RFI-Form.pdf
PDF 69 KB Posted
- Attached to
- OHARNG FY25 CJAG Paving Federal contract opportunity
- Solicitation number
- W91364-25-B-A007
About this file
The document is a standard Request for Information (RFI) form template for federal contract documentation. The form provides a structured format for contractors to request and receive information during a contract process, with designated sections for contract details, subject/title, drawings, specifications, contact information, cost impact determination, information requested, and official responses. The form includes a critical disclaimer that the RFI system is only for information exchange and does not authorize contractors to proceed with work without explicit approval, warning that contractors proceed at their own risk if they take action based solely on an RFI response.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract Cont Sheet.pdf | ||
| Bid Abstract 1419.pdf | ||
| Environmental Procedures.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Solicitation - W9136425BA007.pdf | ||
| Solicitation - W9136425BA007.pdf | ||
| Instructions to Bidders.docx | DOCX document | |
| Wage Determinations DBA Ohio Statewide 27JUNE2025.docx | DOCX document | |
| STATEMENT OF WORK.docx | DOCX document | |
| CJAG 2025 Overall Site Plan.pdf | ||
| CJAG 2025 Paving Maps.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
REQUEST FOR INFORMATION
RFI NUMBER:
PROJECT NUMBER / CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
| CONTRACT NUMBER: |
| RFI NUMBER: |
| PROJECT NUMBER CONTRACT TITLE: |
| PRIME CONTRACTOR: |
| SUBCONTRACTORSUPPLIER: |
| SUBJECTTITLE OF RFI: |
| DRAWINGS: |
| DETAILS: |
| SPECIFICATION: |
| CPM ACTIVITY: |
| PHONE: |
| FAX: |
| COST IMPACT: Off |
| DATE SUBMITTED: |
| RESPOND BY: |
| INFORMATION REQUESTED: |
| By: |
| Date: |
| RESPONSE: |
| By_2: |
| Date_2: |
| COR Concurrence: |
| Date_3: |
| CO Concurrence: |
| Date_4: |
File details come from the government source that posted it. Updated .