This Statement of Work (SOW) details the technical refresh and expansion of the Radio Frequency Emission Monitoring System (RFEMS) for the 412 Test Wing at Edwards Air Force Base, California. The project objectives include expanding coverage with a new monitoring node at Plant 42, upgrading existing system nodes with end-of-life controllers, and implementing advanced Machine Learning/Artificial Intelligence techniques to improve radio frequency environment monitoring capabilities.
Key tasks involve delivering new sensor and master controller computers, supporting sensor initializations at multiple sites (Grey Butte, El Mirage, Plant 42), updating and integrating noise floor models, and developing advanced monitoring and analysis techniques. The project will utilize commercial off-the-shelf hardware and software, with a focus on improving statistical analysis speed and reporting formats. The contract schedule spans approximately 12 months from award, with major milestones including hardware installation (Award + 5 months), system validation (Award + 8 months), and a wrap-up visit and training (Award + 12 months). The effort is a sole-source contract intended to be awarded to Yarcom, Inc. under the engineering services NAICS code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSJ RFEMS_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for
RADIO FREQUENCY EMISSION MONITORING SYSTEM (RFEMS)
TECHINAL REFRESH AND EXPANSION
412 TEST WING
EDWARDS AIR FORCE BASE, CALIFORNIA
6 June 2025
1 Contents 1 Project Description
1.1 Project Objectives
1.2 Upgrade Decision Rationale
1.3 Background
1.4 Scope
1.5 Technical Approach
1.6 Task Description
1.6.1 Deliver Controller Technical Refresh
1.6.2 Support RFEMS Sensor Initializations
1.6.3 Update Noise Floor Model
1.6.4 Integrate Noise Floor Model
1.6.5 Validate Noise Floor Model
1.6.6 Advanced Monitoring and Analysis
1.6.7 IT System Security and Accreditation
1.6.8 Training
1.7 Reports
1.8 Quality Control
1.9 Travel
2 Additional Project Requirements and Information
2.1 Hardware, Software, and Data Security
2.2 Personnel Security
2.3 Delivered Materials Ownership
2.4 Government Points of Contact
2.5 Schedule
2.6 Deliverables
2.6.1 Hardware
2.6.2 Software
2.6.3 Reports
This Statement of Work (SOW) describes the tasks required to accomplish the following
1.1 Project O
• Expanded Coverage: The 412 TW requires Comple at Plant 42. The contract FA9302-17-P-
RFEMS
• Upgrade E System Nodes: -17-P-F030 contract require an End-of- upgrade to ensure and future
The 412 TW considers this a great ensure uninterr
1.2 Upgrade Decision R
• - in the south R-2515
• 412 TW must refresh the end-of-equipment.
• -to-technologies
• The current s scripts .
1.3 Background
to
TW Range to plan, budget, establish policies, and procedures to protect the range
1.4 Scope
• D .
• S .
• S
• S -ements.
• D
1.5 Technical Approach
s, transmission lines,
1.6 Task D
412 TW. This Statement of
1.6.1 Deliver Controller Technical Refresh
reached end-of-life and end-of-support. The new controllers include the host computer,
1.6.2 Support RFEMS Sensor I
1.6.2.1 The contractor will support of the RFEMS measurement sensor
1.6.2.2 The contractor will support of the RFEMS measurement sensor
1.6.2.3
1.6.3 Update Noise Floor Model
age, and Plant 42 require a minimum of 90- -
1.6.4 Integrate Noise Floor Model
(RF-
1.6.5 Validate Noise Floor Model
1.6.6 Advanced Monitoring and Analysis
igence and machine learning reports.
1.6.7 d
1.6.8 Training
modeling modules.
1.7 Reports
1.8 Quality Control
contractor.
1.9 Travel
conducted and reimbursed as required to complete the assigned tasks.
2 Project Requirements and I
2.1
- -the-shelf (COTS), subject to manufacturer to manufacturer licensing
2.2 Personnel Security
upon request).
threat to the good
2.3 Delivered Materials Ownership
2.4 Government Points of Contact
2.5 Schedule
Task schedule below is referenced to this contract’s award date.
site access months
• Wrap-
2.6 Deliverables
2.6.1 Hardware
2.6.2
2.6.3 Reports
Test Range