RFB941800-00 - Project Manual.pdf
PDF 13 MB Posted
- Attached to
- HCR BAS Replacement
- Solicitation number
- 005-RFBCON-1364-2025
- Issued by
- Allamakee County, Iowa
About this file
This document is a Project Manual for RFB941800-00, a Building Automation System (BAS) Replacement project for the Iowa agency that delivers CDC Product to 22 separate facilities throughout the state. The project involves the replacement of the existing BAS system at these locations. The project overview and scope of work are detailed, including specific quantities and requirements for equipment, software, and services. Responses to this Request for Bid (RFB) are due on a specified date, and a mandatory pre-bid conference is scheduled prior to the response due date. The contract award date is also noted, as well as the term of the contract, which includes the potential for renewal options.
The pricing terms for this project are outlined, including any applicable set-asides or preferences. Details on the current environment, funding requirements and sources, and other relevant information are provided to assist bidders in preparing their responses. Incumbents and the anticipated budget for the project are also disclosed in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB941800-00 - Bid Form.pdf | ||
| 1268901-event.pdf | ||
| RFB941800-00 - Drawings.pdf | ||
| RFB941800-00 - Notice to Bidders.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
PROJECT NAME:
DNR Honey Creek Resort Building
Automation System Improvements
PROJECT ADDRESS:
12633 Resort Dr
Moravia, Iowa 52571
PROJECT DATE: September 20, 2024
OWNER:
Iowa Department of Administrative Services
109 Southeast 13th Street
Des Moines, Iowa 50319
OWNER PROJECT NUMBER: 9418.00
OWNER REQUEST FOR BID NUMBER: RFB 941800-00
CONSTRUCTION MANAGER:
McGough Construction
217 E. 2nd St, Suite 120
Des Moines, Iowa 50309
CONSTRUCTION MANAGER PROJECT NUMBER: 101174.010
ARCHITECT:
Farnsworth Design Firm
100 Walnut Street Suite 200
Peoria, IL 61602
ARCHITECT PROJECT NUMBER: 0241027.00
noah.thelen Snapshot
PROJECT 9418.00 NOTICE TO BIDDERS 00 1113 - 1
SECTION 00 1113
NOTICE TO BIDDERS
RFB #941800-00
The Iowa Department of Administrative Services will be receiving bids for DDC Control replacement including new front end network manager, graphics and control replacement for various equipment at Honey Creek Resort, Moravia, Iowa 52571.
The Iowa Department of Administrative Services anticipates construction to begin on February 10th, 2025 and end on May 15th, 2025.
Bids must be received no later than 02:00 pm, Tuesday, November 19, 2024. Late bids will not be considered. Bids shall be submitted on IMPACS Electronic Procurement System. The Bid shall be accompanied by a Bid Security as set forth in the Instructions to Bidders in the amount of 5% of the total bid amount. Each bid shall be accompanied by a bid bond, cashier’s check or a certified check drawn upon a solvent bank chartered under the laws of the United States of America.
Bid Opening The time and place of bid opening will be held at meet.google.com/rom-ymbt-zxb and teleconference number (US)+1 413-438-4530 Pin: 787 306 494# at 3:00 pm on November 19, 2024.
The Iowa Department of Administrative Services reserves the right to reject any and all bids, and to waive irregularities and to accept a bid that is deemed in the best interest of the State of Iowa.
Bidders must comply with all affirmative action/equal employment opportunity provisions of the State of Iowa and the Federal Government.
This project is exempt from Iowa Sales Tax. Davis Bacon Wages will not apply to this project.
Questions must be submitted by 2:00 pm, November 04, 2024, to the Issuing Officer.
Bidding documents may stipulate a specific product. Substitute product will be considered if a written request is received by 2:00 pm, November 04, 2024, prior to bid opening. Substitution requests will be considered for all products per Section 01 2500 Substitution Procedures, even if the specification does not include a statement such as “or equal,” “equal to,” “equivalent to,” or “basis of design,” unless otherwise noted.
An optional Pre-Bid meeting will be held on Wednesday, October 30th, 2024 at 12:00pm at Honey Creek Resort at 12633 Resort Drive, Moravia, Iowa 52571. This meeting is not mandatory but is highly recommended.
Bidding Documents, including drawing sheets bearing the project name Honey Creek Lodge Building Automation System Improvements, Dated 09/20/2024 and the Project Manual prepared by Farnsworth Design Firm dated 09/20/2024, may be obtained from Rapids Reproductions by visiting www.rapidsrepro.com or by calling 515-251-3222 on Friday, October 18th, 2025.
For further information regarding this project contact:
Michael Bradbury – Issuing Officer Phone: (515) 515-823-9327 E-Mail: construction.procurement@iowa.gov
END OF SECTION
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa https://meet.google.com/rom-ymbt-zxb?hs=122&authuser=0 tel:+1-413-438-4530 http://www.rapidsrepro.com/ mailto:construction.procurement@iowa.gov
Activity ID Activity Name Original
Duration
Start Finish
State of Iowa DAS - DNR HCR BAS ImprovementsState of Iowa DAS - DNR HCR BAS Improvements 173 05-Sep-24 15-May-25
Pre ConstructionPre Construction 60 05-Sep-24 27-Nov-24
PRECON 1020 100% Drawings & Design Documents 15 05-Sep-24 25-Sep-24
PRECON 1030 Front End Specs 15 26-Sep-24 16-Oct-24
PRECON 1000 Contract Bidding 20 17-Oct-24 13-Nov-24
PRECON 1010 Award Contractor/Execute Contracts 10 14-Nov-24 27-Nov-24
ProcurementProcurement 45 02-Dec-24 07-Feb-25
SAP 1000 Prepare Controls Submittals 10 02-Dec-24 13-Dec-24
SAP 1010 A/E Review/Approve Controls 10 16-Dec-24 03-Jan-25
SAP 1020 Procure Controls Material/Products 25 06-Jan-25 07-Feb-25
ConstructionConstruction 43 10-Feb-25 09-Apr-25
Lower LevelLower Level 19 10-Feb-25 06-Mar-25
LL 1000 Moblization 1 10-Feb-25 10-Feb-25
LL 1010 Replace and Wire Thermostats (Lodge Room) 10 11-Feb-25 24-Feb-25
LL 1020 Replace DDC Controller (Electrical Room) 5 11-Feb-25 17-Feb-25
LL 1030 Replace Motorized Damper Actuators (Laundry) 3 18-Feb-25 20-Feb-25
LL 1070 Replace Existing Controls ERV & Thermostat (Mechanical Room) 3 18-Feb-25 20-Feb-25
LL 1040 Pool Room Exhaust Motorized Damper Actuator Replace 5 21-Feb-25 27-Feb-25
LL 1060 Touch Up Paint & Patch at Thermostats 2 25-Feb-25 26-Feb-25
LL 1050 Install New Pool Room Controls (Pool Equipment) 5 28-Feb-25 06-Mar-25
First FloorFirst Floor 23 21-Feb-25 25-Mar-25
L1 1010 Replace Thermostats Heat Pump & Wire (Mechanical Room) 5 21-Feb-25 27-Feb-25
L1 1000 Replace Thermostats (Lodge Room) 10 25-Feb-25 10-Mar-25
L1 1020 Install New Controls & Sensors Water Pumps (Mechanical Room) 3 28-Feb-25 04-Mar-25
L1 1030 Replace Thermostats & Wire for Heat Pump (Dinning & Event Hall) 10 28-Feb-25 13-Mar-25
L1 1060 Touch Up Paint 2 11-Mar-25 12-Mar-25
L1 1040 Replace Controls for Rooftop Unit (Kitchen Hood) 3 14-Mar-25 18-Mar-25
L1 1050 Revise Control Sequence (Heat Pumps & Loops) 5 19-Mar-25 25-Mar-25
Second FloorSecond Floor 24 21-Feb-25 26-Mar-25
L2 1010 Replace Controls ERV (Mechanical Room) 5 21-Feb-25 27-Feb-25
L2 1020 Replace and Re-Wire Thermostat Heat Pump (Mechanical Room) 5 28-Feb-25 06-Mar-25
L2 1000 Replace and Wire Thermostats (Lodge Rooms) 10 11-Mar-25 24-Mar-25
L2 1030 Touch Up Paint 2 25-Mar-25 26-Mar-25
Third FloorThird Floor 12 25-Mar-25 09-Apr-25
L3 1000 Replace and Wire Thermostats (Lodge Rooms) 10 25-Mar-25 07-Apr-25
L3 1010 Touch Up Paint 2 08-Apr-25 09-Apr-25
CloseoutCloseout 25 10-Apr-25 15-May-25
CLOSE 1010 Punchlist 5 10-Apr-25 16-Apr-25
CLOSE 1000 Final Clean 5 17-Apr-25 24-Apr-25
CLOSE 1020 Obtain Substantial Completion Certificate 0 17-Apr-25 17-Apr-25
CLOSE 1030 Final Completion 20 17-Apr-25 15-May-25
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
2024 2025
Front End Specs
Contract Bidding
Award Contractor/Execute Contracts
Prepare Controls Submittals
A/E Review/Approve Controls
Procure Controls Material/Products
Moblization
Replace and Wire Thermostats (Lodge Room)
Replace DDC Controller (Electrical Room)
Replace Motorized Damper Actuators (Laundry)
Replace Existing Controls ERV & Thermostat (Mechanical Room)
Pool Room Exhaust Motorized Damper Actuator Replace
Touch Up Paint & Patch at Thermostats
Install New Pool Room Controls (Pool Equipment)
Replace Thermostats Heat Pump & Wire (Mechanical Room)
Replace Thermostats (Lodge Room)
Install New Controls & Sensors Water Pumps (Mechanical Room)
Replace Thermostats & Wire for Heat Pump (Dinning & Event Hall)
Touch Up Paint
Replace Controls for Rooftop Unit (Kitchen Hood)
Revise Control Sequence (Heat Pumps & Loops)
Replace Controls ERV (Mechanical Room)
Replace and Re-Wire Thermostat Heat Pump (Mechanical Room)
Replace and Wire Thermostats (Lodge Rooms)
Touch Up Paint
Replace and Wire Thermostats (Lodge Rooms)
Touch Up Paint
Punchlist
Final Clean
Obtain Substantial Completion Certificate
Final Completion
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Childrens - Hazardous Material Storage noah.thelen Rectangle
D R
A F T
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
9418.00 - DNR HCR Building Automation System Improvements
01 9113 General Commissioning Requirements 1
SECTION 01 9113 - GENERAL COMMISSIONING REQUIREMENTS
PART 1 GENERAL
1.1. SUMMARY
A. Commissioning is intended to achieve the following specific objectives; this section specifies the Contractor's responsibilities for commissioning:
1) Verify that the work is installed in accordance with Contract Documents and the manufacturer’s recommendations and instructions, and that it receives adequate operational checkout prior to startup: Startup reports and Prefunctional Checklists executed by Contractor are utilized to achieve this.
2) Verify and document that functional performance is in accordance with Contract Documents: Functional Tests executed by Contractor and witnessed by the Commissioning Authority are utilized to achieve this.
3) Verify that operation and maintenance manuals submitted to Owner are complete:
Detailed operation and maintenance (O&M) data submittals by Contractor are utilized to achieve this.
4) Verify that the Owner’s operating personnel are adequately trained: Formal training conducted by Contractor is utilized to achieve this.
B. The Commissioning Authority directs and coordinates all commissioning activities; this section describes some but not all of the Commissioning Authority's responsibilities.
C. The Commissioning Authority is employed by Owner.
1.2. SCOPE OF COMMISSIONING
A. The following are to be commissioned:
B. HVAC System, including:
1) Major and minor equipment items.
2) Control system.
C. Other equipment and systems explicitly identified elsewhere in Contract Documents as requiring commissioning.
1.3. RELATED REQUIREMENTS
A. Section 01 7800 - Closeout Submittals: Scope and procedures for operation and maintenance manuals and project record documents.
B. Section 23 0800 - Commissioning of HVAC: HVAC control system testing; other requirements.
1.4. REFERENCE STANDARDS
A. ASHRAE Std 202 - Commissioning Process for Buildings and Systems; 2013.
B. NEBB S110 - Whole Building Technical Commissioning Of New Construction; 2018.
01 9113 General Commissioning Requirements 2
1.5. SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures; except:
1) Make all submittals specified in this section, and elsewhere where indicated for commissioning purposes, directly to the Commissioning Authority, unless they require review by Architect; in that case, submit to Architect first.
2) Submit one copy to the Commissioning Authority, not to be returned.
3) Make commissioning submittals on time schedule specified by Commissioning Authority.
4) Submittals indicated as "Draft" are intended for the use of the Commissioning Authority in preparation of Prefunctional Checklists or Functional Test requirements; submit in editable electronic format, Microsoft Word 2010 preferred.
5) As soon as possible after submittals made to Architect are approved, submit copy of approved submittal to the Commissioning Authority.
B. Manufacturers' Instructions: Submit copies of all manufacturer-provided instructions that are shipped with the equipment as soon as the equipment is delivered.
C. Product Data: If submittals to Architect do not include the following, submit copies as soon as possible:
1) Manufacturer's product data, cut sheets, and shop drawings.
2) Manufacturer's installation instructions.
3) Startup, operating, and troubleshooting procedures.
4) Fan and pump curves.
5) Factory test reports.
6) Warranty information, including details of Owner's responsibilities in regard to keeping warranties in force.
D. Manufacturers' Instructions: Submit copies of all manufacturer-provided instructions that are shipped with the equipment as soon as the equipment is delivered.
E. Startup Plans and Reports.
F. Completed Prefunctional Checklists.
G. Commissioning Issues Log:
1) Construction observations.
2) Supporting photographs.
01 9113 General Commissioning Requirements 3
PART 2 PRODUCTS
2.1. TEST EQUIPMENT
A. Provide all standard testing equipment required to perform startup and initial checkout and required Functional Testing; unless otherwise noted such testing equipment will NOT become the property of Owner.
B. Calibration Tolerances: Provide testing equipment of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified. If not otherwise noted, the following minimum requirements apply:
1) Temperature Sensors and Digital Thermometers: Certified calibration within past year to accuracy of 0.5 degree F and resolution of plus/minus 0.1 degree F.
2) Pressure Sensors: Accuracy of plus/minus 2.0 percent of the value range being measured (not full range of meter), calibrated within the last year.
3) Calibration: According to the manufacturer’s recommended intervals and when dropped or damaged; affix calibration tags or keep certificates readily available for inspection.
C. Equipment-Specific Tools: Where special testing equipment, tools and instruments are specific to a piece of equipment, are only available from the vendor, and are required in order to accomplish startup or Functional Testing, provide such equipment, tools, and instruments as part of the work at no extra cost to Owner; such equipment, tools, and instruments are to become the property of Owner.
D. Dataloggers: Independent equipment and software for monitoring flows, currents, status, pressures, etc.
of equipment.
1) Dataloggers required to for Functional Tests will be provided by the Commissioning Authority and will not become the property of Owner.
PART 3 EXECUTION
3.1. COMMISSIONING PLAN
A. Commissioning Authority has prepared the Commissioning Plan.
1) Attend meetings called by the Commissioning Authority for purposes of completing the commissioning plan.
2) Require attendance and participation of relevant subcontractors, installers, suppliers, and manufacturer representatives.
B. Contractor is responsible for compliance with the Commissioning Plan.
C. Commissioning Plan: The commissioning schedule, procedures, and coordination requirements for all parties in the commissioning process.
D. Commissioning Schedule:
1) Submit anticipated dates of startup of each item of equipment and system to Commissioning Authority within 60 days after award of Contract.
01 9113 General Commissioning Requirements 4
2) Re-submit anticipated startup dates monthly, but not less than 4 weeks prior to startup.
3) Prefunctional Checklists and Functional Tests are to be performed in sequence from components, to subsystems, to systems.
4) Provide sufficient notice to Commissioning Authority for delivery of relevant Checklists and Functional Test procedures, to avoid delay.
3.2. STARTUP PLANS AND REPORTS
A. Startup Plans: For each item of equipment and system for which the manufacturer provides a startup plan, submit the plan not less than 8 weeks prior to startup.
B. Startup Reports: For each item of equipment and system for which the manufacturer provides a startup checklist (or startup plan or field checkout sheet), document compliance by submitting the completed startup checklist prior to startup, signed and dated by responsible entity.
C. Submit directly to the Commissioning Authority.
3.3. PREFUNCTIONAL CHECKLISTS
A. A Prefunctional Checklist is required to be filled out for each item of equipment or other assembly specified to be commissioned.
1) No sampling of identical or near-identical items is allowed.
2) These checklists do not replace manufacturers' recommended startup checklists, regardless of apparent redundancy.
3) Prefunctional Checklist forms will not be complete until after award of the contract; the following types of information will be gathered via the completed Checklist forms:
a. Certification by installing contractor that the unit is properly installed, started up, and operating and ready for Functional Testing.
b. Confirmation of receipt of each shop drawing and commissioning submittal specified, itemized by unit.
c. Manufacturer, model number, and relevant capacity information; list information "as specified," "as submitted," and "as installed."
d. Serial number of installed unit.
e. List of inspections to be conducted to document proper installation prior to startup and Functional Testing; these will be primarily static inspections and procedures; for equipment and systems may include normal manufacturer’s start-up checklist items and minor testing.
f. Sensor and actuator calibration information.
B. Contractor is responsible for filling out Prefunctional Checklists, after completion of installation and before startup; witnessing by the Commissioning Authority is not required unless otherwise specified.
01 9113 General Commissioning Requirements 5
1) Each line item without deficiency is to be witnessed, initialed, and dated by the actual witness; checklists are not complete until all line items are initialed and dated complete without deficiencies.
2) Checklists with incomplete items may be submitted for approval provided the Contractor attests that incomplete items do not preclude the performance of safe and reliable Functional Testing; re-submission of the Checklist is required upon completion of remaining items.
3) Individual Checklists may contain line items that are the responsibility of more than one installer; Contractor shall assign responsibility to appropriate installers or subcontractors, with identification recorded on the form.
4) If any Checklist line item is not relevant, record reasons on the form.
5) Contractor may independently perform startup inspections and/or tests, at Contractor's option.
6) Regardless of these reporting requirements, Contractor is responsible for correct startup and operation.
7) Submit completed Checklists to Commissioning Authority within two days of completion.
C. Commissioning Authority is responsible for furnishing the Prefunctional Checklists to Contractor.
1) Initial Drafts: Contractor is responsible for initial draft of Prefunctional Checklist where so indicated in Contract Documents.
2) Provide all additional information requested by Commissioning Authority to aid in preparation of checklists, such as shop drawing submittals, manufacturers' startup checklists, and O&M data.
3) Commissioning Authority may add any relevant items deemed necessary regardless of whether they are explicitly mentioned in Contract Documents or not.
4) When asked to review the proposed Checklists, do so in a timely manner.
D. Commissioning Authority Witnessing: Required for:
1) Each piece of primary equipment, unless sampling of multiple similar units is allowed by the commissioning plan.
2) A sampling of non-primary equipment, as allowed by the commissioning plan.
E. Deficiencies: Correct deficiencies and re-inspect or re-test, as applicable, at no extra cost to Owner.
1) If difficulty in correction would delay progress, report deficiency to the Commissioning Authority immediately.
3.4. FUNCTIONAL TESTS
A. A Functional Test is required for each item of equipment, system, or other assembly specified to be commissioned, unless sampling of multiple identical or near-identical units is allowed by the final test
01 9113 General Commissioning Requirements 6 procedures.
B. Contractor is responsible for execution of required Functional Tests, after completion of Prefunctional Checklist and before closeout.
C. Commissioning Authority is responsible for witnessing and reporting results of Functional Tests, including preparation and completion of forms for that purpose.
D. Contractor is responsible for correction of deficiencies and re-testing at no extra cost to Owner; if a deficiency is not corrected and re-tested immediately, the Commissioning Authority will document the deficiency and the Contractor's stated intentions regarding correction.
1) Deficiencies are any condition in the installation or function of a component, piece of equipment or system that is not in compliance with Contract Documents or does not perform properly.
2) When the deficiency has been corrected, the Contractor completes the form certifying that the item is ready to be re-tested and returns the form to the Commissioning Authority; the Commissioning Authority will reschedule the test and the Contractor shall re-test.
3) Identical or Near-Identical Items: If 10 percent, or three, whichever is greater, of identical or near-identical items fail to perform due to material or manufacturing defect, all items will be considered defective; provide a proposal for correction within 2 weeks after notification of defect, including provision for testing sample installations prior to replacement of all items.
4) Contractor shall bear the cost of Owner and Commissioning Authority personnel time witnessing re-testing.
5) Contractor shall bear the cost of Owner and Commissioning Authority personnel time witnessing re-testing if the test failed due to failure to execute the relevant Prefunctional Checklist correctly; if the test failed for reasons that would not have been identified in the Prefunctional Checklist process, Contractor shall bear the cost of the second and subsequent re-tests.
E. Functional Test Procedures:
1) Some test procedures are included in Contract Documents; where Functional Test procedures are not included in Contract Documents, test procedures will be determined by the Commissioning Authority with input by and coordination with Contractor.
2) Examples of Functional Testing:
a. Test the dynamic function and operation of equipment and systems (rather than just components) using manual (direct observation) or monitoring methods under full operation (e.g., the chiller pump is tested interactively with the chiller functions to see if the pump ramps up and down to maintain the differential pressure setpoint).
b. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc.
01 9113 General Commissioning Requirements 7
c. Systems are run through all the HVAC control system’s sequences of operation and components are verified to be responding as the sequence's state.
d. Traditional air or water test and balancing (TAB) is not Functional Testing; spot checking of TAB by demonstration to the Commissioning Authority is Functional Testing.
F. Deferred Functional Tests: Some tests may need to be performed later, after substantial completion, due to partial occupancy, equipment, seasonal requirements, design or other site conditions; performance of these tests remains the Contractor's responsibility regardless of timing.
3.5. SENSOR AND ACTUATOR CALIBRATION
A. Calibrate all field-installed temperature, relative humidity, carbon monoxide, carbon dioxide, and pressure sensors and gauges, and all actuators (dampers and valves) on this piece of equipment shall be calibrated. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.
B. Calibrate using the methods described below; alternate methods may be used, if approved by Commissioning Authority and Owner beforehand. See PART 2 for test instrument requirements. Record methods used on the relevant Prefunctional Checklist or other suitable forms, documenting initial, intermediate and final results.
C. All Sensors:
1) Verify that sensor location is appropriate and away from potential causes of erratic operation.
2) Verify that sensors with shielded cable are grounded only at one end.
3) For sensor pairs that are used to determine a temperature or pressure difference, for temperature make sure they are reading within 0.2 degree F of each other, and for pressure, within tolerance equal to 2 percent of the reading, of each other.
4) Tolerances for critical applications may be tighter.
D. Sensors Without Transmitters - Standard Application:
1) Make a reading with a calibrated test instrument within 6 inches of the site sensor.
2) Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrument-measured value.
3) If not, install offset, calibrate or replace sensor.
E. Sensors With Transmitters - Standard Application.
1) Disconnect sensor.
2) Connect a signal generator in place of sensor.
3) Connect ammeter in series between transmitter and building automation system control panel.
01 9113 General Commissioning Requirements 8
4) Using manufacturer’s resistance-temperature data, simulate minimum desired temperature.
5) Adjust transmitter potentiometer zero until 4 mA is read by the ammeter.
6) Repeat for the maximum temperature matching 20 mA to the potentiometer span or maximum and verify at the building automation system.
7) Record all values and recalibrate controller as necessary to comply with specified control ramps, reset schedules, proportional relationship, reset relationship and P/I reaction.
8) Reconnect sensor.
9) Make a reading with a calibrated test instrument within 6 inches of the site sensor.
10) Verify that the sensor reading, via the permanent thermostat, gauge or building automation system, is within the tolerances in the table below of the instrument-measured value.
11) If not, replace sensor and repeat.
12) For pressure sensors, perform a similar process with a suitable signal generator.
F. Sensor Tolerances for Standard Applications: Plus/minus the following maximums:
1) Watthour, Voltage, Amperage: 1 percent of design.
2) Pressure, Air, Water, Gas: 3 percent of design.
3) Air Temperatures (Outside Air, Space Air, Duct Air): 0.4 degrees F.
4) Relative Humidity: 4 percent of design.
5) Barometric Pressure: 0.1 inch of Hg.
6) Flow Rate, Air: 10 percent of design.
7) Flow Rate, Water: 4 percent of design.
8) AHU Wet Bulb and Dew Point: 2.0 degrees F.
G. Critical Applications: For some applications more rigorous calibration techniques may be required for selected sensors. Describe any such methods used on an attached sheet.
H. Valve/Damper Stroke Setup and Check:
1) For all valve/damper actuator positions checked, verify the actual position against the control system readout.
2) Set pump/fan to normal operating mode.
3) Command valve/damper closed; visually verify that valve/damper is closed and adjust output zero signal as required.
01 9113 General Commissioning Requirements 9
4) Command valve/damper to open; verify position is full open and adjust output signal as required.
5) Command valve/damper to a few intermediate positions.
6) If actual valve/damper position does not reasonably correspond, replace actuator or add pilot positioner (for pneumatics).
I. Isolation Valve or System Valve Leak Check: For valves not associated with coils.
1) With full pressure in the system, command valve closed.
2) Use an ultra-sonic flow meter to detect flow or leakage.
3.6. TEST PROCEDURES - GENERAL
A. Provide skilled technicians to execute starting of equipment and to execute the Functional Tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests, adjustments and problem-solving.
B. Provide all necessary materials and system modifications required to produce the flows, pressures, temperatures, and conditions necessary to execute the test according to the specified conditions. At completion of the test, return all affected equipment and systems to their pre-test condition.
C. Sampling: Where Functional Testing of fewer than the total number of multiple identical or near-identical items is explicitly permitted, perform sampling as follows:
1) Identical Units: Defined as units with same application and sequence of operation; only minor size or capacity difference.
2) Sampling is not allowed for:
a. Major equipment.
b. Life-safety-critical equipment.
c. Prefunctional Checklist execution.
3) XX = the percent of the group of identical equipment to be included in each sample;
defined for specific type of equipment.
4) YY = the percent of the sample that if failed will require another sample to be tested;
defined for specific type of equipment.
5) Randomly test at least XX percent of each group of identical equipment, but not less than three units. This constitutes the "first sample."
6) If YY percent of the units in the first sample fail, test another XX percent of the remaining identical units.
7) If YY percent of the units in the second sample fail, test all remaining identical units.
8) If frequent failures occur, resulting in more troubleshooting than testing, the Commissioning Authority may stop the testing and require Contractor to perform and document a checkout of the remaining units prior to continuing testing.
01 9113 General Commissioning Requirements 10
D. Manual Testing: Use hand-held instruments, immediate control system readouts, or direct observation to verify performance (contrasted to analyzing monitored data taken over time to make the “observation”).
E. Simulating Conditions: Artificially create the necessary condition for the purpose of testing the response of a system; for example apply hot air to a space sensor using a hair dryer to see the response in a VAV box.
F. Simulating Signals: Disconnect the sensor and use a signal generator to send an amperage, resistance or pressure to the transducer and control system to simulate the sensor value.
G. Over-Writing Values: Change the sensor value known to the control system in the control system to see the response of the system; for example, change the outside air temperature value from 50 degrees F to 75 degrees F to verify economizer operation.
H. Indirect Indicators: Remote indicators of a response or condition, such as a reading from a control system screen reporting a damper to be 100 percent closed, are considered indirect indicators.
I. Monitoring: Record parameters (flow, current, status, pressure, etc.) of equipment operation using dataloggers or the trending capabilities of the relevant control systems; where monitoring of specific points is called for in Functional Test Procedures:
1) All points that are monitored by the relevant control system shall be trended by Contractor; at the Commissioning Authority’s request, Contractor shall trend up to 20 percent more points than specified at no extra charge.
2) Other points will be monitored by the Commissioning Authority using dataloggers.
3) At the option of the Commissioning Authority, some control system monitoring may be replaced with datalogger monitoring.
4) Provide hard copies of monitored data in columnar format with time down left column and at least 5 columns of point values on same page.
5) Graphical output is desirable and is required for all output if the system can produce it.
6) Monitoring may be used to augment manual testing.
3.7. OPERATION AND MAINTENANCE MANUALS
A. See Section 01 7800 - Closeout Submittals for additional requirements.
B. Submit manuals related to items that were commissioned to Commissioning Authority for review; make changes recommended by Commissioning Authority.
C. Commissioning Authority will add commissioning records to manuals after submission to Owner.
23 0010 MECHANICAL GENERAL REQUIREMENTS 1
SECTION 23 0010 - MECHANICAL GENERAL REQUIREMENTS
PART 1 GENERAL
1.1. GENERAL
A. All work under this section shall comply with the contract requirements noted on the architectural drawings and/or specifications and shall include all mechanical sections specified herein. All work under this section shall comply with the contract requirements noted on architectural drawings and specifications general requirements.
B. All cavity spaces between ceiling and structure (plenum spaces) are to be considered return air plenums and all material installed in plenum shall be rated and UL listed for return air plenums.
C. Mechanical contractor shall schedule start-up session to start HVAC equipment. Schedule one full day of start-up at least two weeks prior to substantial completion.
1.2. RELATED REQUIREMENTS
A. Section 01 9113 - General Commissioning Requirements: Commissioning requirements that apply to all types of work.
1.3. WORK INCLUDED
A. Provide all labor, materials, equipment and tools required for completely finished and operational HVAC and mechanical systems to fulfill the design intent shown on the documents.
B. Work shall be of the finest quality of construction, materials and workmanship.
C. Install equipment in accordance with manufacturer recommendations.
D. Section 01 91 13 - General Commissioning Requirements: Commissioning requirements that apply to all types of work.
1) Commissioning agent is engaged to document the completion of the mechanical, life safety, and building control systems for the project. Section defines the role of each member of the commissioning team.
2) Comply with the requirements of Division 1 for the commissioning of the various building systems.
E. The plans are diagrammatic and generally show the locations of fixtures, equipment, ductwork and piping and shall not be scaled. Provide all offsets, fittings and components required for a complete system even if not explicitly called out on the drawings.
1.4. COORDINATION AND VERIFICATION
A. Refer to the architectural interior details, floor plans, elevations and other contract drawings as well as existing structural, mechanical, fire protection, electrical systems and other existing conditions.
Coordinate work with that of the other trades to avoid interference.
B. All dimensions and existing conditions shall be field verified prior to the commencement of the work.
C. Contract Documents:
23 0010 MECHANICAL GENERAL REQUIREMENTS 2
1) General: The Contract Documents are diagrammatic, showing certain physical relationships which must be established within the mechanical work and its interface with other work. Such establishment is the exclusive responsibility of the Contractor.
Drawings shall not be scaled for the purpose of establishing material quantities.
2) When electronic CAD files or building information modeling (BIM) files have been provided to the contractor, the contractor shall only consider the files as design to only show the intent of the design. The contractor shall be responsible for the Coordination drawings based on the design.
3) Work out all “tight” conditions in advance of installation. If necessary, and before work proceeds in those areas, prepare coordination drawings showing all work in congested areas. Provide additional work necessary to overcome congested conditions at no increase in contract sum or schedule.
4) Clearly indicate solutions to space problems. Identification of space problems without solutions is not acceptable. Only areas clearly identified will be reviewed.
5) Acceptance by the Architect/Engineer does not imply acceptance of any deviations from contract documents requirements or acceptance of uncoordinated work. Review is for general conformance to the design concept and general compliance with the information given in the contract documents.
6) Locate equipment requiring periodic servicing so that it is readily accessible. Provide means of service access, following appropriate manufacturer's recommended service clearance space or, as applicable, means of access using duct, wall, or ceiling access doors.
7) Supplemental Instructions: The exact location for some items in this Specification may not be shown on the Drawings. The location of such items may be established by the Engineer during the progress of the work.
8) If prevented by project conditions, prepare drawings showing proposed rearrangement of Work, including changes to Work specified in other sections. Obtain permission of Architect before proceeding.
9) Discrepancies:
a. Examine Drawings and Specifications.
b. Report any discrepancies to the Architect and obtain written instructions before proceeding.
c. Should there be a conflict within or between the Specifications or Drawings, the more stringent or higher quality requirements shall apply.
d. Items called for in either specifications or drawings shall be required as if called for in both.
e. Be responsible for providing proper documentation of equipment product data and shop drawings to all entities providing service.
23 0010 MECHANICAL GENERAL REQUIREMENTS 3
1.5. UTILITY DISRUPTIONS
A. Existing buildings and their facilities must remain functional while the Work under this Contract is performed. All system shutdowns and outages must be minimized, provided with temporary heating or cooling systems as part of the base bid and coordinated with the Owner.
B. Cause as little interference or interruption of existing utilities and services as possible. Schedule work which will cause interference or interruption a minimum of two weeks in advance with Owner, authorities having jurisdiction, and all affected trades.
C. The Contractor shall provide temporary or new services to all existing facilities and utility streams as required to maintain their proper operation when normal services are disrupted as a result of the work being accomplished under this project.
D. The time allowed for outages will not be during normal working hours unless otherwise approved by the Owner. All costs of outages, including any overtime charges for night and weekend work, and temporary systems shall be included in the contract amount.
1.6. CODES, REGULATIONS, FEES, PERMITS
A. Conform to the codes in force at the time of construction in the jurisdiction of the project.
B. Call for inspections from the authority having jurisdiction. If discrepancies exist between the contract documents and the local requirements, the more stringent shall apply.
C. Contractor shall obtain all required permits prior to the start of the project.
D. Post permits as required.
E. Contractor shall pay all permit fees, tap fees and inspection fees. Owner shall pay any required development fees.
1.7. PROTECTION
A. People
1) Comply with all applicable health and safety regulations. Set barricades and signs as necessary to minimize hazards for building occupants and trades.
2) Equipment, materials or other potential hazards to the public and working occupants of the building shall not be left overnight outside of the designated working or construction areas.
B. Work
1) Take all necessary measure to protect the work during and after installation to ensure that it will be unblemished, undamaged and clean when turned over to the owner.
C. Mechanical Systems
1) During periods of excessive dust generation such as drywall sanding, seal off return and exhaust openings and grilles to prevent dust from accumulating in ductwork.
23 0010 MECHANICAL GENERAL REQUIREMENTS 4
2) If outside air source contains less dust than building air, adjust A/C unit dampers to operate with as much outside air as possible without causing a freezing condition for coil or exceeding capacity of coil to adequately condition supply air.
3) Do not operate any air handling unit without all temporary construction filters, and scheduled filters, pre and final, installed.
D. Equipment and Materials
1) Deliver equipment in its original unbroken package to prevent damage or entrance of foreign matter. Perform all handling and shipping in accordance with manufacturer's recommendations. Provide protective coverings during construction. Identifying labels intact and legible.
2) Immediately upon delivery, identify and inspect materials and equipment delivered to Site to assure compliance with Contract Documents, approved submittals and reviewed Shop Drawings.
3) Protect from loss, damage, dust, water, etc., until notice of completion has been filed.
Promptly replace lost, damaged or defective materials and equipment with new at no increase in Contract Sum. Remove damaged or defective materials from site.
4) Do not store equipment or materials outdoors unprotected. Remove improperly stored equipment and materials from site. Contractor shall provide storage in appropriate enclosed wharehouse as required at contractors expense.
5) Ductwork and piping shall be delivered to site with ends sealed. Seal shall remain in place until installed. Provide seal on end of all open ductwork and piping at end of day.
6) Refer to Division 1 for additional requirements.
1.8. CUTTING AND PATCHING
A. Cut and patch as necessary for the installation of the materials and equipment. Coordinate patching with the architectural contractor.
B. Do not cut any structural members without prior approval from the architect or structural engineer.
1.9. OPERATION AND MAINTENANCE MANUAL
A. Refer to Division 01 for O&M Manual requirements. Provide most stringent between items noted below and in Division 1. If there are no requirements in Division 1, the requirements below shall apply.
B. Upon substantial completion of the work, submit one O&M Manual to the engineer for review and comment. Respond to comments and submit a total of 3 copies of the O&M Manual to the architect upon project completion.
C. Manual shall be in a 3-ring binder with edge and front labels. Include a table of contents and include:
1) Final approved submittals indicating all model numbers, serial numbers, cut sheets, and all performance criteria on furnished equipment
2) Installation, Operation and Maintenance Instructions
23 0010 MECHANICAL GENERAL REQUIREMENTS 5
3) Parts Lists
4) Test and Balance Report
5) Certificates of Inspection
6) Executed Warranties
D. Provide PDF format copy of O&M manual as noted above. PDF shall be bookmarked with titles per specification section and per piece of equipment within each section.
1.10. WARRANTIES
A. Provide a one year warranty on all mechanical work installed under contract. Provide an additional 4 year warranty for all refrigerant compressors installed.
B. Include executed warranties in O&M Manual.
C. Warranty shall include parts, labor, and shipping and shall cover any damage caused by failures in the covered mechanical systems.
1.11. RECORD DRAWINGS
A. Refer to Division 01 for requirements. At a minimum comply with the following requirements.
B. Maintain a set of redlined drawings at the jobsite with all changes to the Contract Documents, whether generated by addenda, change orders, or field conditions, and dimensioned locations of underground utilities. Maintain a daily record of these changes and keep current set of drawings showing these changes. Submit set of redlined drawings to the owner at project close-out.. Record changes and locations of installed systems drawn to scale and fully dimensioned, and as specified in Division 1, but a minimum of:
1) Work concealed behind or within other work, in an inaccessible arrangement.
2) Revised sequences of operation, point to point information and graphics.
3) Revised sensor locations and locations of any controllers.
4) Concealed control system devices and sensors.
C. Provide record drawings that illustrate the work of Division 23 as finally constructed. Deliver record drawings to the Architect in reproducible hard copy, Auto CAD or Revit format and PDF format on CD Rom, DVD, or Flash Drive. Also provide PDF format electronic copies of permit set with all revisions and RFI responses noted. Set shall include all architectural, structural, civil, mechanical, electrical, plumbing, low voltage, and food service and all other vendors issued with the project. Provide PDF format of full specification set with all revisions and RFI responses noted. All PDF sets shall be bookmarked per phase, division and per drawing or specification section. A change log shall be provided listing each drawing and specification section and all drawing and specification issues including all addendums, clarifications, RFIs and change orders. Log shall indicate the most current version of each drawing and specification section.
D. Deliver record drawings to Architect within 30 days of Substantial Completion.
23 0010 MECHANICAL GENERAL REQUIREMENTS 6
1.12. DEMONSTRATION
A. Provide factory trained personnel to instruct operating staff in maintenance and adjustment and operation of mechanical equipment. Provide instruction during regular work hours prior to acceptance and turn over to operating staff. Scheduling of training shall be at owner's direction. Use operating and maintenance manual and updated as-constructed drawings for instruction purposes.
B. Demonstrate normal start-up and shut-down, emergency shut-down and seasonal change over. Review operation of safety devices and control systems.
C. Inspections and Tests:
1) Arrange for all required inspections and tests.
2) Pay all charges.
3) Notify Architect / Engineer two (2) business days before tests.
4) Submit one copy for Owner’s records of permits, licenses, inspection reports and test reports.
PART 2 PRODUCTS
2.1. SUBMITTALS
A. Coordinate submittals 3 weeks (min.) prior to expected order date so that work will not be delayed by submittals.
B. No extension of time will be allowed because of failure to properly coordinate and sequence submittals.
C. Submittals from subcontractors and equipment suppliers are to be carefully checked by the Contractor for space requirements and conformance to the Drawings and Specifications. These submittals shall be so noted by the Contractor prior to forwarding to the Architect/Engineer for checking. No deviations from the Drawings and Specifications will be allowed, recognized or considered unless brought to the attention of the Architect/Engineer at the time the submittals are submitted by the Contractor. Submittals not processed by the Contractor before forwarding to the Architect/Engineer for approval will be returned to the Contractor for his prior processing.
D. Submittal is for information and record, unless otherwise indicated, and is not a change order request.
E. Submitting Contractor is responsible for routing reviewed submittals to all parties affected including but not limited to electrical, structural, temperature control, and test and balance subcontractors.
F. Submittals shall include catalog cut-sheets with submitted products and options clearly identified, written descriptions, and specification sheets detailing the associated product, item and assembly.
G. No substitution for brands named in the Contract Documents will be considered unless written request has been submitted to the Engineer. Each such request shall include a complete description of the proposed substitute, drawings, cut sheets, performance and test data, and any other data or information necessary for complete evaluation. The burden of proving acceptability of a proposed product rests on the party submitting the request for approval. Request for product approval substitutions shall be submitted in writing to the Engineer a minimum of ten (10) working days in advance of the bid date.
23 0010 MECHANICAL GENERAL REQUIREMENTS 7
H. Shop drawings shall include details, installation drawings, assembly drawings, fabrication drawings, diagrams, and other information which show adaptation or installation of Contractor-furnished products or materials for overall project.
I. The purpose of submittals and shop drawings is to ensure Contractor understands design requirements and demonstrates understanding by indicating and detailing intended materials, methods, and installation practices. Submittals and shop drawings are not a method of requesting substitutions or deviation from Specifications. If discrepancies between submittals, shop drawings, and Contract Documents are discovered either prior to or after submittals and shop drawings are reviewed, requirements of Contract Documents shall take precedence.
J. Catalog numbers referenced throughout the Division 23 Drawings and Specifications are intended to convey a general understanding of the type and quality of the product required. Where written descriptions differ from information conveyed by a catalog number, the written description shall govern.
No extra shall be allowed because a catalog number is found to be incomplete or obsolete.
K. Group complete information of related systems, products, and accessories in a single submittal. If submitted as a hard copy, submittals shall be submitted in a three-ring binder, with separate sections for each type or category of equipment, with labeled tabs indicating the contents of the section. If submitted electronically, the submittal shall be in a PDF file with each section bookmarked with labels. Within each section, each sub item or equipment tag shall be bookmarked with a corresponding tag.
L. In the front of each submittal binder, the Mechanical Contractor shall include a signed letter from the project Electrical Contractor indicating that the Electrical Contractor has reviewed the mechanical submittals and has verified that the equipment being submitted will conform to the design of the project electrical systems.
M. After Architect/Engineer review, submittals and shop drawings will be returned together with Submittal Review Sheet which indicates comments on submittals and shop drawings and with specific actions such as "No Exception Taken", "Make Corrections Noted", "Rejected", and "Resubmit". Continue to resubmit submittals and shop drawings until "No Exception Taken" or "Make Corrections Noted-Resubmittal Not Required" action is indicated.
N. Resubmittals will be reviewed for compliance with comment made on the original submittal only.
Clearly identify replied-to comments with a resubmittal number and date. If any other changes are made that are not in reply to comments, clearly identify the changes. Indicate dates of previous submissions and submittal numbers. Direct specific attention to any changes made in addition to those made in reply to previous review comments.
O. If more than two submittals (either for products, materials, shop drawings, record drawings, or test and balance reports) are made by the Contractor of basis of design, listed general equivalents or substitutions, the Owner reserves the right to charge the Contractor for subsequent reviews by their consultants at their consultants current published hourly rate. Such extra fees may be deducted from payments by the Owner to the Contractor.
P. Refer to individual specification sections for submittal requirements. However, a minimum, shop drawings shall be submitted for each of the following items as applicable to the project:
1) Controls & Control Diagrams including Wiring Plans
23 0010 MECHANICAL GENERAL REQUIREMENTS 8
2.2. ESCUTCHEONS
A. Split-casting, cast-brass type with chrome finish, with concealed hinge and set screw with an ID to closely fit around pipe, tube and insulation of insulated piping and an OD that completely covers opening.
PART 3 EXECUTION
3.1. DEMOLITION
A. The Contractor shall be responsible for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .