About this file
Summary of RFB 946600-01 DOC 3JD CBC New Backup Generator - Drawings
This is a set of electrical construction drawings prepared by KCL Engineering for the Iowa Department of Administrative Services for the installation of a new backup generator system at the DOC 3JD Community-Based Corrections facility located at 515 Water Street in Sioux City, Iowa 51103. The project involves the procurement and installation of a 250 kilowatt diesel standby generator with a 24-hour base day fuel tank, automatic transfer switch (ATS), and associated electrical infrastructure to provide backup power for the entire building during utility outages. The generator system is designed to comply with NFPA 110 and NEC Section 702 standards and is classified as non-life-safety backup power only. Key project elements include relocating an existing 60-ton condensing unit to accommodate the new generator pad, downsizing the existing electrical service from 2000 amperes to 1100 amperes, installing new grounding electrode systems with dual 10-foot ground rods, and extending service conductors to the new automatic transfer switch. The project includes demolition of existing electrical facilities, installation of a new concrete generator pad with reinforced specifications, conduit routing along exterior walls, and integration with the existing Siemens building management system, which will be reprogrammed to delay the condensing unit start by five minutes when generator power is active. A pre-bid meeting is scheduled for July 30, 2025, with construction anticipated to begin June 15, 2026.
The electrical drawings specify that all work must comply with current state electrical codes and the Americans with Disabilities Act (ADAAG), with local officials verifying code compliance during permitting. The project requires two separate utility shutdowns coordinated with MidAmerican Energy: Shutdown #1 involves replacing service fuses and reconnecting existing service conductors to the ATS during a maximum four-hour outage between 9 AM and 3 PM, while Alternate #1 (Shutdown #2) provides an option to salvage existing conductors no longer in use during a maximum three-hour outage. The electrical contractor is responsible for providing arc flash calculations, labeling, and documentation for both the new main distribution panel (MDP) and existing MDP upon project completion. Additional contractor responsibilities include sealing all wall, floor, ceiling, and roof penetrations in accordance with fire-rated assembly standards, balancing panel loads during installation, providing typed panel directories for all modified circuits, and coordinating work timing and traffic control with the City of Sioux City. The project includes provisions for a battery heater, block heater with 120-volt circuits utilizing spare breakers in the existing panel, a generator annunciator panel at the reception desk, and an emergency power-off (EPO) button at the electrical room entrance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/17/2025 8:36:11 AM
100% CD
07/18/2025
AG00
STATE OF IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
DOC 3JD CBC NEW BACKUP GENERATOR
PROJECT #: RFB 946600-01
SHEET LIST
Sheet Number Sheet Name
AG00 TITLE SHEET
E000 ELECTRICAL GENERAL NOTES & SYMBOLS
E001 ELECTRICAL SITE PLAN
ED101 ELECTRICAL DEMO
E101 ELECTRICAL POWER
E401 ELECTRICAL ONE-LINE DIAGRAM
E501 ELECTRICAL DETAILS
TITLE SHEETTITLE SHEET
OWNER
IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES
109 SE 13TH STREET
DES MOINES, IA 50319
OWNER PROJECT NUMBER: 9466.00
OWNER REP: JENNIE ELLIOT
CONSTRUCTION MANAGER
ROB GREINER - PROJECT MANAGER
BOYD JONES CONSTRUCTION COMPANY
rgreiner@boydjones.biz 515-650-7777
CM PROJECT NUMBER: 015PC
ENGINEER
ERIC HEYNEN, PE
KCL ENGINEERING
eheynen@kclengineering.com 515-300-8092 ENGINEER PROJECT NUMBER: 25108.00 I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that i am a duly licensed Professional Engineer under the laws of the State of Iowa
(signature)
License Number :
Pages or sheets covered by this seal:
(date)
My license renewal date is December 31, E N
G N
E E
R I
AOFESSION
S E
D
PR
AI O W
L
IC
E N
L
ERIC HEYNEN, P.E.
ERIC
HEYNEN
E. Sheets
P24706P24706
07-18-2025
CONDUIT SLEEVE
CONDUIT UP, REFER TO TAG ON DRAWING FOR SIZE
CONDUIT DOWN, REFER TO TAG ON DRAWING FOR SIZE
CIRCUIT HOMERUN, CONCEALED CONDUIT OR CABLE
CIRCUIT HOMERUN, UNDER FLOOR CONDUIT OR CABLE
EQUIPMENT IDENTIFICATION TAG. REFER TO EQUIPMENT CONNECTION SCHEDULE
DETAIL DRAWING REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
INTERIOR ELEVATION DRAWING REFERENCE TAG
GENERAL SYMBOLS
A101
SIM
A101 1
R e f
KEYNOTE#
XXX
X
SHEET REFERENCE
SECTION CUT REFERENCE TAG, SIM-SIMILAR, TYP-TYPICAL, OPP-OPPOSITE
SHEET REFERENCE
JUNCTION BOX, CEILING OR FLOOR MOUNTED.
JUNCTION BOX, WALL MOUNTED, ELEVATION AS NOTED.
J
J
A101
SIM
1 DRAWINGS REVISION. REFER TO TITLEBLOCK FOR REVISION NAME AND DATE
POWER SYMBOLS
DUPLEX RECEPTACLE, WALL MOUNTED, TAMPER-RESISTANT
EQUIPMENT CONNECTION,
REFER TO EQUIPMENT CONNECTION SCHEDULE FOR CONNECTION TYPE.
REFER TO PANEL SCHEDULES FOR GFCI PROTECTION WHERE REQUIRED
UTILITY TRANSFORMER
UTILITY METER
SURGE PROTECTIVE DEVICE
SAFETY DISCONNECT SWITCH
M
PANELBOARD - SURFACE MOUNTED
PANELBOARD - RECESSED IN WALL
J CORD REEL, CEILING MOUNTED - REFER TO DETAIL
DISTRIBUTION PANELBOARD/SWITCHBOARD - SURFACE MOUNTED AS NOTED.
T
SPD
GENERATOR
MULTI-GROUND ROD ELECTRODE SYSTEM
GEN
MOTOR CONNECTION,
REFER TO EQUIPMENT CONNECTION SCHEDULE FOR CONNECTION TYPE.
REFER TO PANEL SCHEDULES FOR GFCI PROTECTION WHERE REQUIRED
M
AUTOMATIC TRANSFER SWITCHATS
ELECTRICAL ABBREVIATIONS
A DEVICE MOUNTED +8" ABOVE
COUNTER TOP (VERIFY LOCATION)
AFF ABOVE FINISHED FLOOR
ATS AUTOMATIC TRANSFER SWITCH
C CEILING
CB CIRCUIT BREAKER
CT CURRENT TRANSFORMER
E EXISTING ITEM TO REMAIN
EC ELECTRICAL CONTRACTOR
EM EMERGENCY LIGHT FIXTURE
ER NEW LOCATION OF EXISTING ITEM
F ROUGH IN FOR FUTURE DEVICE
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FSD FIRE SMOKE DAMPER
G GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
KVA KILO-VOLT-AMPERES
KW KILOWATTS
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
N NEW DEVICE IN EXISTING LOCATION
NIC NOT IN CONTRACT
NM NONMETALLIC
NTS NOT TO SCALE
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED,
OWNER INSTALLED
R EXISTING ITEM TO BE REMOVED
RR EXISTING ITEM TO BE REMOVED AND
RELOCATED
RN EXISTING ITEM TO BE REMOVED AND
REPLACED WITH NEW
SCCR SHORT CIRCUIT CURRENT RATING
T TAMPER PROOF DEVICE
TCC TEMPERATURE CONTROL CONTRACTOR
TV TELEVISION
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS
VA VOLT-AMPERES
WG WIREGUARD COVER
WP WEATHERPROOF DEVICE
WR WEATHER RESISTANT DEVICE
+24" INDICATES MOUNTING HEIGHT CENTER
LINE OF DEVICE TO FINISHED FLOOR
1. PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL STATE CODES.
2. THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE IS THE STANDARD FOR THE
ELECTRICAL INSTALLATION. VERIFY WITH LOCAL OFFICIALS WHEN PERMITS ARE OBTAINED.
NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR
DRAWINGS AND THE GOVERNING CODE.
3. INSTALLATION SHALL FOLLOW REQUIREMENTS OF THE ADAAG –AMERICANS WITH
DISABILITIES ACT.
CODE NOTES - ELECTRICAL
1. INSTALL NEW STANDBY GENERATOR FOR THE ENTIRE BUILDING.
2. GENERATOR TO COMPLY WITH NFPA 110 AND NEC SECTION 702. THIS GENERATOR IS NOT
PROVIDED FOR LIFE SAFETY AND WILL ONLY BE UTILIZED FOR BACKUP POWER.
3. EXISTING LIFE SAFETY SYSTEM (EMERGENCY LIGHTING AND FIRE ALARM) TO REMAIN INTACT AND
OPERATIONAL DURING CONSTRUCTION.
4. EXISTING ELECTRICAL SERVICE IS BEING DOWNSIZED FROM 2000A TO 1100A.
5. RELOCATE CONDENSING UNIT TO MAKE WAY FOR NEW GENERATOR.
6. THE OWNER WILL REPROGRAM SIEMENS DDC SYSTEM TO LAPSE START OF 60 TON CONDENSING
UNIT WHEN ON GENERATOR POWER.
7. ALTERNATE #1: SALVAGE EXISTING SERVICE CONDUCTORS NO LONGER IN USE. REFER TO MORE
NOTES ON SHEET E401.
8. AT PROJECT COMPLETION, ELECTRICAL CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE ARC FLASH CALCULATIONS, LABELING, AND DOCUMENTATION FOR THE "MDP" AND "EXISTING" MDP.
SCOPE
1. INCREASE CONDUCTOR SIZES ON 20A 120V-1 PHASE CIRCUITS EXCEEDING 100 FEET TO
CENTER OF LOAD TO ACCOUNT FOR VOLTAGE DROP.
2. RACEWAYS AND BOXES ARE SHOWN DIAGRAMMATICALLY ONLY AND INDICATE GENERAL
AND APPROXIMATE LOCATIONS. LAYOUTS DO NOT ALWAYS SHOW THE TOTAL NUMBER
OF RACEWAYS OR BOXES FOR THE CIRCUITS REQUIRED, NOR ARE THE LOCATIONS OF
INDICATED RUNS INTENDED TO SHOW THE ACTUAL ROUTING OF THE RACEWAYS.
3. LIGHT FIXTURES, SWITCHES, DEVICES, ETC. ARE SHOWN IN PREFERRED LOCATION.
MODIFY CONDUIT, HANGERS, CIRCUITING, ETC. TO PROVIDE A COMPLETE AND
OPERATIONAL SYSTEM.
4. PROVIDE A DEDICATED GREEN INSULATED GROUND CONDUCTOR TO ALL DEVICES. DO
NOT USE CONDUIT SYSTEM AS THE ONLY EQUIPMENT GROUNDING METHOD.
5. DO NOT INSTALL BOXES BACK-TO-BACK ON OPPOSITE SIDES OF THE SAME WALL.
MAINTAIN MINIMUM OF 8” DISTANCE BETWEEN BOXES WHEREVER APPLICABLE.
6. BALANCE PANEL LOADS DURING INSTALLATION. CIRCUIT NUMBERING SHOWN ON PLANS
MAY BE ADJUSTED TO ACCOMMODATE.
7. PROVIDE TYPED PANEL DIRECTORY AT PROJECT COMPLETION FOR NEW PANELS AND
EXISTING PANELS WITH CIRCUITS MODIFIED DURING PROJECT. USE OWNER’S CURRENT
ROOM NUMBERS AND EQUIPMENT NAMES. PROVIDE UNIQUE CIRCUIT IDENTIFICATION
PER NEC 408.4(A)
8. CONTRACTOR IS RESPONSIBLE FOR OPENINGS IN WALLS, FLOORS, CEILINGS, AND
ROOFS THAT ARE REQUIRED TO COMPLETE THEIR SCOPE OF WORK. SEAL
PENETRATIONS IN ACCORDANCE WITH THE RATING OF THE AFFECTED ASSEMBLY.
REFER TO ARCHITECTURAL CODE PLAN FOR RATED WALLS, FLOORS, AND CEILINGS.
INSTALLATION NOTES - ELECTRICAL
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
E000
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL GENERAL
NOTES & SYMBOLS
# Revision Date
5TH STREET
W A
T E
R S
T
EXISTING TEST
WELL LOCATION
EXISTING
BUILDING
APPROXIMATE LOCATION OF
EXISTING FIBER OPTICS AND
COMMUNICATIONS. FIELD VERIFY
LOCATIONS
SITE GENERAL NOTES
A. UTILITIES SHOWN ARE FROM THE PREVIOUS CONSTRUCTION DOCUMENTS.
ALL LOCATIONS SHOULD BE CONSIDERED APPROXIMATE. AS-BUILT
DOCUMENTS WERE NOT PROVIDED. VERIFY ALL SITE CONDITIONS AND
DIMENSIONS ON SITE.
B. NEW WORK SCOPE IS UNDERLINED AND BOLD ON PLAN.
C. PROVIDE TRENCHING, PULL BOXES, BACKFILL, AND PATCHWORK AS
REQUIRED TO COMPLETE SITE ELECTRICAL INSTALLATION.
D. REPAIR ALL AFFECTED SURFACES AND RESTORE TO EXISTING CONDITIONS
AT COMPLETION OF PROJECT.
E. PROVIDE ALL SITE CONDUIT AS 1" MINIMUM, ALL CONDUCTORS AS #10 AWG
CU. MINIMUM.
F. WARNING - CALL BEFORE YOU DIG: LAW REQUIRES ANYONE DOING
EXCAVATION, FENCING, PLANTING OR DRILLING TO CALL 48 HOURS IN
ADVANCE. HAND DIG WITHIN 18 INCHES OF ANY LOCATE MARK OR FLAG.
ONE-CALL 811
GENERAL NOTE:
UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN SHOWN BASED UPON
INFORMATION OBTAINED FROM FIELD LOCATIONS BY UTILITY COMPANIES, AVAILABLE SURVEYS
AND RECORDS. THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS ALSO
POSSIBLE THAT THERE MAY BE OTHER UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES IN
EXISTENCE THAT ARE NOT SHOWN. IT IS THE RESPONSIBILITY OF EACH INDIVIDUAL PARTY
REFERENCING THIS PLAN TO DETERMINE THE EXACT LOCATION AND TYPE OF UNDERGROUND
FACILITIES ON THE SITE. HAND EXCAVATE AT CRITICAL POINTS AS NECESSARY TO VERIFY
LOCATIONS, SIZES, ELEVATIONS, FLOW LINES, ETC. IF A PROBLEM OR INTERFERENCE EXISTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING.
IOWA
ONE CALL
1-800-292-8989
CALL - BEFORE - YOU - DIG
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
E001
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL SITE
PLAN
NOT TO SCALE
EXISTING SITE PLAN
NEW LOCATION OF
DIESEL GENERATOR
EXISTING UTILITY
TRANSFORMER TO REMAIN
APPROXIMATE
LOCATION OF CRANE
AND FUEL TANK.
COORDINATE TRAFFIC
SIGNALING, TIMING,
AND REQUIREMENTS
WITH THE CITY OF
SIOUX CITY.
# Revision Date
PROTECT LAWN FROM
EQUIPMENT BEING
USED
A. DEMOLITION DRAWINGS PRESENT LAYOUT OF EXISTING
CONDITIONS AND MAJOR ELECTRICAL ITEMS. FIELD VERIFY
EXISTING CONDITIONS AND BECOME FAMILIAR WITH EXISTING
ELECTRICAL SYSTEM AND DEMOLITION SCOPE BEFORE WORK
BEGINS. CONTRACTOR SHALL NOTE EXISTING CONDITIONS AND
NOTE DAMAGE BEFORE STARTING WORK.
B. ADDITIONAL COMPONENTS MAY EXIST WHICH ARE NOT SHOWN.
HANDLE SUCH ITEMS IN A MANNER SIMILAR TO THOSE ITEMS
WHICH ARE SHOWN.
C. REMOVE ELECTRICAL FACILITIES AND CLEAR THE AREA TO
RECEIVE THE NEW WORK.
a. REMOVE AND REINSTALL CEILING TILES AS REQUIRED
TO REMOVE THE ELECTRICAL FACILITIES NOTED.
REPLACE CEILINGS TILES DAMAGED DURING
DEMOLITION.
b. KEEP EXISTING SYSTEMS OPERATIONAL DURING ALL
PHASES OF CONSTRUCTION UNLESS NECESSARY FOR
DEMOLITION.
c. OBTAIN OWNER AND CM PERMISSION TO SHUT OFF
SERVICES 2 WEEKS IN ADVANCE OR SYSTEMS WHICH
MAY AFFECT OTHER AREAS BEYOND DEMOLITION AREA.
INFORM OWNER AS TO THE REASON FOR AND THE
DURATION OF THE SHUTDOWN.
d. REPAIR AT CONTRACTORS EXPENSE ANY DAMAGED
CONDUIT OR WIRE NOT IDENTIFIED FOR DEMOLITION.
D. ALL WIRING FOR REMODELED AREAS SHALL BE NEW UNLESS
SPECIFICALLY NOTED OTHERWISE.
E. PROTECT EXISTING DEVICES IDENTIFIED TO REMAIN OR BE
RELOCATED. IF AN EXISTING DEVICE CANNOT BE REINSTALLED
NOTIFY DESIGN TEAM DURING DEMOLITION. REPLACE
FUNCTIONING ITEMS DAMAGED DURING DEMOLITION.
ELECTRICAL DEMOLITION NOTES
EXISTING ELECTRICAL
TRANSFORMER LOCATION
QUIET LOUNGE
101A
CHECK IN
VEST
STOR
MECH
MECH
EXISTING 60 TON ACCU
EXISTING LINES TO REMAIN
REMOVE REFRIGERANT LINES BACK TO APPROXIMATE
LOCATION AND READY FOR REINSTALLATION.
CUT EXISTING 6" PAD AS NECESSARY
TO READY AREA FOR NEW CONCRETE
PAD REQUIRED FOR GENERATOR
EXISTING MDP
OLD MDP
REMOVE/SALVAGE
EXISTING
CONDENSING UNIT
FOR RELOCATION
ISOLATE REFRIGERANT OR PROVIDE
ADDITIONAL REFRIGERANT AS REQUIRED
FOR CU RELOCATION. DRAIN AND REUSE
IF POSSIBLE.
REMOVE/SALVAGE
EXISTING
DISCONNECT AND
RELOCATE WITH
CONDENSING UNIT
5' - 4"
7' - 0"
EXISTING PANEL D
EXISTING PANEL 1A
APPROXIMATE
LOCATION OF EXISTING
SERVICE ENTRANCE
CONDUCTORS
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
ED101
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL DEMO
1/4" = 1'-0"
DEMO PLAN
POWER GENERAL NOTES
A. COORDINATE LOCATION/INSTALLATION OF MECHANICAL AND ELECTRICAL
WORK WITH ALL OTHER TRADES. NO ASPECT OF A SYSTEM INSTALLATION
OR ITS ROUGH-IN SHALL COMMENCE UNTIL PROPER AND TIMELY
COORDINATION WITH ALL TRADES ASSOCIATED WITH THE INSTALLATION HAS
TRANSPIRED. ITEMS TO BE COORDINATED SHALL INCLUDE BUT NOT BE
LIMITED TO: BUILDING STRUCTURE, SHEET METAL, PIPING SYSTEMS, LIGHT
FIXTURES, CONDUITS, CABLE TRAYS, ETC. REFER TO ALL GENERAL,
MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR THIS
PROJECT.
B. COORDINATE ELECTRICAL REQUIREMENTS FOR MECHANICAL UNITS WITH
MECHANICAL CONTRACTOR AND FINAL MECHANICAL SHOP DRAWINGS.
C. PROVIDE PENETRATIONS REQUIRED FOR ROUTING RACEWAYS THROUGH
THE BUILDING. COORDINATE FIRE RATED WALL PENETRATIONS AND
PROVIDE CONDUIT SLEEVES AND FIRE STOPPING TO MAINTAIN RATING.
EXISTING
ELECTRICAL
TRANSFORMER
LOCATION
OWNER TO REPROGRAM UNIT TO
DELAY 5 MINUTES AFTER UTILITY
LOSS OF POWER WITHIN DDC
SYSTEM. EXISTING SYSTEM IS
SIEMENS.
REPLACE EXISTING
FUSES. REFER TO ONE-LINE
FOR MORE INFORMATION
OLD MDP
MDP
EXISTING PANEL 1A
QUIET LOUNGE
VEST
101A
CHECK IN
STOR
MECH
OFFICE
MECHANICAL
MECH
LNDRY
197A
DINING
197B
KITCHEN
147A
CORRIDOR
RECREATION
149B
COMP
DORM
166A
RCP
166B
CONTROL
GENERATOR ANNUNCIATOR
PANEL INSTALLED AT RECEPTION
DESK WALL. INSTALL IN GYP WALL.
INSTALL AT 40" TO CENTER OF BOX.
INSTALL EPO BUTTON FOR
GENERATOR AT ENTRANCE
TO ELECTRICAL ROOM. ALL
OTHER LOCATIONS NEAR GENERATOR
ARE OPEN TO GENERAL PUBLIC.
120V BATTERY HEATER
H-39
CONFIRM POWER
REQUIREMENTS WITH
MANUFACTURER
120V BLOCK HEATER
H-41
ATS
INSTALL NEW ATS ABOVE EXISTING
PAD. INSTALL 6" ABOVE PAD ON
UNISTRUT WITH COVER FOR ACCESS
TO EXISTING HATCH. EXISTING PAD IS 30"
DEEP X 37" WIDE.
EXISTING 60 TON ACCU
INSTALL NEW CONCRETE
PAD TO MATCH HEIGHTS OF
EXISTING SO THAT EXISTING
ACCU CAN BE RELOCATED TO
THE NORTH TO MAKE WAY FOR
GENERATOR. INSTALL 6X6-6/6
WELDED WIRE FABRIC OR REBAR
EQUIVALENT IN PAD.
RELOCATE ACCU 4' TO THE
NORTH.
REUSE DISCONNECT.
INSTALL JUNCTION BOX AT END
OF STUBBED CONDUIT. EXTEND
CONDUIT/CONDUCTORS FROM
DISCONNECT TO UNIT AS
NECESSARY.
PROVIDE NEW/REVISE REFRIGERANT PIPING
AS REQUIRED TO TIE INTO EXISTING LINES. MATCH LINE
SIZE/INSULATION AND RECHARGE LINES AS REQUIRED.
OPERABLE WINDOWS ARE APPROXIMATELY 15'-6"
ABOVE GRADE. TOP OF GENERATOR ENCLOSURE SHALL
BE LESS THAN 9'-6" TALL SUCH THAT IT IS MORE THAN 6'
FROM THE WINDOW OPENINGS.
LAUNDRY
STOR
REC LOUNGE
101B
CORRIDOR
MECH
W DORM
13'
3'
3'
12'-6" LONG MAXIMUM
3' MINIMUM
3' MINIMUM
3' MINIMUM
REVISE AND EXTEND
CONTROL WIRING FOR
CU AS REQUIRED
DOWEL #5 EPOXY COATED BAR
4" INTO EXISTING PAD AT 12"
O.C. TIE DOWELS
INTO REINFORCING STEEL IN
NEW PAD.
EXISTING PANEL D
UTILIZE 20A 1P SPARE BREAKERS IN
SPACES 39 AND 41 FOR GENERATOR
HEATER AND CHARGER
INSTALL CONDUIT ON UNISTRUT
ABOVE GRADE FOR CONTROLS
AND 120V CIRCUITS BACK TO
MECHANICAL ROOM
5' - 4"
NEW GENERATOR ON PAD.
REFER TO DETAIL ON E501
1/4" = 1'-0"
POWER PLAN
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
E101
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL POWER
FIELD VERIFY/MAINTAIN
EXISTING SERVICE
CLEARANCE FOR BOTH
ACCUs
METER
2000 A
MCB
MDP
B U
S
,0
A
/ 4W- 3ɸ120/208V
UTIL XFMR
208Y/120V
500kVA
EXISTING PRIMARY UTILITY
/3P100A
/3P200A
/3P200A
/3P200A
/3P60A
/3P200A
/3P200A
/3P200A
/3P800A PANEL
A
PANEL
D
PANEL
C
PANEL
B
TVSS
PANEL
F
PANEL
G
PANEL
H
SIEMENS SWITCHBOARD
800 A
MCB
EXISTING OLD MDP
B U
S
A
/ 4W- 3ɸ120/208V
A /3
P
(3) SETS OF 500 MCM
SIEMENS
SWITCHBOARD
G
STANDBY GENERATOR
250KW
208V
ATS
208V /
3 POLE
SCCR: 30,000 A
1200A
N
E
800A
/3P
SERVICE ENTRANCE
RATED WITH 1200A FUSES
REPLACE WITH 1100A
FUSES
INSTALL (2) 10' GROUND RODS
INSTALL 10' APART WITH #3/0 CU
FOR GROUNDING ELECTRODE SYSTEM.
COORDINATE EXACT LOCATION WITH EXISTING
UTILITIES AND GEOTHERMAL BORE FIELD.
COORDINATE SHUTDOWN AND INSTALLATION
WITH MIDAMERICAN. VERIFY TRIMECS
REQUIREMENTS ARE MET
(3) SETS OF 500 MCM
EXTEND EXISTING
GROUNDING ELECTRODE
SYSTEM TO NEW ATS VIA
#3/0 COPPER
CONDUCTOR
2000AS
1100AF(3)
A. DIAGRAM INDICATES OVERALL LAYOUT OF ELECTRICAL
DISTRIBUTION SYSTEM. REFER TO FLOOR PLANS FOR
EQUIPMENT LOCATIONS.
B. USE COPPER CONDUCTORS UNLESS OTHERWISE INDICATED.
C. MATCH NEUTRAL CONDUCTOR SIZE TO THE PHASE
CONDUCTORS UNLESS OTHERWISE NOTED.
D. ALL WIRING SHALL BE IN RACEWAY AS NOTED. REFER TO
SPECIFICATIONS FOR CONDUIT APPLICATION REQUIREMENTS.
E. INSTALL UTILITY TRANSFORMER PAD, METERING EQUIPMENT,
AND SERVICE ENTRANCE FEEDERS IN ACCORDANCE WITH
UTILITY COMPANY REQUIREMENTS.
RISER DIAGRAM GENERAL NOTES
RECOMMENDED PHASING
PREP WORK:
-REMOVE CONCRETE
-INSTALL NEW CONCRETE
-RELOCATE ACCU UNIT
1. INSTALL NEW GENERATOR AND ATS ON PADS
2. -INSTALL NEW CONDUCTORS FROM GENERATOR TO ATS.
-INSTALL NEW CONDUIT FROM GENERATOR TO ATS AND ATS TO MDP MAIN SERVICE
SECTION.
-INSTALL NEW GROUNDING CONDUCTORS AS SHOWN.
3. SHUTDOWN #1 -- MAXIMUM OF 4 HOUR DURATION
-COORDINATE UTILITY SHUTDOWN WITH MIDAMERICAN ENERGY
-REPLACE SERVICE FUSES IN MDP. INSTALL FUSE CLIPS AND ACCESSORIES AS
NECESSARY TO FIT NEW FUSES.
-REMOVE (3) CONDUCTOR SETS FROM TERMINALS.
-EXTEND (3) CONDUCTOR SETS TO ATS LOCATION.
-TURN UTILITY POWER BACK ON.
-GROUND CLUSTER THE (3) EXISTING CONDUCTORS NO LONGER IN USE AT THE
UTILITY TRANSFORMER AND AT THE MDP IF ALTERNATE #1 IS NOT SELECTED.
4. ALTERNATE #1:
SHUTDOWN #2 -- MAXIMUM OF 3 HOUR DURATION
-COORDINATE UTILITY SHUTDOWN WITH MIDAMERICAN ENERGY
-REMOVE (3) CONNECTED CONDUCTORS IN THE MDP THAT ARE NO LONGER IN USE.
-TERMINATE (3) ATS CONNECTED CONDUCTORS ONTO FUSES IN THE MDP.
-UTILIZE PERMANENT GENERATOR TO TURN POWER BACK ON.
-REMOVE (3) SETS OF CONDUCTORS FROM TRANSFORMER SIDE. CONTRACTOR TO
SALVAGE EXISTING COPPER.
NOTES:
SHUTDOWNS TO BE NO LONGER THAN MAXIMUM DURATIONS NOTED. SHUTDOWNS TO TAKE
PLACE DURING THE DAY. BETWEEN THE HOURS OF 9AM AND 3PM.
CONTRACTOR TO HAVE OAC MEETING TO COORDINATE SHUTDOWN. OBTAIN OWNER AND CM
PERMISSION TO SHUT OFF SERVICES 1 WEEK IN ADVANCE OF SHUTDOWN.
A. BASIS OF DESIGN IS 250KW DIESEL GENERATOR WITH A 24 HOUR BASE DAY TANK.
B. SOUND ATTENUATING TYPE 1 ENCLOSURE
GENERATOR NOTES
METER
2000 A
MCB
MDP
B U
S
,0
A
/ 4W- 3ɸ120/208V
UTIL XFMR
208Y/120V
500kVA
EXISTING PRIMARY UTILITY
/3P100A
/3P200A
/3P200A
/3P200A
/3P60A
/3P200A
/3P200A
/3P200A
/3P800A PANEL
A
PANEL
D
PANEL
C
PANEL
B
TVSS
PANEL
F
PANEL
G
PANEL
H
SIEMENS SWITCHBOARD
800 A
MCB
EXISTING OLD MDP
B U
S
A
/ 4W- 3ɸ120/208V
A /3
P
SIEMENS
SWITCHBOARD
G
STANDBY GENERATOR
250KW
208V
ATS
208V /
3 POLE
SCCR: 30,000 A
1200A
N
E
800A
/3P
SERVICE ENTRANCE
RATED WITH 1200A FUSES
(3) SETS OF 500 MCM
(3) SETS OF 500 MCM 4
2000AS
1100AF(3)
METER
2000 A
MCB
MDP
B U
S
,0
A
/ 4W- 3ɸ120/208V
UTIL XFMR
208Y/120V
500kVA
EXISTING PRIMARY UTILITY
/3P100A
/3P200A
/3P200A
/3P200A
/3P60A
/3P200A
/3P200A
/3P200A
/3P800A PANEL
A
PANEL
D
PANEL
C
PANEL
B
TVSS
PANEL
F
PANEL
G
PANEL
H
SIEMENS SWITCHBOARD
800 A
MCB
EXISTING OLD MDP
B U
S
A
/ 4W- 3ɸ120/208V
A /3
P
SIEMENS
SWITCHBOARD
#3/0 GNDG
STANDBY GENERATOR
250KW
208V
ATS
208V /
3 POLE
SCCR: 30,000 A
1200A
N
E
800A
/3P
(3) SETS OF 500 MCM - ABANDONED IN PLACE
ALTERNATE #1 TO REMOVE
2000AS
1100AF(3)
SERVICE ENTRANCE
RATED WITH 1200A FUSES
METER
2000 A
MCB
MDP
B U
S
,0
A
/ 4W- 3ɸ120/208V
UTIL XFMR
208Y/120V
500kVA
EXISTING PRIMARY UTILITY
/3P100A
/3P200A
/3P200A
/3P200A
/3P60A
/3P200A
/3P200A
/3P200A
/3P800A PANEL
A
PANEL
D
PANEL
C
PANEL
B
TVSS
PANEL
F
PANEL
G
PANEL
H
SIEMENS SWITCHBOARD
800 A
MCB
EXISTING OLD MDP
B U
S
A
/ 4W- 3ɸ120/208V
A /3
P
SIEMENS
SWITCHBOARD
(3) SETS OF 500 MCM
TOTAL OF (6) SETS IN PARALLEL.
SHOWN AS SUCH FOR PHASING PURPOSES
(3) SETS OF 500 MCM
2000AS
2000AF(3)
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
E401
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL ONE-LINE
DIAGRAM
NOT TO SCALE
SHUTDOWN #1 - ONE-LINE DIAGRAM
FEEDER SCHEDULE
TAG PHASE GROUND
CONDUCTOR
MATERIAL CONDUIT
804 2- SETS (4) 500 MCM 1/0 COPPER (2) 4"
1204 3- SETS (3) 600 MCM 3/0 COPPER (3) 4"
NOT TO SCALE
ALTERNATE - SHUTDOWN #2 - ONE-LINE DIAGRAM
NOT TO SCALE
COMPLETE - ONE-LINE DIAGRAM
EXISTING SERVICE LOAD SUMMARY
(PER NEC 220.87)
EXISTING MAXIMUM DEMAND: 189kW PEAK DEMAND CALCULATION: 189kW x 125% (NEC 220.87) = 236 kW LOAD: 236kW / (208V/3P) = 656A
NOT TO SCALE
EXISTING ONE-LINE DIAGRAM
5'-6"
6" 6"
6"
6"
PLAN VIEW
SECTION A/A
5"
5"
18"
LENGTH OF
GENERATOR (VERIFY
WITH MANUFACTURER)
WIDTH OF GENERATOR
(VERIFY WITH
MANUFACTURER)
ANCHOR BOLTS AS
REQUIRED (TYP.)
#5 REINFORCING (TYP.)
GRADE
A
A
CAULK AROUND ENTIRE PAD AT
JOINT BETWEEN NEW PAD AND
EXISTING
RELOCATE APPROXIMATELY 4' TO THE NORTH.
FIELD VERIFY EXACT DIMENSIONS ONSITE.
EXTEND PAD FOR CONDENSING
UNIT TO MATCH FLOOR PLANS
CUT EXISTING PAD TO MAKE
WAY FOR NEW FOOTING OF
GENERATOR PAD. TIE EXISTING
PAD INTO NEW FOOTING.
INSTALL CONDUIT FOR CONTROL WIRING
AND SEPARATE CONDUIT FOR
120V CIRCUIT.CORE HOLES THROUGH EXTERIOR BRICK.
CAULK AND SEAL AROUND CONDUIT. TYPICAL FOR ALL.
COMBINE CONDUIT
ONTO VERTICAL STRAND
OF GALVANIZED UNISTRUT.
MOUNT UNISTRUT IN MORTAR
BED AND NOT IN BRICK.
RELOCATE EXISTING CU AS
SHOWN ON FLOOR PLANS
MODIFY REFRIGERANT
AS SHOWN ON FLOOR
PLANS
Drawing #:
Date:
Project No:
© 2022 KCL Engineering L.L.C. These documents have been prepared specifically for this project. they are not suitable for use on other projects or in other locations without the expressed written approval and participation of KCL Engineering L.L.C. A limited license is granted to the owner/contractor to reproduce these documents or portions thereof, but only for use in connection with this project. Unauthorized reproduction is prohibited.
P lo t D a te
T im e
Drawing Name:
info@kclengineering.com
300 4th Street West Des Moines, Iowa 50265 515.724.7938
/1
/2
:3 :1
A
M
E501
100% CD
07/18/25
9466.00
IO
W
A D
A S
D O
C
J D
C B
C N
E W
B A
C K
U P
G E
N E
R A
T O
R
W a te r S t, S io u x C it y
IA
ELECTRICAL DETAILS
NOT TO SCALE
GENERATOR PAD DETAIL
1/4" = 1'-0"
RELOCATE ACCU
1/4" = 1'-0"
CONDUIT ROUTING
(2) 4" CONDUIT INSTALLED ALONG
EXTERIOR WALL. INSTALL
ABOVE EXISTING FLUE AND DOOR
FRAME.
1/4" = 1'-0"
CONDENSING UNIT EXISTING LOCATION
| Sheets |
| AG00 - TITLE SHEET |
| E000 - ELECTRICAL GENERAL NOTES & SYMBOLS |
| E001 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL POWER |
| E401 - ELECTRICAL ONE-LINE DIAGRAM |
| E501 - ELECTRICAL DETAILS |
| ED101 - ELECTRICAL DEMO |
File details come from the government source that posted it. Updated .