RFC_26Q0073.pdf

PDF 99 KB Posted

Attached to
N5523626Q0073 - Iris M Federal System and Accessories
Solicitation number
N5523626Q0073
Issued by

About this file

This is a Request for Specification Clarification form issued by the Southwest Regional Maintenance Center (SWRMC), a Navy activity, for Solicitation No. N5523626Q0073. The form is a template used to document contractor questions regarding solicitation specifications and the government's technical responses. The specific solicitation concerns the "Iris M Federal System and Accessories," though the contractor's question section is blank, indicating this is an unfilled form or template.

The document establishes the procedural framework for managing specification clarification requests, with designated points of contact including Abigail Monroy and Jorge Morales at SWRMC. The form includes internal review checkpoints requiring technical review, planner review, supervisor review, Code 230 review, and advance planning review, with corresponding approval boxes for specification changes, drawing/reference changes, requirements changes, and material changes. The request date is listed as 05/21/2026, and the form provides space for contractor point of contact information, though these fields remain empty. This is a blank template rather than a completed solicitation document containing specific product requirements or contract terms.

View the file

Other files

File Type Posted
26Q0073_PD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SWRMC

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 05/21/2026 QUESTION NO: 001

SHIP/HULL NO: N/A SOLICITATION NO: N5523626Q0073

ITEM NO: N/A

TITLE: Iris M Federal System and Accessories SWRMC POC & PHONE: Abigail Monroy EMAIL: abigail.monroy.civ@us.navy.mil

Jorge Morales jorge.a.morales67.civ@us.navy.mil

PAGE NO: CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

DO NOT WRITE BELOW THIS LINE

(FOR SWRMC USE ONLY)

TECHNICAL REVIEW: SERIAL NO:

PLANNER REVIEW DATE: SUPERVISOR REVIEW: DATE:

CODE 230 REVIEW: DATE: ADV PLAN REVIEW: DATE:

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

File details come from the government source that posted it. Updated .