RFB937200-01 - Drawings.pdf

PDF 20 MB Posted

Attached to
Mount Pleasant Correctional Facility Building 20 Plumbing Replacement
Solicitation number
RFB937200-01
Issued by
Polk County, Iowa

About this file

The provided document is a set of architectural and plumbing drawings for the Iowa Department of Administrative Services' project to replace plumbing systems in Building 20 at the Mount Pleasant Correctional Facility, located at 1200 E Washington St in Mount Pleasant, Iowa. The project involves comprehensive removal and replacement of existing waste, vent, and water piping systems and plumbing fixtures across the basement, first, second, and third floors of the building. The project is scheduled for construction from March 25, 2025, with detailed phasing plans for demolition and installation, and covers multiple areas designated as Area A and Area B on various floor levels.

The project documents specify adherence to multiple building codes, including the 2015 International Existing Building Code, 2015 International Building Code, and 2015 International Fire Code. The scope includes maintaining existing building use and occupancy classifications while updating plumbing infrastructure. The drawings provide extensive technical details, including plumbing fixture schedules, domestic water and sanitary system plans, demolition plans, and 3D isometric views of piping systems. The project will involve careful coordination with potential asbestos abatement contractors and requires preservation of existing building systems and architectural elements during the renovation process.

View the file

Other files

File Type Posted
RFB937200-01 - Bid Form.pdf PDF
RFB937200-01 - Notice to Bidders.pdf PDF
1310390-event.pdf PDF
RFB937200-01 - Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E. WASHINGTON ST

LI

LA

C D

R

S G

R

AN

D A

VE

HOSPITAL AVE

H O

SP

IT

AL

A

VE

PROJECT LOCATION

Applicable Codes:

2015 International Existing Building Code 2015 International Building Code 2015 International Fire Code 2010 Americans with Disabilities Act State Mechanical Code State Plumbing Code State Electrical Code ASME A17.1 Safety Code for Elevators and Escalators State of Iowa Elevator Safety Rules

Project Description:

Removal and replacement of existing waste, vent, and water piping plumbing systems and plumbing fixtures that serve Building 20 at Mount Pleasant Correctional Facility.

International Existing Building Code Chapter 5 Classification of Work

503.1 Scope

Level 1 alterations include the removal and replacement or the covering of existing materials, elements, equipment, or fixtures using new materials, elements, equipment, or fixtures that serve the same purpose.

503.2 Application

Level 1 alterations shall comply with the provisions of Chapter 7.

Chapter 7 Alterations - Level 1 701 General

Alterations shall not make an existing building less safe than its existing condition.

702 Building Elements and Materials

New finishes shall comply with Chapter 8 of the IBC.

703 Fire Protection

Alterations will maintain the level of fire protection provided.

704 Means of Egress

Alterations will maintain the level of protection provided for means of egress.

705 Accessibility

Alterations shall not reduce or have the effect of reducing accessibility of a facility or portion of a facility.

International Building Code Chapter 3 – Use and Occupancy Classification

The use and occupancy classification of the existing building will remain unchanged.

Chapter 5 – General Building Heights and Areas

Existing building height and area to remain unchanged.

Chapter 6 – Types of Construction

The type of construction for the existing building will remain unchanged.

Chapter 7 – Fire and Smoke Protection Features

New construction is minimal.

Chapter 10 – Means of Egress

Means of egress will remain unchanged in the existing building.

CODE SUMMARY

BA D E

FC G

SHEET INDEX

PR

O

JE

C

T N

O

Io w a

Il lin oi s

In di an a

H

Pr in te d:

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

CERTIFICATIONS

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

G000

1200 E Washington St, Mt Pleasant, IA 52641

C O

N

ST

R U

C

TI

O N

-2

5-

SHEET LIST

SHEET NAME

GENERAL

G000 COVER SHEET

G001 PHASING PLANS

G002 PROJECT GENERAL INFORMATION

ARCHITECTURAL

AD01 OVERAL DEMOLITION PLANS - BASEMENT AND FIRST FLOOR

AD02 OVERALL DEMOLITION PLANS - SECOND AND THIRD FLOORS

AD03 BASEMENT DEMOLITION PLAN - AREA A

AD04 BASEMENT DEMOLITION PLAN - AREA B

AD05 FIRST FLOOR DEMOLITION PLAN - AREA A

AD06 FIRST FLOOR DEMOLITION PLAN - AREA B

AD07 SECOND FLOOR DEMOLITION PLAN - AREA A

AD08 SECOND FLOOR DEMOLITION PLAN - AREA B

AD09 THIRD FLOOR DEMOLITION PLAN - AREA A

AD10 THIRD FLOOR DEMOLITION PLAN - AREA B

AD20 OVERALL REFLECTED CEILING DEMOLITION PLANS -

BASEMENT AND FIRST FLOOR

AD21 OVERALL REFLECTED CEILING DEMOLITION PLANS - SECOND

AND THIRD FLOORS

A101 FLOOR PLANS - BASEMENT AND FIRST FLOOR

A102 FLOOR PLANS - SECOND AND THIRD FLOORS

A103 BASEMENT FLOOR PLAN - AREA A

A104 BASEMENT FLOOR PLAN - AREA B

A105 FIRST FLOOR PLAN - AREA A

A106 FIRST FLOOR PLAN - AREA B

A107 SECOND FLOOR PLAN - AREA A

A108 SECOND FLOOR PLAN - AREA B

A109 THIRD FLOOR PLAN - AREA A

A110 THIRD FLOOR PLAN - AREA B

A131 OVERALL REFLECTED CEILING PLAN - BASEMENT AND FIRST

FLOOR

A132 OVERALL REFLECTED CEILING PLAN - SECOND AND THIRD

FLOORS

A210 INTERIOR ELEVATIONS PHOTOS

A211 INTERIOR ELEVATIONS PHOTOS

A212 INTERIOR ELEVATIONS PHOTOS

A320 DETAILS, INTERIOR PARTITION AND FINISH INFORMATION

PLUMBING

P000 PLUMBING GENERAL INFORMATION

PD100A BELOW FLOOR SANITARY AND STORM - AREA A

PD100B BELOW FLOOR SANITARY AND STORM - AREA B

PD110A BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA A

PD110B BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA B

PD111A FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA A

PD111B FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA B

PD112A SECOND FLOOR PLUMBING DEMOLITON PLAN - AREA A

PD112B SECOND FLOOR PLUMBING DEMOLITON PLAN - AREA B

PD113A THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA A

PD113B THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA B

PD114 ROOF PLUMBING DEMOLITION PLAN

P100A BELOW FLOOR SANITARY AND STORM - AREA A

P100B BELOW FLOOR SANITARY AND STORM - AREA B

P110A BASEMENT FLOOR SANITARY AND VENT PLAN - AREA A

P110B BASEMENT FLOOR SANITARY AND VENT PLAN - AREA B

P111A FIRST FLOOR SANITARY AND VENT PLAN - AREA A

P111B FIRST FLOOR SANITARY AND VENT PLAN - AREA B

P112A SECOND FLOOR SANITARY AND VENT PLAN - AREA A

P112B SECOND FLOOR SANITARY AND VENT PLAN - AREA B

P113A THIRD FLOOR SANITARY AND VENT PLAN - AREA A

P113B THIRD FLOOR SANITARY AND VENT PLAN - AREA B

P114 ROOF SANITARY AND VENT PLAN

P210A BASEMENT LEVEL DOMESTIC WATER PLAN - AREA A

P210B BASEMENT FLOOR DOMETSIC WATER PLAN - AREA B

P211A FIRST FLOOR DOMESTIC WATER PLAN - AREA A

P211B FIRST FLOOR DOMESTIC WATER PLAN - AREA B

P212A SECOND FLOOR DOMESTIC WATER PLAN - AREA A

P212B SECOND FLOOR DOMESTIC WATER PLAN - AREA B

P213A THIRD FLOOR DOMESTIC WATER PLAN - AREA A

P213B THIRD FLOOR DOMESTIC WATER PLAN - AREA B

P500 PLUMBING DETAILS

P501 PLUMBING DETAILS

P600 PLUMBING SCHEDULES

P700 PLUMBING 3D VIEWS

P701 PLUMBING 3D VIEWS

P702 PLUMBING 3D VIEWS

P703 PLUMBING 3D VIEWS

P704 PLUMBING 3D VIEWS

P705 PLUMBING 3D VIEWS

P706 PLUMBING 3D VIEWS

P707 PLUMBING 3D VIEWS

NOT TO SCALEA6 SITE LOCATION

N

I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL

SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER

MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY

LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS JUNE 30,

DATE

ARCHITECT

LICENSE NUMBER

Cameron L. Manley

G000, G002, A-SERIES

06716

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL

MY LICENSE RENEWAL DATE IS DECEMBER 31,

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

PRINTED OR TYPED NAME

SIGNATURE DATE

LICENSE NUMBER

Austin L. Hilton

G001, P-SERIES

23780

MECHANICAL ENGINEER

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL

MY LICENSE RENEWAL DATE IS DECEMBER 31,

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

PRINTED OR TYPED NAME

SIGNATURE DATE

LICENSE NUMBER

Christopher R. Marvin

A4/A320, A6/A320, C6/A320

P27417

STRUCTURAL ENGINEER

03/25/2025

03/25/2025

03/25/2025

PHASE 2 WORK

PHASE 3 WORK

PHASE 1 WORK

PHASING LEGEND

BA D E

FC G

Io w a

I lli n o is

I n d ia n

D R

A W

N

A P

P R

O V

E D

IS

S

U E

D F

O R

D A

T E

F

IE

L D

B O

O K

P R

O J E

C T

N O

H

P ri n te d

W e s to w n P k w y S u it e

W e s t D e s M o in e s

IA

.2

.8 w w w

.s h iv e -h a tt e ry

.c o m

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

A S

P R

O J E

C T

.0

M P

C F

B L D

G

P

L U

M B

IN

G

R E

P L A

C E

M E

N T

E

W

A S

H

IN

G T

O N

S T

M O

U N

T P

L E

A S

A N

T

IA

G001

P H

A S

IN

G

P L A

N S

C O

N S

T R

U C

T

IO

N

M S

J

B C

-2

-2

NORTH

1/32" = 1'-0"1

BASEMENT PHASING PLAN

48'

NORTH

1/32" = 1'-0"2

LEVEL 1 PHASING PLAN

48'

NORTH

1/32" = 1'-0"3

LEVEL 2 PHASING PLAN

48' 0

NORTH

1/32" = 1'-0"4

LEVEL 3 PHASING PLAN

48'

SYMBOLS

& AND

@ AT

# NUMBER or POUND

A

A/E ARCHITECT / ENGINEER

ACP ACOUSTICAL CEILING PANEL

ADA AMERICANS WITH DISABILITIES ACT

ADAAG AMERICANS WITH DISABILITIES ACT

ACCESSIBILITY GUIDELINES

ADD ADDENDUM

ADJ ADJUSTABLE or ADJACENT

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AL or ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APA AMERICAN PLYWOOD ASSOCIATION

APPROX APPROXIMATE (LY)

ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS

AUTO AUTOMATIC (DOOR OPERATOR)

AVE AVENUE

AVG AVERAGE

B

B/O BOTTOM OF

BLDG BUILDING

BLVD BOULEVARD

BRG BEARING

C

CCTV CLOSED CIRCUIT TELEVISION

CG CORNER GUARD

CFCI CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFOI CONTRACTOR FURNISHED OWNER INSTALLED

CJ CONSTRUCTION/CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR (ANCE)

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONST CONSTRUCTION

CORR CORRIDOR

CPT CARPET

CT CERAMIC TILE

CTRL CONTROL

CF CUBIC FEET

CW COLD WATER

D

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION/ DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DISP DISPENSER

DIV DIVISION

DN DOWN

DTL DETAIL

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWGS DRAWINGS

E

EA EACH

EF EPOXY FLOORING or EXHAUST FAN

EJ EXPANSION JOINT

ELEC ELECTRIC / ELECTRICAL

ELEV ELEVATION

EL ELEVATOR

ENGR ENGINEER

EP EPOXY PAINT

EPXY EPOXY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

F FDN or FNDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISH (ED) FLOOR ELEVATION

FHC FIRE HOSE CABINET

FL FLOOR

FLR FLOOR (ING)

FM FM GLOBAL

FRP FIBERGLASS REINFORCED PANEL

FT FOOT (FEET)

FTG FOOTING

FURN FURNITURE

G GA GAGE or GAUGE

GAL GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GWB GYPSUM WALLBOARD

H

HDWD HARDWOOD

HDWR HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION, AIR CONDITIONING

HW HOT WATER

I

IBC INTERNATIONAL BUILDING CODE

ICC INTERNATIONAL CODE COUNCIL

ID IDENTIFICATION or INSIDE DIAMETER

IN INCHES

INCL INCLUDE

INFO INFORMATION

J

JAN JANITOR

JC JANITOR'S CLOSET

JST JOIST (S)

JT JOINT

ABBREVIATIONS

K

KO KNOCKOUT

L

LAV LAVATORY

LF LINEAR FOOT

LH LEFT HAND

LHR LEFT HAND REVERSE

LLV LONG LEG VERTICAL

LVL LAMINATED VENEER LUMBER

LVT LUXURY VINYL TILE

M

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEZZ MEZZANINE

MFRG MANUFACTURING

MFR MANUFACTURER

MIC MICROPHONE

MIN MINIMUM or MINUTE

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

N

N/A NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NIC NOT IN CONTRACT

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

OPP OPPOSITE

OHD OVERHEAD DOOR

P

P PAINT

PERP PERPENDICULAR

PKWY PARKWAY

PL PLATE or PLASTIC LAMINATE

PLAM PLASTIC LAMINATE

PLWD PLYWOOD

PR PAIR

PREFAB PREFABRICATED

PREFIN PREFINISHED

PREP PREPARE (ATION)

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

R R RAD or RADIUS

RCI ROOF CONSULTANTS INSTITUTE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REINF REINFORCE (D) (ING) (MENT)

REQD REQUIRED

RESIL RESILIENT

RF RADIO FREQUENCY

RH RIGHT HAND

RHR RIGHT HAND REVERSE

RM ROOM

RO ROUGH OPENING

VTR VENT THROUGH ROOF

S

SAN SANITARY

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT

SHT SHEET REFERRING TO PAGES

SIM SIMILAR

SH SHIVE-HATTERY

SOG SLAB ON GRADE

SPEC(S) SPECIFICATION(S)

SQ SQUARE

SQ IN SQUARE INCH

SS SOLID SURFACE or STAINLESS STEEL ST STREET or STONE

STAG STAGGERED

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STRUC STRUCTURE (AL)

SYM SYMMETRICAL

T

T/O TOP OF

T&G TONGUE AND GROOVE

TAN TANGENT

TBD TO BE DETERMINED

TEL TELEPHONE

TEMP TEMPORARY

THRU THROUGH

TV TELEVISION

TYP TYPICAL

U

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

V

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VT VINYL TILE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W WIDTH

W/ WITH

W/O WITHOUT

WC WATER CLOSET or WALL COVERING WT WALL TILE or WEIGHT

WTR WATER

1. COLOR HAS BEEN USED ON THESE DRAWINGS TO ENHANCE

UNDERSTANDING. PRINTING IN COLOR IS RECOMMENDED TO

ENSURE CLARITY.

2. ANY DAMAGE TO AREAS INSIDE OR OUTSIDE OF THE PROJECT

AREA SHALL BE REPAIRED TO THE STATUS PRIOR TO

CONSTRUCTION AT NO COST TO OWNER.

3. THE PRIME CONTRACTOR SHALL BE ULTIMATELY RESPONSIBLE

FOR ALL CUTTING, SUPPORTING, AND PATCHING IF NOT

COVERED BY A SPECIFIC TRADE.

4. PROVIDE FOR PROTECTION OF ANY ROOF SURFACES USED

DURING CONSTRUCTION. PROTECTION IS REQUIRED OVER

FULL EXTENT OF THE WORK AREAS. MINIMUM PROTECTION

CONSISTS OF 1/2” PLYWOOD OVER 1” EPS INSULATION.

5. EACH TRADE SHALL PROVIDE TESTED FIRESTOPPING

ASSEMBLIES FOR PENETRATIONS OF THEIR WORK THROUGH

FIRE-RATED WALLS AND FLOOR/CEILING

ASSEMBLIES. FIRESTOPPING ASSEMBLIES ARE TO BE OF

DESIGNS THAT PROVIDE THE SCHEDULED FIRE RATINGS WHEN

TESTED IN ACCORDANCE WITH ASTM E119, ASTM E814, OR UL

1479, AND ARE TO BE INSTALLED BY INDIVIDUALS TRAINED AND

EXPERIENCED WITH INSTALLATION OF SUCH ASSEMBLIES.

PROVIDE SUBMITTALS TO LOCAL AUTHORITIES AS REQUESTED

6. IF COMPLIANCE WITH TWO OR MORE STANDARDS IS SPECIFIED

AND THE STANDARDS ESTABLISH DIFFERENT OR CONFLICTING

REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY

LEVELS, COMPLY WITH THE MOST STRINGENT

REQUIREMENT. REFER UNCERTAINTIES AND REQUIREMENTS

THAT ARE DIFFERENT, BUT APPARENTLY EQUAL, TO

ARCHITECT FOR A DECISION BEFORE PROCEEDING.

7. ABATEMENT WORK WILL BE UNDER SEPARATE CONTRACT.

OBTAIN AND MAINTAIN ON SITE A COMPLETE SET OF

ABATEMENT DOCUMENTS, INCLUDING ADDENDA AND CHANGES

AFTER START OF CONSTRUCTION, FOR REFERENCE AND

COORDINATION BY ALL TRADES. COORDINATE ALL DEMOLITION

AND CONSTRUCTION WORK WITH THE ABATEMENT

CONTRACTOR.

8. THE INDICATION OF TYPE AND LOCATION OF EXISTING

CONDITIONS AND MATERIALS IN THE DRAWINGS IS NOT

INTENDED AS EXACT DOCUMENTATION OF IN-PLACE

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR

VERIFYING EXISTING CONDITIONS BEFORE SUBMISSION OF

BIDS. EXISTING CONDITIONS VARYING FROM THOSE SHOWN IN

THE DRAWINGS WILL NOT BE JUSTIFICATION FOR ADDITIONAL

ALLOWANCE TO THE CONTRACTOR. NOTIFY THE ARCHITECT

IMMEDIATELY IF ANY CONDITIONS CONFLICT WITH THE

DRAWINGS.

9. PROTECT ALL BUILDING SYSTEMS, NEW AND EXISTING. COVER

SUPPLY, RETURN, AND EXHAUST AIR GRILLES, AND PROTECT

OTHER SENSITIVE EQUIPMENT FROM ALL ACTIVITIES RELATED

TO THIS CONTRACT. REMOVE PROTECTION AT END OF

CONSTRUCTION.

10. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH

OTHER EVEN IF NOT SPECIFICALLY IDENTIFIED IN THE

CONTRACT DOCUMENTS.

11. ALL CODE-REQUIRED LABELS SUCH AS "UL", “FACTORY

MUTUAL”, OR ANY EQUIPMENT IDENTIFICATION, PERFORMANCE

RATING, NAME, OR NOMENCLATURE PLATES SHALL REMAIN

READABLE AND NOT PAINTED OR COVERED BY OTHER

CONSTRUCTION.

12. STRUCTURAL INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY.

13. ARCHITECTURAL DIMENSIONS AND DESIGN INTENT ARE

INDICATED ON ARCHITECTURAL DRAWINGS. IF THE

INSTALLATION OF EQUIPMENT FROM OTHER TRADES

INTERFERES WITH COMPLIANCE OF THE DESIGN INTENT,

NOTIFY THE ARCHITECT BEFORE PROCEEDING.

14. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN LOCATION

OF BUILDING ELEMENTS. IF DIMENSIONS ARE NOT AVAILABLE,

CONTACT THE ARCHITECT.

15. WHEN DIMENSIONS ON SMALL SCALE DRAWINGS CONFLICT

WITH THOSE ON LARGE SCALE DRAWINGS, THE LARGE SCALE

DRAWINGS GOVERN.

PROJECT GENERAL INFORMATION

VIEW NUMBER

GENERAL SYMBOLS LEGEND

A1 VIEW NAME

100'-0"

12" = 1'-0" 12"

VIEW SCALE

NORTH ARROW

VIEW NUMBER

SHEET NUMBER

BUILDING SECTION MARK

VIEW NUMBER

SHEET NUMBER

WALL SECTION MARK

VIEW NUMBER

SHEET NUMBER

DETAIL SECTION MARK

VIEW NUMBER

SHEET NUMBER

EXTERIOR ELEVATION MARK

VIEW NUMBER

SHEET NUMBER

INTERIOR ELEVATION MARK

ENLARGED DETAIL MARK

VIEW NUMBER

SHEET NUMBER

KEYNOTE VALUEA00

REVISION NUMBER

REVISION TYPE

EXISTING GRID ID MARK

NEW GRID ID MARK

IDENTIFIED LEVEL NAME

ELEVATION MARK

SPOT ELEVATION MARK

ROOM NAME

101 ROOM NUMBER

A4/A104

VIEW NUMBER / SHEET NUMBER OF

CONTINUING VIEW

MATCHLINE

A1 A101

A1 A101

A1 A101

A1 A101

A1 A101

A1

A1A1

A1

A100

A1 A101

RFI

FIRST FLOOR

100'-0"

N

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

G002

PR

O

JE

C

T G

EN

ER

AL

IN

FO

R

M

AT

IO

N

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

FW026-2

FW004

FW025-2

FW001

FW028

FW031

FW030

FW016 FW010

FW004

FW002-2

FW003

FW009AA

FW008

FW007

FW009

FC003 FC006

FC005

FC002

AFC001

FW013

FW014

B

FW104ABFW104ACFW104ADFW104AE

FW104AA

FW104AGFW104AF

FW104BB

FW026-1

FW025-1

FW107

J

FW106

FW103

FC116 FC117

FC305

FC127

FC123

FC106-1

FC120

FC122 FC121

FC118

FC101-1

FC103

FC107 FC106

FN117

FC105

FN109 FN111

G

FN107

FN105

FN104-1

FN103

FN116

FN115

FN114

FN113

FN112

FN120

FN100

FN126

FC128

S126

S127

S125

FN131FN132

B

S122-1

S121

S114

S113

S112

S111

S106

S105

S103 S102

S101

S107

S108

S109

S116

S117

S118

S120 S119

S123 S124

FR101

FR102

FR106 FR107

FR104

FR105 FR109

FR110

FR100

S104

FC119

FN108

FN106-1

HATCH LEGEND

PHASE 1

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 2

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 3

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD01

O

VE

R

AL

D

EM

O

LI

TI

O

N

PL

AN

S

BA

SE

M

EN

T

AN

D

FI

R

ST

F

LO

O

R

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

N

01/16" = 1'-0"A6 BASEMENT - DEMOLITION PLAN

24'

N

01/16" = 1'-0"D6 FIRST FLOOR - DEMOLITION PLAN

24'

B

FW204

FW206

FW207FW208FW209-1FW210FW211

FW104AC-2

FW227FW228FW229FW230FW231FW232

FW218

FW221

FW222FW223FW224FW225

FW213

FW214FW215FW216

FW217

FW212

FW205-1

FW203

FW201

FC306-2

FC204

FC101-2

FN233

FC201

FN232FN230

FN214

FN215

FN216

FN217

FN218

FN219

FN220 FN221

H

FN222

FN223

FN224

FN225

FN226

FN227FN228

FN201

FN202

FN203

FN204

FN205

FN206

FN208

FN209

FN210

FN211

FN212

FN213

S227 S228

S214

S215

S217

S218

S219

S220

S221

S222

S223

S225

S226

S122-2

S200

S201

S202

S203

S204

S205

S206

S207

S208

S209

S210

S211 S212

S213

FW321FW322FW323FW324FW325FW326

FW334

FW328FW329FW330FW331FW332FW333

FW304

FW305

FW306

S

FW308

FW309

FW310

FW311FW312

FW315

FW316

FW317FW318FW319FW320

FW209-2

R

FW314

FW313

FW305-2

FW301

FW303

FC303

Q

FN335

FC301

FC302

S327 S328

FN330

FN332

FN333

FN334

O

FN321

FN322

FN323

FN324

FN325

FN326

FN327

FN328

FN329

FN301

FN302

FN303

FN304

FN305

FN306

FN307

FN308

FN309

FN310

FN311

FN312

FN313FN314

FN315

FN316

FN317

FN318

FN319

S300

S301

S302

S303

S304

S305

S306

S307

S308

S309

S310

S311

S312

S313

S314

S315

S317

S318

S319

S320

S321

S322

S323

L

S325

S326

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD02

O

VE

R

AL

L D

EM

O

LI

TI

O N

PL

AN

S -S

EC

O

N D

AN

D

T H

IR

D

FL

O

O R

S

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

N

01/16" = 1'-0"A6 SECOND FLOOR - DEMOLITION PLAN

24'

N

01/16" = 1'-0"D6 THIRD FLOOR - DEMOLITION PLAN

1. FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

DEMOLITION WORK. NOTIFY ARCHITECT IN WRITING OF

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

ELEVATOR

B

DINING HALL

FW001

STORAGE

FW028

Room

FW031 -

FOOD STORAGE

FW030

KITCHEN OFFICE

FW016

DIETARY STORAGE

FW010

MEN'S RESTROOM

FW009AA

RESTROOM

FW008

ELECTRICIAL STORAGE

FW007

TELEPHONE ROOM

FW009

TUNNEL

ENTRANCE

FC003

WATER SERVICE

FC006

WALK IN FREEZER

FW013

EQUIPMENT ROOM

FW014

A01.03

A01.08

A02.03

A02.03 A02.03A02.03

A01.08

A01.08

HATCH LEGEND

PHASE 1

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 2

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 3

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD04

BA

SE

M

EN

T D

EM

O

LI

TI

O N

PL

AN

AR

EA

B

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

KEYNOTES

KEY NOTE

A01.03 LOCATION OF FIRST FLOOR SLAB REMOVAL ABOVE

A01.08 TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR

TO SLAB REMOVAL. PROVIDE SHORING PLAN FOR EOR

REVIEW PRIOR TO CONSTRUCTION.

A02.03 EXISTING WALLS AND DOORS TO REMAIN

N

01/8" = 1'-0"A6 BASEMENT DEMOLITION PLAN - AREA B

12'

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

OFFICE

FW104AB

OFFICE-1

FW104AC

OFFICE

FW104AD

OFFICE

FW104AE

WAITING AREA

FW104AA

OFFICE

FW104AG

MEDICAL RECORDS

FW104AF

FW104BB

COMPRESSOR ROOM-1

FW026-1

WALK IN COOLER-1

FW025-1

HEATING & A/C UNITS

FW107

FREIGHT ELEV.

J

LOADING DOCK

FW106

LOADING DOCK

FW103

NURSING

SUPERVISOR

FC116

DEPT. OFFICE

FC117

MWU STORAGE

FC305

RESTROOM

FC127

RESTROOM

FC123

PIPE CHASE-1

FC106-1

NURSING SERVICES

FC120

CLOSET

FC122

RR

FC121

EXAM OFFICE

FC118

ICN ROOM-1

FC101-1

CLINICAL DIRECTORS

OFFICE

FC103

RESTROOM

FC107 RESTROOM

FC106

CORRIDOR

FN117

JC

FC105

MEN'S BATHROOM

FN109

RESTROOM

FN111

RR

G

BREAK ROOM

FN107

OFFICE

FN105

OFFICE

FN104-1

OFFICE

FN103

MAIL ROOM

FN116

CLOSET

FN115

OFFICE

FN114

OFFICE

FN113

KITCHEN

FN112

LIBRARIAN OFFICE

FN120

MHI LIBRARY

FN100

PROFESSIONAL

LIBRARY

FN126

STORAGE

FC128

EQUIPMENT ROOM

S126

RESTROOM

S127

CONTROL ROOM

S125

FN131 FN132

ELEVATOR

B

CHEMICAL

STORAGE

FC119

STORAGE

FN108

BREAK ROOM-1

FN106-1

AD.08

A210

A2

3' -6

A02.03A01.08

A210G2

HATCH LEGEND

PHASE 1

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 2

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 3

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD05

FI

R

ST

F

LO

O

R D

EM

O

LI

TI

O N

PL

AN

AR

EA

A

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

KEYNOTES

KEY NOTE

A01.08 TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR

TO SLAB REMOVAL. PROVIDE SHORING PLAN FOR EOR

REVIEW PRIOR TO CONSTRUCTION.

A02.03 EXISTING WALLS AND DOORS TO REMAIN

AD.08 REMOVE CASEWORK

N

01/8" = 1'-0"A6 FIRST FLOOR - DEMOLITION PLAN - AREA A

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

OFFICE

FW104AG

MEDICAL RECORDS

FW104AF

LOADING DOCK

FW106

LOADING DOCK

FW103

NURSING

SUPERVISOR

FC116 DEPT. OFFICE

FC117

MWU STORAGE

FC305

STORAGE

FC128

EQUIPMENT ROOM

S126

CONTROL ROOM

S125

FN131 FN132

ROOM

S122-1

RESTROOM

S121

PASSTHROUGH

RESTROOM

S114

OFFICER BREAK RM

S113

COUNSELOR OFFICE

S112

RECORDS

S111

EXAM ROOM

S106

HEALTH SERVICES

S105

RESTROOM

S103

PILL LINE

S102

PSYCHOLOGIST OFFICE

S101

SCHOOL

S107

LIBRARY

S108

Room S109

PIPE CHASE

S116

TREATMENT MANAGER

S117

SHIFT SUPERVISOR

S118

RESTROOM

S120

WAITING AREA

S119

CORRIDOR

S123

VESTIBULE

S124

GYMNASIUM

FR101

CHILLER CONTROL

ROOM (MECHANICAL

ROOM)

FR102

WOMEN'S

FR106

MEN'S

FR107

STORAGE ROOM

FR104

REC DEPT OFFICE

FR105

VENDING AREA

FR109

GAME ROOM

FR110

CORRIDOR

FR100

CLOSET

S104

A210

C2

AD.09

A02.03

A210C4

A210E4

A210

A4

HATCH LEGEND

PHASE 1

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 2

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

PHASE 3

CONCRETE REMOVAL AND REPLACEMENT

TILE REMOVAL AND REPLACEMENT

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD06

FI

R

ST

F

LO

O

R D

EM

O

LI

TI

O N

PL

AN

AR

EA

B

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

KEYNOTES

KEY NOTE

A02.03 EXISTING WALLS AND DOORS TO REMAIN

AD.09 REMOVE CASEWORK, SALVAGE FOR REINSTALLATION

N

01/8" = 1'-0"6A FIRST FLOOR DEMOLITION PLAN - AREA B

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

ELEVATOR

B

TUB ROOM

FW204

RESTROOM

FW206

FW207

OFFICE

FW208

UNIT

BEDROOM

FW209-1

UNIT

BEDROOM

FW210

UNIT BEDROOM

FW211

OFFICE-2

FW104AC-2

UNIT BEDROOM

FW227

UNIT BEDROOM

FW228

UNIT BEDROOM

FW229

UNIT BEDROOM

FW230

UNIT BEDROOM

FW231

UNIT BEDROOM

FW232

STAFF RESTROOM

FW218

NURSES STATION

FW221UNIT BEDROOM

FW222

UNIT BEDROOM

FW223

UNIT BEDROOM

FW224

UNIT BEDROOM

FW225

JC

FW213

STORAGE

FW214

UNIT

BEDROOM

FW215

UNIT

BEDROOM

FW216

LAUNDRY UTILITY

ROOM

FW217FW212

SHOWER ROOM-1

FW205-1

RESTROOM

FW203

KITCHEN

FW201

PIPE CHASE-2

FC306-2

STORAGE

FC204

ICN ROOM-2

FC101-2

EMPLOYEE LOCKER

AREA & STORAGE

FN233

NURSING SERVICE

FC201

DAY ROM

FN232

KITCHEN AREA

FN230

OFFICE & MEDICINE

FN214

STAFF RR

FN215

SECLUSION ROOM

FN216

SECLUSION ROOM

FN217

TREATMENT ROOM

FN218

UNIT BEDROOM

FN219

BATHROOM

FN220 TUB ROOM

FN221

CHASE

H

BATHROOM

FN222

JC

FN223

PATIENT STORAGE

LAUNDRY

FN224

CONFERENCE ROOM

FN225

CONFERENCE ROOM

FN226

LAUNDRY ROOM

FN227

FN228

STORAGE

FN201

UNIT BEDROOM

FN202

UNIT BEDROOM

FN203

UNIT BEDROOM

FN204

UNIT BEDROOM

FN205

UNIT BEDROOM

FN206

UNIT BEDROOM

FN208

UNIT BEDROOM

FN209

UNIT BEDROOM

FN210

UNIT BEDROOM

FN211

UNIT BEDROOM

FN212

UNIT BEDROOM

FN213

DAYROOM

S2272 SOUTH KITCHEN REC

ROOM

S228

AD.10

A210

G4

A02.01

A211

A2

AD.03

AD.03

AD.12

AD.13

AD.09

4'-0"

AD.16

AD.01

A210

A6

A210

C6

A210 E6

G6

ELEVATOR

A

A211C2

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD07

SE

C

O N

D F

LO

O

R D

EM

O

LI

TI

O N

PL

AN

AR

EA

A

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

KEYNOTES

KEY NOTE

A02.01 EXISTING CASEWORK TO REMAIN

AD.01 REMOVE TUB, PATCH AND PREPARE FLOOR BENEATH

TUB FOR NEW WORK

AD.03 REMOVE CASEWORK AND SINK, PATCH AND PREPARE

WALL AND FLOOR FOR NEW WORK

AD.09 REMOVE CASEWORK, SALVAGE FOR REINSTALLATION

AD.10 REMOVE RAISED FLOOR

AD.12 REMOVE SINK, PATCH AND PREPARE WALL FOR NEW

WORK

AD.13 REMOVE ACCESS PANEL, SALVAGE FOR

REINSTALLATION

AD.16 REMOVE WALL AS INDICATED ON PLAN UP TO 7'-0"

N

01/8" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN - AREA A

DISCREPANCIES BETWEEN WORK SHOWN IN THE DRAWINGS

AND FIELD CONDITIONS ENCOUNTERED.

2. TO PROTECT OWNER AND CONTRACTOR, CONSTRUCTION

MANAGER TO PHOTOGRAPHICALLY DOCUMENT EXISTING

CONDITIONS TO REMAIN, PRIOR TO START OF DEMOLITION AND

CONSTRUCTION ACTIVITIES. COPY ARCHITECT AND OWNER ON

PHOTOGRAPHIC DOCUMENTATION.

3. OPEN FLAME EQUIPMENT IS NOT PERMITTED FOR REMOVAL OF

EXISTING WORK WITHOUT SPECIFIC WRITTEN PERMISSION

FROM THE OWNER.

4. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

5. OWNER WILL REMOVE ALL NON-FIXED FURNISHINGS AND

EQUIPMENT FROM THE CONSTRUCTION AREA PRIOR TO START

OF CONSTRUCTION UNLESS NOTED OTHERWISE.

6. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION. DO NOT

PERFORM WORK ON EXTERIOR OPENINGS THAT CANNOT BE

COMPLETED OR MADE WEATHER-TIGHT WHEN INCLEMENT

WEATHER IS POSSIBLE.

7. REMOVE FLOOR MATERIALS TO THE EXTENT SHOWN OR

DESCRIBED IN THE DRAWINGS. REMOVAL INCLUDES

ADHESIVES, GROUTING BEDS, ANCHORING DEVICES,

ASSOCIATED WALL BASE, ETC. CLEAN AND PREPARE

SURFACES FOR INSTALLATION OF NEW FLOOR MATERIALS.

8. COORDINATE WITH OTHER TRADES CUTTING AND PATCHING

REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION.

9. ANY DEMOLITION OR REMOVAL INDICATED IS SHOWN IN

GENERAL TO PROVIDE THE EXTENT OF DEMOLITION AND IS

NOT TO BE CONSIDERED AS A RECORD DRAWING OF EXISTING

CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR IN FIELD

VERIFICATION AND COORDINATION WITH THE ARCHITECT

PRIOR TO COMMENCING WITH STATED WORK.

10. ALL CONSTRUCTION TO REMAIN WHICH IS AFFECTED BY

DEMOLITION SHALL BE PATCHED, BE PROPERLY ALIGNED AND

FINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR

REPAIR. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION,

MATERIALS, OR EQUIPMENT DAMAGED DURING DEMOLITION TO

LIKE NEW CONDITION.

11. THE CONTRACTOR IS TO RETURN SALVAGEABLE MATERIALS,

INCLUDING BUT NOT LIMITED TO DOORS, FRAMES, HARDWARE,

MARBLE, EQUIPMENT, AND LIGHTING FIXTURES TO THE OWNER

AND STOCKPILE THEM IN AN APPROVED CONSTRUCTION AREA.

DISPOSE OF THESE MATERIALS AFTER OWNER'S REVIEW AND

APPROVAL.

12. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL

FINISHES (TO REMAIN) IN THE PROJECT AREA. COORDINATE

WITH ARCHITECT AND OWNER PRIOR TO DEMOLITION.

13. CONTRACTOR SHALL ENSURE THAT DUST AND DEBRIS ARE

PREVENTED FROM ENTERING THE EXISTING HVAC SYSTEM

AND ADJOINING SPACES WITH TEMPORARY BARRIERS AS

REQUIRED PER THE BUILDING.

14. INDICATION OF NEW MATERIALS SHALL INFER ALL REMOVAL OR

DEMOLITION AND PATCHING REQUIRED OF EXISTING

MATERIALS AND SUBSTRATES FOR PROPER ALIGNMENT.

MATCH EXISTING FINISHES.

15. IN PROJECT WORK AREAS ALL NEW AND EXISTING

PENETRATIONS IN EXISTING WALLS, FLOORS AND CEILING

DECKS SHALL BE THE RESPONSIBILITY OF THE

ARCHITECTURAL PRIME CONTRACTOR AND SHALL RECEIVE UL

AND FACILITY APPROVED FIRE SEALANT MATERIALS TO MATCH

RATING REQUIREMENT OF AREA BEING PENETRATED.

16. PLUMBING INFORMATION ON ARCHITECTURAL DRAWINGS IS

FOR REFERENCE ONLY. REFER TO PLUMBING SHEETS FOR

FIXTURE REMOVAL, REINSTALLATION, AND DEMOLITION.

17. TUNNEL WALLS TO BE TEMPORARILY SHORED PRIOR TO SLAB

REMOVAL. PROVIDE SHORING PLAN FOR EOR REVIEW PRIOR

TO CONSTRUCTION.

ARCHITECTURAL DEMOLITION NOTES

EXISTING WALL PARTITIONS

DEMOLITION PLAN SYMBOLS LEGEND

TEMPORARY WALL PARTITIONS

DEMOLISHED WALL PARTITIONS

EXISTING DOOR

DEMOLISHED DOOR

ELEVATOR

B

STAFF RESTROOM

FW218

NURSES STATION

FW221UNIT BEDROOM

FW222

UNIT BEDROOM

FW223

UNIT BEDROOM

FW224

UNIT BEDROOM

FW225

JC

FW213

STORAGE

FW214

UNIT

BEDROOM

FW215

UNIT

BEDROOM

FW216

SHOWER ROOM-1

FW205-1

DAYROOM

S2272 SOUTH KITCHEN REC

ROOM

S228

ROOM

S214

BARBER SHOP

S215

S217

S218

S219

S220

CORRIDOR

S221

SHOWER ROOM

S222

RESTROOM

S223

LAUNDRY

S225

KITCHEN

S226

CLOSET

S122-2

UNIT BEDROOM

S200

UNIT BEDROOM

S201

UNIT BEDROOM

S202

UNIT BEDROOM

S203

UNIT BEDROOM

S204

UNIT BEDROOM

S205

UNIT BEDROOM

S206

UNIT BEDROOM

S207

UNIT BEDROOM

S208

UNIT BEDROOM

S209

UNIT BEDROOM

S210

UNIT BEDROOM

S211

CORRIDOR

S212

STAND PIPE

S213

8'-0"

A211

E2

AD.18

AD.17

A211

A4

AD.22

A211 C4

AD.09

AD.23

AD.25

A211

G2

AD.27

A211

G4

E4

A211

G6

BA D E

FC G

Io w a

Il lin oi s

In di

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

H

Pr in

W es to w n Pk w y, S ui te

W es t D es

M oi ne s, IA

5.

3.

w w w

.s hi ve -h at te ry .c om

BA D E FC G H

Autodesk Revit 2019

A

B

KEYPLAN

NOT TO SCALE

IA

D

AS

P

R O

JE

C

T #9

2.

M

PC

F

BL

D G

PL

U

M

BI

N G

R

EP

LA

C

EM

EN

T

Io w a D ep ar tm en t o f A dm in is tra tiv e

Se rv ic es

E W as hi ng to n St

, M t P le as an t, IA

AD08

SE

C

O N

D F

LO

O

R D

EM

O

LI

TI

O N

PL

AN

AR

EA

B

C O

N

ST

R U

C

TI

O N

Fi el d Bo ok

C

LM

R C

B

-2

5-

KEYNOTES

KEY NOTE

AD.09 REMOVE CASEWORK, SALVAGE FOR REINSTALLATION

AD.17 REMOVE GLAZED BLOCK PORTION OF WALL AS

INDICATED ON PLANS

AD.18 REMOVE WALLBOARD, WALL STUDS TO REMAIN

AD.22 REMOVE AND REINSTALL ALL PANELS AND

ACCESSORIES ALONG SINK WALL

AD.23 REMOVE AND REINSTALL SHELVING SYSTEM

AD.25 REMOVE GRAB BARS, PATCH WALL

AD.27 REMOVE CHASE WALL AS INDICATED ON PLAN UP TO

7'-0"

N

01/8" = 1'-0"A6 SECOND FLOOR DEMOLITION PLAN - AREA B

UNIT BEDROOM

FW321

UNIT BEDROOM

FW322

UNIT BEDROOM

FW323

UNIT BEDROOM

FW324

UNIT BEDROOM

FW325

UNIT BEDROOM

FW326

CORRIDOR

FW334

UNIT BEDROOM

FW328

UNIT BEDROOM

FW329

UNIT BEDROOM

FW330

UNIT BEDROOM

FW331

UNIT BEDROOM

FW332

UNIT BEDROOM

FW333

RESTROOM

FW304

BATHROOM

FW305

LINEN

ROOM

FW306

JC

S

RR

FW308

PATIENT

PERSONAL

STORAGE

FW309

FW310

ROOM

FW311LAUNDRY

FW312

RESTROOM

FW315

ROOM

FW316MEDICAL

SUPPLIES

FW317

UNIT

BEDROOM

FW318

UNIT

BEDROOM

FW319

UNIT

BEDROOM

FW320

FW209-2

PIPE CHASE

R

TUB ROOM

FW314

ROOM

FW313

SHOWER ROOM-2

FW305-2

3 WEST KITCHEN

FW301

DAY ROOM

FW303

CORRIDOR

FC303

FIRE SPRINKLER

Q

NURSING SERVICES &

SUPPLIES

FN335

NURSING CONFERENCE

ROOM

FC301

NURSING OFFICE

FC302

3 SOUTH DAYROOM

S327

3 SOUTH KITCHEN REC

ROOM

S328

DAYROOM FN

FN330

CORRIDOR

FN332

CLASSROOM

FN333

CLASSROOM

FN334

CHASE

O

RESTROOM

FN321

TUB ROOM

FN322

PIPE CHASE

FN323

LAUNDRY ROOM

FN324UNIT BEDROOM

FN325

UNIT BEDROOM

FN326

UNIT BEDROOM

FN327

JC

FN328

RESTROOM

FN329

UNIT BEDROOM

FN301

UNIT BEDROOM

FN302

UNIT BEDROOM

FN303

UNIT BEDROOM

FN304

UNIT BEDROOM

FN305

UNIT BEDROOM

FN306

CORRIDOR

FN307

UNIT BEDROOM

FN308

UNIT BEDROOM

FN309

UNIT BEDROOM

FN310

UNIT BEDROOM

FN311

UNIT BEDROOM

FN312

UNIT BEDROOM

FN313

OFFICE

FN314

STAFF RR

FN315

UNIT BEDROOM

FN316

UNIT BEDROOM

FN317

UNIT BEDROOM

FN318

UNIT BEDROOM

FN319

A212

E4

A212

2C

A212

E2

AD.10

A212

G2

A212

A2

6' -6

1'

-6

AD.09

AD.24

AD.01

AD.01

AD.26

AD.13

A212

A4

C4

A212G4

1. FIELD VERIFY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .