RFI for K-SWISS Software integration.pdf
PDF 141 KB Posted
- Solicitation number
- RFI-AFLCMC-KSWISS-2026
About this file
This is a Request for Information (RFI) from the United States Air Force (USAF) AFLCMC/WLC (KC-46 Program Office) seeking qualified contractors interested in providing KC-46 Software (SW) Integration and Sustainment Support (K-SWISS). The RFI is for information and planning purposes only and does not constitute a Request for Proposal or commitment to contract. Responses are at the respondent's expense, and the Government will not fund or accept unsolicited quotes. Not responding does not preclude future consideration if an RFP is issued.
The KC-46A Tanker is a commercial derivative of the Boeing 767-2C aircraft modified to meet USAF requirements for worldwide aerial refueling. The original Interim Contracted Support (ICS) contract (FA8625-11-C-6600) concluded in June 2022 without provisions for stand-alone software maintenance, creating a critical gap. The USAF seeks to consolidate software efforts into integrator-led contracts through K-SWISS. The program encompasses multiple systems including the Wing Aerial Refueling Pod (WARP), Remote Vision System (RVS), Actuator Control Unit (ACU), Avionics Flight Management Computer (AFMC), Aerial Refueling Management System (ARMS), Military Data Network (MDN), Centerline Drogue System (CDS), Tactical Situation Awareness System (TSAS), and Radar Warning Receiver (RWR), with associated suppliers including Eaton, Collins, Boeing, Woodward, GE, and Raytheon.
Respondents must demonstrate technical expertise and capability in multiple areas: agile software development compliant with DoD 5000.87; system integration experience with KC-46 specific systems; relationships with original equipment manufacturers; software maintenance and operating system patching; federated multi-bus avionics integration including ARINC standards (429, 664, 739, 708) and MIL-STD-1553B; FAA airworthiness compliance (RTCA DO-178B/C and DO-254) and military certification merge strategies; Risk Management Framework (RMF) and Cyber Survivability Attributes (CSAs 1-10) implementation; software configuration and database management including Computer Program Identification Number (CPIN) labeling and deficiency report resolution; Type-1 technical training curriculum development; and data rights strategy ensuring Government Purpose Rights or Limited Rights. Responses must address whether K-SWISS operations should be combined with the KC-46 SIL Operations & Sustainment (O&S) contract or remain distinct efforts, with rationale addressing operational, technical, cybersecurity, cost, schedule, staffing, governance, and risk implications.
Response requirements include a capability package with cover letter (10-page maximum excluding cover page), formatted with 8.5 x 11-inch pages, single-spaced, Arial 10-12 point font, 1-inch top and bottom margins, and 3/4-inch side margins. Responses must include contractor interest level (not likely to highly likely), potential teaming arrangements with task delineation between prime and subcontractor, and prospective business identification including company information, security clearance level, business status (Small, Small Disadvantaged, Woman-Owned, 8(a) Certified, Service-Disabled Veteran-Owned, etc.), previous contract numbers, contracting officer and program manager contacts, CAGE Code, Unique Entity Identifier (UEI) Number, and size/socioeconomic status for NAICS 336413. Responses must be delivered electronically to Mr. Michael Crane at michael.crane.11@us.af.mil no later than 11 December 2026 at 5:00 PM EST.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
REQUEST FOR INFORMATION (RFI)
RFI for KC-46 SW Integration Sustainment & Support (K-SWISS)
Requestor: USAF AFLCMC/WLC (KC-46 Program Office)
Description
The United States Air Force (USAF) KC-46 Tanker Program Office (PO) seeks information from qualified contractors interested in and capable of supporting requirements to provide KC-46 Software (SW) Integration and Sustainment Support (K-SWISS).
THIS IS A REQUEST FOR INFORMATION ONLY. This RFI is solely for information and planning purposes – it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit to contract for supply or service. The PO is not seeking quotes at this time and will not accept unsolicited quotes. Additionally, the PO will not fund responding to this RFI; cost to respond is at respondent’s expense.
Finally, not responding does not preclude/prevent respondent participation/consideration if future RFP is issued.
Background
The KC-46A Tanker is a commercial derivative of the Boeing 767-2C aircraft, finished to meet unique USAF Tanker requirements. The KC-46A Tanker provides worldwide, day, night, and adverse weather aerial refueling to receiver-capable US, allied, and coalition military aircraft, including unoccupied aircraft. KC-46A SILs were built to serve as high-fidelity testing centers to verify software, avionics, and hardware interactions.
Under the original Interim Contracted Support (ICS) contract (FA8625-11-C-6600), which concluded its Period of Performance (PoP) in June 2022, requirements nor provisions were established for stand-alone software maintenance. This lack of coverage created a critical gap, leaving the Program Office without a contract vehicle to execute software sustainment including regression testing in the SIL when software updates were released by common item program offices (e.g., MAGR2K, LAIRCM, KG-245). Consequently, the burden of software "care and feeding" shifted to the initial KOSS contract. To resolve severe gaps in software sustainment, the USAF is investigating the ability to consolidate SW efforts into integrator led contracts; in this instance for the KC-46 via K-SWISS.
There are two similar but different RFIs that are being released by AFLCMC/WLC. The first one entitled “RFI for KC-46 SW Integration Sustainment & Support (K-SWISS)” is intended to provide system integrator capability for the KC-46 aircraft. An integrator will perform the duties of creating a relationship (contract) with all the systems within the aircraft to perform integration, test, certification, design and development.
The second one entitled “RFI for KC-46 Systems Integration Lab Operations & Sustainment (SW) Operations and Sustainment” is intended to provide regular maintenance for the individual systems within the KSIL environment, such as hardware and software modifications.
It will be up to each vendor to decide if their response to these RFIs will be one consolidated RFI or a standalone RFI.
Scope
The PO seeks Industry perspective for establishing integrated organic SW sustainment and support for the KC-46. Parties responding must provide the following information and/or documentation that validates technical ability to provide system integration services to create agreements with suppliers, manage software sustainment efforts and guide development of combined supplier and organic SW sustainment and support for the KC-
46. Please respond to the following:
1. Does your company currently have appropriate manpower with technical expertise and skill set, and does the company have required capability to provide the full level of system integrator support required of K-SWISS? Agile SW development is structured to increase flexibility, collaboration and user satisfaction stemming from user feedback and interaction thus scope and performance requirements will vary.
a. Please explain your current agile software development process, how it aligns with DoD 5000.87 and how it can be applied to K-SWISS in detail.
2. K-SWISS comprises many systems including (Wing Aerial Refueling Pod (WARP), Remote Vison System (RVS), Actuator Control Unit (ACU), AROS Flight Control Stick Electronic Unit (AR_FCSEU), Avionics Flight Management Computer (AFMC), Ariel Refueling Management System (ARMS), Aerial Refueling Operator Control and Display Unit (AROCDU), Multifunction Control and Display Unit (MCDU), Military Data Network (MDN), Centerline Drogue System (CDS), Tactical Situation Awareness System (TSAS) and Radar Warning Receiver (RWR). Most of these systems/subsystems are specific to KC-46 refueling capability. All systems/subsystems contain software that was modified for the KC-46 program.
a. Does your company possess technical and fundamental awareness of these systems/subsystems? Does your company have system integration experience with these systems/sub-systems, with similar aircraft system/subsystems? Please explain in detail.
3. The following companies correlate to the above systems: WARP (Eaton), RVS (Collins), ACU (Boeing), AF_FCSEU (Woodward), AFMC (GE), ARMS (Boeing), AROCDU (Boeing), MCDU (GE), MDN (Boeing), CDS (Eaton), TSAS (Boeing) and RWR (Raytheon).
a. Does your company have other business relations with any of the above vendors, with the above systems/subsystems? Please explain in detail.
4. Technical aspects
a. The KOSS SW service contract prevents gaps in critical operational support.
1. Scope encompasses, Software Maintenance, and System Integrator capability for KC-46 aircraft and currently relies on continued Original Equipment Manufacturer (OEM) support to facilitate use of a dedicated contractor owned and operated software development environment.
b. Systems Integrator Requirement
1. Sustain KC-46 Major Modernization & Software baselines enhancements overlapping post-production modernization programs such as:
a. Block 1 PACS (Post-Production Modernization) integrates four (4) critical mission capabilities: Mobile User Objective System (MUOS) for BLOS UHF satellite comms, Second-generation Anti-jam Tactical UHF Radio for NATO (SATURN) waveform, MIDS-JTRS Link-16, and Airspace Control Order (ACO) overlays in the Tactical Situational Awareness System (TSAS).
b. Remote Vision System (RVS 2.0) replaces the single Video Graphics System (VGS) with a revised design including Video Processing Unit (VPU), Video Routing and Communication Unit (VRCU), and updated Boom Sensor LRU utilizing 4K and Full HD LWIR cameras with 3D displays. Mitigations are currently managed through Enhanced RVS (eRVS) updates across Aerial Refueling Management System (ARMS) and ARO Control and Display Unit (AROCDU).
c. Boom Telescope Actuator Redesign (BTAR) redesigns telescoping actuator to use active hydraulic flow control with a pressure feedback valve (PQ-valve), delivering smooth, continuous "spring-like" resistive force. Introduces flight control stick shaker to provide tactile force queuing to the ARO/AROI under high radial loads. This alters control laws and built-in tests (BIT) within the Actuator Control Unit (ACU), ARMS, and Central Maintenance Computing Function (CMCF).
d. Contractor must show qualified comprehensive technical ability and compliance for the following core requirements that will support this software consolidation and sustainment program:
1. Providing system integrator capability for annual/Multi-Year SW releases consisting of maintenance, patching, integration and lifecycle support:
a. Managing and maintaining specialized military flight software and providing COTS software oversight and support.
b. Perform software operating system patching (e.g., Windows Embedded Standard 7, Red Hat Enterprise Linux 6.5) and Java environment updates across distributed and multi-workstation architectures without impacting certified avionics baselines.
c. Manage and deploy cybersecurity tools and configurations (e.g., McAfee VirusScan, Cisco Intrusion Prevention Systems [IPS]).
2. Federated Multi-Bus Avionics Integration & Software Partitioning:
a. Extensive technical experience working with tightly integrated, federated avionics suites and diverse data bus protocols.
b. Required interfaces include ARINC-429, MIL-STD-1553B, ARINC- 664 (AFDX Ethernet), ARINC-739 (MCDU), ARINC-708 (Weather Radar), and serial standards (RS-422, RS-485, USB).
c. Demonstrated experience managing ARINC 653 Integrated Modular Avionics (IMA) partitioning, implementing robust software boundaries to segregate unclassified data (e.g., civil Aircraft Communications Addressing and Reporting System (ACARS), unclassified crew apps) from classified mission networks (e.g., TSAS, Secret Internet Protocol Router Network (SIPRNet)).
3. FAA Airworthiness Compliance & Military Cert Merge Strategy:
a. Experience executing software verification and validation under RTCA DO-178B/C (Design Assurance Levels [DAL] A through D) and RTCA DO-254 guidelines.
b. Proven ability to support FAA's 4 Stages of Involvement (SOI 1-4) process, update the Plan for the Software Aspects of Certification (PSAC), and perform safety hazard analyses.
c. Proven capability to manage FAA Amended Type Certificate (ATC) and Supplemental Type Certificate (STC) compliance, while aligning with Military Type Certification (MTC) and Military Sovereignty of Flight (SoF) requirements.
d. Demonstrated methodology executing continuous "Cert Merge," systematically merging divergent, highly complex developmental branches (e.g., RVS 2.0 ARMS 2.x and BTAR ARMS 3.x/ACU 3.x) into a unified, certified release baseline.
4. RMF & Cyber Survivability Attributes (CSAs 1-10) Implementation:
a. Experience ensuring compliance with DoDI 8500.01, DoDI 8520.02, DoDI 5200.39 (Critical Program Information protection), and the Risk Management Framework (RMF).
b. Ability to implement and maintain the 10 Cyber Survivability Attributes (CSAs) at the software/firmware layer, including:
1) CAS-01: Control Access
2) CAS-02: Reduce System’s Cyber Detectability
3) CAS-03: Secure Transmissions and Communications
4) CAS-04: Protect System’s Information from Exploitatation
5) CAS-05: Partition and Ensure Critical Functions at Mission
Completion Performance Levels
6) CSA-06: Minimize and Harden Attack Surfaces
7) CSA-07: Baseline & Monitor Systems and Detect Anomalies
8) CSA-08: Manage System Performance if Degraded by Cyber
Events
9) CSA-09: Recover System Capabilities
10) CSA-10: Actively Manage System’s Configurations to Achieve and
Maintain an Operationally Relevant Cyber Survivability Risk Posture (CSRP)
5. Software Configuration & Database Management:
a. Manage complex Computer Program Identification Number (CPIN) labeling, indexing software packages in ETIMS library, and coordinating distributions through the Software Control Center (SCC).
b. Manage aircraft-specific General Software Manuals (TO 1C-46(K)A- 8-1) and Software Version Description (SVD) database parameters.
c. Provide a rigid step-by-step process detailing Software Deficiency Report resolution via Root Cause Analysis, regression testing and RMF validation prior to fielding ensuring flight safety and cybersecurity postures are appropriate
d. Identify and document the vendor-specific Agile and DevSecOps continuous integration/continuous development (CI/CD) strategy supporting the program, to include the processes, tools, environments, pipelines, governance, security controls, testing approach, release procedures, and roles and responsibilities required to develop, integrate, secure, test, and deliver software capabilities.
e. Identify and document a data rights strategy for the KC-46 aircraft program that ensures all Intellectual Property (IP), technical data, computer software, computer software documentation, and other contract-developed or contract-used deliverables are assessed and structured to provide the Government with Government Purpose Rights, Limited Rights, or other appropriate license rights sufficient to enable the United States Air Force to organically operate, maintain, sustain, repair, modify, upgrade, and support the entire KC-46 aircraft, as required.
6. Type-1 Training Transition & Organic Training Curricula:
a. Proven ability designing, establishing, and executing Type-1 technical training courses in accordance with DAFH 36-2675 (Information for Designers of Instructional Systems) and AFI 36-2670 (Total Force Development).
b. Providing curriculum that qualifies software personnel to independently operate SDE/SIL environments, troubleshoot faults, and perform depot-level software maintenance.
7. The K-SWISS operation will contract with a System Integrator that will create subcontracts with suppliers and manage the development, testing, and certification of KC-46 software. The KC-46 SIL O&S contract will provide regular maintenance for the K-SIL environment including managing modifications as required with aircraft updates, managing DMS issues, updating software versions as required, system patches and firmware updates, hardware preventative maintenance, rack and server inspections, switches, cabling and maintain core lab network service. Assess and explain whether K-SWISS operations should be combined with KC-46 SIL O&S as a single support construct, or whether they should remain two distinct efforts.
The response shall provide the rationale for the recommended approach and address the operational, technical, cybersecurity, cost, schedule, staffing, governance, and risk implications associated with each option
e. Information Requested / Instructions for Response
1. Page size shall be 8.5 x 11 inches; foldouts are permitted and will be included in total page count.
2. Pages shall be single-spaced, Arial font 10-12 point, 1-inch top and bottom margins, ¾ inch side margins.
3. Capability package with cover letter documenting ability to meet the stated requirements with sufficiently qualified personnel.
a. Qualification – relevant type and duration of employee experience.
b. Level of involvement - prime or subcontractor.
c. Time/Years providing similar support and oversight.
d. Other relevant details or information.
4. Capability Package should include the following elements:
a. 10-page maximum not including cover page describing the items listed above. The responses should be formatted as follows:
1. Level of contractor interest, likelihood of submitting a proposal as a prime contractor: not likely, somewhat not likely, likely, somewhat likely, highly likely.
b. Potential teaming arrangements (if likely to submit a proposal).
c. If considering a teaming arrangement, describe the tasks the prime would perform versus tasks the subcontractor would perform.
5. Prospective Business Identification
a. Company Name, Address, Phone Number, E-mail, Point of Contact Information, website address.
b. Highest security clearance your company currently holds.
c. Business status - Small, Small Disadvantaged, Woman- Owned, 8(a) Certified, Service-Disabled, Veteran-Owned Business, etc.
d. Previous contract numbers with descriptions of services.
e. Contracting Officers’ and Program Managers’ contact information.
f. Cage Code, Unique Entity Identifier (UEI) Number, size/socio-economic status (large, small, 8(a), etc.) for NAICS 336413 and other information the US Air Force should consider reviewing responses.
5. Please deliver the completed response to this RFI electronically to Mr. Michael Crane via email at michael.crane.11@us.af.mil No Later Than (NLT) 11 Dec 2026 5pm EST.
END
mailto:michael.crane.11@us.af.mil
File details come from the government source that posted it. Updated .