RFI 07012024 EIC B1pF Collar Machining and Welding.pdf

PDF 157 KB Posted

Attached to
Electron Ion Collider (EIC) B1pF Collar Machining and Welding
Solicitation number
07012024WPK
Issued by

About this file

This is a Request for Information (RFI)/Sources Sought notice from Brookhaven Science Associates, LLC (BSA) regarding Electron Ion Collider (EIC) B1pF Collar Machining and Welding. BSA is seeking expressions of interest from firms to provide manufacturing and inspection services for the EIC B1pF collars, which are made of work-hardened Nitronic-40 material. BSA is requesting information on the specific manufacturing methods, in-house inspection capabilities, prior experience with similar parts, and budgetary estimates for the required services. Responses are due by July 22, 2024. This RFI is for informational and planning purposes only and does not constitute a solicitation or commitment by the U.S. Government. The information gathered will help the Department of Energy (DOE) Office of Basic Energy Sciences (BES) survey available resources for the EIC project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 01, 2024

Request for Information (RFI)/Sources Sought

No. 07012024WPK

Electron Ion Collider (EIC) B1pF Collar Machining and Welding

To all Potential/Interested Suppliers, Brookhaven Science Associates, LLC (herein known as “BSA”), operator of Brookhaven National

Laboratory (BNL) under a Prime Contract with the U.S. Department of Energy (DOE), is seeking expressions of interest from firms regarding Electron Ion Collider (EIC) B1pF Collar Machining and Welding as outlined in Attachment A – Statement of Work for the EIC B1pF Collar

Machining and Welding dated June 22, 2024.

Please note that this is an RFI/Sources Sought notice, not a Request for Proposal, and no solicitation exists at this time.

This RFI is for informational and planning purposes only and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information received. The information from this notice will help the Department of Energy (DOE) Office of

Basic Energy Sciences (BES) survey available resources.

The Electron Ion Collider (EIC) is a new Nuclear Physics Facility that will use collisions between polarized Ions and polarized electrons to study it inner structure of the Nucleon.

Please provide the following information:

1. What specific manufacturing methods do you plan to employ to create these parts?

2. Do you plan to offer in-house inspection for these parts, if not, who would you outsource inspection to?

3. Have you worked with work hardened (cold rolled) Nitronic-40 before?

4. Have you made parts like this before?

5. Can you provide a budgetary estimate for the services to be provided?

We are open to all information you can and care to provide at this point. Please provide responses to BSA no later than July 22, 2024.

BSA prefers electronic submissions of submittals. Electronic submissions will be accepted by the following method:

• Email submissions should express your interest and describe your capabilities related to delivering this product. Emails shall be sent to William Koncelik, wkoncelik@bnl.gov with the BSA RFI 06132024WPK in the Subject Line.

We trust that the information contained herein is sufficient to permit your company to prepare a submittal outlining your capabilities, however, should you have any questions, please contact the undersigned. All questions must be submitted in writing, via email.

Sincerely, William Koncelik

William Koncelik

Contracts Administrator, C.P.M.

Brookhaven National Laboratory

Tel: 631-344-5281

Email: wkoncelik@bnl.gov mailto:wkoncelik@bnl.gov mailto:wkoncelik@bnl.gov

Attachment A

Technical Specification for the Scintillating Fibers for the Barrel Imaging Calorimeter

1 BACKGROUND

The Electron-Ion Collider (EIC) is a Nuclear Physics facility being built at the United States (U.S).

Department of Energy’s (DOE) Brookhaven National Laboratory (BNL). The EIC will create intense beams of relativistic energy electrons and ions in opposing particle storage rings that will be brought into collision in a large experimental detector. This will provide insight into the internal structure of protons and neutrons and the gluelike force that holds them together.

1.1 Background

The EIC Project includes one interaction region, with an allowance for a second, and one detector.

The EIC detector is being designed as a hermetic, general-purpose detector. It will be an approximately 10-meter-long cylindrical barrel detector with additional instrumentation that extends to up to 45m in each direction down the EIC beamline. It will use cutting-edge technologies to detect particles created in collisions between high energy electrons and protons or heavy ions (the nuclei of larger atoms) moving close to the speed of light. It will be based on a 1.7 Tesla superconducting magnet for curving the trajectories of charged particles created in these collisions and will include high precision tracking and particle identification systems to measure and identify charged particles, electromagnetic calorimeters to measure and identify electromagnetic particles, and hadronic calorimeters to allow for high precision jet (a collimated spray of particles) measurements.

Scintillating fibers are one of the components of the Barrel Imaging electromagnetic Calorimeter

(BIC), one of the subsystems of the EIC detector. They will be glued to corrugated lead sheets

(absorber) and will serve to convert the energy of the secondary particles generated in the absorber into light, subsequently detected by photo sensors.

2 APPLICABLE DOCUMENTS

None.

REQUIREMENTS

3.1 Technical/Performance Characteristics

A. Light yield: the average response to a Sr-90 source shall be greater than 5 photoelectrons measured using a bialkali photomultiplier tube 200 cm from the source, and the opposite end blackened (assessed via methods mutually acceptable to the BSA and Contractor).

B. Diameter mean value and variation shall be 1.00 +/- 0.01 mm, RMS ≤0.02 mm.

C. Attenuation length for blue light > 4m.

D. Batch to batch or lot to lot variation of light yield <15%.

E. Batch to batch or lot to lot variation of attenuation length <10%.

F. Emission spectrum in blue-green light

G. Scintillation decay time <3ns

H. Total length ~4500 km

I. Delivery method in cans. Length of fibers 4.55 meters +/- 0.01m.

3.5 Environment, Safety and Health

Identification of hazards, and their mitigation, during all stages of the life of the Equipment including; installation, commissioning, operation, maintenance, and repair. Identification of means to eliminate or manage each hazard shall be provided based on the following hierarchy:

• Eliminate the hazard, or

• Substitute with something less hazardous, or

• Engineer – mitigate the severity of the hazard, or

• User Personal Protective Equipment (least desirable).

4 VERIFICATION

Appropriate inspection/tests shall be performed to ensure fibers conform to all requirements in section 3 of this specification. As a practical matter, the light output will be determined in comparison to average light yield of a set of "standard reference fibers," identified during the first-article testing, with an agreed upon light yield to which all subsequent production batches will be compared. BSA will measure the absolute photon yield (section 3.1) to verify that the standard reference fibers meet the specification for absolute light yield. 4.1 Classification of Inspections

Items covered by this specification shall be subjected to the following tests to determine compliance with all applicable requirements:

4.1.1. Preproduction Tests (First Article).

For this purpose, a minimum of 100 well distributed fibers from the same lot meeting this specification shall be requested by BSA.

4.1.2. Acceptance Tests.

The approval to proceed into production shall be granted based on the results of the tests with first article fibers carried out by BSA.

File details come from the government source that posted it. Updated .