This document is Addendum #2 for a Request for Information (RFI) issued by the Kissimmee Utility Authority (KUA) regarding a GIS Utility Network Migration project. The addendum provides detailed responses to six specific questions from potential bidders about KUA's current technical environment, system integrations, and migration plans. The document clarifies KUA's existing systems, including their use of Cogsdale (built on Microsoft Dynamics Great Plains), Schneider Electric's Designer, ArcFM Session Manager, and various data exchange methodologies between GIS and other enterprise systems.
The addendum reveals that KUA does not currently have a true work order/construction design workflow management solution and plans to carry over existing Facility IDs from the Geometric Network to the Utility Network. KUA is open to including additional assets like substations, fiber, and PV systems in the new ESRI version. The systems currently integrated with GIS include CIS, Designer, Cogsdale, ArcGIS/ArcFM, Responder OMS (to be replaced in 2025 with EcoStruxure Grid Operation), and Synergi. Bidders are required to acknowledge receipt of this addendum by signing and returning a form with their bid response, with the full RFP anticipated to be released in the summer of 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_25-021-RM_Addednum_.pdf | ||
| RFI_25-021-RM_GIS_Utility_Network_Migration.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e 1 | 2
TO: All Proposers FROM: Ramandeep Mann, MBA, CPPB, NIGP-CPP DATE: March 10, 2025 RE: RFI 25-021-RM, GIS Utility Network Migration
ADDENDUM #2
Bidders are hereby notified that this addendum shall be made a part of the above-named Request for Information. The items listed below are issued to add, modify, and/or clarify the solicitation document. The items shall have the same force and effect as the original bidding. Bids, to be submitted, shall confirm with the addition and revision listed herein. Return this sheet with your bid response.
I. QUESTIONS
Q1. What does KUA currently use for Work Order/Construction Design workflow management?
A1. KUA does not have a true work order/construction design workflow management solution. We do use Cogsdale, built on Microsoft Dynamics Great Plains as well as Schneider Electric’s Designer.
Q2. Is KUA using Schneider`s GDBM application? (Job Design workflow, Session management, Posting to Default)
A2. KUA does not currently use Schneider’s GDBM application. We do employ ArcFM Session Manager and Designer Workflow Manager.
Q3. What are the current tools\technologies used to exchange data between GIS and other enterprise systems?
A3. • CIS and GIS – SQL View/Flat File
• Designer and Cogsdale – Code provided by Cogsdale
• ArcGIS/ArcFM and Responder OMS (to be replaced in 2025 with
EcoStruxure Grid Operation) – Configurable interface provided by Schneider Electric
Q4. Could you provide some details around KUA current systems integrated with
GIS?
P a g e 2 | 2
A4. • CIS and GIS – SQL View/Flat File
• Designer and Cogsdale WMS – Code provided by Cogsdale
• ArcGIS/ArcFM and Responder OMS (to be replaced in 2025 with
EcoStruxure Grid Operation) – Configurable interface provided by Schneider Electric
• ArcGIS/ArcFM and Synergi – Code written by SSP Innovations
Q5. Section 2, Question B When you migrate your Geometric Network data, do you expect historical information for unique identifiers for all your integrations? How are you getting this data currently from the Geometric Network?
A5. We plan to carry over existing Facility IDs from the Geometric Network to the Utility Network.
• Designer and Cogsdale WMS – Code provided by Cogsdale
• ArcGIS/ArcFM and Responder OMS (to be replaced in 2025 with
EcoStruxure Grid Operation) – Configurable interface provided by Schneider Electric
• ArcGIS/ArcFM and Synergi – Code written by SSP Innovations
Q6. Section 5, Question B Is there a plan for these unmapped / legacy assets to be added to the new version of ESRI?
A6. Yes, we are open to including items such as substations, fiber, and PV systems in the new version of Esri.
Bidder(s) must acknowledge receipt of this amendment by signing this form below and returning it with your bid response.
Acknowledgment is hereby made of Addendum #2 to project RFI 25-021-RM, GIS Utility Network Migration
Bidder Signature Date
Bidder Printed Name Company Name
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or to answers questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as if set forth therein. All other parts of the solicitation have been maintained as originally distributed.
This addendum supersedes any verbal or other instructions given to any proposer qualified to respond pursuant to the requirements set forth in the solicitation document.