RFI Atch 1 Draft SOW FSH BLDG 1469 Dorm Furniture.pdf
PDF 175 KB Posted
- Attached to
- FSH BLDG 1469 DORM FURNITURE
- Solicitation number
- F2MRAA1098
About this file
This document includes a draft Statement of Work and Request for Information for the removal and installation of dormitory furniture at Joint Base San Antonio-Fort Sam Houston in Texas. The contractor will be required to remove 1200 beds, 600 blinds, and install 1200 beds, 600 blinds, and 92 wardrobes according to the salient characteristics provided. The beds must be a metal platform with bolt on plywood bottom measuring 42 inches wide by 36 inches deep by 15 inches tall in black powder coat finish. Underbed storage units must be 39 inches wide by 84 inches deep by 19.25 inches tall with oak drawer fronts. Wardrobes must be 71.5 inches tall, 42 inches wide, 24 inches deep with oak doors and drawer fronts. The Government is seeking information from contractors on their ability to provide the required services by May 24, 2021 at 10:00 AM Central Time to determine how best to proceed with procurement. The work will be performed for the Department of the Air Force Air Education and Training Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Atch 1 Draft SOW FSH BLDG 1469 Dorm Furniture rev 1.pdf | ||
| FSH BLDG 1469 Dorm Furniture RFI rev 1.doc | DOC document | |
| FSH BLDG 1469 Dorm Furniture RFI.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR PURCHASE, DELIVERY, INSTALLATION, & REMOVAL, DISPOSAL
JBSA-FORT SAM HOUSTON BLDG 1469 DORM FURNITURE
1. DESCRIPTION/GENERAL INFORMATION.
1.1 Contractor shall provide all management, tools, supplies, equipment, labor and transportation necessary to provide beds, wardrobes and blinds for individual dorm rooms and to remove/disposal the existing beds and blinds that are currently in place. All materials and accessories shall be installed in accordance with (IAW) industry standards, manufacturer’s recommendations and this Statement of Work (SOW).
1.2 The Contractor shall make adjustments without impact to the user during government critical mission training.
1.3 The Contractor shall confirm delivery 15-days prior to delivery and provide a 24-hour notification prior to truck arrival. The Contractor shall provide an email notification as to the date and time the trucks will be arriving to both Technical Representatives (TR):
Ms. Charlene Holbrook at (210) 221-2381; charlene.d.holbrook.civ@mail.mil and Mr. Ronny Vardaman at (210)221-5309; ronny.vardaman.civ@mail.mil.
2. Project Location: There are two locations:
1. Building 1469, 3280 CPL Johnson, JBSA-Fort Sam Houston TX, 78234 and
2. Warehouse Building 1493, 2100 Supply Ave, JBSA-Fort Sam Houston TX.
Building 1469 has 600 rooms and three floors. The building is currently occupied and have an elevator (Freight or passenger) and 4 Stairwell(s) to access floors. COVID policies are in place, which may limit the number of personnel allowed in the elevator.
3. Project Description:
Beds, Wardrobes and Blinds:
As the building is occupied, the Contractor shall remove, deliver and install the furniture into each dorm room. A room that has the old furniture removed shall have the new furniture installed the same day; including blinds, and wardrobe (if applicable). The contractor shall complete one floor prior to moving to the next floor. At the end of the period of performance:
• 1200 beds shall have been removed from Bldg 1469 and taken to the mailto:charlene.d.holbrook.civ@mail.mil mailto:ronny.vardaman.civ@mail.mil
Warehouse Bldg 1493. 1200 beds shall have been delivered and installed into the rooms.
• 600 blinds shall have been removed from Bldg 1469 and taken to the
Warehouse Bldg 1493. 600 blinds shall have been delivered and installed into the rooms.
• 92 wardrobes shall have been installed in the dorm rooms Bldg 1469 that are specified by the TR(s).
4. SALIENT CHARACTERISTICS
BED METAL PLATFORM W/ BOLT ON PLYWOOD BED BOTTOM
A. Width: 42″, Depth: 36″, Height: 15″ with no variance.
B. Black powder coat with insert wood panel 41 X 80.
C. Solid Oak construction with Cherry Wood Finish.
UNDERBED STORAGE
A. Width: 39″, Depth: 84″, Height: 19.25″ with no variance.
B. Four-side hardwood interior frames.
C. Solid oak drawer fronts. With inset Nickel pulls.
D. English dovetailed drawers.
E. Plywood bed Bottom is ¾” oak veneer plywood.
F. Side mounted heavy-duty drawer runners.
G. End Panels are powder coated steel with inset ½” wood panels.
H. 3-drawer under bed unit is attached to frame at headboard and footboard.
WARDROBE 2 DOOR/3 DRAWER
A. Height 71.5", Width 42", and Depth 24" with no variance.
B. Four-sided hardwood interior frames.
C. Solid oak side panels & drawer fronts.
D. English dovetails drawers.
E. Drawer Unit top is laminated with 3mmPVC edge.
F. Side mounted heavy-duty drawer runners.
G. Finished Backs.
H. Wardrobe includes hasp loop for lock, mirror and Coat hook.
I. Wardrobe doors are oak veneer on plywood cord.
J. Drawers and Doors have inset Nickel finish pulls.
BLINDS
A. Width: 33.5, Length 46.75” standard valance with no variance.
B. Aluminum Blinds.
C. 1” Slates, cord lift, wand tilt, inside mount.
D. Color True White 544
5. HOURS OF OPERATION: The delivery and installation shall be performed during normal duty hours (7:30 A M. to 4:15 P. M., Monday thru Friday). In the event that delivery falls on a federal holiday, the delivery date shall be moved to the following workday.
6. ACCEPTANCE AND INSPECTION:
7.1. The vendor shall manage ordering, shipment, delivery and installation of all new furniture until final acceptance by the designated Government Acceptor.
7.2. The contractor shall deliver all items specified in SOW Order specification sheet deliverables will be new and not used or factory refurbished.
7. WARRANTIES: Contractor shall provide industry standard commercial warranties. A period of not less than one-year from the date of installation and acceptance.
8. WORKMANSHIP: The Contractor shall perform all operations in a professional manner in accordance to industry standards.
19. ACCESSORIES AND INCIDENTALS: Contractor shall provide all incidentals necessary to perform as required in accordance with this SOW. Cost for these items shall be included as part and parcel of the finished installation.
10. QUALITY ASSURANCE: The government shall inspect all work performed by the contractor. The Contractor and TR(s) shall verify and inspect all items to ensure that no damage has occurred to the furniture during loading, transport, unloading, staging and set up. Copies of the discrepancy reports shall be forwarded to the government.
If repair or replacement of damaged items is needed, the contractor will repair or coordinate replacement of damaged, defective, or missing items. The Government shall require repair or replacement of nonconforming supplies or re-performance of non-conforming services at no additional cost. Any disputes in this area must be brought to the attention of the TR(s) and the Contracting Officer immediately.
11. CLEANUP: The Contractor shall collect all trash, debris, refuse, garbage, etc., generated in performance of entire process and remove and properly dispose in provided Roll Offs/Dumpsters on site.
12. GOVERNMENT PROPERTY: The contractor shall take precautions to prevent damage to government buildings and property. The contractor shall repair or replace damaged items at no additional cost to the government.
13. COMPLETION OF WORK: The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project. In order for the project to be considered completed, work performance shall be deemed satisfactory and acceptable to the government when the TR and 802 CES/CEIH declares the project satisfactory.
14. ENVIRONMENTAL REQUIREMENTS: The contractor shall perform all work in accordance with federal, state, and local environmental regulations.
15. INSTALLATION ACCESS
16.1. The contractor and its employees shall meet minimum-security requirements in order to gain access on to Joint Base San Antonio - Fort Sam Houston, Texas a ten
(10) - day advance notice is needed for access pass, and any person with recent arrest will not be able to enter the post. A base access pass for an employee without a US Driver’s License of US State issue ID card may take longer.
16.2. The contractor shall obtain all required installation passes for contractor personnel by providing the employees full name, date of birth, Driver’s License/ID information to the Technical Representatives identified in para 1.2. Contractor personnel shall be able to produce personal identification when required by current force protection conditions or special instructions.
16.3. The contractor personnel shall wear an identifiable outer garment (company shirt) or badge which clearly identifies a contract employee. The badge will contain a name of employee, and contractor's name.
16.4. All contractor vehicles must enter and depart through JBSA -Fort Sam Houston via the Jadwin Gate Access Control Point which can be accessed via Interstate 35. Any questions regarding this route should be filtered the Government POC(s) prior to delivery.
File details come from the government source that posted it. Updated .