The Subsystem shall comply with MIL-STD-882E.
MIL-STD-1472G
The Subsystem shall comply with the MIL-STD-1472G.
Identify the sections in compliance.
Output "IBIT Report" -
IBIT Cancelled
The Subsystem shall, upon receipt of the "IBIT Command" input indicating IBIT is to be cancelled, cancel IBIT and output "IBIT Report" indicating all in-process IBIT has been cancelled.
Output "Fault Report"
The Subsystem shall, upon performing IBIT, output "Fault
Report" for any faults set/cleared during IBIT (one Fault
Report per fault).
Safe Hazardous
Elements Then
Transition to Off Mode
The Subsystem in Active Enabled, Maintenance/Active or
Sense Only Mode shall, upon receipt of the "Zeroize" input indicating Zeroize=Asserted for at least three seconds without interruption, safe any hazardous elements and then transition to Off Mode.
Safe Hazardous
Elements Then
Transition to Fault
Mode
The Subsystem in Active Enabled or Sense Only Modes shall, upon determining that a Critical fault exists, safe any hazardous elements and then transition to Fault Mode.
Store Configurable
Registration Time Limit
The Subsystem shall store a configurable registration time limit (the time after outputting "Registration Request", waits before outputting another "Registration Request") in non-volatile memory. The registration time limit will not be contained in the "Configuration Data" input the MAC receives during registration.
(Yes/No/Unknown)
Output "Subsystem
Status Report"
The Subsystem shall output "Subsystem Status Report" at the rate cited in the configuration file.
Output "Fault Report" -
All OPERATIONAL
Modes Except
Initialization
The Subsystem in all OPERATIONAL Modes except
Initialization shall perform continuous BIT and output a
"Fault Report" if a fault is detected or cleared (one Fault
Report per fault).
Mode
The Subsystem in Initialization, Standby or Training Modes shall, upon determining that a Critical fault exists, transition to Fault Mode.
Output "Heartbeat" The Subsystem shall output "Heartbeat" at the rate specified in the configuration file.
Accept "Heartbeat" The Subsystem shall accept a periodic "Heartbeat"
Output "Mode
Acknowledgment"
The Subsystem shall, upon receipt of the "Mode Transition
Command" input and prior to transitioning to the commanded mode, output "Mode Acknowledgment"
Output "Mode Status" The Subsystem shall, upon completing a transition to a new mode, output "Mode Status"
MIL-STD-1275E The Subsystem shall comply with MIL-STD-1275E.
Transition to Normal
Operation Mode After
Reverse Polarity
The Subsystem shall transition to normal operation mode within 100 ms when reverse polarity applied to +28 VDC input returns to normal operational voltage range.
Mode - Consecutive
Heartbeat Fault
The Subsystem shall, upon not receiving a "Heartbeat" for three consecutive cycles, transition to Fault Mode.
Identify Hazardous
Conditions
The Subsystem shall identify hazardous conditions (caused by subsystem equipment) with signs / labels that comply with ANSI Z535.4-2011.
Identification Markings The Subsystem shall have item identification markings in
English on each of its LRUs.
Log MAF Messages
The Subsystem shall log all sent and received MAF messages in accordance with the MAF Message Logging setting cited in the configuration file.
(Yes/No/Unknown)
Synchronize Clock
The Subsystem shall synchronize its clock with network time using 802.1AS generalized-Precision Time Protocol with a jitter of less than 5 μs.
Fault Table
Implementation
The subsystem shall implement all applicable Standard
Faults AND any faults identified within the Subsystem
MCE Operate
Continuously Without
Failure
The subsystem shall, upon successfully initializing with the
Vehicle Base Kit (VBK), operate continuously without failure for a period of at least 72 hours.
Network Settings
Implementation
The subsystem shall implement the network settings IAW the MAF Network ICD.
Power Down to a Safe
State
The Subsystem shall power down to a safe state.
Check Software
Signature
The Subsystem shall, upon determining software integrity is valid, check software signature.
Output "M_Software
Update Status"
The Subsystem shall, upon determining the software signature is invalid, discard the software update and output "M_Software Update Status" indicating Status=Not
Staged.
The Subsystem shall, upon determining the software signature is valid, stage the software update and output
"M_Software Update Status" indicating whether the software update is or is not staged.
Accept "M_INS Data
Output" Input
The Subsystem shall accept the "M_INS Data Output" input.
The Subsystem shall, upon receipt of the "M_Software
Update Request" input indicating Request=Software
Update Readiness, output "M_Software Update Status" indicating the subsystems’ readiness for a software update.
The Subsystem shall, upon determining software integrity is invalid, discard the software update and output
"M_Software Update Status" indicating Status=Not
Staged.
The Subsystem shall, upon receipt of the "M_Software
Update Request" input indicating Request=Cancelled, (Yes/No/Unknown) cancel the software update and output "M_Software
Update Status" indicating Status=Cancelled".
Output "M_Secure
Connection Request"
The Subsystem shall, upon receipt of the "M_Software
Update Request" input indicating Request=Secure
Connection, output "M_Secure Connection Request"
Data Integrity"
The Subsystem shall, upon completed delivery of the
"M_Software Update" inputs, verify software integrity and output "M_Software Data Integrity"
The Subsystem shall, upon receipt of the "M_Software
Update Request" input indicating Status=Install, install the software and output "M_Software Update Status" indicating whether the subsystem is ready for reboot or experienced an error during software installation.
Accept Software
Updates
The Subsystem shall have the ability to accept software updates without impact to current software.
Read a De-asserted
State
The Subsystem shall read a de-asserted state when the resistance to 28 VDC return is in a high impedance (greater than 1 Mohm) state.
Read an Asserted State
The Subsystem shall read an asserted state when the voltage on the output connector is less than or equal to
4.9 VDC.
Note: The transition to the asserted state may take place at a voltage higher than 4.9 VDC.
Implement Maximum
De-bounce
The Subsystem shall implement a maximum de-bounce of
10 ms.
Implement Minimum
De-bounce
The Subsystem shall implement a minimum de-bounce of
5 ms.
Isolate De-bounce
Circuitry
The Subsystem's de-bounce circuitry shall not introduce capacitive characteristics to the input/output pin.
Limit Output Source
Current
The Subsystem shall limit the output source current to a maximum of 50 mA.
Pull Up Discrete Signals The Subsystem shall pull up all discrete signals to the platform 28 VDC power bus.
(Yes/No/Unknown)
Read an Asserted State
The Subsystem shall read an asserted state when the resistance to the 28VDC platform return is less than 200 ohms.
Accept Discretes at 20-
33 VDC
The Subsystem shall be able to accept discretes over a range of 20-33 VDC.
Limit Leakage Current
The Subsystem shall limit leakage current to the LRU's internal pull-up source to less than 250 uA when connected to 28 VDC RTN through a 100 Kohm resistor.
Transition to Off Mode
The Subsystem shall, upon receipt of the "Zeroize" input indicating Zeroize=Asserted for at least three seconds without interruption, transition to Off Mode.
Indicating Zeroize
Status=Asserted
The Subsystem shall, upon receipt of the "Zeroize" input indicating Zeroize=Asserted, output "Subsystem Status
Report" indicating Zeroize Status=Asserted.
Erase Cryptographic
Keys
The Subsystem shall, upon receipt of the "Zeroize" input indicating Zeroize=Asserted for at least three seconds without interruption, erase all cryptographic keys.
Indicating Crypto Key
Status=Zeroized
The Subsystem shall, upon erasing all cryptographic keys, output "Subsystem Status Report" indicating Crypto Key
Status=Zeroized.
Prevent Installation of
Software Components
The Subsystem shall prevent the installation of all software components without a digitally signed certificate.
Prevent Installation of
Firmware Components
The Subsystem shall prevent the installation of all firmware components without a digitally signed certificate.
File details come from the government source that posted it. Updated .