RFB940100-01 - Addendum 01.pdf
PDF 438 KB Posted
- Attached to
- DOC 3JD Sheldon Admin Bldg. Window Replacements
- Solicitation number
- RFB940100-01
- Issued by
- O'brien County, Iowa
About this file
This Addendum No. 1, issued on August 8, 2024, by the State of Iowa Department of Administrative Services (DAS), amends the Project Manual and Drawings for window replacement work at the DOC 3JD Sheldon Administrative Building located at 720 Western Ave, Sheldon, Iowa 51201. The project involves the demolition and installation of new wood-clad commercial windows with insulated glazed units and solid surface windowsills. The general contractor may access one entire building wing at a time, with rooms requiring completion except for solid surface sill installation and owner painting. Key specifications clarify that the solid surface sill need not extend past the window jamb; the metal flashing above windows may be contractor-supplied break metal matching the window frame color; and the stain finish shall be semi-transparent, water-based polyurethane in a color selected from the manufacturer's standard line. The Quaker W600 Clad Wood Commercial Series is approved for use. Bids were due on August 13, 2024, at 2:00 PM through the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 PM the same day. The pre-bid meeting was held on August 1, 2024, with a mandatory site visit requirement for contractors to verify existing conditions. Substantial completion is anticipated by April 30, 2025, with the Notice of Intent to Award expected on August 14, 2024, and commencement on August 26, 2024.
Bidders were required to submit a 5% bid security, project-specific Certificates of Insurance, and Performance and Payment bonds prior to contract execution. The successful contractor must submit a subcontractor and supplier list within 48 hours of bid opening and execute a modified ConsensusDocs 802 agreement. The contractor shall maintain onsite supervision at all times, provide daily logs, and participate in construction progress meetings. Work hours are 7:30 AM to 4:00 PM, with no smoking or vaping permitted on site. The contractor will have access to existing building facilities and is not required to provide temporary facilities or obtain background checks. A Schedule of Values must be submitted with a minimum 1% closeout line item invoiceable only after final completion certification. Project management will be conducted through Procore at no cost to the contractor, with submittals, invoicing, and contract modifications handled via Docusign. The addendum includes responses to ten bidder questions addressing phasing, window removal sequencing, temporary covering requirements, existing finish documentation, substrate conditions, and material substitution procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #9370.00 Addendum #01 Page 1 of 3
ADDENDUM NO. 1
Date: 08/08/2024
Project Name: DOC 3JD Sheldon Admin Bldg. Window Replacements
DAS RFB #: 940100-01
DAS Project #: 9401.00
BIDS DUE: 08/13/2024
The original Project Manual and Drawings for the project noted above are amended as noted in this
Addendum. Included in this Addendum are Specification, Architectural, & Engineering items.
Please review all sheets and incorporate them into your set of Contract Documents.
The receipt of this Addendum shall be acknowledged by inserting its number and date in the space provided on the Bid Form.
This Addendum consists of:
General Items:
1. Meeting Minutes: RFP Pre-Proposal Meeting held on 08/01/24 ( 4 Pages)
Questions and Answers:
Q1. How many rooms can be worked on at a time and what level of complete does the room need to be before moving to the next room?
A1. The GC may have access to an entire building wing at a time. The room will need to be complete except for the installation of the solid surface windowsill and the owner’s painting scope.
Q2. Does the solid surface sill need to extend 1” +/- past the window jamb?
A2. No, the solid surface does not need to extend past the window jamb. The solid surface sill may stop in line with the window jamb but the gyp behind the existing sill may need to be patched.
Q3. What are existing finishes?
A3. All existing materials / furniture exc. that may be damaged by performing the GC’s scope of work or damage done to areas when getting to the defined area of work.
Example – scratch up a hallway wall when carrying a tool to the area you are performing work.
Q4. Do you have photos that can be shared?
Project #9370.00 Addendum #01 Page 2 of 3
A4. The GC will need to make a site visit to verify the existing conditions.
Q5. Can we remove all windows or are they phased?
A5. See response to question 1.
Q6. Will they remove all windows or are they phased?
A6. Correct, the owner will remove all window curtains, rods, and brackets.
Q7. How much temporary covering will be needed? Do they want us to leave temporary covering for owners to use while painting.
A7. Provide adequate covering for your scope of work. Depending on the project schedule, the owner may ask you to leave your coverings. For bidding, do not plan on leaving your coverings.
Q8. How many rooms can be demoed at a time? If drywall would like to do as many as possible when texturing to minimize covering and to match finish in all rooms
A8. See response to question 1.
Q9. How do we quantify or estimate what will be rotten/compromised?
A9. Note K on sheet A2.00 means the substrate is not adequate to mount/support the new construction.
Q10. Will the downturn edge be wider than the window width?
A10. See response to question 2.
Drawings and Specifications:
Architectural Addendum
SPECIFICATIONS
SECTION – 09 9300 - Staining and Transparent Finish
A. Section 2.03, paragraph A line 2 to read as follows.
i. 2. Stain: Semi-transparent stain for wood, water based with polyurethane.
a. Color: to be selected from the manufacturer’s standard line.
SECTION – 08 5200 - Wood Windows
A. Question at Pre-Bid: Does the metal flashing above the window need to be supplied by the window manufacturer? Keynote #4 on Sheet A4.00.
B. Answer: No, this flashing piece can be contractor-supplied break metal but the color needs to match the window frame.
Project #9370.00 Addendum #01 Page 3 of 3
ARCHITECTURAL PRODUCT APPROVALS
The following materials or equipment furnished by the manufacturer listed may be substituted as equivalent, provided that each item and piece of equipment conforms to the design, quality and requirements of the specifications and drawings.
SECTION ITEM APPROVED
08 5200 QUAKER - W600 CLAD WOOD COMMERCIAL SERIES YES
END OF ADDENDUM NO. 1
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9401.00 DOC 3JD Sheldon Admin Bldg Window Replacements
720 Western Ave Sheldon, Iowa 51201
P: 712-324-5366
RFB Pre-Bid Minutes: Meeting #1
Meeting Date Aug 1, 2024 Meeting Time 10:00 AM - 11:00 AM Central Time (US & Canada)
Meeting Location 720 Western Ave Sheldon, Iowa 51201 Video Conferencing Link https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI 1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?c ontext=%7b%22Tid%22%3a%22705e7dc3-c582- 4519-a026- 3a1c9fd5fc88%22%2c%22Oid%22%3a%22c10595 4f-766c-49c6-8c77-6c5b7e17bacc%22%7d
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Notes
Attachments
Scheduled Attendees
Name Company Phone Number Email Attendance
Andrew Paleczny Boyd Jones Construction Company
P: (402) 553-1804 apaleczny@boydjones.biz Present
Brett Salzwedel Cannon Moss Brygger Architects P: (712) 499-0921 salzwedel.b@cmbaarchitects.com Present
Adam Van Gorp Cannon Moss Brygger Architects P: (712) 262-3426 vangorp.a@cmbaarchitects.com Present
Maureen Hansen DOC CBC #3 P: (712) 224-6844 maureen.hansen@iowa.gov Present
Laura Sullivan DOC CBC #3 laura.sullivan@iowa.gov Present
Jennie Elliott State of Iowa - Department of Administrative Services jennie.elliott@iowa.gov Present
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description DAS - Owner Representative
• Jennie Elliot
Boyd Jones - Construction Manager
• Andrew Paleczny
• Adam Papesh
• Mike Hoover
DOC CBC #3
• Maureen Hansen
• Laura Sullivan
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Aug 8, 2024 07:44 AM CDT https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2JiYTM0MGUtNDExYi00ZmI1LThlMmEtZTM2ZjNkNzU1MDFj%40thread.v2/0?context=%7b%22Tid%22%3a%22705e7dc3-c582-4519-a026-3a1c9fd5fc88%22%2c%22Oid%22%3a%22c105954f-766c-49c6-8c77-6c5b7e17bacc%22%7d
CMBA
• Adam Van Gorp
• Brett Salzwedel
Project Overview
2.1 1 Project Description Open
Description Bid Package #01 - Window Replacement
2.2 1 Project Schedule Open
Description
• Anticipated Notice of Intent of Award - 08/14/24
• Anticipated Date of Commencement - 08/26/24
• Substantial Completion by - 04/30/25
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
Site specific rules
• Temporary facilities
• Tool control
• Background checks
• Work hours
• View Specification 01 1200 - Contract Summary for more information.
Official Documented Meeting Minutes The Contractor will have access to the building facilities and will not need to provide temporary facilities.
Background checks will not be required for this project.
Work hours will 7:30am - 4:00pm
RFB Overview
Meeting #1 - RFB Pre-Bid Project: 9401.00 DOC 3JD Sheldon Admin Bldg Window Replacements
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Aug 8, 2024 07:44 AM CDT
3.1 1 Bid Submission Open
Description
• Bids are due Tuesday, August 13, 2024 by 2:00PM
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on Tuesday, August 13, 2024 at 3:00PM
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
Official Documented Meeting Minutes Plan to register early in the IMPACS system so that if there are any issues, those can be addressed prior to bid day.
IMPACS will show the bid value as "0". DAS and the CM will be reviewing the bid form that was uploaded for the bid value, not what IMPACS shows.
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: Tuesday, August 6, 2024 by 2:00PM
• Addendum Issued:
• Bids Due: Tuesday, August 13, 2024 by 2:00PM
• Tentative NOI Issued: Wednesday, August 14, 2024
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Aug 8, 2024 07:44 AM CDT mailto:Construction.Procurement@iowa.gov:
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
3.4 1 Pre-Bid Site Visits Open
Description Please contact CM (Boyd Jones) to set up any additional site visits.
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
Official Documented Meeting Minutes Dumpster and job trailer can be stored on the southwest side of the parking lot.
As-builts can be provided to the prime contractor at their request.
The interior finish on the wood to be selected from standard list of prime contractor.
Metal to be used outside above windows can be break metal.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Aug 8, 2024 07:44 AM CDT