RFI - Form.pdf

PDF 66 KB Posted

Attached to
Bunker Door Repair
Solicitation number
FA667525Q0006
Issued by

About this file

This document is a Request for Information (RFI) / Clarification Form, a two-page standard federal contract communication template designed to facilitate information exchange between a contractor and government contracting personnel. The form provides structured sections for documenting requests, proposed solutions, and responses, with spaces for signatures, dates, and administrative tracking. It includes specific fields for contract number, subject, drawing references, and sections for both contractor and government use, with a dedicated page for recording the RFI response and clarification details.

The form requires parties to indicate whether a change order or project cost increase might be necessary after reviewing the government's response, with a requirement for the contractor to return the reviewed form to the Contracting Officer. The document is specifically routed to 301 CONF/PK (Contracting Officer) and Richard Nemetz from Base Civil Engineering, suggesting an Air Force (AF) contracting process. While the specific details of the information request are not filled out in this template, the form provides a standardized mechanism for requesting and documenting technical or procedural clarifications during a federal contract's execution.

View the file

Other files

File Type Posted
IMG_0104.mov MOV file
25Q0006 Bunker Door Repair RFI Responses.pdf PDF
IMG_0103.mov MOV file
SCA Wage Determination 2015-5231.pdf PDF
F5A6CE5212AW03 Bunker Door Repairs -- SOW.pdf PDF
FA667525Q0006 Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO: RFI NO: DATE (YYYYMMDD)

SUBJECT: DRAWING REFERENCE/ DETAIL:

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:

REQUEST:

PROPOSED SOLUTION (If applicable:

TO(Contracting Officer): 301 CONF/PK FROM (Contractor):

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

FOR GOVERNMENT USE ONLY

FROM CONTRACTING

TO:(Base Civil Engineering):Richard Nemetz (__)

For Evaluation and Action

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

REQUEST FOR INFORMATION / CLARIFICATION FORM

RFI RESPONSE / CLARIFICATION:-

Government to complete following sections:

TO:(AF Contractiing Office)

TO:(Contractor)

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO

Reviewer:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.