RFI_Attch1-SF_PWS_Rev 4_24Aug2023.pdf
PDF 1 MB Posted
- Solicitation number
- RFI1-SF-GEODSS_Feasibility
About this file
This document is a Performance Work Statement (PWS) for the Space Fence (SF) system. The PWS outlines the requirements for the contractor to provide non-personal services to manage, maintain, and provide logistical and general support for the SF system. The key objectives include sensor operations, technical services, operations support, mission system maintenance, logistics management, communications operations and maintenance, cybersecurity management, and program management.
The PWS covers requirements for one sensor site located at the U.S. Army Garrison-Kwajalein Atoll in the Republic of the Marshall Islands. The contract includes a Firm Fixed-Price line item for the sensor site operations and maintenance, with a Cost Reimbursable line item for local purchases, travel, and labor surges. The contractor is expected to ensure availability of the radar sensors to meet mission operational requirements, with a minimum acceptable quality level of 99.7% sensor availability. The PWS also includes requirements for configuration control, maintenance training, logistics management, cybersecurity, and various reporting and documentation deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_Attch2-GEODSS_PWS_Rev5_13Feb2024.pdf | ||
| RFI_SF-GEODSS_20Mar2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPACE FENCE
Performance Work Statement
(PWS)
Revision 4
FA2518-21-C-0005
24 August 2023
Contents
CHANGE CONTROL SUMMARY
SECTION 1.0. SPACE FENCE GENERAL REQUIREMENTS
1.1. Mission
1.2. Space Fence Scope
1.3. Site Changes
1.4. Active Cyber Defense
1.5. PWS Organization
1.6. Contractor Performance Assessment Report (CPAR)
1.7. Site Operations
1.8. Withdrawal of Privileges
1.9 Contract Line Item (CLIN) types
1.10. Contractor Documentation of Contract Performance
1.11. Workload Data
1.12. Incident Reporting
1.13. Continuance of Performance/Mission Essential Services
1.14. Mission Essential Services Plan
1.15. Third-Party Support
1.16. Uncleared Personnel Escort
1.17. SF Operating Instructions (SF OIs)
1.18. Technical Order (TO) Distribution and Control
1.19. Quality Program
1.20. Technical Meetings
1.21. Familiarization Briefings and Tours
1.22. Inspections and Exercise Support
1.23. Budget Information
1.24. Training
1.25. Contractor Common Access Cards (CACs)
1.26. SIPRNet Tokens
1.27. Hand Tools and Equipment
1.28. Program Management
SECTION 2.0. MISSION OPERATIONS AND SUPPORT REQUIREMENTS
2.1. Sensor Operations and Support
2.2. Mission System Maintenance Management
2.3 Logistics Management:
2.4. Communications O&M:
2.4.3. Cybersecurity Management
2.5. Environmental Management
2.6. Reserved
2.7. Industrial, Physical, and Operational Security
2.8. Knowledge Operations
2.9. Contract Transition
SECTION 3.0. DELETED
SECTION 4.0 SENSOR SITE 1 SUPPORT REQUIREMENTS
4.1. Reserved
4.2. Test, Measurement, and Diagnostic Equipment (TMDE)
4.3. Environmental Services
4.4. Civil Engineering (CE)
4.5. Environmental Health
SECTION 5.0 GOVERNMENT PROVIDED SUPPORT OF CONTRACT SERVICE PERFORMANCE . 47
5.1. Government-Furnished Property (GFP) and Government-Furnished Equipment (GFE)
5.2. Government-Furnished Information (GFI)
5.3. Government-Furnished Services (GFS)
SECTION 6.0 SERVICES SUMMARY
APPENDIX A - DELIVERABLE REQUIREMENTS
APPENDIX B - PUBLICATIONS AND FORMS
APPENDIX B - FORMS
APPENDIX C - SUPPORT AGREEMENTS
APPENDIX D - PWS ACRONYMS
APPENDIX E - PWS DEFINITIONS
APPENDIX F - GOVERNMENT-FURNISHED TRAINING
APPENDIX G - RMF ARTIFACTS
CHANGE CONTROL SUMMARY
Revision/Change Number
Date Summary of Change or Revision
Basic 17 Dec 2020 Initial PWS.
Revision 1 25 Oct 2021 Updated deliverable POCs Revision 2 26 Sep 2022 Deleted requirements for SOC operations Revision 3 11 Nov 2022 Add COR to deliverables; delete ECRMA requirement Revision 4 Admin chgs; Supply requirement deletions/chgs
SECTION 1.0. SPACE FENCE GENERAL REQUIREMENTS
1.1. Mission. The United States Space Force (USSF) Delta (DEL) 2 located at Peterson Space Force Base (PSFB), Colorado exercises responsibility for Space Fence (SF) Increment One through the 20th Space Surveillance Squadron (20 SPSS) at Eglin AFB, FL.
The SF radar is remotely operated at the Mission Operations Center (MOC) at 20 SPSS and designated as 20 SPSS. The SF radar is located at the U.S. Army Garrison-Kwajalein Atoll (USAG-KA) in the Republic of the Marshall Islands in the Western Pacific and is designated as 20 SPSS 4 Sensor Site 1. The SF SS1 is managed by the 20 SPSS Operations Flight Commander, who performs as the SF contracting officer representative (COR). The implementation of the SF Increment One expands and strengthens U.S. space superiority through improved Space Domain Awareness (SDA) mission capabilities.
1.2. Space Fence Scope. Provide non-personal services to manage, maintain, and provide logistical and general support for the SF system. Provide all personnel, tools, materials, transportation, supervision, and other items necessary to perform SF Performance Work Statement (PWS) requirements on 24-hours-a-day, 7-days-a-week (24/7) year-round.
Contractor’s furnished materials and equipment shall include transportation, fuel, non-specialized tools (specialized tools provided as Government Furnished Property (GFP)), custodial supplies, office administrative supplies and equipment, and any other supplies and materials not furnished by the Government which the Contractor believes necessary to perform these requirements. In addition to providing SF mission system operation and maintenance (O&M) requirements, contracted services include logistics, communications, environmental, civil engineering, occupational health, security, and knowledge operations support requirements, as well as support of system upgrades and modifications. Upgrade and modification support includes system acceptance testing and organizational level maintenance both while in acceptance testing and after acceptance. Many support services are provided by the Host Installations and the contractor is required to interface Sensor Site 1 Hosts IAW requirements specified in the PWS.
Reference: United States Government Inter-Agency Agreements (IAAs) and IAA #A2110- 057-021-000001 between 20 SPSS and USAG at KA
1.3. Site Changes. Support additional sites and relocations, as needed during the performance of this contract. There is potential for SF Sensor Site 2, located in the southern hemisphere, to be added to this PWS during the life of this contract. The anticipated type of work is covered within this PWS and support for additional sites and relocations will be negotiated separately after contract award, when and if, the need arises.
1.4. Active Cyber Defense. The Air Force (AF) is moving towards active United States (US) cyber defense capabilities and implementation. The type of work required has not been determined at this time, but if the work is added to the contract, it will be separately negotiated after contract award.
1.5. PWS Organization. PWS requirements have been organized in a manner to facilitate clarity and location of performance. The grouping of requirements is not intended to imply a preferred organizational structure to meet requirements. Requirements are included in the body of the PWS and all appendices and must be adhered to in total. The contractor is expected to understand the interrelationship between requirements and to organize and perform accordingly.
1.5.1. PWS Standards and References. A Standard (STD) is a PWS requirement, for which compliance is mandatory. Standards may include an entire directive publication, or may only include titles of chapters or sections, or applicable paragraphs within the directive publication. For example, if a STD states: “IAW Air Force Instruction (AFI) 17-130 – Privileged User with Cybersecurity Responsibilities” the section titled “Privileged User with Cybersecurity Responsibilities” within the AFI is a mandatory requirement. Publications listed as reference are included for informational purposes only for background and context.
When not otherwise specified, apply industry standards and commercial best practices, and comply with local, state and federal statutes in performance of PWS requirements.
1.5.2. Acceptable Quality Levels (AQLs). Certain standards are identified as AQLs and will be assessed on a scheduled basis by the Government. Report contractor self-assessment of AQLs and other PWS requirements in the Site Quality Status Report (QSR) Deliverable: Appendix A, D1.1.5, Site QSR
1.5.3. Publication Updates. Review product announcements and the Product Index on the e- Publishing web site to ensure publications are current. Comply with the current version of all publications cited as a standard. Review all publications listed in the PWS and notify the Contracting Officer (CO) of any changes in writing within 30 calendar days including any cost impacts, if applicable. Cost impacts will be negotiated in accordance with DFARS REA Clause 252.243-7002 Requests for Equitable Adjustment. If the CO is not notified in writing within 30 calendar days, perform IAW publication changes at no increase to contract price.
1.6. Contractor Performance Assessment Report (CPAR). The contractor will receive an annual CPAR reflecting performance each year of contract performance.
1.7. Site Operations. Contractor personnel may be removed from the site, when the presence of such employee endangers life, property, or security, or where the employee violates regulations or lawful orders. Categories of violations or misconduct, which may cause employees to be removed from the installation/site include, but are not limited to:
• Security violations
• Negligence, willful damage to, or destruction of property
• Injuries inflicted upon other personnel
• Alcohol or drug abuse
• Engagement in unauthorized private business transactions
1.8. Withdrawal of Privileges. Contractor employee abuse(s) of installation/site privileges may, upon investigation of facts and circumstances of any incident, be withdrawn by the 20 SPSS Commander (20 SPSS/CC) or the Host Commander on a permanent or temporary basis.
1.9 Contract Line Item (CLIN) types. The following contract types are applicable to the contract CLINs.
1.9.1. Firm Fixed Price (FFP) Contract Line Item Numbers (CLINS). Provide on a FFP basis non-personal services for all labor, management, transportation, equipment, materials, supplies, parts, (not available through the Integrated Logistics System-Supply (ILS-S) for mission equipment maintenance) and services necessary in performance of PWS requirements that are foreseeable (see definition in Appendix E). The FFP includes all supplies, parts and materials needed to perform preventive maintenance, routine maintenance, and organizational level maintenance in accordance with (IAW) the PWS and stated standards. The FFP also includes consumables (custodial supplies, light bulbs, paper, etc.) in performance of day-to-day contract requirements. Requirements shall be covered in the fixed price even if the Contractor chooses to subcontract to a company to perform the work. Include in the FFP all employee expenses to include unofficial travel, for example leave, to and from site(s). Cover any employee unofficial travel expenses as agreed to between the Contractor and the contractor’s employees. The Government will not reimburse these costs on a cost reimbursable basis.
1.9.2. Cost Reimbursable (CR) CLINS. The Government will reimburse the contractor for Government-approved equipment, materials, supplies, labor, and parts necessary for repairs that are not part of preventive maintenance, routine maintenance and organizational level maintenance as defined in the PWS, and which are not foreseeable (see definition in Appendix E). The Government will reimburse the contractor for Government-approved temporary duty (TDY) and non-local travel, and labor hours resulting from pre-approved minor labor surges. The contractor will be reimbursed for costs determined to be allowable, allocable, and reasonable in accordance with the Federal Acquisition Regulation (FAR), Part 31, Subpart 31.2. For the purposes of this provision, allowable costs shall include costs for initial or replenishment spare parts, operational materials, supplies, material handling, off-site depot-level maintenance, packaging, freight, contingencies, and general & administrative (G&A) burden (when applicable), for Government approved purchases authorized by and in accordance with the PWS. Fee/profit will not be allowed.
1.9.2.1. Local Purchases. Procure all parts and supplies necessary to support the Mission System through ILS-S. For parts and supplies not available through ILS-S, provide three quotes to the COR and Government PM and CO for approval. Once approved, items may be procured and charged to the CR CLIN.
1.9.3. Individual Job Orders (IJOs). This paragraph outlines the Government’s requirement for work, which is not specifically identified in the PWS, but which is still within the general scope of this contract. The CO will determine the appropriate contract type on a case-by-case basis, depending on the nature of the work. Develop initial technical and cost proposals for Government review and approval at the request of the CO. Types of work may include, but are not limited to, planning, development, and distribution of plans and specifications, installation instructions, bills of materials, and inspections to complete the job at the work location. Provide all necessary management for IJOs to include technical management, logistics support and services, administrative support and services, and similar requirements as they occur. The CO will negotiate IJOs prior to any action occurring.
1.10. Contractor Documentation of Contract Performance. Make all information and documentation generated in performance of PWS requirements available to the Government upon request in editable electronic format. Contractor-generated format is acceptable, unless otherwise noted in the PWS.
1.11. Workload Data. Provide a Deliverable (D1.1.1, Workload Data) that captures performance workload data. Examples include numbers of actions and types of actions performed, or level of effort required in performance of contract requirements. Deliverable D1.1.1, will be noted for various paragraphs throughout the PWS that require the Contractor to collect, maintain, and submit performance workload data to the Government.
Deliverable: Appendix A, D1.1.1, Workload Data
1.12. Incident Reporting. Notify the COR, Government PM, CO, and other responsible agencies involved of all incidents, accidents, threats, events, and natural disasters (impending or actual) that may affect or involve the performance of PWS requirements.
1.13. Continuance of Performance/Mission Essential Services. In the event of a crisis declared by the President of the United States and/or the Secretary of Defense, continue all PWS requirements. Continue services through all Force Protection and Defense Conditions without interruption. In a time of crisis, other services to increase the security and well-being of the Sites may be required on a continuous basis as identified by the COR and directed by the CO. The Contractor shall notify the Contracting Officer of an increase or decrease in costs within ninety days after continued performance has been directed by the Contracting Officer, or within any additional period that the Contracting Officer approves in writing, but not later than the date of final payment under the contract.
1.14. Mission Essential Services Plan. Develop a contingency plan for continued operations and return of systems to operational status in the event of a declared crisis, catastrophic and non-catastrophic events, and work stoppages for each site. All site personnel shall be made aware of the Contractor’s contingency plan.
Deliverable: Appendix A, D1.1.2, Mission Essential Services Plan
1.15. Third-Party Support. Provide technical information and logistical support for other contractors, subcontractors, or Government agencies in support of upgrades, projects and other efforts impacting PWS requirements and site operations. It is permissible for the contractor to separately contract with third parties under the following conditions:
(a) the services are performed on a non-interference basis with the contractual services performed under this contract,
(b) no Government property provided under this contract is used in performance of third-party services without written approval of the CO, and
(c) the Government PM and CO are informed of third-party contracts prior to final agreement.
(d) subject to Host support requirements
1.16. Uncleared Personnel Escort. Escort uncleared personnel as requested by the COR.
Provide escort support, except in circumstances where the support will cause mission degradation. Notify the COR and CO if requested support is in excess of seven calendar days per project, either consecutive or intermittent.
Deliverable: Appendix A, D1.1.1, Workload Data; project name, purpose and dates capturing the nature and duration that escort support was provided
1.17. SF Operating Instructions (SF OIs). Create new, update and maintain SF OIs where other manuals and directives are not available or do not provide sufficient instructions. Use the Technical Order (TO) change process (AFTO 22) for recommended changes to TOs.
Deliverable: Appendix A, D1.1.3, SF OIs
1.18. Technical Order (TO) Distribution and Control. Appoint a Technical Order Distribution Office (TODO) Point of Contact (POC) with approved access to the current version of Enhanced Technical Information Management System (ETIMS). Establish and maintain a TO library.
Performance Standard:
a) STD: IAW TO-00-5-1
1.19. Quality Program. Develop, implement, and maintain a Quality Program ensuring performance meets or exceeds all requirements in the PWS.
1.19.1. Quality Program Plan (QPP). Implement the Quality Program IAW a QPP providing insight into the following quality processes: internal audits; procedures and oversight; identification of deficiencies/ nonconformances, actions taken to correct deficiency(ies) and nonconformance(s), root cause analysis, and actions taken to prevent reoccurrence; and a methodology for ensuring all PWS requirements are met, such as a checklist of PWS requirements/paragraphs.
Deliverable: Appendix A, D1.1.4, QPP
1.19.2. Site Quality Status Report (QSR). Generate and distribute a QSR.
Deliverable: Appendix A, D1.1.5, QSR
1.20. Technical Meetings. Participate in sustainment and performance working group meetings, Multi-Functional Team (MFT) meetings, the weekly Maintenance Production Status Teleconference (provide briefing slides identified below) and all invited ad hoc technical meetings and conferences that affect the Contractor’s execution of the operations, maintenance, and repair functions of this contract.
Deliverables:
a) Appendix A, D1.1.1, Workload Data; number of meetings attended, and amount of time spent at meetings
b) Appendix A, D1.1.6, Maintenance Production Status Briefing (for weekly teleconference)
1.21. Familiarization Briefings and Tours. Conduct site briefings, such as technical orientation/familiarization briefings and tours when requested by the COR. Include as part of all briefings any areas that pose a threat to human safety within the installation/site.
Deliverable: Appendix A, D1.1.1, Workload Data; number of briefings and tours provided
1.22. Inspections and Exercise Support. Participate in exercises and debriefings as requested by the COR or 20 SPSS/CC. Support inspection teams, as identified by the COR.
Immediately limit or terminate support if personnel are needed to meet real-world operational requirements.
Deliverable: Appendix A, D1.1.1, Workload Data; number of inspections and exercises participated in or supported
1.22.1. Trusted Agent (TA). Designate a TA at the request of the COR or 20 SPSS/CC before the start of an exercise. Complete TA training upon designation. The TA shall assist the COR in developing and implementing exercises.
1.22.2. Exercise Reports. Provide findings to the COR, for the completion of the after-action report, by the time requested and, in the format, designated.
1.22.3. Crisis Response. Participate in the unit crisis response team during HHQs inspections or local exercises as determined by the COR.
1.23. Budget Information. Participate in developing budget information including projected costs for unfunded requirements with justification and impact statements.
Deliverable: Appendix A, D1.1.7, Resource Utilization Report
1.24. Training. Manage training to ensure technical competency to fully execute all PWS requirements. Maintain individual training records for all personnel. Training records shall reflect all training received on- and off-site.
1.24.1. Government-Furnished Training. The Government will furnish and fund the training identified in Appendix F. Submit requests for Government-furnished training in writing to the COR, Government PM and CO for approval, funding, and contractual action.
Disseminate knowledge gained by contractor personnel at Government training courses and conferences to other contractor personnel requiring the same information. If turnover of personnel creates the need for another Government-furnished training quota within 1 year of completion of the last training, the contractor is solely responsible for all costs of obtaining training (including course, travel and per diem costs) and any failure in meeting contract requirements.
1.24.2. Knowledge Capture/Management (KCM) Plan. Create, implement, and maintain a KCM Plan for a sustainable workforce qualified in meeting PWS requirements for the contract period of performance. Standardize the KCM Plan across the SF sites.
Deliverable: Appendix A, D1.1.8, KCM Plan
1.24.3. Contractor Personnel Qualifications, Training, Certification, and Licensing.
Staff positions with personnel that are qualified, trained, certified, and licensed to perform PWS requirements. Provide initial and refresher training as required to meet PWS requirements.
1.25. Contractor Common Access Cards (CACs). A CAC is required for contractor personnel requiring on-going access to a military installation, or who require Department of Defense (DoD) unclassified network access in performance of PWS requirements. A favorable background investigation is required for Non-Secure Internet Protocol Router Network (NIPRNet) access. Coordinate with the appointed Trusted Agent Security Manager (TASM) to acquire a CAC.
1.26. SIPRNet Tokens. Coordinate with the appointed Trusted Agent Security Manager (TASM) and host to acquire Secure Internet Protocol Router Network (SIPRNet) tokens required for contractor personnel access to the DoD classified network for PWS performance.
1.27. Hand Tools and Equipment. The Government will retain ownership of specialized tools and equipment identified on the contract Government Furnished Property (GFP) listing.
1.28. Program Management. Integrate all activities needed to execute the Space Fence requirements ensuring timeliness, completeness, and quality of deliverables; identification and resolution of issues; corrective action plans; proposal submittals; scheduling and proper allocation of resources to minimize impacts of personnel turnover, issues with shift coverage, gaps in qualified personnel and requirements. Immediately report problems affecting functional area accomplishment or Contractor performance to the COR, Government PM, and CO.
1.28.1. Key Points of Contact. Provide the names, home, cell, and duty phone numbers of key points of contact at each SF location to the COR, Government PM, and CO in writing.
Deliverable: Appendix A, D1.1.9, Key Points of Contact
1.28.2. Staffing Positions. Retain personnel to meet mission and support requirements essential to the work being performed under this contract. Employees shall have current and valid certifications at contract performance start in accordance with proposed position descriptions. Immediately notify the CO of a personnel vacancy. Submit a plan to the CO and Government Program Manager (PM) no later than 15 calendar days after a vacancy occurs and provide an updated personnel staffing chart. The contractor will have 60 calendar days from the date a personnel vacancy occurs. Replacement personnel must meet the qualifications and certifications of position descriptions as proposed by the contractor. If a Government delay prevents compliance with this requirement, submit a written waiver request to the CO for approval. The Government expects that performance continues for the areas vacant until the vacancy is filled. The vacancy is considered filled when the individual is on-site performing work meeting the position description requirements. Moving, hiring or promoting personnel from one location to another will constitute a vacancy at the losing location, with no reset of the 60-day period.
Deliverable: Appendix A, D1.1.10, Organizational and Staffing Chart
1.28.3. Safety Training and Meetings. Attend host safety training and provide safety information to all Contractor personnel. Attend host safety meetings and participate in safety committees IAW support agreements and local regulations, directives and procedures.
1.28.4. Site Personnel Evacuation. Evacuate a site whenever directed by the COR, Host Unit, or at Contractor discretion if COR is unavailable and circumstances warrant.
Notify the COR, Government PM and CO once safely off-site.
1.28.5. COR Briefings. Conduct a weekly briefing to the COR including status of operations and maintenance, any inspections, exercises, visits, training, funding status, and other pertinent information, and as requested by the COR.
1.28.6. Travel Orders for Contractor TDY. Coordinate contractor travel through the COR. Submit travel orders/letter of identification (LOI) for non-local travel to the CO for approval. Include sufficient information for the CO to determine whether the TDY is required to fulfill PWS requirements and with all transportation and per diem costs clearly identified. If traveling overseas, indicate whether the US Government rate tariff applies.
Compliance with DoD Foreign Clearance Guide for clearance, passport, and immunization requirements are the responsibility of the Contractor. The Government shall reimburse the Contractor for CO-approved TDY/non- local travel as determined necessary for performance of the contract. Cost for delays enroute for local, staffing-related, or personal travel shall not be reimbursed by the Government. Note: The CR CLIN will be used for official TDY travel only, not local travel, staffing-related, or personal travel.
a) IAW Defense Travel Regulation (DTR)
SECTION 2.0. MISSION OPERATIONS AND SUPPORT REQUIREMENTS
2.1. Sensor Operations and Support. Provide radar sensor operations, technical services, and operations support to meet SDA mission requirements.
2.1.1. Sensor Operations. From the Mission Operations Center at 20th Space Surveillance Squadron, Eglin AFB FL Site C-6, the United States Space Force military personnel shall be the primary operators of the Space Fence weapon system. This will include all operational activity support including radar monitoring, controlling, tasking, and data processing IAW Combined Special Operations Center (CSpOC), 18 SDS, and National Space Defense Center (NSDC) taskings. Additionally, the 20 SPSS operators shall develop and update tactics, techniques, and procedures (TTPs), standard operating procedures (SOPs), and provide updates to TOs within their standard on-duty schedule.
2.1.2. Sensor Site 1 Dual-Role Operator/Maintainers. Sensor Site 1 shall accomplish limited operational mission tasks in the event of contingencies or when the MOC becomes unavailable. The contractor shall provide operator/maintainers at the radar site capable of performing limited operations. When required for continued operations, Sensor Site 1 shall be operated independently providing data to the Command and Control (C2) Centers using Net- Centric Services provided via the DoD Information Network (DoDIN) or controlled by on-site personnel.
2.1.2.1. Continuity of Operations (COOP). To ensure Continuity of Operations (COOP), limited mission taskings include, but are not limited to, monitoring, reporting, and logging Cat 1 passes, Break-up processing, maneuver, and Proximity Operations Events, responding to C2 tasking (voice or message), Positive/Negative reporting for high interest objects, initiation/management of Black Box recording, and operational reporting {Operations Capability (OPSCAP), Operations Reporting (OPREP), and Situational Reporting
(SITREP)}.
2.1.3. Operations Logs. Document operations, security events, equipment status, authorized software changes, shift changes, changing of the Zulu day, and any other significant events in an operations log. Include start and end times for events as well as initials of individuals documenting the information. Maintain operations logs in mission subsystem and make available to the Government upon request.
a) STD: IAW SSOPs OI 534-9 (S)
2.1.4. Health and Status Monitoring. Monitor and direct corrective maintenance for system calibrations and system capability. Provide operational reporting, as required.
a) STD: IAW SSOPs OI 534-9 (S)
2.1.5. Sensor Contractor-Controlled Availability (Acc). Ensure availability of radar sensors to meet mission operational requirements. Provide the monthly calculation for Acc in the QSR.
Performance Standards:
a) AQL (PO# 3): Maintain an overall sensor Acc each calendar month of not less than 99.7%
b) URMSTD: IAW SSOPs OI 534-9 (S)
2.1.6. Training Plan. Develop and maintain a Master Task List. Develop and implement a Training Plan that certifies proficient maintainers capable of performing limited operations.
Standardize training program for Sensor Site 1 operator/maintainers, who shall be qualified, trained, and knowledgeable in both maintenance and operations.
Reference: AFI 13-602V1 – Attachment 2, Sample Master Task List Deliverable: Appendix A, D2.1.1, Operations Training Plan
2.1.6.1. Operations Training Classes and Curriculum. Develop training curriculum and provide training to all Sensor Site 1 operator/maintainer personnel Provide limited Combat Mission Ready training to all Sensor Site 1 operator/maintainer personnel for performance of limited operational mission tasks during contingencies and when the ROC is not available. Provide training material to operator/maintainers and make training available to other Air Force personnel, such as test personnel, upon request and COR approval. Support 20 SPSS advanced training activities, as requested.
Reference: AFI 13-602V1 Deliverable: Appendix A, D2.1.2, Operations Training curriculum
2.1.6.2. Initial and Annual Certification. Conduct and document training to ensure proficiency in all required functions before operating the Mission System. Maintain a comprehensive list of all monthly sensor operations training tasks. Certify in writing that operations personnel have completed all applicable training for an operational position and document within contractor training records. No individual shall perform any system operations task for which they have not been trained unless under the direct supervision of fully trained and certified personnel. Each Sensor Site 1 operator/maintainer shall perform at least one real-world proficiency shift per month. Documented completion of recurring training as outlined above and within the Contractor’s Training Plan shall constitute annual re-certification.
Reference: AFI 13-602V1 - Qualification Training, Unit and Space crew Status, Currency and Sample Master Task List
2.1.6.3. Continuation Training. Conduct monthly continuation training using task and scenario-based approaches, addressing mission performance requirements. Monthly continuation training shall cover all individual tasks within a one-year timeframe. Sensor Site 1 operator/maintainer personnel designated to support operations for tasks required (i.e., Operations Supervisor position during Contingency Operations), will receive mission operations training similar to Mission Ready (MR) Mission Qualification Training (MQT) required for Space Operations Command (SPOC) military and DoD civilian space operators, upon arrival at the unit. This initial mission operations training is a prerequisite to being certified Basic Mission Capable (BMC) for Contingency Operations. Document all training and certifications within individual training records.
a) STD: IAW AFI 13-602V1 - Continuation Training
2.1.6.4. Individual Training Records. Maintain individual training records for all operators and make available to the Government upon request. Training records shall reflect all training received on- and off-site.
2.1.7. Equipment Familiarization Training. Provide on-site equipment familiarization training for AF personnel upon request and with COR approval.
2.1.8. Collaboration. Support system life-cycle activities such as program management reviews, design reviews, data collection, tests, physical and functional configurations audits.
2.1.9. System Performance. Monitor system logs, security logs, security configuration, and performance utilities to assure system performance to identify and correct imminent system failures.
2.1.9.1. System Malfunctions or Anomalies. Notify the 20 SPSS Mission Operations Center and the SF COR of all system malfunctions or anomalies.
a) STD: SF OPSCAP Determination Matrix
2.1.9.2. Deficiency Reporting (DR). For qualifying events, generate a DR within 30 calendar days of an anomaly or outage. Maintain supporting data including references to associated Problem Reports (PRs), computer printouts, and system data logs.
a) STD: IAW TO 00-35D-54, Chapter 3 – Deficiency Identification and Reporting
2.1.9.3. System or Software Modifications or Enhancements. Generate a DR, AF Form 1067, for system or software modifications or enhancements. All 1067’s will be coordinated through the 20 SPSS Director of Operations and COR prior to submission.
Performance Standards:
a) STD: IAW TO 00-35D-54, Chapter 3 – Deficiency Identification and Reporting
b) STD: IAW AFI 63-101/20-101, Attachment 2 – Modification Management and
Modification Proposal Process and AF Form 1067 Descriptions
2.1.9.4. System Requirements Validation Board (SRVB). Participate in 20 SPSS SRVB, providing SF technical expertise, as required. Technical inputs may include improvements to software, hardware, operations/maintenance procedures, equipment availability, and utilization.”
Performance Standards:
a) STD: IAW 21 SWI 21-131 - SRVB responsibilities Reference: TO 00-35D-54
2.1.9.5. Materiel Improvement Project Review Board (MIPRB). Participate in MIPRB meetings and discussions and provide feedback as requested.
Performance Standards:
a) STD: IAW TO 00-35D-54 - MIP Review Boards (MIPRB)
2.1.9.6. System Changes. Advise the SRVB in identifying and prioritizing new requirements for, and changes to, the operational system. Submit change requests to the COR for approval, NLT 30 calendar days prior to the Wing Requirements Validation Board (WRVB), Submit to the WRVB upon approval from the COR.
a) STD: IAW 21st Space Wing Instruction (21 SWI) 21-131, The SRVB provides the first level of review in the change approval process section and attachment
2.1.10. Mission System Risk Management Framework (RMF) for DoD Information Technology (IT). Maintain situational awareness and initiate actions to implement or restore cybersecurity posture as directed by the Mission System Information System Security Officer (ISSO). Provide information to support RMF authorization, information system continuous monitoring activities, and maintain system artifacts. Coordinate any changes impacting the Mission System RMF package through the COR and send to ISSO for approval. Support artifacts development as identified in Appendix G for information assurance (IA) control validation, and inclusion into the AF Assessment and Authorization (A&A) package.
Performance Standards:
a) STD: IAW STD: IAW AFI 17-101 - Information System Security Officer (ISSO)
b) STD: IAW Department of Defense Instruction (DoDI) 8500.01 - Risk Management
c) STD: IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53
d) STD: IAW 21 SWI 21-131 – Cybersecurity Reference: DoDI 8510.01- RMF for DoD IT Deliverable: Appendix A, D2.1.3, RMF Artifacts
2.1.11. System Analysis and Performance. Monitor and analyze system performance.
Analyze critical system files, computer and radar logs ensuring the logs are maintained and archived. Analyze daily UCT rates to identify abnormal performance. Review and analyze system calibration, operability assessment test results, and other indicators of system performance utilizing the system calibration metrics on the Space C2 Agency website, https://www.space-track.org. Analyze occurrences of system outages or operational degradation such as the following: indications of radar system degradation; uncommon computer halts or hangs; CAT 1 satellite misses; electro-magnetic interference (EMI); and other abnormal data, performance, and occurrences that may lead to a system failure. Provide analyses to support site operations investigations to the COR.
Performance Standard:
a) STD: Completion of investigation of occurrences of system outages or operational degradation within five calendar days of the problem or by request of the COR References: SSOps OI 534-9(S) Deliverable: Appendix A, D2.1.4, System Analysis Results
2.1.11.1. Document and Report Analysis and Findings. Provide Problem Reports (PRs) to support site operations investigations by the COR. Submit a DR for unusual and unique anomalies, or outages. Generate an AF Form 1067 or Standard Change Form (SCF) prior to installing new software constants for the subarray test and element test installations.
Generate an SCF for system or software modifications for corrective or preventive action as a result of analyses or any other proposed system/software modifications. Evaluate and provide written technical analysis on any system modification/upgrade proposal or recommendation. Maintain references to any associated PR, DR and SCF and supporting data.
Performance Standards:
a) STD: IAW TO 00-35D-54 - Deficiency Identification and Reporting
b) STD: IAW 21 SW Instruction (21 SWI) 21-131 - System Modification and Deficiency Processing http://www.space-track.org/ http://www.space-track.org/
c) STD: Submit DR within 30 calendar days of the anomaly or outage
d) STD: Submit SCF within 30 calendar days of the anomaly or outage; prior to installing new software constants; and for system or software modifications Deliverables:
a) Appendix A, D2.1.5, Problem Report (PR)
b) Appendix A, D2.1.6, Deficiency Report (DR)
c) Appendix A, D2.1.7, AF Forms 1067 or Standard Change Form (SCF)
d) Appendix A, D2.1.8, Evaluation and Technical Analysis
2.1.12. Emergency Actions. Perform emergency actions as requested by the 20 SPSS Commander or their designated representative.
a) STD: Respond immediately and report on site as determined by COR
2.1.13. Events or Incidents Reporting. When Sensor Site 1 is accomplishing contingency operations, perform OPSCAP reporting to CSpOC and notify the 20 SPSS Mission Operations Center (MOC) of OPSCAP changes. Notify the 20 SPSS Mission Operations Center and COR with information on events or incidents that may require OPREP or Commander’s Critical Information Request (CCIR) Reporting. Record status within the Operational Log and make available to the government upon request. Maintain checklists and implement Information Condition (INFOCON) and Force Protection (FP) Condition (FPCON) measures for both exercise and real-world scenarios.
Performance Standards:
a) STD: IAW AFI AFMAN10-206/AFSPC SUP
b) STD: IAW SSOPs OI 534-9 (S)
c) STD: IAW HHQ policy letters
d) STD: IAW Strategic Instruction (SI) 527-1
2.1.14. Chatroom Communications. When Sensor Site 1 is accomplishing contingency operations, establish the necessary chat-type accounts via SIPRNet and NIPRNet. Ensure operators are actively logged into the HHQ-designated account and utilizing “chatrooms” or similar collaboration applications. During periods of exercise and/or contingency, continuously monitor or check collaboration chatrooms via the SIPRNet/NIPRNet and make any postings needed in response to questions or direction from HHQ.
2.1.15. Depot/Testing Agency Support. Interface and assist in testing activities being accomplished by Government and other Contractor team personnel. Provide data and feedback to the teams on the adequacy of test procedures, noting any system deficiencies or anomalies, and assist in developing methods for ensuring all testing is complete prior to system acceptance.
2.1.15.1. Installation, Development, Test and Evaluate (DT&E) and Software and Operational Test and Evaluation (OT&E) Support. Provide organizational level support for installation and evaluation of all software and hardware modifications to include planning, technical, and administrative support. Provide organizational level maintenance in support of installation activities, perform applicable test plan actions, and notify the COR and testing/depot agencies of any system anomalies.
2.1.15.2. Installation and Checkout Evaluation (ICE) Plan. Develop and submit ICE plans for newly installed hardware, firmware, or software through the COR and 20 SPSS/MA as requested. Execute approved installation and checkout plans with Government oversight for final approval and acceptance by the Government.
Performance Standards:
a) STD: IAW 21 SWI 10-202
b) STD: IAW 21 SWI 21-131 - Unit (organizational) maintenance personnel, Installation Checkout and Evaluation (ICE), DEL 2 units and Restricted Operational Use (ITW/AA and Surveillance) Deliverable: Appendix A, D2.1.9, ICE Plan
2.1.15.3. Visiting Team Preparation. Support all teams visiting SS1. Provide logistics support for visiting teams and coordinate receipt and storage of project materials and equipment.
Deliverable: Appendix A, D1.1.1, Workload Data; number of visiting contractor teams supported
2.2. Mission System Maintenance Management. Ensure Mission Systems are serviceable, safely operable, and properly configured to meet mission requirements and system readiness.
Plan, schedule, direct, organize, coordinate, control, document, report, and execute all actions necessary to maintain Mission System equipment operability and availability. Perform inspections, repairs, modifications, analyses, and other maintenance related tasks. Maintain logs, records, inspection forms and Maintenance Information Systems (MIS) reflecting equipment status, inspections, and maintenance performed.
2.2.1. Scope of Maintenance. Perform all authorized organizational level maintenance.
Site maintenance level authorized for repair is determined by Source, Maintenance, and Recoverability (SMR) Codes and Expendability, Recoverability, Reparability Codes (ERRC) assigned to stock listed items.
Performance Standards:
a) STD: IAW TO 31-10-7 (CUI, Distribution Statement: B)
b) STD: IAW SF TOs.
Reference: TO 00-33A-1001(CUI, Distribution Statement: D)
2.2.1.1. Depot-Level Maintenance. Request depot-level maintenance when the maintenance required exceeds organizational-level maintenance through the COR or 20
SPSS/CC.
Deliverable:
Appendix A, D1.1.1, Workload Data; number, type, and frequency of depot-level maintenance requests
2.2.1.2. Requests for Assistance. Submit Maintenance Assistance Requests for Technical Assistance (TA), Engineering Assistance (EA), Emergency Depot Level Maintenance (EDLM) or Urgent Depot Level Maintenance (UDLM).
Performance Standards:
a) STD: 21 SWI 21-131 – Depot Level Maintenance (DLM)
b) STD: IAW TO 00-25-107 - Procedures for Requesting Assistance, Response Time and Required Actions
c) STD: IAW TO 00-25-108 Deliverable:
Appendix A, D2.2.1, Maintenance Assistance Requests
2.2.1.3. Non-Integrated Logistics System-Supply (ILS-S) Inventory Items. Maintain sufficient non-stock listed items (outside the AF inventory) to support the Mission System.
Submit request to purchase non-stock listed items to the PM for approval, prior to purchase on the CR CLIN.
2.2.1.4. Shop Stock. Maintain shop stock for day-to-day operations. Monitor shop stock to prevent materiel from becoming excessive or outdated. Shop stock should not normally exceed 90-calendar days usage, or the unit of issue or unit pack, whichever is greater. Store shop stock near/adjacent to bench stock items, if practical, but do not mix them together.
Clearly identify materiel as "Shop Stock" and label them with noun, national stock number or part number, unit of issue, and shelf-life, if applicable. Shop stock includes gas cylinders, random length bar stock, sheet metal, plastic, fabric, electrical wire, and similar items not normally included in bench stocks.
Performance Standards:
a) STD: IAW AFI 23-101 AFGM2019-01 – Sourcing of Materiel, Make and Maintain Materiel, Delivery of Materiel, Materiel Returns and Logistics Programs and Systems
b) STD: 100% accountability of tools IAW TO 00-33A-1001 (CUI, Distribution Statement:
D) - Unit/Work Center Tool Management
c) STD: No systems misaligned or erroneously declared serviceable/unserviceable or damaged equipment components or hardware due to unserviceable tools
2.2.1.5. Operating Stock. Store operating stock near/adjacent to bench stock items, if practical, but do not mix them together. Monitor operating stock to prevent it from becoming excessive or outdated. Retain partially used bench stock items in bench stock and not in operating stock. Identify, tag, and turn in items with no forecasted use. Clearly identify items as "Operating Stock" and label them with noun, national stock number or part number, unit of issue, and shelf-life as applicable. Operating stock includes connector dust covers, hydraulic line caps/plugs, and similar items that are normally recovered after use and re-used.
Performance Standard:
a) STD: IAW AFI 23-101 AFGM2019-01 – Sourcing of Materiel, Make and Maintain Materiel, Delivery of Materiel, Materiel Returns and Logistics Programs and Systems
2.2.2. Equipment Status Reporting (ESR). Fulfill requirements listed in performance standards below. Report equipment status changes, as they occur. Input data into the Integrated Maintenance Data System (IMDS) ESR subsystem.
Performance Standards:
a) AQL (PO# 4): Submit IMDS entry within two hours of the equipment status change
b) STD: IAW DAFI 21-103, Chapter 8
c) STD: IAW TO 00-33A-1001 (CUI, Distribution Statement: D) - Equipment Status Report (ESR)
d) STD: IAW Air Force Computer System Manuals (AFCSM) 21-560, Volume 2 (V2) (Distribution Statement: D) - Communications Equipment Status and Inventory Reporting
e) STD: IAW AFSPCI 21-108 - Equipment Status Reporting (ESR) and Maintenance Data Documentation (MDD)
2.2.2.1. ESR Changes. Implement changes to ESR provided by Delta 2/S4M within one duty-day.
2.2.3. SRD Reporting. Report all Mission System equipment that is assigned Standard Reporting Designators (SRDs) listed in the IMDS REMIS SRD Table. Alphanumeric characters 1 through 8, B, C, E, F, J, K, Q, and U, as listed in the IMDS REMIS SRD Table
2.2.4. Maintenance Data Collection (MDC). Collect, input, and submit MDC data and utilize all appropriate documentation forms for MDC on systems listed as reportable in the REMIS SRD tables.
Performance Standards:
a) STD: IAW TO-00-20-2
b) STD: IAW Applicable –06 TOs
c) STD: Input SRD reportable data in IMDS within three calendar days of completion References: AFSPCI 21-108 and AFCSMs 21-556 V2, 21-560 V2, 21-561 V2, 21-562 V2, 21- 563 V2, 21-564 V2, 21-569 V2, and 21-571 V2 (All AFCSM 21-x publications Distribution Statement: D)
2.2.4.1. Integrated Maintenance Data System (IMDS) Data Entries. Complete IMDS training prior to use of the system. Input all MDC data on reportable equipment into the IMDS MDC subsystem. Input MDC data into IMDS for all maintenance performed on the mission system, to include maintenance performed by on-site Depot teams.
Performance Standards:
a) AQL (PO# 5): MDC data shall be entered into IMDS with 95% initial accuracy, 98% accuracy within 72 hours, and 100% accuracy within 5 calendar days
b) STD: IAW TO-00-20-2
c) STD: IAW TO 00-33A-1001 (CUI, Distribution Statement: D) - AF-Approved
Automated Information System
d) STD: IAW TO 31P7-2FSY1-6WC1 (CUI, Distribution Statement: D)
e) STD: IAW AFCSM 21-556V2 (CUI, Distribution Statement: D)
f) STD: IAW AFCSM 21-560V2 (CUI, Distribution Statement: D)
g) STD: IAW AFCSM 21-561V2 (CUI, Distribution Statement: D)
h) STD: IAW AFCSM 21-562V2 (CUI, Distribution Statement: D)
i) STD: IAW AFCSM 21-563V2 (CUI, Distribution Statement: D)
j) STD: IAW AFCSM 21-564V2 (CUI, Distribution Statement: D)
k) STD: IAW AFCSM 21-569V2 (CUI, Distribution Statement: D)
l) STD: IAW AFCSM 21-571V2 (CUI, Distribution Statement: D)
2.2.4.2. IMDS Reconciliations. Set up contingency procedures to track equipment status while IMDS is unavailable. Process IMDS status changes when IMDS is restored. Maintain and update the Equipment Inventory List (EIL). Process NFS5B0 reconciliation program and review the quarterly NFS5B0 error output file for action. Reconcile all Red/Amber jobs using the Open Incident List (OIL). Implement changes provided by Delta 2/S4M to ensure accurate data submissions.
Performance Standards:
a) STD: IAW DAFI 21-103, Chapter 8
b) STD: Weekly reconciliation of all Red/Amber jobs
2.2.5. Scheduled and Unscheduled Maintenance. Maintain, calibrate, and repair Mission System equipment, including upgrades and modifications. Schedule maintenance downtime and complete scheduled system downtime for maintenance between 75% and 100% of the estimate. Immediately initiate restoration actions for unscheduled maintenance.
Performance Standards:
a) STD: IAW 21 SWI 10-202
b) STD: Immediately initiate restoration actions for unscheduled maintenance
c) STD: Complete scheduled system downtime for maintenance between 75% and 100% of the estimate Reference: TO 00-33A-1001 (CUI, Distribution Statement: D)
2.2.5.1. Preventive Maintenance Inspections (PMIs). Load all preventive maintenance routines into the IMDS database for recurring equipment PMIs.
Deliverable: Appendix A, D2.2.2, IMDS PMI inputs and updates
2.2.5.1.1. Locally Developed Maintenance Procedures. Submit all contractor-developed Local Work Cards (LWCs) to the COR and Government PM for submission to the Space Delta 2 S4/6 for approval prior to use. LWCs cannot modify existing PMIs. Ensure compliance with all parent TO procedures and ensure new requirements for tools or test equipment are not introduced. Do not use locally prepared technical instructions to circumvent centrally managed responsibilities. Do not inter-file LWCs in TO binders.
Performance Standard:
a) STD: LWCs will be updated/deleted within 60 calendar days of equipment modification/removal
b) STD: IAW TO 00-5-1 - Locally Prepared Work Cards, Checklists, Job Guides, and Page Supplements
c) STD: IAW TO 00-33A-1001 (CUI, Distribution Statement: D) - Local Work Cards
d) STD: IAW AFSPCI 21-108
Appendix A, D2.2.3, Local Work Cards
2.2.5.2. Maintenance Events. Document scheduled and unscheduled maintenance (both software and hardware) events for MDC Job Data Documentation (JDD) in the IMDS database for equipment with MDC reportable SRDs.
Performance Standards:
a) AQL (PO# 5): MDC data shall be entered into IMDS with 95% initial accuracy, 98% accuracy…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .